{"schema_version":1,"layer":"power","reviewed_on":"2026-10-28","coverage_note":"Selected utility and state proceedings. Other utilities and states are not yet reviewed. One utility tariff does not establish statewide coverage. Current and earlier captured electricity comparisons retain separate periods and sources.","items":[{"id":"grid-va","kind":"grid_context","subject":"PJM regional forecast adjustment process","state_codes":["de","dc","il","in","ky","md","mi","nj","nc","oh","pa","tn","va","wv"],"scope":"PJM regional context. A state assignment is not a quantitative allocation to Virginia.","fields":{"meaning":{"value":"Forecast adjustments, no load interconnection queue","source_ids":["pjm-process"],"scope":"Regional context for the PJM footprint, not a Virginia only total.","locator":"Named request or forecast discussion"},"observation_date":{"value":"2026-09-29","source_ids":["pjm-process"],"scope":"PJM publication date.","locator":"Named request or forecast discussion"},"requested_capacity":{"value":null,"source_ids":["pjm-process"],"scope":"No comparable regional queue total established in this review.","locator":"Named request or forecast discussion","unknown_reason":"No comparable regional queue total established in this review.","unit":"GW","measurement_role":"requested_capacity"}}},{"id":"price-mi","kind":"residential_price","subject":"Michigan","state_codes":["mi"],"scope":"A two point comparison, not a complete time series. State average revenue per unit sold is not a household bill. No causal attribution to data centers.","fields":{"period":{"value":"July 2026","source_ids":["eia-prices"],"scope":"Residential comparison month.","locator":"Table heading"},"prior_period":{"value":"July 2025","source_ids":["eia-prices"],"scope":"Same month in the preceding year.","locator":"Table heading"},"price":{"value":23.05,"source_ids":["eia-prices"],"scope":"Preliminary residential state average, cents per kWh.","locator":"Residential July 2026, Michigan","unit":"cents per kWh","measurement_role":"published_price"},"prior_price":{"value":20.55,"source_ids":["eia-prices"],"scope":"Residential state average for the comparison month.","locator":"Residential July 2025, Michigan","unit":"cents per kWh","measurement_role":"published_price"}}},{"id":"tariff-mi-im-lp","kind":"tariff","state_codes":["mi"],"subject":"Indiana Michigan Power Michigan Tariff LP large loads","scope":"Selected Michigan utility large load protections. A tariff approval is not a connection approval, actual operating load or a guarantee of realized rate savings.","fields":{"status":{"value":"approved","source_ids":["mi-im-order-20260827"],"scope":"Approval documented for this Michigan utility only. No individual customer service or savings outcome inferred.","locator":"Final order and issued tariff"},"utility":{"value":"Indiana Michigan Power Company in Michigan","source_ids":["mi-im-order-20260827","mi-im-book19-20260918"],"scope":"Michigan service territory only, not the utility service territory in another state.","locator":"Tariff heading and final order"},"docket":{"value":"U-21986","source_ids":["mi-im-order-20260827"],"scope":"Michigan case, separate from Indiana IURC46097.","locator":"Order page1"},"filed_on":{"value":"2025-10-17","source_ids":["mi-im-order-20260827"],"scope":"Original application date, not later compliance filing.","locator":"Order page1"},"approved_on":{"value":"2026-08-27","source_ids":["mi-im-order-20260827"],"scope":"Final Commission decision date, not the proposal for decision.","locator":"Order pages1 and44"},"tariff_issued_on":{"value":"2026-09-18","source_ids":["mi-im-book19-20260918"],"scope":"Issue date on the reviewed LP sheets.","locator":"Book PDF96 through100, sheet footers"},"effective_on":{"value":"2026-09-18","source_ids":["mi-im-book19-20260918"],"scope":"Service effect on the reviewed LP sheets, separate from August approval.","locator":"Book PDF96 through100, sheet footers"},"threshold":{"value":"Contract capacity at least 50 MW, or reasonably expected to grow above 50 MW at one or more aggregated premises, each at least 1 MW.","source_ids":["mi-im-book19-20260918","mi-im-order-20260827"],"scope":"Company aggregation discretion considers common ownership, parent, local electrical infrastructure or control. This is not the Indiana 70 MW or 150 MW test.","locator":"Sheet D39.00, PDF96; order page11"},"contract_length":{"value":"At least fifteen years after an optional load ramp of no more than five years. Total contract term includes the ramp plus the initial term.","source_ids":["mi-im-book19-20260918","mi-im-order-20260827"],"scope":"The ramp is additional to fifteen years. Generic LP service clauses do not replace this large load term.","locator":"Sheet D39.10, PDF97; order pages13 through15"},"renewal_notice":{"value":"Five year automatic extensions apply unless termination notice is given at least 60 months in advance. The sheet also uses 60 months notice for early termination, supplier departure or a capacity reduction above 10 percent, subject to exit fees.","source_ids":["mi-im-book19-20260918"],"scope":"The separate 48 month notice for a limited capacity reduction is not the contract termination notice.","locator":"Sheet D39.10, PDF97"},"capacity_reduction":{"value":"One reduction of no more than 10 percent without an exit fee is allowed after the first five years of the contract term, on at least 48 months written notice before the relevant PJM delivery year. Other reductions require Commission review.","source_ids":["mi-im-book19-20260918","mi-im-order-20260827"],"scope":"The order requires review for other reductions. Neither a requested reduction nor notice establishes approval of an individual request.","locator":"Sheet D39.10, PDF97; order page19"},"minimum_bill":{"value":"Monthly billing demand is at least 90 percent of the greater of contract capacity or the highest previously established monthly billing demand in the past eleven months. Base billing energy is contract kW times 65 percent times monthly billing hours.","source_ids":["mi-im-book19-20260918"],"scope":"Demand and energy billing bases are separate. These are not promises of actual energy use, a total bill percentage or a minimum operating load factor.","locator":"Sheet D39.20, PDF98"},"exit_fees":{"value":"The order bases the exit fee on full contract capacity and remaining minimum charges over the applicable contract term, including the ramp and applicable extensions. It does not permit an automatic reduction of exit capacity by the separate discretionary reduction allowance.","source_ids":["mi-im-order-20260827","mi-im-book19-20260918"],"scope":"Reduced or mitigated exit fees require Commission review and approval, which may be ex parte when the Commission finds that appropriate. No customer dollar fee is calculated.","locator":"Order pages22 through24; sheets D39.10 and D39.20, PDF97 and98"},"collateral":{"value":"Default collateral is 50 percent of the exit fee, due within ten business days of signing, recalculated annually or on material changes. Cash or a qualifying irrevocable bank letter of credit are the default forms.","source_ids":["mi-im-book19-20260918","mi-im-order-20260827"],"scope":"Different amounts or forms require Commission review and approval. Bank rating requirements do not themselves establish a customer waiver or sufficient parent guarantee.","locator":"Sheet D39.40, PDF100; order pages26 and42 through43"},"application_costs":{"value":"The final order adopts an upfront $100,000 administrative amount reconciled against actual costs of all relevant proposal studies, instead of the proposed tiered fee. The issued sheet also calls its project proposal fee nonrefundable.","source_ids":["mi-im-order-20260827","mi-im-book19-20260918"],"scope":"The amount is not a cap, collateral amount or observed payment. No individual refund or legal resolution of wording is inferred.","locator":"Order page28; sheet D39.30, PDF99"},"temporary_service":{"value":"If requested temporary facilities will have no continuing customer or system use after permanent service begins, the customer must pay the stated full construction, removal and remedial costs.","source_ids":["mi-im-book19-20260918"],"scope":"Conditional temporary service requirement, not proof of a project request, energization or observed costs.","locator":"Sheet D39.20, PDF98"},"customer_review":{"value":"Before each large load customer takes service, I&M must make a separate ex parte filing demonstrating tariff compliance and protection of other customers from that load cost. A future general rate case must present a standalone large load rate and six cost allocation designs.","source_ids":["mi-im-order-20260827"],"scope":"Directions for further review are not completed customer approvals or approval of a future standalone rate.","locator":"Order page42 B throughE"},"source_notes":{"value":"The captured book filename and index identify book19, while its new LP sheets retain book18 headers. Reviewed sheets expressly cite U-21986 and September 18, 2026 effect.","source_ids":["mi-im-book19-20260918"],"scope":"Exact source identity retained. No unsupported renumbering, legal correction or later tariff amendment is assumed.","locator":"Book index and LP sheet headings and footers"},"individual_outcomes":{"value":null,"source_ids":["mi-im-order-20260827","mi-im-book19-20260918"],"scope":"No individual agreement approval, collateral decision, actual load or realized bill effect is established by this review. Later appeals or stays are not reviewed.","locator":"Review boundary","unknown_reason":"No individual agreement approval, collateral decision, actual load or realized bill effect is established by this review. Later appeals or stays are not reviewed."}}},{"id":"tariff-mi-consumers-gpd","kind":"tariff","state_codes":["mi"],"subject":"Consumers Energy Michigan Rate GPD large loads","scope":"Selected Michigan utility large load protections. A tariff approval is not a connection approval, actual operating load or a guarantee of realized rate savings.","fields":{"status":{"value":"approved","source_ids":["mi-consumers-order-20251106"],"scope":"Approval documented for this Michigan utility only. No individual customer service or savings outcome inferred.","locator":"Final order and issued tariff"},"utility":{"value":"Consumers Energy Company","source_ids":["mi-consumers-order-20251106","mi-consumers-book14-20261023"],"scope":"Michigan service territory only, not the utility service territory in another state.","locator":"Tariff heading and final order"},"docket":{"value":"U-21859","source_ids":["mi-consumers-order-20251106"],"scope":"Michigan large load tariff case.","locator":"Order page1"},"filed_on":{"value":"2025-02-07","source_ids":["mi-consumers-order-20251106"],"scope":"Original application date.","locator":"Order page1"},"approved_on":{"value":"2025-11-06","source_ids":["mi-consumers-order-20251106"],"scope":"Final Commission decision date.","locator":"Order pages1 and126"},"effective_on":{"value":"2025-11-07","source_ids":["mi-consumers-compliance-20251229","mi-consumers-book14-20261023"],"scope":"Service effect expressly stated in issued sheets. It precedes their issue and acceptance dates.","locator":"Compliance PDF8 and9; current book PDF214 and215"},"tariff_issued_on":{"value":"2025-12-03","source_ids":["mi-consumers-compliance-20251229"],"scope":"Issue date of the reviewed large load compliance sheets.","locator":"Compliance PDF8 and9"},"staff_accepted_on":{"value":"2025-12-23","source_ids":["mi-consumers-compliance-20251229"],"scope":"Staff acceptance stamp, not approval order or service effect date.","locator":"Compliance PDF8 and9"},"compliance_filed_on":{"value":"2025-12-29","source_ids":["mi-consumers-compliance-20251229"],"scope":"Cover filing date of the accepted tariff sheets.","locator":"Compliance PDF1"},"rehearing_denied_on":{"value":"2026-02-19","source_ids":["mi-consumers-rehearing-20260219"],"scope":"The Attorney General rehearing petition was denied. This does not establish a later judicial appeal outcome.","locator":"Rehearing order page20"},"threshold":{"value":"At least 100 MW at one site, or same owner sites each at least 20 MW and totaling at least 100 MW within the utility service territory.","source_ids":["mi-consumers-order-20251106","mi-consumers-book14-20261023"],"scope":"End use neutral. The final order rejects a load factor eligibility test. No statewide rule for other Michigan utilities inferred.","locator":"Order pages106 and107; sheet D67.40, current book PDF214"},"contract_length":{"value":"At least fifteen years after a negotiated ramp of no more than five years. Five year automatic extensions apply unless four years advance written termination notice is given.","source_ids":["mi-consumers-order-20251106","mi-consumers-book14-20261023"],"scope":"The ramp is additional to fifteen years. The generic one year GPD term does not replace the large load provision.","locator":"Order pages107 and108; sheets D67.40 and D69.00, current book PDF214 and217"},"minimum_bill":{"value":"The final order requires an 80 percent minimum billing demand after the ramp, applied to maximum and peak billing demand including transmission charges.","source_ids":["mi-consumers-order-20251106","mi-consumers-book14-20261023"],"scope":"Demand floor, not 80 percent of actual energy or the entire bill. No minimum operating load factor was adopted.","locator":"Order pages108 and109; sheet D67.40, current book PDF214"},"capacity_reduction":{"value":"The utility may allow one reduction of no more than 10 percent on at least 48 months written notice when other customers are not harmed. Additional or larger reductions involve prorated exit charges or further Commission review.","source_ids":["mi-consumers-order-20251106","mi-consumers-book14-20261023"],"scope":"A discretionary reduction is not automatic. The order retains review for other reductions and alternative treatment without exit charges.","locator":"Order page111; sheet D67.50, current book PDF215"},"exit_fees":{"value":"The order uses minimum billing demand and system access charge for the months remaining in the contract, including the ramp and extensions. It requires reasonable mitigation and rejects a five year cap. The issued sheet retains the wording minimum billing demand plus system access charge.","source_ids":["mi-consumers-order-20251106","mi-consumers-book14-20261023"],"scope":"The source wording is retained without silently converting a demand measure into dollars. No individual dollar fee or guaranteed waiver is calculated.","locator":"Order pages109 through111; sheet D67.50, current book PDF215"},"collateral":{"value":"Default collateral is half the exit fee, recalculated annually or on material changes. Cash earning interest and qualifying bank letters of credit are default forms; different amounts or forms require Commission approval.","source_ids":["mi-consumers-order-20251106","mi-consumers-book14-20261023"],"scope":"A parent guarantee is not a default exemption. Customer creditworthiness and alternatives are reviewed individually.","locator":"Order pages112 through114; sheet D67.40, current book PDF214"},"application_costs":{"value":"An upfront $100,000 project proposal amount is reconciled to actual costs without a cap. The order allows refunds or additional payments after reconciliation, while the issued fee clause also labels the fee nonrefundable.","source_ids":["mi-consumers-order-20251106","mi-consumers-book14-20261023"],"scope":"Both source statements are retained. No individual refund, payment or legal resolution of wording is inferred.","locator":"Order pages123 and124; sheet D67.50, current book PDF215"},"customer_review":{"value":"Before a large load customer takes service, Consumers must file a separate demonstration of tariff compliance and full cost coverage by that customer. The Commission endeavors to decide these filings within 90 days.","source_ids":["mi-consumers-order-20251106"],"scope":"A review objective is not automatic approval after 90 days. No completed individual filing or realized ratepayer savings is established.","locator":"Order pages117 and125"},"individual_outcomes":{"value":null,"source_ids":["mi-consumers-order-20251106","mi-consumers-book14-20261023","mi-consumers-rehearing-20260219"],"scope":"No individual agreement, actual load, customer dollar benefit or later court outcome is established in these sources.","locator":"Review boundary","unknown_reason":"No individual agreement, actual load, customer dollar benefit or later court outcome is established in these sources."}}},{"id":"price-mi-202608","kind":"residential_price","subject":"Michigan","state_codes":["mi"],"scope":"Captured August residential comparison. The earlier July comparison remains in the source history. State average revenue per unit sold is not a household bill or evidence of a data center effect.","fields":{"period":{"value":"August 2026","source_ids":["eia-residential-xlsx-20261023"],"scope":"Residential comparison month.","locator":"Table_5_06_A!B4:C4"},"prior_period":{"value":"August 2025","source_ids":["eia-residential-xlsx-20261023"],"scope":"Same month in the preceding year.","locator":"Table_5_06_A!B4:C4"},"price":{"value":22.99,"source_ids":["eia-residential-xlsx-20261023"],"scope":"Preliminary August2026 residential state average, cents per kWh.","locator":"Table_5_06_A!B19:C19","unit":"cents per kWh","measurement_role":"published_price"},"prior_price":{"value":20.73,"source_ids":["eia-residential-xlsx-20261023"],"scope":"Final August2025 residential state average, cents per kWh.","locator":"Table_5_06_A!B19:C19","unit":"cents per kWh","measurement_role":"published_price"},"source_context":{"value":"The August table and public spreadsheet agree. The surrounding report header still identifies July and its older release date. The exact publication day of these August values is not established here.","source_ids":["eia-price-check-20261023-1645","eia-residential-xlsx-20261023"],"scope":"The scheduled next release day is not treated as proof of actual publication. This review uses the periods stated in the two data tables and preserves the earlier July capture.","locator":"HTML table heading and report header; spreadsheet rows1 through4 and67"}}},{"id":"grid-pjm-manual19-procedure-20260630","kind":"grid_context","subject":"PJM adopted forecast adjustment review procedure","state_codes":["de","dc","il","in","ky","md","mi","nj","nc","oh","pa","tn","va","wv"],"scope":"Regional procedure shown in the PJM state panels for context. Manual approval, utility submissions, final forecasts and actual load remain distinct.","fields":{"status":{"value":"approved","source_ids":["pjm-manual19-current-20261023"],"scope":"Approval concerns this manual revision only.","locator":"Printed page 3"},"process_basis":{"value":"Forecast review procedure","source_ids":["pjm-manual19-current-20261023"],"scope":"Regional process documentation, excluded from utility tariff status.","locator":"Attachment B printed pages 26 through 32"},"revision":{"value":"Revision 39","source_ids":["pjm-manual19-current-20261023"],"scope":"Captured current clean version, separate from the earlier change presentation.","locator":"Cover and printed page 4"},"approved_on":{"value":"2026-06-29","source_ids":["pjm-manual19-current-20261023"],"scope":"Manual approval day.","locator":"Printed page 3"},"effective_on":{"value":"2026-06-30","source_ids":["pjm-manual19-current-20261023"],"scope":"Manual effect, separate from approval and original posting.","locator":"Cover and printed page 3"},"threshold_wording":{"value":"Solicitation covers changes of at least 50 MW, positive or negative. Verification instead says category totals greater than 50 MW.","source_ids":["pjm-manual19-current-20261023"],"scope":"Both threshold descriptions retained; no silent resolution for exactly 50 MW.","locator":"Printed pages 26 and 29"},"regulator_review":{"value":"Submitters must offer each relevant state regulator review before submission. Participation is voluntary, and submissions need not follow regulator feedback if both perspectives are provided.","source_ids":["pjm-manual19-current-20261023"],"scope":"Review opportunity and feedback are distinct from approval of forecasts or connections.","locator":"Printed page 28"},"firm_classification":{"value":"Firm status requires a qualifying service, construction or supply commitment plus financial support. Nonfirm portions may enter forecast periods outside the capacity auction horizon.","source_ids":["pjm-manual19-current-20261023"],"scope":"Forecast classification only. Firm portions can still be reduced for growth constraints.","locator":"Printed pages 28 through 30"},"duplicate_requests":{"value":"Customers must be asked about potentially duplicated requests lacking service or construction commitments. Silence counts toward duplication. Missing site, location and MW details can remove such requests; discounting can reflect project milestones.","source_ids":["pjm-manual19-current-20261023"],"scope":"No actual duplicate count or adjustment result is established.","locator":"Printed pages 29 and 30"},"final_determination":{"value":"PJM reviews assumptions, regulator feedback and independent forecast uncertainty before determining the final adjustment. A submitter can retain its preliminary amount if the calculated final is higher.","source_ids":["pjm-manual19-current-20261023"],"scope":"A submitted number or firm classification does not guarantee unchanged final inclusion.","locator":"Printed pages 30 and 31"},"timing":{"value":"The manual schedules final adjustments for November or December and independent forecast review for October or November.","source_ids":["pjm-manual19-current-20261023"],"scope":"General schedule, not proof of a completed presentation or final 2027 forecast.","locator":"Printed pages 26 and 30"},"utility_tariff":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No individual utility tariff approval is established by this manual.","locator":"Procedure review boundary","unknown_reason":"No individual utility tariff approval is established by this manual."},"actual_load":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No measured actual load quantity is established by this procedure.","locator":"Procedure review boundary","unknown_reason":"No measured actual load quantity is established by this procedure."},"approved_capacity":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No connection capacity approval is established.","locator":"Procedure review boundary","unknown_reason":"No connection capacity approval is established."},"individual_approvals":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No individual customer decision is established.","locator":"Procedure review boundary","unknown_reason":"No individual customer decision is established."},"requested_capacity":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No comparable regional queue total is established.","locator":"Procedure review boundary","unknown_reason":"No comparable regional queue total is established."},"pjm_final_forecast":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No final amount for the current submitted forecast is established.","locator":"Procedure review boundary","unknown_reason":"No final amount for the current submitted forecast is established."},"atlas_record_id":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No facility identity join is made.","locator":"Procedure review boundary","unknown_reason":"No facility identity join is made."}}},{"id":"grid-miso-epr-preliminary2026-20260130","kind":"grid_context","state_codes":["ar","il","in","ia","ky","la","mi","mn","ms","mo","mt","nd","sd","tx","wi"],"subject":"MISO dated preliminary regional large load submissions","scope":"One historical regional EPR request chart repeated across partial footprint states. Requests are not load or approved projects.","fields":{"miso_epr_history_basis":{"value":"Dated preliminary member submissions for MTEP Expedited Project Review.","source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"Regional requests, not approved connections, installed load, a current October queue or data center only totals.","locator":"Slide6 right chart"},"status":{"value":"historical","source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"Historical source snapshot, not operating status of requested projects.","locator":"Slide1 and6"},"workshop_on":{"value":"2026-01-30","source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"Printed workshop day, not an inferred exact publication day or queue observation date.","locator":"Slide1"},"snapshot_period":{"value":"Preliminary2026","source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"Chart label only; no exact observation day inferred from workshop or checked date.","locator":"Slide6 right axis"},"requested_capacity":{"value":13.1,"source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"Preliminary2026 EPR member submissions before studies and approvals; requests, not load.","locator":"Slide6 right chart2026bar","unit":"GW","measurement_role":"requested_capacity","measurement_period":"2026","measure_scope":"MISO MTEP EPR large load additions member submissions"},"earlier_chart_values":{"value":"2020:0.1 GW;2021:0.2 GW;2022:0.3 GW;2023:0.9 GW;2024:2.7 GW;2025:9.7 GW.","source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"Separate annual labels retained. No cumulative queue sum, completion total or data center only capacity inferred.","locator":"Slide6 right chart"},"approval_boundary":{"value":"Footnote identifies preliminary MTEP data from MISO member submissions prior to studies and approvals.","source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"No approved capacity or final interconnection agreements inferred.","locator":"Slide6 footnote"},"forecast_difference":{"value":"Left chart is a separate OMS MISO survey forecast with122 GW actual2024 summer peak and future survey lines and forecast range.","source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"Not the13.1 GW EPR request basis. No arithmetic combination of forecast, actual summer peak and EPR request amounts.","locator":"Slide6 left chart"},"region":{"value":"MISO region includes all or portions of Arkansas, Illinois, Indiana, Iowa, Kentucky, Louisiana, Michigan, Minnesota, Mississippi, Missouri, Montana, North Dakota, South Dakota, Texas and Wisconsin, plus Manitoba.","source_ids":["atc-miso-footprint-20261024","miso-about-footprint-20261024"],"scope":"State pages repeat one regional total, not each state share. Does not imply whole state service or exclusive territory.","locator":"ATC member description; MISO introduction"},"source_review_boundary":{"value":"Only workshop cover and slide6 chart frames inspected; selected extracted text on3,7,9and37 read.","source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"No full deck review or admission of unreviewed slides, later policy status or current2026October queue.","locator":"Review boundary"},"current_requested_capacity":{"value":null,"source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"No current queue, deduplicated total, state share, project actual or identity join established.","locator":"Scope boundary","unknown_reason":"Selected historical request chart does not establish this quantity or outcome. Unknown does not mean zero, approval or absence."},"approved_capacity":{"value":null,"source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"No current queue, deduplicated total, state share, project actual or identity join established.","locator":"Scope boundary","unknown_reason":"Selected historical request chart does not establish this quantity or outcome. Unknown does not mean zero, approval or absence."},"actual_load":{"value":null,"source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"No current queue, deduplicated total, state share, project actual or identity join established.","locator":"Scope boundary","unknown_reason":"Selected historical request chart does not establish this quantity or outcome. Unknown does not mean zero, approval or absence."},"actual_energy":{"value":null,"source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"No current queue, deduplicated total, state share, project actual or identity join established.","locator":"Scope boundary","unknown_reason":"Selected historical request chart does not establish this quantity or outcome. Unknown does not mean zero, approval or absence."},"data_center_only_capacity":{"value":null,"source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"No current queue, deduplicated total, state share, project actual or identity join established.","locator":"Scope boundary","unknown_reason":"Selected historical request chart does not establish this quantity or outcome. Unknown does not mean zero, approval or absence."},"deduplicated_capacity":{"value":null,"source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"No current queue, deduplicated total, state share, project actual or identity join established.","locator":"Scope boundary","unknown_reason":"Selected historical request chart does not establish this quantity or outcome. Unknown does not mean zero, approval or absence."},"individual_project_approval":{"value":null,"source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"No current queue, deduplicated total, state share, project actual or identity join established.","locator":"Scope boundary","unknown_reason":"Selected historical request chart does not establish this quantity or outcome. Unknown does not mean zero, approval or absence."},"atlas_record_id":{"value":null,"source_ids":["miso-framework-presentation-20260130-20261024"],"scope":"No current queue, deduplicated total, state share, project actual or identity join established.","locator":"Scope boundary","unknown_reason":"Selected historical request chart does not establish this quantity or outcome. Unknown does not mean zero, approval or absence."},"miso_operational_proposal_scope":{"value":"MISO introduction describes August27,2026 working group review of proposed BPM032 and BPM025 language, a forecast incentive proposal and a forecasting submission system. Feedback invitation is not evidence of final adoption or current enforceable requirements.","source_ids":["miso-operational-forecast-feedback-20260827"],"scope":"Dated proposal and source attribution only; no individual site association.","locator":"Agency introduction before Submitted Feedback"},"miso_feedback_attribution_boundary":{"value":"Submitted stakeholder comments are attributed recommendations, not MISO findings or adopted settlement rules. This review does not establish final incentive amounts, penalties, approved project connections or measured load.","source_ids":["miso-operational-forecast-feedback-20260827"],"scope":"Dated proposal and source attribution only; no individual site association.","locator":"Agency introduction before Submitted Feedback"},"miso_forecast_request_separation":{"value":"Operational forecast proposal is separate from historical preliminary2026 EPR member submissions. Neither stakeholder feedback nor an operational forecast submission system updates the13.1GW historical request chart or establishes operating demand.","source_ids":["miso-operational-forecast-feedback-20260827"],"scope":"Dated proposal and source attribution only; no individual site association.","locator":"Agency introduction before Submitted Feedback"}}},{"id":"sector-price-mi-202608","kind":"sector_price_context","subject":"Michigan commercial and industrial electricity prices","state_codes":["mi"],"scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","fields":{"period":{"value":"August 2026","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A header","scope":"Current preliminary comparison month."},"prior_period":{"value":"August 2025","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A header","scope":"Final same month previous year."},"sector_price_boundary":{"value":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A notes, including row67","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class."},"commercial_price":{"value":16.21,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!D19; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"prior_commercial_price":{"value":14.85,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!E19; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"industrial_price":{"value":8.99,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!F19; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"prior_industrial_price":{"value":8.4,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!G19; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_price":{"value":16.71,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Michigan All Sectors August comparison","unit":"cents per kWh","measurement_role":"published_price"},"prior_all_sector_price":{"value":15.23,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Michigan All Sectors August comparison","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_boundary":{"value":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A sector headers and notes"},"ytd_commercial_price":{"value":15.8,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!D19; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_commercial_price":{"value":14.55,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!E19; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_industrial_price":{"value":9.29,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!F19; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_industrial_price":{"value":8.55,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!G19; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_all_sector_price":{"value":16.07,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!J19; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_all_sector_price":{"value":14.77,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!K19; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_period":{"value":"January through August 2026","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"prior_ytd_period":{"value":"January through August 2025","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"ytd_price_boundary":{"value":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"retail_sales_basis":{"value":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Title,end-use headers and source notes"},"retail_sales_period":{"value":"August 2026","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"retail_sales_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"retail_sales_residential":{"value":3419.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Michigan row,column1","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"3,419"},"retail_sales_residential_prior":{"value":3420.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Michigan row,column2","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"3,420"},"retail_sales_commercial":{"value":3632.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Michigan row,column3","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"3,632"},"retail_sales_commercial_prior":{"value":3531.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Michigan row,column4","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"3,531"},"retail_sales_industrial":{"value":2544.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Michigan row,column5","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"2,544"},"retail_sales_industrial_prior":{"value":2560.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Michigan row,column6","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"2,560"},"retail_sales_transportation":{"value":0.45,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Michigan row,column7","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"0.45"},"retail_sales_transportation_prior":{"value":0.48,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Michigan row,column8","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"0.48"},"retail_sales_all":{"value":9595.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Michigan row,column9","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"9,595"},"retail_sales_all_prior":{"value":9511.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Michigan row,column10","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"9,511"},"ytd_retail_sales_basis":{"value":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Title,end-use headers and source notes"},"ytd_retail_sales_period":{"value":"January through August 2026","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"ytd_retail_sales_prior_period":{"value":"January through August 2025","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"ytd_retail_sales_residential":{"value":23896.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Michigan row,column1","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"23,896"},"ytd_retail_sales_residential_prior":{"value":24014.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Michigan row,column2","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"24,014"},"ytd_retail_sales_commercial":{"value":25501.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Michigan row,column3","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"25,501"},"ytd_retail_sales_commercial_prior":{"value":25356.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Michigan row,column4","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"25,356"},"ytd_retail_sales_industrial":{"value":18989.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Michigan row,column5","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"18,989"},"ytd_retail_sales_industrial_prior":{"value":19080.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Michigan row,column6","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"19,080"},"ytd_retail_sales_transportation":{"value":4.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Michigan row,column7","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"4"},"ytd_retail_sales_transportation_prior":{"value":4.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Michigan row,column8","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"4"},"ytd_retail_sales_all":{"value":68390.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Michigan row,column9","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"68,390"},"ytd_retail_sales_all_prior":{"value":68453.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Michigan row,column10","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"68,453"},"retail_revenue_basis":{"value":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Title,end-use headers and source notes"},"retail_revenue_period":{"value":"August 2026","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"retail_revenue_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"retail_revenue_residential":{"value":786.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Michigan row,column1","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"786"},"retail_revenue_residential_prior":{"value":709.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Michigan row,column2","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"709"},"retail_revenue_commercial":{"value":589.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Michigan row,column3","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"589"},"retail_revenue_commercial_prior":{"value":524.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Michigan row,column4","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"524"},"retail_revenue_industrial":{"value":229.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Michigan row,column5","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"229"},"retail_revenue_industrial_prior":{"value":215.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Michigan row,column6","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"215"},"retail_revenue_transportation":{"value":0.08,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Michigan row,column7","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"0.08"},"retail_revenue_transportation_prior":{"value":0.07,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Michigan row,column8","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"0.07"},"retail_revenue_all":{"value":1604.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Michigan row,column9","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1,604"},"retail_revenue_all_prior":{"value":1449.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Michigan row,column10","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1,449"},"ytd_retail_revenue_basis":{"value":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Title,end-use headers and source notes"},"ytd_retail_revenue_period":{"value":"January through August 2026","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"ytd_retail_revenue_prior_period":{"value":"January through August 2025","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"ytd_retail_revenue_residential":{"value":5194.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Michigan row,column1","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"5,194"},"ytd_retail_revenue_residential_prior":{"value":4788.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Michigan row,column2","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"4,788"},"ytd_retail_revenue_commercial":{"value":4029.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Michigan row,column3","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"4,029"},"ytd_retail_revenue_commercial_prior":{"value":3689.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Michigan row,column4","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"3,689"},"ytd_retail_revenue_industrial":{"value":1764.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Michigan row,column5","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1,764"},"ytd_retail_revenue_industrial_prior":{"value":1631.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Michigan row,column6","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1,631"},"ytd_retail_revenue_transportation":{"value":1.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Michigan row,column7","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1"},"ytd_retail_revenue_transportation_prior":{"value":1.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Michigan row,column8","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1"},"ytd_retail_revenue_all":{"value":10987.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Michigan row,column9","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"10,987"},"ytd_retail_revenue_all_prior":{"value":10109.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Michigan row,column10","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"10,109"},"retail_customers_basis":{"value":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Title,end-use headers and source notes"},"retail_customers_period":{"value":"August 2026","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Column headers"},"retail_customers_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Column headers"},"retail_customers_residential":{"value":4559955,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Michigan row,column1","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"4,559,955"},"retail_customers_residential_prior":{"value":4538415,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Michigan row,column2","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"4,538,415"},"retail_customers_commercial":{"value":573979,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Michigan row,column3","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"573,979"},"retail_customers_commercial_prior":{"value":567906,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Michigan row,column4","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"567,906"},"retail_customers_industrial":{"value":5846,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Michigan row,column5","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"5,846"},"retail_customers_industrial_prior":{"value":5835,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Michigan row,column6","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"5,835"},"retail_customers_transportation":{"value":2,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Michigan row,column7","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"2"},"retail_customers_transportation_prior":{"value":2,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Michigan row,column8","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"2"},"retail_customers_all":{"value":5139782,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Michigan row,column9","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"5,139,782"},"retail_customers_all_prior":{"value":5112158,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Michigan row,column10","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"5,112,158"}}},{"id":"sector-price-mi-202607","kind":"sector_price_context","subject":"Michigan historical commercial and industrial electricity prices","state_codes":["mi"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","fields":{"period":{"value":"July 2026","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"prior_period":{"value":"July 2025","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"sector_price_boundary":{"value":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"commercial_price":{"value":16.46,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Michigan commercial_price","unit":"cents per kWh","measurement_role":"published_price"},"prior_commercial_price":{"value":14.96,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Michigan prior_commercial_price","unit":"cents per kWh","measurement_role":"published_price"},"industrial_price":{"value":9.81,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Michigan industrial_price","unit":"cents per kWh","measurement_role":"published_price"},"prior_industrial_price":{"value":8.94,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Michigan prior_industrial_price","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_price":{"value":17.43,"source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Michigan All Sectors July comparison","unit":"cents per kWh","measurement_role":"published_price"},"prior_all_sector_price":{"value":15.7,"source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Michigan All Sectors July comparison","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_boundary":{"value":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A sector headers and notes"}}},{"id":"generation-mi-202608","subject":"Michigan utility scale generation","kind":"generation_context","state_codes":["mi"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","fields":{"status":{"value":"historical","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A period and source notes"},"period":{"value":"August 2026","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"prior_period":{"value":"August 2025","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table title, producer sector headers and source notes"},"all_generation":{"value":12064.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"12,064"},"prior_all_generation":{"value":11575.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"11,575"},"published_generation_change":{"value":4.2,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Michigan row; column3","unit":"percent","measurement_role":"published_net_generation_percentage_change","source_token":"4.2%"},"utility_generation":{"value":8834.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"8,834"},"prior_utility_generation":{"value":8663.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"8,663"},"ipp_generation":{"value":3050.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"3,050"},"prior_ipp_generation":{"value":2742.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"2,742"},"commercial_generation":{"value":67.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"67"},"prior_commercial_generation":{"value":66.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"66"},"industrial_generation":{"value":113.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"113"},"prior_industrial_generation":{"value":106.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"106"},"gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table title, producer sector headers and source notes"},"gas_period":{"value":"August 2026","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_prior_period":{"value":"August 2025","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_all_generation":{"value":5777.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"5,777"},"gas_prior_all_generation":{"value":5532.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"5,532"},"gas_published_generation_change":{"value":4.4,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Michigan row; column3","unit":"percent","measurement_role":"published_gas_generation_percentage_change","source_token":"4.4%"},"gas_utility_generation":{"value":3302.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"3,302"},"gas_prior_utility_generation":{"value":3284.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"3,284"},"gas_ipp_generation":{"value":2373.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"2,373"},"gas_prior_ipp_generation":{"value":2145.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"2,145"},"gas_commercial_generation":{"value":58.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"58"},"gas_prior_commercial_generation":{"value":56.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"56"},"gas_industrial_generation":{"value":45.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"45"},"gas_prior_industrial_generation":{"value":47.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"47"},"nuclear_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table title, producer sector headers and source notes"},"nuclear_period":{"value":"August 2026","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_prior_period":{"value":"August 2025","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_all_generation":{"value":2448.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"2,448"},"nuclear_prior_all_generation":{"value":2440.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"2,440"},"nuclear_published_generation_change":{"value":0.3,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Michigan row; column3","unit":"percent","measurement_role":"published_nuclear_generation_percentage_change","source_token":"0.3%"},"nuclear_utility_generation":{"value":2448.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"2,448"},"nuclear_prior_utility_generation":{"value":2440.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"2,440"},"nuclear_ipp_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"coal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table title, producer sector headers and source notes"},"coal_period":{"value":"August 2026","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_prior_period":{"value":"August 2025","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_all_generation":{"value":2518.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"2,518"},"coal_prior_all_generation":{"value":2477.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"2,477"},"coal_published_generation_change":{"value":1.7,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Michigan row; column3","unit":"percent","measurement_role":"published_coal_generation_percentage_change","source_token":"1.7%"},"coal_utility_generation":{"value":2503.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"2,503"},"coal_prior_utility_generation":{"value":2457.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"2,457"},"coal_ipp_generation":{"value":15.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"15"},"coal_prior_ipp_generation":{"value":20.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"20"},"coal_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_industrial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"wind_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table title, producer sector headers and source notes"},"wind_period":{"value":"August 2026","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_prior_period":{"value":"August 2025","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_all_generation":{"value":442.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"442"},"wind_prior_all_generation":{"value":431.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"431"},"wind_published_generation_change":{"value":2.5,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Michigan row; column3","unit":"percent","measurement_role":"published_wind_generation_percentage_change","source_token":"2.5%"},"wind_utility_generation":{"value":262.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"262"},"wind_prior_utility_generation":{"value":254.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"254"},"wind_ipp_generation":{"value":180.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"180"},"wind_prior_ipp_generation":{"value":177.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"177"},"wind_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"hydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table title, producer sector headers and source notes"},"hydro_period":{"value":"August 2026","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_prior_period":{"value":"August 2025","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_all_generation":{"value":92.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"92"},"hydro_prior_all_generation":{"value":79.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"79"},"hydro_published_generation_change":{"value":15.7,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Michigan row; column3","unit":"percent","measurement_role":"published_hydro_generation_percentage_change","source_token":"15.7%"},"hydro_utility_generation":{"value":87.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"87"},"hydro_prior_utility_generation":{"value":75.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"75"},"hydro_ipp_generation":{"value":null,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"hydro_prior_ipp_generation":{"value":4.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"4"},"hydro_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_industrial_generation":{"value":null,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"hydro_prior_industrial_generation":{"value":null,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"pumped_storage_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table title, producer sector headers and source notes"},"pumped_storage_period":{"value":"August 2026","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_prior_period":{"value":"August 2025","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_all_generation":{"value":-92.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-92"},"pumped_storage_prior_all_generation":{"value":-79.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-79"},"pumped_storage_published_generation_change":{"value":16.8,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Michigan row; column3","unit":"percent","measurement_role":"published_pumped_storage_generation_percentage_change","source_token":"16.8%"},"pumped_storage_utility_generation":{"value":-92.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-92"},"pumped_storage_prior_utility_generation":{"value":-79.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-79"},"pumped_storage_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"solar_pv_period":{"value":"August 2026","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_prior_period":{"value":"August 2025","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_generation_basis":{"value":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table title, producer sector headers and source notes"},"solar_pv_all_estimated_generation":{"value":576.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column1","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"576"},"solar_pv_prior_all_estimated_generation":{"value":417.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column2","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"417"},"solar_pv_published_generation_change":{"value":38.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column3","unit":"percent","measurement_role":"published_solar_pv_generation_percentage_change","source_token":"38.0%"},"solar_pv_utility_scale_generation":{"value":521.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"521"},"solar_pv_utility_scale_prior_generation":{"value":371.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"371"},"solar_pv_estimated_small_scale_generation":{"value":55.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column6","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"55"},"solar_pv_estimated_small_scale_prior_generation":{"value":46.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column7","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"46"},"solar_pv_electric_utilities_generation":{"value":172.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"172"},"solar_pv_electric_utilities_prior_generation":{"value":88.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"88"},"solar_pv_independent_producers_generation":{"value":349.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"349"},"solar_pv_independent_producers_prior_generation":{"value":283.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"283"},"solar_pv_commercial_estimated_total_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column12","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_commercial_estimated_total_prior_generation":{"value":19.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column13","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"19"},"solar_pv_commercial_utility_scale_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column14","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_commercial_utility_scale_prior_generation":{"value":0.03,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column15","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0.03"},"solar_pv_commercial_estimated_small_scale_generation":{"value":22.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column16","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"22"},"solar_pv_commercial_estimated_small_scale_prior_generation":{"value":19.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column17","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"19"},"solar_pv_industrial_estimated_total_generation":{"value":1.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column18","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"1"},"solar_pv_industrial_estimated_total_prior_generation":{"value":1.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column19","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"1"},"solar_pv_industrial_utility_scale_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column20","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_industrial_utility_scale_prior_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column21","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_industrial_estimated_small_scale_generation":{"value":1.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column22","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"1"},"solar_pv_industrial_estimated_small_scale_prior_generation":{"value":1.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column23","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"1"},"solar_pv_residential_estimated_small_scale_generation":{"value":31.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column24","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"31"},"solar_pv_residential_estimated_small_scale_prior_generation":{"value":27.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Michigan row; column25","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"27"},"solar_thermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table title, producer sector headers and source notes"},"solar_thermal_period":{"value":"August 2026","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_prior_period":{"value":"August 2025","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_published_generation_change":{"value":null,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Michigan row; column3","unit":"percent","measurement_role":"published_solar_thermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"solar_thermal_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"other_energy_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"other_energy_period":{"value":"August 2026","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_prior_period":{"value":"August 2025","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_all_generation":{"value":5.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"5"},"other_energy_prior_all_generation":{"value":5.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"5"},"other_energy_published_generation_change":{"value":8.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Michigan row; column3","unit":"percent","measurement_role":"published_other_energy_generation_percentage_change","source_token":"8.0%"},"other_energy_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_utility_generation":{"value":-0.13,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"-0.13"},"other_energy_ipp_generation":{"value":0.33,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0.33"},"other_energy_prior_ipp_generation":{"value":-0.19,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"-0.19"},"other_energy_commercial_generation":{"value":5.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"5"},"other_energy_prior_commercial_generation":{"value":5.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"5"},"other_energy_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"geothermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table title, producer sector headers and source notes"},"geothermal_period":{"value":"August 2026","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_prior_period":{"value":"August 2025","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_published_generation_change":{"value":null,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Michigan row; column3","unit":"percent","measurement_role":"published_geothermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"geothermal_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"biomass_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"biomass_period":{"value":"August 2026","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_prior_period":{"value":"August 2025","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_all_generation":{"value":185.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"185"},"biomass_prior_all_generation":{"value":162.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"162"},"biomass_published_generation_change":{"value":14.1,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Michigan row; column3","unit":"percent","measurement_role":"published_biomass_generation_percentage_change","source_token":"14.1%"},"biomass_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_ipp_generation":{"value":128.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"128"},"biomass_prior_ipp_generation":{"value":113.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"113"},"biomass_commercial_generation":{"value":4.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"4"},"biomass_prior_commercial_generation":{"value":4.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"4"},"biomass_industrial_generation":{"value":52.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"52"},"biomass_prior_industrial_generation":{"value":45.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"45"},"petroleum_liquids_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_liquids_period":{"value":"August 2026","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_prior_period":{"value":"August 2025","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_all_generation":{"value":7.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"7"},"petroleum_liquids_prior_all_generation":{"value":8.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"8"},"petroleum_liquids_published_generation_change":{"value":-6.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Michigan row; column3","unit":"percent","measurement_role":"published_petroleum_liquids_generation_percentage_change","source_token":"-6.0%"},"petroleum_liquids_utility_generation":{"value":6.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"6"},"petroleum_liquids_prior_utility_generation":{"value":7.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"7"},"petroleum_liquids_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_commercial_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.00"},"petroleum_liquids_industrial_generation":{"value":1.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"1"},"petroleum_liquids_prior_industrial_generation":{"value":0.44,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.44"},"petroleum_coke_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_coke_period":{"value":"August 2026","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_prior_period":{"value":"August 2025","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_all_generation":{"value":162.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"162"},"petroleum_coke_prior_all_generation":{"value":149.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"149"},"petroleum_coke_published_generation_change":{"value":8.4,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Michigan row; column3","unit":"percent","measurement_role":"published_petroleum_coke_generation_percentage_change","source_token":"8.4%"},"petroleum_coke_utility_generation":{"value":147.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"147"},"petroleum_coke_prior_utility_generation":{"value":137.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"137"},"petroleum_coke_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_industrial_generation":{"value":15.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"15"},"petroleum_coke_prior_industrial_generation":{"value":12.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"12"},"other_fossil_gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table title, producer sector headers and source notes"},"other_fossil_gas_period":{"value":"August 2026","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_prior_period":{"value":"August 2025","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_all_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_all_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_published_generation_change":{"value":null,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Michigan row; column3","unit":"percent","measurement_role":"published_other_fossil_gas_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"other_fossil_gas_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"nonhydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table title, producer sector headers and source notes"},"nonhydro_period":{"value":"August 2026","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_prior_period":{"value":"August 2025","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_all_generation":{"value":1148.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"1,148"},"nonhydro_prior_all_generation":{"value":964.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"964"},"nonhydro_published_generation_change":{"value":19.1,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Michigan row; column3","unit":"percent","measurement_role":"published_nonhydro_generation_percentage_change","source_token":"19.1%"},"nonhydro_utility_generation":{"value":434.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"434"},"nonhydro_prior_utility_generation":{"value":342.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"342"},"nonhydro_ipp_generation":{"value":658.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"658"},"nonhydro_prior_ipp_generation":{"value":573.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"573"},"nonhydro_commercial_generation":{"value":4.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"4"},"nonhydro_prior_commercial_generation":{"value":4.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"4"},"nonhydro_industrial_generation":{"value":52.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"52"},"nonhydro_prior_industrial_generation":{"value":45.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"45"}}},{"id":"generation-mi-202608-ytd","subject":"Michigan utility scale generation","kind":"generation_context","state_codes":["mi"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","fields":{"status":{"value":"historical","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B period and source notes"},"period":{"value":"January through August 2026","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"prior_period":{"value":"January through August 2025","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table title, producer sector headers and source notes"},"all_generation":{"value":82669.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"82,669"},"prior_all_generation":{"value":85251.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"85,251"},"published_generation_change":{"value":-3.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Michigan row; column3","unit":"percent","measurement_role":"published_net_generation_percentage_change","source_token":"-3.0%"},"utility_generation":{"value":58436.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"58,436"},"prior_utility_generation":{"value":65788.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"65,788"},"ipp_generation":{"value":22825.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"22,825"},"prior_ipp_generation":{"value":18115.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"18,115"},"commercial_generation":{"value":504.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"504"},"prior_commercial_generation":{"value":490.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"490"},"industrial_generation":{"value":903.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"903"},"prior_industrial_generation":{"value":858.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"858"},"gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table title, producer sector headers and source notes"},"gas_period":{"value":"January through August 2026","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_prior_period":{"value":"January through August 2025","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_all_generation":{"value":38097.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"38,097"},"gas_prior_all_generation":{"value":34225.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"34,225"},"gas_published_generation_change":{"value":11.3,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Michigan row; column3","unit":"percent","measurement_role":"published_gas_generation_percentage_change","source_token":"11.3%"},"gas_utility_generation":{"value":20476.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"20,476"},"gas_prior_utility_generation":{"value":20863.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"20,863"},"gas_ipp_generation":{"value":16797.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"16,797"},"gas_prior_ipp_generation":{"value":12599.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"12,599"},"gas_commercial_generation":{"value":459.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"459"},"gas_prior_commercial_generation":{"value":424.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"424"},"gas_industrial_generation":{"value":365.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"365"},"gas_prior_industrial_generation":{"value":339.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"339"},"nuclear_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table title, producer sector headers and source notes"},"nuclear_period":{"value":"January through August 2026","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_prior_period":{"value":"January through August 2025","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_all_generation":{"value":17226.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"17,226"},"nuclear_prior_all_generation":{"value":18659.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"18,659"},"nuclear_published_generation_change":{"value":-7.7,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Michigan row; column3","unit":"percent","measurement_role":"published_nuclear_generation_percentage_change","source_token":"-7.7%"},"nuclear_utility_generation":{"value":17226.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"17,226"},"nuclear_prior_utility_generation":{"value":18659.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"18,659"},"nuclear_ipp_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"coal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table title, producer sector headers and source notes"},"coal_period":{"value":"January through August 2026","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_all_generation":{"value":14350.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"14,350"},"coal_prior_all_generation":{"value":20500.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"20,500"},"coal_published_generation_change":{"value":-30.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Michigan row; column3","unit":"percent","measurement_role":"published_coal_generation_percentage_change","source_token":"-30.0%"},"coal_utility_generation":{"value":14230.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"14,230"},"coal_prior_utility_generation":{"value":20366.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"20,366"},"coal_ipp_generation":{"value":119.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"119"},"coal_prior_ipp_generation":{"value":134.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"134"},"coal_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_industrial_generation":{"value":null,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"coal_prior_industrial_generation":{"value":0.21,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0.21"},"wind_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table title, producer sector headers and source notes"},"wind_period":{"value":"January through August 2026","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_prior_period":{"value":"January through August 2025","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_all_generation":{"value":6537.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"6,537"},"wind_prior_all_generation":{"value":6754.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"6,754"},"wind_published_generation_change":{"value":-3.2,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Michigan row; column3","unit":"percent","measurement_role":"published_wind_generation_percentage_change","source_token":"-3.2%"},"wind_utility_generation":{"value":3943.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"3,943"},"wind_prior_utility_generation":{"value":4092.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"4,092"},"wind_ipp_generation":{"value":2594.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"2,594"},"wind_prior_ipp_generation":{"value":2663.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"2,663"},"wind_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"hydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table title, producer sector headers and source notes"},"hydro_period":{"value":"January through August 2026","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_prior_period":{"value":"January through August 2025","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_all_generation":{"value":1047.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"1,047"},"hydro_prior_all_generation":{"value":912.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"912"},"hydro_published_generation_change":{"value":14.7,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Michigan row; column3","unit":"percent","measurement_role":"published_hydro_generation_percentage_change","source_token":"14.7%"},"hydro_utility_generation":{"value":994.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"994"},"hydro_prior_utility_generation":{"value":861.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"861"},"hydro_ipp_generation":{"value":48.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"48"},"hydro_prior_ipp_generation":{"value":46.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"46"},"hydro_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_industrial_generation":{"value":null,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"hydro_prior_industrial_generation":{"value":null,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"pumped_storage_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table title, producer sector headers and source notes"},"pumped_storage_period":{"value":"January through August 2026","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_prior_period":{"value":"January through August 2025","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_all_generation":{"value":-545.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-545"},"pumped_storage_prior_all_generation":{"value":-458.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-458"},"pumped_storage_published_generation_change":{"value":18.9,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Michigan row; column3","unit":"percent","measurement_role":"published_pumped_storage_generation_percentage_change","source_token":"18.9%"},"pumped_storage_utility_generation":{"value":-545.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-545"},"pumped_storage_prior_utility_generation":{"value":-458.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-458"},"pumped_storage_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"solar_pv_period":{"value":"January through August 2026","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_prior_period":{"value":"January through August 2025","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_generation_basis":{"value":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table title, producer sector headers and source notes"},"solar_pv_all_estimated_generation":{"value":3842.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column1","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"3,842"},"solar_pv_prior_all_estimated_generation":{"value":2355.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column2","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"2,355"},"solar_pv_published_generation_change":{"value":63.1,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column3","unit":"percent","measurement_role":"published_solar_pv_generation_percentage_change","source_token":"63.1%"},"solar_pv_utility_scale_generation":{"value":3477.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"3,477"},"solar_pv_utility_scale_prior_generation":{"value":2047.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"2,047"},"solar_pv_estimated_small_scale_generation":{"value":365.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column6","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"365"},"solar_pv_estimated_small_scale_prior_generation":{"value":308.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column7","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"308"},"solar_pv_electric_utilities_generation":{"value":1149.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1,149"},"solar_pv_electric_utilities_prior_generation":{"value":345.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"345"},"solar_pv_independent_producers_generation":{"value":2327.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"2,327"},"solar_pv_independent_producers_prior_generation":{"value":1702.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1,702"},"solar_pv_commercial_estimated_total_generation":{"value":149.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column12","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"149"},"solar_pv_commercial_estimated_total_prior_generation":{"value":122.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column13","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"122"},"solar_pv_commercial_utility_scale_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column14","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_commercial_utility_scale_prior_generation":{"value":0.2,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column15","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0.20"},"solar_pv_commercial_estimated_small_scale_generation":{"value":149.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column16","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"149"},"solar_pv_commercial_estimated_small_scale_prior_generation":{"value":122.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column17","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"122"},"solar_pv_industrial_estimated_total_generation":{"value":8.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column18","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"8"},"solar_pv_industrial_estimated_total_prior_generation":{"value":5.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column19","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"5"},"solar_pv_industrial_utility_scale_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column20","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_industrial_utility_scale_prior_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column21","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_industrial_estimated_small_scale_generation":{"value":8.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column22","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"8"},"solar_pv_industrial_estimated_small_scale_prior_generation":{"value":5.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column23","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"5"},"solar_pv_residential_estimated_small_scale_generation":{"value":208.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column24","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"208"},"solar_pv_residential_estimated_small_scale_prior_generation":{"value":181.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Michigan row; column25","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"181"},"solar_thermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table title, producer sector headers and source notes"},"solar_thermal_period":{"value":"January through August 2026","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_published_generation_change":{"value":null,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Michigan row; column3","unit":"percent","measurement_role":"published_solar_thermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"solar_thermal_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"other_energy_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"other_energy_period":{"value":"January through August 2026","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_prior_period":{"value":"January through August 2025","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_all_generation":{"value":28.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"28"},"other_energy_prior_all_generation":{"value":43.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"43"},"other_energy_published_generation_change":{"value":-36.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Michigan row; column3","unit":"percent","measurement_role":"published_other_energy_generation_percentage_change","source_token":"-36.0%"},"other_energy_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_utility_generation":{"value":-1.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"-1"},"other_energy_ipp_generation":{"value":3.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"3"},"other_energy_prior_ipp_generation":{"value":8.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"8"},"other_energy_commercial_generation":{"value":24.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"24"},"other_energy_prior_commercial_generation":{"value":36.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"36"},"other_energy_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"geothermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table title, producer sector headers and source notes"},"geothermal_period":{"value":"January through August 2026","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_published_generation_change":{"value":null,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Michigan row; column3","unit":"percent","measurement_role":"published_geothermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"geothermal_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"biomass_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"biomass_period":{"value":"January through August 2026","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_prior_period":{"value":"January through August 2025","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_all_generation":{"value":1360.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"1,360"},"biomass_prior_all_generation":{"value":1319.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"1,319"},"biomass_published_generation_change":{"value":3.2,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Michigan row; column3","unit":"percent","measurement_role":"published_biomass_generation_percentage_change","source_token":"3.2%"},"biomass_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_ipp_generation":{"value":937.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"937"},"biomass_prior_ipp_generation":{"value":866.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"866"},"biomass_commercial_generation":{"value":20.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"20"},"biomass_prior_commercial_generation":{"value":30.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"30"},"biomass_industrial_generation":{"value":403.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"403"},"biomass_prior_industrial_generation":{"value":423.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"423"},"petroleum_liquids_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_liquids_period":{"value":"January through August 2026","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_prior_period":{"value":"January through August 2025","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_all_generation":{"value":74.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"74"},"petroleum_liquids_prior_all_generation":{"value":64.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"64"},"petroleum_liquids_published_generation_change":{"value":16.5,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Michigan row; column3","unit":"percent","measurement_role":"published_petroleum_liquids_generation_percentage_change","source_token":"16.5%"},"petroleum_liquids_utility_generation":{"value":72.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"72"},"petroleum_liquids_prior_utility_generation":{"value":62.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"62"},"petroleum_liquids_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_commercial_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_prior_commercial_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_industrial_generation":{"value":2.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"2"},"petroleum_liquids_prior_industrial_generation":{"value":2.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"2"},"petroleum_coke_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_coke_period":{"value":"January through August 2026","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_prior_period":{"value":"January through August 2025","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_all_generation":{"value":1018.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"1,018"},"petroleum_coke_prior_all_generation":{"value":1088.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"1,088"},"petroleum_coke_published_generation_change":{"value":-6.4,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Michigan row; column3","unit":"percent","measurement_role":"published_petroleum_coke_generation_percentage_change","source_token":"-6.4%"},"petroleum_coke_utility_generation":{"value":890.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"890"},"petroleum_coke_prior_utility_generation":{"value":998.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"998"},"petroleum_coke_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_industrial_generation":{"value":128.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"128"},"petroleum_coke_prior_industrial_generation":{"value":90.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"90"},"other_fossil_gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table title, producer sector headers and source notes"},"other_fossil_gas_period":{"value":"January through August 2026","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_prior_period":{"value":"January through August 2025","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_all_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_all_generation":{"value":98.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"98"},"other_fossil_gas_published_generation_change":{"value":-100.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Michigan row; column3","unit":"percent","measurement_role":"published_other_fossil_gas_generation_percentage_change","source_token":"-100.0%"},"other_fossil_gas_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_ipp_generation":{"value":98.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"98"},"other_fossil_gas_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"nonhydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table title, producer sector headers and source notes"},"nonhydro_period":{"value":"January through August 2026","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_prior_period":{"value":"January through August 2025","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_all_generation":{"value":11374.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Michigan row; column1","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"11,374"},"nonhydro_prior_all_generation":{"value":10120.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Michigan row; column2","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"10,120"},"nonhydro_published_generation_change":{"value":12.4,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Michigan row; column3","unit":"percent","measurement_role":"published_nonhydro_generation_percentage_change","source_token":"12.4%"},"nonhydro_utility_generation":{"value":5093.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Michigan row; column4","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"5,093"},"nonhydro_prior_utility_generation":{"value":4436.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Michigan row; column5","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"4,436"},"nonhydro_ipp_generation":{"value":5858.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Michigan row; column6","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"5,858"},"nonhydro_prior_ipp_generation":{"value":5231.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Michigan row; column7","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"5,231"},"nonhydro_commercial_generation":{"value":20.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Michigan row; column8","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"20"},"nonhydro_prior_commercial_generation":{"value":30.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Michigan row; column9","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"30"},"nonhydro_industrial_generation":{"value":403.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Michigan row; column10","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"403"},"nonhydro_prior_industrial_generation":{"value":423.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Michigan row; column11","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"423"}}},{"id":"capacity-state-utility-mi-202608","subject":"Michigan utility scale net summer capacity","kind":"capacity_context","state_codes":["mi"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","fields":{"utility_capacity_basis":{"value":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Title,technology headers and exclusions"},"utility_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Column headers"},"utility_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Column headers"},"status":{"value":"historical","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Dated source period"},"utility_capacity_renewables":{"value":7602.2,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Michigan row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"7,602.2"},"utility_capacity_renewables_prior":{"value":6283.2,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Michigan row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"6,283.2"},"utility_capacity_fossil":{"value":20166.3,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Michigan row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"20,166.3"},"utility_capacity_fossil_prior":{"value":20208.8,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Michigan row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"20,208.8"},"utility_capacity_pumped_storage":{"value":2179.8,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Michigan row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"2,179.8"},"utility_capacity_pumped_storage_prior":{"value":2179.8,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Michigan row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"2,179.8"},"utility_capacity_other_storage":{"value":115.3,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Michigan row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"115.3"},"utility_capacity_other_storage_prior":{"value":115.3,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Michigan row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"115.3"},"utility_capacity_nuclear":{"value":4086.5,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Michigan row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"4,086.5"},"utility_capacity_nuclear_prior":{"value":4086.5,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Michigan row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"4,086.5"},"utility_capacity_other_sources":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Michigan row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_other_sources_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Michigan row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_all":{"value":34150.1,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Michigan row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"34,150.1"},"utility_capacity_all_prior":{"value":32873.6,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Michigan row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"32,873.6"},"renew_capacity_basis":{"value":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Title,technology headers and exclusions"},"renew_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Column headers"},"renew_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Column headers"},"renew_capacity_status":{"value":"historical","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Dated source period"},"renew_capacity_wind":{"value":3774.3,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"3,774.3"},"renew_capacity_wind_prior":{"value":3774.3,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"3,774.3"},"renew_capacity_solar_pv":{"value":3084.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"3,084.0"},"renew_capacity_solar_pv_prior":{"value":1765.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,765.0"},"renew_capacity_solar_thermal":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_solar_thermal_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_conventional_hydro":{"value":263.9,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"263.9"},"renew_capacity_conventional_hydro_prior":{"value":263.9,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"263.9"},"renew_capacity_biomass":{"value":480.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"480.0"},"renew_capacity_biomass_prior":{"value":480.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"480.0"},"renew_capacity_geothermal":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_geothermal_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_total_utility":{"value":7602.2,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"7,602.2"},"renew_capacity_total_utility_prior":{"value":6283.2,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"6,283.2"},"renew_capacity_small_pv_estimated":{"value":354.2,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column15","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"354.2"},"renew_capacity_small_pv_estimated_prior":{"value":299.3,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column16","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"299.3"},"renew_capacity_combined_pv_estimated":{"value":3438.2,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column17","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"3,438.2"},"renew_capacity_combined_pv_estimated_prior":{"value":2064.3,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column18","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"2,064.3"},"renew_capacity_combined_solar_estimated":{"value":3438.2,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column19","unit":"MW","measurement_role":"estimated_solar_net_summer_capacity","source_token":"3,438.2"},"renew_capacity_combined_solar_estimated_prior":{"value":2064.3,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Michigan row,column20","unit":"MW","measurement_role":"estimated_solar_net_summer_capacity","source_token":"2,064.3"},"fossil_capacity_basis":{"value":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Title,technology headers and exclusions"},"fossil_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Column headers"},"fossil_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Column headers"},"fossil_capacity_status":{"value":"historical","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Dated source period"},"fossil_capacity_gas_combined_cycle":{"value":7712.9,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"7,712.9"},"fossil_capacity_gas_combined_cycle_prior":{"value":7712.9,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"7,712.9"},"fossil_capacity_gas_combustion_turbine":{"value":3547.7,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"3,547.7"},"fossil_capacity_gas_combustion_turbine_prior":{"value":3547.7,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"3,547.7"},"fossil_capacity_gas_other":{"value":2490.4,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"2,490.4"},"fossil_capacity_gas_other_prior":{"value":2532.9,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"2,532.9"},"fossil_capacity_coal":{"value":5732.3,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"5,732.3"},"fossil_capacity_coal_prior":{"value":5732.3,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"5,732.3"},"fossil_capacity_petroleum_coke":{"value":47.2,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"47.2"},"fossil_capacity_petroleum_coke_prior":{"value":47.2,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"47.2"},"fossil_capacity_petroleum_liquids":{"value":385.8,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"385.8"},"fossil_capacity_petroleum_liquids_prior":{"value":385.8,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"385.8"},"fossil_capacity_other_fossil_gas":{"value":250.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"250.0"},"fossil_capacity_other_fossil_gas_prior":{"value":250.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"250.0"},"fossil_capacity_total":{"value":20166.3,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column15","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"20,166.3"},"fossil_capacity_total_prior":{"value":20208.8,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Michigan row,column16","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"20,208.8"},"reported_new_unit_rows":{"value":7,"source_ids":["eia-new-utility-units-aug2026"],"scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","locator":"Calculated count of Table6.3 rows for MI","unit":"generators","measurement_role":"calculated_count_reported_new_utility_unit_rows"},"reported_new_unit_capacity_sum":{"value":1118.2,"source_ids":["eia-new-utility-units-aug2026"],"scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","locator":"Calculated sum of rounded Table6.3 Net Summer Capacity(MW) cells for MI","unit":"MW","measurement_role":"calculated_sum_reported_unit_net_summer_capacity"},"reported_new_unit_basis":{"value":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","source_ids":["eia-new-utility-units-aug2026"],"scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","locator":"Table6.3 title,columns,notes and explicit calculation scope"},"reported_retired_unit_rows":{"value":2,"source_ids":["eia-retired-utility-units-aug2026"],"scope":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","locator":"Calculated count of Table6.4 rows for MI","unit":"generators","measurement_role":"calculated_count_reported_retired_utility_unit_rows"},"reported_retired_unit_capacity_sum":{"value":42.5,"source_ids":["eia-retired-utility-units-aug2026"],"scope":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","locator":"Calculated sum of rounded Table6.4 Net Summer Capacity(MW) cells for MI","unit":"MW","measurement_role":"calculated_sum_reported_retired_unit_net_summer_capacity"},"reported_retired_unit_basis":{"value":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","source_ids":["eia-retired-utility-units-aug2026"],"scope":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","locator":"Table6.4 title,columns,notes and explicit calculation scope"},"reported_planned_unit_rows":{"value":35,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for MI across all source target dates,not simultaneous supply","unit":"generators","measurement_role":"calculated_count_reported_planned_utility_unit_rows"},"reported_planned_unit_capacity_sum":{"value":5606.6,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for MI across all source target dates,not simultaneous supply","unit":"MW","measurement_role":"calculated_sum_planned_unit_net_summer_capacity"},"reported_planned_unit_nameplate_sum":{"value":5748.0,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for MI across all source target dates,not simultaneous supply","unit":"MW","measurement_role":"calculated_sum_planned_unit_nameplate_capacity"},"reported_planned_unit_complete_nonoperating_rows":{"value":3,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for MI across all source target dates,not simultaneous supply","unit":"generators","measurement_role":"calculated_count_reported_complete_nonoperating_planned_units"},"reported_planned_unit_basis":{"value":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Table6.5 title,status/date/capacity columns,notes and explicit calculation boundary"},"reported_retirement_plan_rows":{"value":29,"source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Calculated from Table6.6 reported rows for MI across all target dates,not simultaneous removal","unit":"generators","measurement_role":"calculated_count_reported_retirement_plan_units"},"reported_retirement_plan_capacity_sum":{"value":5702.1,"source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Calculated from Table6.6 reported rows for MI across all target dates,not simultaneous removal","unit":"MW","measurement_role":"calculated_sum_retirement_plan_net_summer_capacity"},"reported_retirement_plan_unknown_month_rows":{"value":0,"source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Calculated from Table6.6 reported rows for MI across all target dates,not simultaneous removal","unit":"generators","measurement_role":"calculated_count_retirement_plan_missing_months"},"reported_retirement_plan_basis":{"value":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Table6.6 title/date/capacity columns,notes and explicit calculation scope"}}},{"id":"power-ieee-reliability-2025-mi","kind":"reliability_context","subject":"Michigan historical IEEE distribution reliability2025 and2024","state_codes":["mi"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","fields":{"status":{"value":"historical","source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 years2025 and2024"},"ieee_reliability_basis":{"value":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 header and definitions"},"ieee_coverage_2025":{"value":94.4,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;coverage;Year 2025","source_token":"94.4%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"ieee_coverage_2024":{"value":94.3,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;coverage;Year 2024","source_token":"94.3%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saidi_2025":{"value":608.6,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;all_events_saidi;Year 2025","source_token":"608.6","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saidi_2024":{"value":481.7,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;all_events_saidi;Year 2024","source_token":"481.7","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saifi_2025":{"value":1.418,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;all_events_saifi;Year 2025","source_token":"1.418","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saifi_2024":{"value":1.365,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;all_events_saifi;Year 2024","source_token":"1.365","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_caidi_2025":{"value":429.1,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;all_events_caidi;Year 2025","source_token":"429.1","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_caidi_2024":{"value":353.0,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;all_events_caidi;Year 2024","source_token":"353","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saidi_2025":{"value":161.0,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;without_major_days_saidi;Year 2025","source_token":"161","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saidi_2024":{"value":161.3,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;without_major_days_saidi;Year 2024","source_token":"161.3","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saifi_2025":{"value":1.038,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;without_major_days_saifi;Year 2025","source_token":"1.038","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saifi_2024":{"value":0.983,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;without_major_days_saifi;Year 2024","source_token":"0.983","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_caidi_2025":{"value":155.1,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;without_major_days_caidi;Year 2025","source_token":"155.1","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_caidi_2024":{"value":164.0,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;without_major_days_caidi;Year 2024","source_token":"164","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saidi_2025":{"value":476.0,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;loss_supply_removed_saidi;Year 2025","source_token":"476","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saidi_2024":{"value":456.2,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;loss_supply_removed_saidi;Year 2024","source_token":"456.2","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saifi_2025":{"value":1.223,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;loss_supply_removed_saifi;Year 2025","source_token":"1.223","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saifi_2024":{"value":1.252,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;loss_supply_removed_saifi;Year 2024","source_token":"1.252","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_caidi_2025":{"value":389.3,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;loss_supply_removed_caidi;Year 2025","source_token":"389.3","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_caidi_2024":{"value":364.5,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Michigan row;loss_supply_removed_caidi;Year 2024","source_token":"364.5","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"saidi_history_ieee_all_events_2023":{"value":1127.7,"source_token":"1127.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_all_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2022":{"value":520.7,"source_token":"520.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_all_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2021":{"value":890.9,"source_token":"890.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_all_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2020":{"value":416.7,"source_token":"416.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_all_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2019":{"value":570.2,"source_token":"570.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_all_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2018":{"value":450.2,"source_token":"450.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_all_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2017":{"value":802.2,"source_token":"802.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_all_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2016":{"value":268.4,"source_token":"268.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_all_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2015":{"value":374.5,"source_token":"374.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_all_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2023":{"value":164.8,"source_token":"164.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_without_major_days;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2022":{"value":166.8,"source_token":"166.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_without_major_days;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2021":{"value":178.6,"source_token":"178.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_without_major_days;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2020":{"value":168.3,"source_token":"168.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_without_major_days;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2019":{"value":213.9,"source_token":"213.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_without_major_days;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2018":{"value":186.4,"source_token":"186.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_without_major_days;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2017":{"value":180.1,"source_token":"180.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_without_major_days;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2016":{"value":194.2,"source_token":"194.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_without_major_days;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2015":{"value":183.4,"source_token":"183.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_without_major_days;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2023":{"value":1131.2,"source_token":"1131.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2022":{"value":519.9,"source_token":"519.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2021":{"value":882.1,"source_token":"882.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2020":{"value":414.3,"source_token":"414.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2019":{"value":565.5,"source_token":"565.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2018":{"value":448.0,"source_token":"448","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2017":{"value":798.2,"source_token":"798.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2016":{"value":262.6,"source_token":"262.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2015":{"value":363.7,"source_token":"363.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_basis":{"value":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","source_ids":["eia-epa2025-saidi-state-history"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","locator":"Table11.4 header and method notes;2015-2023 supplemental history"},"saifi_history_ieee_all_events_2023":{"value":1.543,"source_token":"1.543","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_all_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2022":{"value":1.34,"source_token":"1.34","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_all_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2021":{"value":1.647,"source_token":"1.647","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_all_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2020":{"value":1.375,"source_token":"1.375","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_all_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2019":{"value":1.542,"source_token":"1.542","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_all_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2018":{"value":1.374,"source_token":"1.374","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_all_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2017":{"value":1.413,"source_token":"1.413","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_all_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2016":{"value":1.13,"source_token":"1.13","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_all_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2015":{"value":1.151,"source_token":"1.151","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_all_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2023":{"value":0.931,"source_token":"0.931","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_without_major_days;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2022":{"value":1.016,"source_token":"1.016","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_without_major_days;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2021":{"value":1.017,"source_token":"1.017","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_without_major_days;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2020":{"value":1.069,"source_token":"1.069","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_without_major_days;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2019":{"value":1.162,"source_token":"1.162","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_without_major_days;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2018":{"value":1.054,"source_token":"1.054","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_without_major_days;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2017":{"value":0.984,"source_token":"0.984","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_without_major_days;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2016":{"value":1.004,"source_token":"1.004","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_without_major_days;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2015":{"value":0.979,"source_token":"0.979","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_without_major_days;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2023":{"value":1.533,"source_token":"1.533","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2022":{"value":1.326,"source_token":"1.326","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2021":{"value":1.615,"source_token":"1.615","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2020":{"value":1.339,"source_token":"1.339","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2019":{"value":1.505,"source_token":"1.505","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2018":{"value":1.346,"source_token":"1.346","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2017":{"value":1.388,"source_token":"1.388","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2016":{"value":1.105,"source_token":"1.105","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2015":{"value":1.119,"source_token":"1.119","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_basis":{"value":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","source_ids":["eia-epa2025-saifi-state-history"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","locator":"Table11.5 header and method notes;2015-2023 supplemental history"},"caidi_history_ieee_all_events_2023":{"value":730.9,"source_token":"730.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_all_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2022":{"value":388.7,"source_token":"388.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_all_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2021":{"value":540.8,"source_token":"540.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_all_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2020":{"value":303.1,"source_token":"303.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_all_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2019":{"value":369.7,"source_token":"369.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_all_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2018":{"value":327.6,"source_token":"327.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_all_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2017":{"value":567.8,"source_token":"567.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_all_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2016":{"value":237.5,"source_token":"237.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_all_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2015":{"value":325.4,"source_token":"325.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_all_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2023":{"value":177.1,"source_token":"177.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_without_major_days;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2022":{"value":164.2,"source_token":"164.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_without_major_days;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2021":{"value":175.6,"source_token":"175.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_without_major_days;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2020":{"value":157.5,"source_token":"157.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_without_major_days;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2019":{"value":184.1,"source_token":"184.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_without_major_days;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2018":{"value":176.8,"source_token":"176.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_without_major_days;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2017":{"value":183.0,"source_token":"183","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_without_major_days;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2016":{"value":193.5,"source_token":"193.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_without_major_days;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2015":{"value":187.3,"source_token":"187.3","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_without_major_days;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2023":{"value":738.0,"source_token":"738","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2022":{"value":391.9,"source_token":"391.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2021":{"value":546.2,"source_token":"546.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2020":{"value":309.5,"source_token":"309.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2019":{"value":375.8,"source_token":"375.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2018":{"value":332.7,"source_token":"332.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2017":{"value":574.9,"source_token":"574.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2016":{"value":237.7,"source_token":"237.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2015":{"value":324.9,"source_token":"324.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_basis":{"value":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","source_ids":["eia-epa2025-caidi-state-history"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","locator":"Table11.6 header and method notes;2015-2023 supplemental history"}}},{"id":"power-any-reliability-2025-mi","kind":"reliability_context","subject":"Michigan historical any-method distribution reliability2025 and2024","state_codes":["mi"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","fields":{"status":{"value":"historical","source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 years2025 and2024"},"any_reliability_basis":{"value":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 header and definitions"},"any_coverage_2025":{"value":97.6,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Michigan row;coverage;Year 2025","source_token":"97.6%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"any_coverage_2024":{"value":97.5,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Michigan row;coverage;Year 2024","source_token":"97.5%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saidi_2025":{"value":671.5,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Michigan row;all_events_saidi;Year 2025","source_token":"671.5","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saidi_2024":{"value":470.4,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Michigan row;all_events_saidi;Year 2024","source_token":"470.4","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saifi_2025":{"value":1.424,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Michigan row;all_events_saifi;Year 2025","source_token":"1.424","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saifi_2024":{"value":1.356,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Michigan row;all_events_saifi;Year 2024","source_token":"1.356","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_caidi_2025":{"value":471.6,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Michigan row;all_events_caidi;Year 2025","source_token":"471.6","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_caidi_2024":{"value":346.8,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Michigan row;all_events_caidi;Year 2024","source_token":"346.8","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saidi_2025":{"value":160.3,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Michigan row;without_major_events_saidi;Year 2025","source_token":"160.3","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saidi_2024":{"value":160.1,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Michigan row;without_major_events_saidi;Year 2024","source_token":"160.1","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saifi_2025":{"value":1.036,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Michigan row;without_major_events_saifi;Year 2025","source_token":"1.036","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saifi_2024":{"value":0.986,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Michigan row;without_major_events_saifi;Year 2024","source_token":"0.986","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_caidi_2025":{"value":154.8,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Michigan row;without_major_events_caidi;Year 2025","source_token":"154.8","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_caidi_2024":{"value":162.4,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Michigan row;without_major_events_caidi;Year 2024","source_token":"162.4","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"saidi_history_any_all_events_2023":{"value":1093.6,"source_token":"1093.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_all_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2022":{"value":513.1,"source_token":"513.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_all_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2021":{"value":873.3,"source_token":"873.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_all_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2020":{"value":410.7,"source_token":"410.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_all_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2019":{"value":554.9,"source_token":"554.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_all_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2018":{"value":442.9,"source_token":"442.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_all_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2017":{"value":778.8,"source_token":"778.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_all_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2016":{"value":267.8,"source_token":"267.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_all_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2015":{"value":363.4,"source_token":"363.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_all_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2023":{"value":162.7,"source_token":"162.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_without_major_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2022":{"value":166.0,"source_token":"166","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_without_major_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2021":{"value":178.4,"source_token":"178.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_without_major_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2020":{"value":167.2,"source_token":"167.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_without_major_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2019":{"value":211.1,"source_token":"211.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_without_major_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2018":{"value":185.0,"source_token":"185","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_without_major_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2017":{"value":179.4,"source_token":"179.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_without_major_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2016":{"value":193.1,"source_token":"193.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_without_major_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2015":{"value":178.8,"source_token":"178.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Michigan row;any_without_major_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_basis":{"value":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","source_ids":["eia-epa2025-saidi-state-history"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","locator":"Table11.4 header and method notes;2015-2023 supplemental history"},"saifi_history_any_all_events_2023":{"value":1.512,"source_token":"1.512","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_all_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2022":{"value":1.339,"source_token":"1.339","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_all_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2021":{"value":1.656,"source_token":"1.656","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_all_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2020":{"value":1.384,"source_token":"1.384","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_all_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2019":{"value":1.535,"source_token":"1.535","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_all_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2018":{"value":1.373,"source_token":"1.373","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_all_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2017":{"value":1.414,"source_token":"1.414","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_all_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2016":{"value":1.146,"source_token":"1.146","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_all_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2015":{"value":1.141,"source_token":"1.141","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_all_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2023":{"value":0.921,"source_token":"0.921","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_without_major_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2022":{"value":1.015,"source_token":"1.015","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_without_major_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2021":{"value":1.033,"source_token":"1.033","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_without_major_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2020":{"value":1.082,"source_token":"1.082","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_without_major_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2019":{"value":1.162,"source_token":"1.162","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_without_major_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2018":{"value":1.055,"source_token":"1.055","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_without_major_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2017":{"value":0.989,"source_token":"0.989","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_without_major_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2016":{"value":1.012,"source_token":"1.012","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_without_major_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2015":{"value":0.967,"source_token":"0.967","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Michigan row;any_without_major_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_basis":{"value":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","source_ids":["eia-epa2025-saifi-state-history"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","locator":"Table11.5 header and method notes;2015-2023 supplemental history"},"caidi_history_any_all_events_2023":{"value":723.5,"source_token":"723.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_all_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2022":{"value":383.2,"source_token":"383.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_all_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2021":{"value":527.5,"source_token":"527.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_all_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2020":{"value":296.8,"source_token":"296.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_all_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2019":{"value":361.5,"source_token":"361.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_all_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2018":{"value":322.6,"source_token":"322.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_all_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2017":{"value":550.9,"source_token":"550.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_all_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2016":{"value":233.6,"source_token":"233.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_all_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2015":{"value":318.5,"source_token":"318.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_all_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2023":{"value":176.7,"source_token":"176.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_without_major_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2022":{"value":163.6,"source_token":"163.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_without_major_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2021":{"value":172.6,"source_token":"172.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_without_major_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2020":{"value":154.6,"source_token":"154.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_without_major_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2019":{"value":181.7,"source_token":"181.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_without_major_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2018":{"value":175.4,"source_token":"175.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_without_major_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2017":{"value":181.5,"source_token":"181.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_without_major_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2016":{"value":190.8,"source_token":"190.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_without_major_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2015":{"value":184.8,"source_token":"184.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Michigan row;any_without_major_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_basis":{"value":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","source_ids":["eia-epa2025-caidi-state-history"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","locator":"Table11.6 header and method notes;2015-2023 supplemental history"}}}],"sources":{"pjm-process":{"url":"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/","title":"Annual process for vetting large load requests","publisher":"PJM Interconnection","published_on":"2026-09-29","date_note":null,"checked_at":"2026-10-23T11:36:35.258210+00:00","sha256":"fd217cefb4a51c7c12bc244d293d2933e95d84ac8115ceb58e7b1f76a192cae6","scope":"PJM says it does not have a load interconnection queue. Utilities submit forecast adjustments. No comparable queue total is established.","tier":"A","establishes_status":[]},"eia-prices":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"Electric Power Monthly, table 5.6.A","publisher":"U.S. Energy Information Administration","published_on":"2026-09-24","date_note":null,"checked_at":"2026-10-23T11:36:34.899891+00:00","sha256":"17ebeca2c90f3f0e5aa41062a2f90952c8ffdf396479281ce6b363ef2fcc1b90","scope":"Captured public table compares July 2026 and July 2025 residential average prices. Preliminary estimates, not bills or data center cost attribution. The next scheduled release is not treated as available.","tier":"A","establishes_status":[],"additional_review_scope":"October26additionalreview of retainedJulycommercialandindustrialcolumns,51states/DC. Originalresidentialscope,clocks,releaseidentityandhashpreserved;no newsourcecapture."},"mi-im-order-20260827":{"url":"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27533","title":"Michigan I&M U-21986 final order","publisher":"Michigan Public Service Commission","published_on":"2026-08-27","date_note":null,"checked_at":"2026-10-23T16:38:38.505468+00:00","sha256":"b0623a71e2a7b72e825e70e325829621c80b770b385400f491c68c670ec38df5","scope":"Michigan utility tariff and order requirements. Approval does not establish a particular customer agreement, actual load, realized savings or a statewide rule for every utility.","tier":"A","establishes_status":["approved"]},"mi-im-book19-20260918":{"url":"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf","title":"Michigan I&M tariff book dated September18,2026","publisher":"Indiana Michigan Power Company","published_on":"2026-09-18","date_note":"Compilation filename and index identify book19, while the reviewed newly issued LP sheets retain book18 headers. The sheets explicitly give September18,2026 issue and effect under U-21986.","checked_at":"2026-10-23T16:37:53.723108+00:00","sha256":"011bb0946fb4301ea4b79085231f72a5f9bf542fcc348ca927d3c53612e1d5ac","scope":"Michigan utility tariff and order requirements. Approval does not establish a particular customer agreement, actual load, realized savings or a statewide rule for every utility.","tier":"A","establishes_status":["approved"]},"mi-consumers-order-20251106":{"url":"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293","title":"Consumers Energy U-21859 final order","publisher":"Michigan Public Service Commission","published_on":"2025-11-06","date_note":null,"checked_at":"2026-10-23T16:37:55.003014+00:00","sha256":"6bc535bb1d62fb94df1155b23fe54f279f1d91e714931ec604c644ea9a6f34c4","scope":"Michigan utility tariff and order requirements. Approval does not establish a particular customer agreement, actual load, realized savings or a statewide rule for every utility.","tier":"A","establishes_status":["approved"]},"mi-consumers-compliance-20251229":{"url":"https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001ZGWSKAA5","title":"Consumers Energy accepted large load compliance tariff filing","publisher":"Michigan Public Service Commission","published_on":"2025-12-29","date_note":"Docket filing letter December29,2025 encloses sheets issued December3 and staff stamped December23. Service effect is separately November7,2025.","checked_at":"2026-10-23T16:38:39.300882+00:00","sha256":"b3deb0731b6aa87b900efb66f612eecd1238be62bd8d42ebec9916ee6bb49ee2","scope":"Michigan utility tariff and order requirements. Approval does not establish a particular customer agreement, actual load, realized savings or a statewide rule for every utility.","tier":"A","establishes_status":["approved"]},"mi-consumers-rehearing-20260219":{"url":"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27373","title":"Consumers Energy U-21859 rehearing denial","publisher":"Michigan Public Service Commission","published_on":"2026-02-19","date_note":null,"checked_at":"2026-10-23T16:39:53.666133+00:00","sha256":"d747b19d55bc7c8b18150cbde09b7a8ea349bffd4dfdceb6e2700c641034bc8b","scope":"Michigan utility tariff and order requirements. Approval does not establish a particular customer agreement, actual load, realized savings or a statewide rule for every utility.","tier":"A","establishes_status":[]},"mi-consumers-book14-20261023":{"url":"https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/consumer/rate-books/electric/consumers/Consumers_14_current.pdf?rev=b1cbb572f3294f91ac6fa56a1aa0a40a&hash=656847480CFD7FFBC929E34152B64816","title":"Consumers Energy MPSC14 current rate book capture","publisher":"Michigan Public Service Commission","published_on":null,"date_note":"Mixed date tariff compilation checked October23,2026. Relevant D67.40 and D67.50 sheets retain December3,2025 issue and November7,2025 service effect. The PDF metadata title is not a publication date for the full current compilation.","checked_at":"2026-10-23T16:40:52.203764+00:00","sha256":"0005e61c994923bebcb6ae2c07d205723a099fcc2996668cd6fba3bf3d8babbe","scope":"Michigan utility tariff and order requirements. Approval does not establish a particular customer agreement, actual load, realized savings or a statewide rule for every utility.","tier":"A","establishes_status":["approved"]},"eia-price-check-20261023-1645":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"EIA table5.6.A August2026 and2025 public HTML capture","publisher":"U.S. Energy Information Administration","published_on":null,"date_note":"Exact publication day is not established by these captures. The table and spreadsheet show August2026 and August2025, while the report page header and main index still identify July2026 with a September24 release and October23 scheduled next release. That older header date is not assigned to these new values.","checked_at":"2026-10-23T16:45:07.936393+00:00","sha256":"fbfc4385f5613eb8d2b118ef2603bd81d1162f33e5ffda2dc8f03a1a3bfeb813","scope":"Public table5.6.A residential state average prices in cents per kWh. All51 state and DC pairs agree across the retained HTML and spreadsheet at the displayed hundredth. 2026values are preliminary and2025values final. Regional divisions and the U.S.total are excluded.","tier":"A","establishes_status":[]},"eia-residential-xlsx-20261023":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx","title":"EIA table5.6.A August2026 and2025 public spreadsheet","publisher":"U.S. Energy Information Administration","published_on":null,"date_note":"Exact publication day is not established by these captures. The table and spreadsheet show August2026 and August2025, while the report page header and main index still identify July2026 with a September24 release and October23 scheduled next release. That older header date is not assigned to these new values.","checked_at":"2026-10-23T16:47:20.189135+00:00","sha256":"7830737eb277be4096b3c0eb491f53c71ff91ce7133e9869b76de61f64f679b9","scope":"Public table5.6.A residential state average prices in cents per kWh. All51 state and DC pairs agree across the retained HTML and spreadsheet at the displayed hundredth. 2026values are preliminary and2025values final. Regional divisions and the U.S.total are excluded.","tier":"A","establishes_status":[]},"pjm-manual19-current-20261023":{"url":"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf","title":"PJM Manual 19 revision 39 and current forecast adjustment guidelines","publisher":"PJM Interconnection","published_on":null,"date_note":"Original public posting day is unknown. Approval June 29 and effect June 30, 2026 are separately documented, not substituted for publication.","checked_at":"2026-10-23T20:06:42.444133+00:00","sha256":"50434e43f309ae57ca33e49943552a46248ddd1f271086e9a45524c01dabc449","scope":"Actual current clean manual, cover, approval and full Attachment B. Supports adoption of this forecast review procedure only, not tariff approval, final adoption of any submitted forecast or actual connection and load.","tier":"A","establishes_status":["approved"]},"miso-framework-presentation-20260130-20261024":{"url":"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf","title":"MISO January30 large load workshop","publisher":"Midcontinent Independent System Operator","published_on":null,"date_note":"Exact publication day unknown. Workshop printed January30,2026 day retained separately from capture time.","scope":"Cover and slide6 viewed; selected text3,7,9,37 read. Remaining deck not reviewed.","checked_at":"2026-10-24T20:31:09.716534+00:00","sha256":"eeaae0bd7518f4f6db6cbf788411a57f48ab943f65c5af894828edac5c49956e","tier":"A","establishes_status":["historical"]},"atc-miso-footprint-20261024":{"url":"https://www.atcllc.com/","title":"ATC description of MISO regional footprint","publisher":"American Transmission Company","published_on":null,"date_note":"Exact publication day unknown. Workshop printed January30,2026 day retained separately from capture time.","scope":"Member description naming15states and Manitoba read; no inference of state request shares.","checked_at":"2026-10-24T20:35:58.947180+00:00","sha256":"75248820002dfed7ae724ae6efbdb84ae23129ef87af609d537a038cc8b97395","tier":"A","establishes_status":[]},"miso-about-footprint-20261024":{"url":"https://www.misoenergy.org/meet-miso/about-miso/","title":"MISO introduction and footprint","publisher":"Midcontinent Independent System Operator","published_on":null,"date_note":"Exact publication day unknown. Workshop printed January30,2026 day retained separately from capture time.","scope":"Introduction identifying15states and Manitoba read; no detailed map or full geography audit.","checked_at":"2026-10-24T20:36:11.262817+00:00","sha256":"57d4cfd1af6eec53cc30980847772e75c9110c36c49d77050ba8e53c167b91e0","tier":"A","establishes_status":[]},"miso-operational-forecast-feedback-20260827":{"url":"https://www.misoenergy.org/engage/stakeholder-feedback/2026/llwg-large-load-operational-forecast-requirements-llwg-2026-4a-20260827/","title":"MISO large load operational forecast proposal feedback","publisher":"Midcontinent Independent System Operator","published_on":null,"date_note":"Agency introduction describes August27,2026 meeting and September10 feedback deadline; exact web publication date unknown.","scope":"Agency introduction reviewed. Submitted stakeholder comments are separate attributed opinions; no final BPM or tariff adoption established.","checked_at":"2026-10-26T01:01:20.198916+00:00","sha256":"9b5f11134645315d5be01a789a4193c10f2e39b03fe9294777322a387ac8c39c","tier":"A","establishes_status":["historical"]},"eia-sector-xlsx-20261026":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx","title":"EIA table5.6.A commercial and industrial state comparisons","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"CurrentcapturedHTMLexplicitlyReleaseDateOctober23,2026;nextNovember24isnotactualpublicationofnewdata.","scope":"Commercial/industrial columnsDthroughG XLSX and matchingHTMLrows for50statesandDC,notregionalorUSaggregate rows. State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","checked_at":"2026-10-26T12:25:57.117925+00:00","sha256":"7830737eb277be4096b3c0eb491f53c71ff91ce7133e9869b76de61f64f679b9","tier":"A","establishes_status":["historical"]},"eia-sector-html-20261026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"EIA August2026 price table and released report header","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"CurrentcapturedHTMLexplicitlyReleaseDateOctober23,2026;nextNovember24isnotactualpublicationofnewdata.","scope":"Commercial/industrial columnsDthroughG XLSX and matchingHTMLrows for50statesandDC,notregionalorUSaggregate rows. State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","checked_at":"2026-10-26T12:25:57.563354+00:00","sha256":"fd9538a038063f2ad2d62d799c6616392150c100da2e27001b409a7db61e43c0","tier":"A","establishes_status":["historical"]},"eia-ytd-xlsx-20261026":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx","title":"EIA Table5.6.B January through August cumulative sector prices","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"Report header explicitly releases August2026 data October23,2026. Next scheduled release is not actual publication.","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","checked_at":"2026-10-26T15:32:57.123492+00:00","sha256":"bddeeb6e562bf3c982d11ad990d3ea22285275d7d5a75b54039e19757876994e","tier":"A","establishes_status":["historical"]},"eia-ytd-html-20261026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b","title":"EIA Table5.6.B January through August cumulative sector prices","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"Report header explicitly releases August2026 data October23,2026. Next scheduled release is not actual publication.","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","checked_at":"2026-10-26T15:32:38.218526+00:00","sha256":"8c7409cacc21048b831d96d094400d3a7b2bbac0d4cbd78e84c3d4c99b334a29","tier":"A","establishes_status":["historical"]},"eia-state-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a","title":"EIA Electric Power Monthly Table1.3.A, utility scale facility net generation by state and sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T00:26:58.495431+00:00","sha256":"9a89406a41427b37eda8d8f18d214983c7f51834ebceeb528cdfdb4244f09990","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-net-generation-aug2026.html","tier":"A","scope":"Complete51state/DC utility scale generation rows, not Census division totals or USaggregate. August2026 preliminary versusAugust2025 final;commercial/industrial generator classification is not customer electricity use.","establishes_status":["historical"]},"eia-state-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b","title":"EIA Electric Power Monthly Table1.3.B utility scale facility net generation by state and sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T00:55:44.858242+00:00","sha256":"c8ba76926634a47f369116b1c7820b084eabb24d7d5f83bd1a4683a703f825d6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulative January throughAugust2026/2025 generation rows, not monthlyAugust, annualtotals orCensusdivision/USaggregates. Generatorsectors notcustomeruse.","establishes_status":["historical"]},"eia-state-gas-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a","title":"EIA Electric Power Monthly Table1.7.A utility scale facility net generation from natural gas by state and producer sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T01:25:59.736250+00:00","sha256":"6a32013bfbe60c7bb68a2c80aeadb72b7dd57a7f66a64e835f1ef62beff2fa3e","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-gas-generation-aug2026.html","tier":"A","scope":"Whole51state/DC list for natural gas fuel generation only. Not gasproduction/fuelconsumption/allfuelgeneration ordata-center electricityfuelmix. NM/-- andnegativezero source markers retained.","establishes_status":["historical"]},"eia-state-gas-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b","title":"EIA Electric Power Monthly Table1.7.B utility scale facility net generation from natural gas by state and producer sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T01:55:48.321070+00:00","sha256":"c306bd11fb76bc034b474ed8f06f7c29000d2b93b10afe14ee9a3563220db80c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-gas-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulativeJanthroughAug naturalgas generation rows,notmonthlyAugust/annualtotals,gasproduction/fuelconsumption ordata-centerfuelmix. Publishedpercentagescalculatedbeforerounding;NMand--retainliteralmeaning.","establishes_status":["historical"]},"eia-state-nuclear-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a","title":"EIA Electric Power Monthly Table1.9.A utility scale facility net generation from nuclear energy by state and producer sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T05:25:41.261720+00:00","sha256":"ae346eb0bc5140a0fe5e38187badd5ce334c10c1468707f4af5147d56dacdb28","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nuclear-generation-aug2026.html","tier":"A","scope":"Complete51state/DC nuclear generation rows,not installedcapacity/plantinventory,customerdemand,deliveredpowerfuelmix or emissions. Preliminary2026/final2025;sourcepercentagecalculatedbeforerounding. Zero generation notabsenceofnuclearcapacity.","establishes_status":["historical"]},"eia-state-nuclear-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b","title":"EIA Electric Power Monthly Table1.9.B utility scale facility net generation from nuclear energy by state and producer sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T05:55:38.727441+00:00","sha256":"159560c5a77a375a4c2f3ebb7aab21c2ecfb013d23fa7baa0781eddf7e642471","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nuclear-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulativeJanthroughAug nuclear netgeneration rows,notmonthlyAugust/annualtotals,capacity/plantinventory or data-center deliveredfuelmix. Preliminary2026/final2025;publishedpercentagebeforerounding,zero notplantabsence.","establishes_status":["historical"]},"eia-state-coal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a","title":"EIA Electric Power Monthly Table1.4.A August2026/2025 utility scale facility net generation from coal by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:26:07.500962+00:00","sha256":"fc35026730bc070c8b0094d7394bd496c2fed4e09aa42688371d0ca1a1246495","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-coal-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC coal netgeneration rows;monthlyAugust notYTD;notcoalreceipts/fuelconsumption/capacity/plantinventory/emissions ordata-centerfuelmix. Preliminary2026/final2025,sourceNM/--percentagesnotzero.","establishes_status":["historical"]},"eia-state-coal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b","title":"EIA Electric Power Monthly Table1.4.B cumulativeJanuarythroughAugust2026/2025 utility scale facility net generation from coal by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:26:07.859775+00:00","sha256":"69316d2a9768e8ff9285da375c444eb7b187c4caefbda6d753bf9cbbc5dca9d3","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-coal-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC coal netgeneration rows;cumulativeYTD notmonthly/annual;notcoalreceipts/fuelconsumption/capacity/plantinventory/emissions ordata-centerfuelmix. Preliminary2026/final2025,sourceNM/--percentagesnotzero.","establishes_status":["historical"]},"eia-state-wind-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a","title":"EIA Electric Power Monthly Table1.14.A August2026/2025 utility scale facility net generation from wind by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:56:02.206920+00:00","sha256":"e58a6e19a58949e89669f6a56b58918418a443c305a4ac8bcc1d37417abcb437","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-wind-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC wind netgeneration rows;monthAugust notYTD;notcapacity/turbineinventory,renewableprocurement/hourlymatching,deliveredpower oravoidedemissions. Preliminary2026/final2025;NM/--retained,zero notcapacityabsence.","establishes_status":["historical"]},"eia-state-wind-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b","title":"EIA Electric Power Monthly Table1.14.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from wind by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:56:02.511460+00:00","sha256":"ea80ce88a0eb5af674faa0e89b52b7a03a1af2fe547f6750160c5c895281a03c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-wind-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC wind netgeneration rows;cumulativeYTD notmonth/annual;notcapacity/turbineinventory,renewableprocurement/hourlymatching,deliveredpower oravoidedemissions. Preliminary2026/final2025;NM/--retained,zero notcapacityabsence.","establishes_status":["historical"]},"eia-state-hydro-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a","title":"EIA Electric Power Monthly Table1.10.A August2026/2025 utility scale facility net generation from conventional hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:30:06.432055+00:00","sha256":"9e12df2bd7d252a9fa01d46fc8457ba8ad61319a7eab99f9314316b04c3b3589","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-hydro-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC conventionalhydro generation rows,excludingpumpedstorage;monthAugust notYTD;notreservoirlevels/wateravailability/withdrawal,capacity/daminventory,deliveredpower/renewableprocurement oravoidedemissions. Preliminary2026/final2025;NM/--retained.","establishes_status":["historical"]},"eia-state-hydro-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b","title":"EIA Electric Power Monthly Table1.10.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from conventional hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:30:07.032975+00:00","sha256":"4b7f8c5f24097203262594ab1a5943139918233f3fe99b4eec3c6c40f7ec4565","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-hydro-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC conventionalhydro generation rows,excludingpumpedstorage;cumulativeYTD notmonth/annual;notreservoirlevels/wateravailability/withdrawal,capacity/daminventory,deliveredpower/renewableprocurement oravoidedemissions. Preliminary2026/final2025;NM/--retained.","establishes_status":["historical"]},"eia-state-pumped-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a","title":"EIA Electric Power Monthly Table1.12.A August2026/2025 utility scale facility net generation from pumped storage hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:55:51.178196+00:00","sha256":"f47cb6a724ad141bfef77dd1b93133635b60b03ef6f373012aeee441f3fd250b","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-pumped-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC pumpedstorage netgeneration rows,separatefromconventionalhydro;month notYTD;negativevalueskept,notstoragecapacity/grossdischargedenergy/efficiency/waterwithdrawal ordatacenterpower. Preliminary2026/final2025,undefinedpercentmarkersretained.","establishes_status":["historical"]},"eia-state-pumped-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b","title":"EIA Electric Power Monthly Table1.12.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from pumped storage hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:55:51.535361+00:00","sha256":"7adac72989762f18b744568df6258ad9a8ef9c26b3e6b3acee36d31948f85ec2","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-pumped-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC pumpedstorage netgeneration rows,separatefromconventionalhydro;YTD notmonth/annual;negativevalueskept,notstoragecapacity/grossdischargedenergy/efficiency/waterwithdrawal ordatacenterpower. Preliminary2026/final2025,undefinedpercentmarkersretained.","establishes_status":["historical"]},"eia-state-solar-pv-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a","title":"EIA Electric Power Monthly Table1.17.A solar photovoltaic state net generation: utility scale and estimated small scale, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:26:06.274803+00:00","sha256":"527d6c8a60272658c71f308929e0f68ee652fd8c922947fe574963371e6f2b56","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-pv-generation-month-aug2026.html","tier":"A","scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","establishes_status":["historical"]},"eia-state-solar-pv-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b","title":"EIA Electric Power Monthly Table1.17.B solar photovoltaic state net generation: utility scale and estimated small scale, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:26:06.616834+00:00","sha256":"6f6fce2d81012f27d144838cc41d611e8d7e5b75c472289c064f1934cdf6be4c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-pv-generation-ytd-aug2026.html","tier":"A","scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","establishes_status":["historical"]},"eia-state-solar-thermal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a","title":"EIA Electric Power Monthly Table1.18.A solar thermal utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:55:36.602781+00:00","sha256":"9741f9ca822bd33c5ed8414f2dc95dcfa451ac39975a3207e188104d9303f7aa","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-thermal-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","establishes_status":["historical"]},"eia-state-solar-thermal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b","title":"EIA Electric Power Monthly Table1.18.B solar thermal utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:55:36.899676+00:00","sha256":"522fb2bee7cace3160be662d153680672e3d07c3494ac1882b71561f7514e22e","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-thermal-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","establishes_status":["historical"]},"eia-state-other-energy-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a","title":"EIA Electric Power Monthly Table1.13.A Other Energy Sources utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:25:44.215156+00:00","sha256":"b8589b23d096be4e03c11bedffc6d7af0bed5fa2ec64fa89e2f21624909cc7b6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Capture filename initially called geothermal in error; exact source title is Other Energy Sources. Filename is not evidence of fuel identity.","establishes_status":["historical"]},"eia-state-other-energy-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b","title":"EIA Electric Power Monthly Table1.13.B Other Energy Sources utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:25:44.437082+00:00","sha256":"cc0d7f4a0db49596101f43d4cd1103a6b80dcb399ed620f52157ffa31e28269c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Capture filename initially called geothermal in error; exact source title is Other Energy Sources. Filename is not evidence of fuel identity.","establishes_status":["historical"]},"eia-state-geothermal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a","title":"EIA Electric Power Monthly Table1.16.A Geothermal utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:55:37.792695+00:00","sha256":"430765fda25b13841593833228c799f768849344f4e4645d5c29783c76b3a310","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-actual-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","establishes_status":["historical"]},"eia-state-geothermal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b","title":"EIA Electric Power Monthly Table1.16.B Geothermal utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:55:38.021096+00:00","sha256":"02b888bc082f02e9a803e89552c180df37b090ac4bb92376bcc69f668a9bc109","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-actual-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","establishes_status":["historical"]},"eia-state-biomass-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a","title":"EIA Electric Power Monthly Table1.15.A Biomass utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:25:40.960261+00:00","sha256":"1f5e6b6e275bacc2d88c3d2692efda69e80284e71dddfd1e5caca84dffae92d4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-biomass-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","establishes_status":["historical"]},"eia-state-biomass-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b","title":"EIA Electric Power Monthly Table1.15.B Biomass utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:25:41.153412+00:00","sha256":"f3f3f854afa04798193429529b13e82f74000ac95e7d1a2a12aa51662437eca2","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-biomass-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","establishes_status":["historical"]},"eia-state-petroleum-liquids-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a","title":"EIA Electric Power Monthly Table1.5.A Petroleum Liquids utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:44.484512+00:00","sha256":"a23eb87738ca68822004a0426eed58a8ea1b0ee0f5ae96170253a31cbd18942f","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-liquids-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-liquids-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b","title":"EIA Electric Power Monthly Table1.5.B Petroleum Liquids utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:44.728254+00:00","sha256":"5ee9f2be2884f3e256ce2a3e02c8270753ab2e5d7ab0507d54250638c00487a8","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-liquids-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-coke-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a","title":"EIA Electric Power Monthly Table1.6.A Petroleum Coke utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:45.070566+00:00","sha256":"64935012da6e62146d74425ac1c830a9c62e840901393f03f3ad363dad2f9d17","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-coke-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-coke-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b","title":"EIA Electric Power Monthly Table1.6.B Petroleum Coke utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:45.279055+00:00","sha256":"1e09b99b06270a93a8293578b1e47c67dcdddf03959878851a1ac453f2202f80","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-coke-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-other-fossil-gas-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a","title":"EIA Electric Power Monthly Table1.8.A Other Fossil Gas utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:25:42.932701+00:00","sha256":"ebc1838c0d9e26e1884695c95399f2793f7fa08d6de5762f9ab8c0a5daebda9c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-other-gases-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Index uses Other Gases; original table title specifies Other Fossil Gas, retained here without equating Natural Gas.","establishes_status":["historical"]},"eia-state-other-fossil-gas-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b","title":"EIA Electric Power Monthly Table1.8.B Other Fossil Gas utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:25:43.279403+00:00","sha256":"b273bf54a3b99a153e08448d69e5e56cf5496cc792125e6a73f9e4e915a27104","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-other-gases-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Index uses Other Gases; original table title specifies Other Fossil Gas, retained here without equating Natural Gas.","establishes_status":["historical"]},"eia-state-nonhydro-renewables-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a","title":"EIA Electric Power Monthly Table1.11.A Renewable Sources Excluding Hydroelectric utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:55:43.156505+00:00","sha256":"d98e7e79804a0ccd737e9ac399f64c210a141f7df3200368f3a2b0a6433f6f00","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nonhydro-renewables-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","establishes_status":["historical"]},"eia-state-nonhydro-renewables-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b","title":"EIA Electric Power Monthly Table1.11.B Renewable Sources Excluding Hydroelectric utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:55:43.340447+00:00","sha256":"3d4249d5d441323d0849b1fdb08845cb45ee2587311b84364aa75d52f0dce665","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nonhydro-renewables-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","establishes_status":["historical"]},"eia-state-retail-sales-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a","title":"EIA Electric Power Monthly Table5.4.A Sales of Electricity to Ultimate Customers by End-Use Sector,by State, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:01:02.155248+00:00","sha256":"f289ad1eb2b68b07f015bb846f8c19135fbbe9ff4a5aabead8de9796c354212f","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-sales-month-aug2026.html","tier":"A","scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","establishes_status":["historical"]},"eia-state-retail-sales-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b","title":"EIA Electric Power Monthly Table5.4.B Sales of Electricity to Ultimate Customers by End-Use Sector,by State, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:01:02.440305+00:00","sha256":"836b3186730666bcf3a4adcbe5fd29931786fffc3cd5663f22dfde4ee2389243","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-sales-ytd-aug2026.html","tier":"A","scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","establishes_status":["historical"]},"eia-state-retail-revenue-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a","title":"EIA Electric Power Monthly Table5.5.A Revenue from Sales of Electricity to Ultimate Customers by End-Use Sector,by State, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:30:48.417748+00:00","sha256":"67b465253fdf956455755bd3ca342eeee983672af9cf883ec12fc3bdacd8eba6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-revenue-month-aug2026.html","tier":"A","scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","establishes_status":["historical"]},"eia-state-retail-revenue-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b","title":"EIA Electric Power Monthly Table5.5.B Revenue from Sales of Electricity to Ultimate Customers by End-Use Sector,by State, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:30:49.025316+00:00","sha256":"f3630914ac0a13920af8b7afad9e321630c90d87731b7ca06b278312db06273b","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-revenue-ytd-aug2026.html","tier":"A","scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","establishes_status":["historical"]},"eia-state-retail-customers-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08","title":"EIA Electric Power Monthly Table5.8 Number of Ultimate Customers Served by Sector by State:August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T17:01:56.921729+00:00","sha256":"94daef9ec234f1151524adbc5a5a221aeaccc71a48d1c117663f50a52a89d2b7","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-customers-aug2026.html","tier":"A","scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","establishes_status":["historical"]},"eia-state-utility-capacity-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a","title":"EIA Electric Power Monthly Table6.2.A Net Summer Capacity of Utility Scale Units by Technology and State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:03:55.269501+00:00","sha256":"489bfa1db54aa8bebb976a2f1f0e9e6f85076837cdb16b785ce7727484a41ef4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-aug2026.html","tier":"A","scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","establishes_status":["historical"]},"eia-state-utility-capacity-b-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b","title":"EIA Electric Power Monthly Table6.2.B Net Summer Capacity Using Primarily Renewable Energy Sources and by State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:33:44.899891+00:00","sha256":"20f576441d75cc9a13b4fecd53baea7b9c348ce5a405db26a130ba9d907cd6e5","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-b-aug2026.html","tier":"A","scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","establishes_status":["historical"]},"eia-state-utility-capacity-c-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c","title":"EIA Electric Power Monthly Table6.2.C Net Summer Capacity of Utility Scale Units Using Primarily Fossil Fuels and by State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:33:45.187621+00:00","sha256":"c02ce3ee446a70f915c4a47e07e680b6b048cf2b1d7e51cb055c1a6beeab78a7","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-c-aug2026.html","tier":"A","scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","establishes_status":["historical"]},"eia-new-utility-units-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03","title":"EIA Electric Power Monthly Table6.3 New Utility Scale Generating Units by Operating Company,Plant,and Month,2026(January-August rows)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T19:04:07.797419+00:00","sha256":"051d48e2118d42562fccb54c91dc2e566cea1e24bf3dd2ccfff5094597e72f5f","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-new-utility-units-aug2026.html","tier":"A","scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","establishes_status":["historical"]},"eia-retired-utility-units-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_04","title":"EIA Electric Power Monthly Table6.4 Retired Utility Scale Generating Units by Operating Company,Plant,and Month,2026(January-August rows)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T19:33:44.657669+00:00","sha256":"082ac6feac8278666b21661a55d6546b8a3f45379be8727ffeed79c635c3f76a","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-retired-utility-units-aug2026.html","tier":"A","scope":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","establishes_status":["historical"]},"eia-planned-utility-additions-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05","title":"EIA Electric Power Monthly Table6.5 Planned U.S.Electric Generating Unit Additions(August2026 dataset)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T20:03:52.284370+00:00","sha256":"769a513425ec30e9bf6983fc4186d2f367e253fb6ed1072537ae44495c762912","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-planned-utility-additions-aug2026.html","tier":"A","scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","establishes_status":["historical"]},"eia-planned-utility-retirements-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06","title":"EIA Electric Power Monthly Table6.6 Planned U.S.Electric Generating Unit Retirements(August2026 dataset)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T20:33:47.123009+00:00","sha256":"41ddaac546510a68c479078c4a014eb477bf8d230f0a4a2c18e6596f4f2f1f71","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-planned-utility-retirements-aug2026.html","tier":"A","scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","establishes_status":["historical"]},"eia-epa2025-ieee-reliability-states":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.2 IEEE distribution reliability by state2025 and2024","published_on":"2026-10-21","checked_at":"2026-10-27T23:04:08.692385+00:00","sha256":"5709d427dc11697b35e5e04aa1a247483fe64906acac03437366504ec591003c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-reliability-ieee-20261027.html","tier":"A","establishes_status":["historical"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution."},"eia-epa2025-any-reliability-states":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.3 any-method distribution reliability by state2025 and2024","published_on":"2026-10-21","checked_at":"2026-10-27T23:33:56.041642+00:00","sha256":"40cf45b1731954b256ee1d6c79f2e29b126baf8012ba47794d6546dd6f239cb5","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-reliability-any-method-20261027.html","tier":"A","establishes_status":["historical"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins."},"eia-epa2025-saidi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.4 annual SAIDI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T00:04:10.386421+00:00","sha256":"52f619cdbec1026136cd0b2a0414cc6b551066272aebf2de3c6ddee772b1fc3d","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-saidi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution."},"eia-epa2025-saifi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.5 annual SAIFI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T00:34:19.009385+00:00","sha256":"6b41da37d3a8d7491eee3d7355e4625b385f362fb6c4796d0335b92f4d0b3ff4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-saifi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation."},"eia-epa2025-caidi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.6 annual CAIDI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T01:03:57.191681+00:00","sha256":"1b065b30dbde195e80079c282ba99411c62ead9d971e378dd03df0baae861675","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-caidi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution."}},"details":[{"id":"grid-va","html":"<article><h3>PJM regional forecast adjustment process</h3><p class=\"layer-scope\">PJM regional context. A state assignment is not a quantitative allocation to Virginia.</p><dl class=\"layer-fields\"><dt>Meaning</dt><dd>Forecast adjustments, no load interconnection queue<span class=\"layer-source\"><a href=\"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/\">PJM Interconnection</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Regional context for the PJM footprint, not a Virginia only total. Locator: Named request or forecast discussion.</p></dd><dt>Observation date</dt><dd>September 29, 2026<span class=\"layer-source\"><a href=\"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/\">PJM Interconnection</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">PJM publication date. Locator: Named request or forecast discussion.</p></dd><dt>Requested capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/\">PJM Interconnection</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No comparable regional queue total established in this review. Locator: Named request or forecast discussion.</p></dd></dl></article>"},{"id":"price-mi","html":"<article><h3>Michigan</h3><p class=\"layer-scope\">A two point comparison, not a complete time series. State average revenue per unit sold is not a household bill. No causal attribution to data centers.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>July 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential comparison month. Locator: Table heading.</p></dd><dt>Prior period</dt><dd>July 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Same month in the preceding year. Locator: Table heading.</p></dd><dt>Price</dt><dd>23.05 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Preliminary residential state average, cents per kWh. Locator: Residential July 2026, Michigan.</p></dd><dt>Prior price</dt><dd>20.55 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential state average for the comparison month. Locator: Residential July 2025, Michigan.</p></dd></dl></article>"},{"id":"tariff-mi-im-lp","html":"<article><h3>Indiana Michigan Power Michigan Tariff LP large loads</h3><p class=\"layer-scope\">Selected Michigan utility large load protections. A tariff approval is not a connection approval, actual operating load or a guarantee of realized rate savings.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>approved<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27533\">Michigan Public Service Commission</a>. Source: August 27, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Approval documented for this Michigan utility only. No individual customer service or savings outcome inferred. Locator: Final order and issued tariff.</p></dd><dt>Utility</dt><dd>Indiana Michigan Power Company in Michigan<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27533\">Michigan Public Service Commission</a>. Source: August 27, 2026. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf\">Indiana Michigan Power Company</a>. Source: September 18, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Michigan service territory only, not the utility service territory in another state. Locator: Tariff heading and final order.</p></dd><dt>Docket</dt><dd>U-21986<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27533\">Michigan Public Service Commission</a>. Source: August 27, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Michigan case, separate from Indiana IURC46097. Locator: Order page1.</p></dd><dt>Filed on</dt><dd>October 17, 2025<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27533\">Michigan Public Service Commission</a>. Source: August 27, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Original application date, not later compliance filing. Locator: Order page1.</p></dd><dt>Approved on</dt><dd>August 27, 2026<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27533\">Michigan Public Service Commission</a>. Source: August 27, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Final Commission decision date, not the proposal for decision. Locator: Order pages1 and44.</p></dd><dt>Tariff issued on</dt><dd>September 18, 2026<span class=\"layer-source\"><a href=\"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf\">Indiana Michigan Power Company</a>. Source: September 18, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Issue date on the reviewed LP sheets. Locator: Book PDF96 through100, sheet footers.</p></dd><dt>Effective on</dt><dd>September 18, 2026<span class=\"layer-source\"><a href=\"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf\">Indiana Michigan Power Company</a>. Source: September 18, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Service effect on the reviewed LP sheets, separate from August approval. Locator: Book PDF96 through100, sheet footers.</p></dd><dt>Threshold</dt><dd>Contract capacity at least 50 MW, or reasonably expected to grow above 50 MW at one or more aggregated premises, each at least 1 MW.<span class=\"layer-source\"><a href=\"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf\">Indiana Michigan Power Company</a>. Source: September 18, 2026. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27533\">Michigan Public Service Commission</a>. Source: August 27, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Company aggregation discretion considers common ownership, parent, local electrical infrastructure or control. This is not the Indiana 70 MW or 150 MW test. Locator: Sheet D39.00, PDF96; order page11.</p></dd><dt>Contract length</dt><dd>At least fifteen years after an optional load ramp of no more than five years. Total contract term includes the ramp plus the initial term.<span class=\"layer-source\"><a href=\"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf\">Indiana Michigan Power Company</a>. Source: September 18, 2026. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27533\">Michigan Public Service Commission</a>. Source: August 27, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The ramp is additional to fifteen years. Generic LP service clauses do not replace this large load term. Locator: Sheet D39.10, PDF97; order pages13 through15.</p></dd><dt>Renewal notice</dt><dd>Five year automatic extensions apply unless termination notice is given at least 60 months in advance. The sheet also uses 60 months notice for early termination, supplier departure or a capacity reduction above 10 percent, subject to exit fees.<span class=\"layer-source\"><a href=\"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf\">Indiana Michigan Power Company</a>. Source: September 18, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The separate 48 month notice for a limited capacity reduction is not the contract termination notice. Locator: Sheet D39.10, PDF97.</p></dd><dt>Capacity reduction</dt><dd>One reduction of no more than 10 percent without an exit fee is allowed after the first five years of the contract term, on at least 48 months written notice before the relevant PJM delivery year. Other reductions require Commission review.<span class=\"layer-source\"><a href=\"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf\">Indiana Michigan Power Company</a>. Source: September 18, 2026. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27533\">Michigan Public Service Commission</a>. Source: August 27, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The order requires review for other reductions. Neither a requested reduction nor notice establishes approval of an individual request. Locator: Sheet D39.10, PDF97; order page19.</p></dd><dt>Minimum bill</dt><dd>Monthly billing demand is at least 90 percent of the greater of contract capacity or the highest previously established monthly billing demand in the past eleven months. Base billing energy is contract kW times 65 percent times monthly billing hours.<span class=\"layer-source\"><a href=\"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf\">Indiana Michigan Power Company</a>. Source: September 18, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Demand and energy billing bases are separate. These are not promises of actual energy use, a total bill percentage or a minimum operating load factor. Locator: Sheet D39.20, PDF98.</p></dd><dt>Exit fees</dt><dd>The order bases the exit fee on full contract capacity and remaining minimum charges over the applicable contract term, including the ramp and applicable extensions. It does not permit an automatic reduction of exit capacity by the separate discretionary reduction allowance.<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27533\">Michigan Public Service Commission</a>. Source: August 27, 2026. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf\">Indiana Michigan Power Company</a>. Source: September 18, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Reduced or mitigated exit fees require Commission review and approval, which may be ex parte when the Commission finds that appropriate. No customer dollar fee is calculated. Locator: Order pages22 through24; sheets D39.10 and D39.20, PDF97 and98.</p></dd><dt>Collateral</dt><dd>Default collateral is 50 percent of the exit fee, due within ten business days of signing, recalculated annually or on material changes. Cash or a qualifying irrevocable bank letter of credit are the default forms.<span class=\"layer-source\"><a href=\"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf\">Indiana Michigan Power Company</a>. Source: September 18, 2026. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27533\">Michigan Public Service Commission</a>. Source: August 27, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Different amounts or forms require Commission review and approval. Bank rating requirements do not themselves establish a customer waiver or sufficient parent guarantee. Locator: Sheet D39.40, PDF100; order pages26 and42 through43.</p></dd><dt>Application costs</dt><dd>The final order adopts an upfront $100,000 administrative amount reconciled against actual costs of all relevant proposal studies, instead of the proposed tiered fee. The issued sheet also calls its project proposal fee nonrefundable.<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27533\">Michigan Public Service Commission</a>. Source: August 27, 2026. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf\">Indiana Michigan Power Company</a>. Source: September 18, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The amount is not a cap, collateral amount or observed payment. No individual refund or legal resolution of wording is inferred. Locator: Order page28; sheet D39.30, PDF99.</p></dd><dt>Temporary service</dt><dd>If requested temporary facilities will have no continuing customer or system use after permanent service begins, the customer must pay the stated full construction, removal and remedial costs.<span class=\"layer-source\"><a href=\"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf\">Indiana Michigan Power Company</a>. Source: September 18, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Conditional temporary service requirement, not proof of a project request, energization or observed costs. Locator: Sheet D39.20, PDF98.</p></dd><dt>Customer review</dt><dd>Before each large load customer takes service, I&amp;M must make a separate ex parte filing demonstrating tariff compliance and protection of other customers from that load cost. A future general rate case must present a standalone large load rate and six cost allocation designs.<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27533\">Michigan Public Service Commission</a>. Source: August 27, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Directions for further review are not completed customer approvals or approval of a future standalone rate. Locator: Order page42 B throughE.</p></dd><dt>Source notes</dt><dd>The captured book filename and index identify book19, while its new LP sheets retain book18 headers. Reviewed sheets expressly cite U-21986 and September 18, 2026 effect.<span class=\"layer-source\"><a href=\"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf\">Indiana Michigan Power Company</a>. Source: September 18, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Exact source identity retained. No unsupported renumbering, legal correction or later tariff amendment is assumed. Locator: Book index and LP sheet headings and footers.</p></dd><dt>Individual outcomes</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27533\">Michigan Public Service Commission</a>. Source: August 27, 2026. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Michigan/IM_MI_TB_Bk_19_2026_09_18.pdf\">Indiana Michigan Power Company</a>. Source: September 18, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual agreement approval, collateral decision, actual load or realized bill effect is established by this review. Later appeals or stays are not reviewed. Locator: Review boundary.</p></dd></dl></article>"},{"id":"tariff-mi-consumers-gpd","html":"<article><h3>Consumers Energy Michigan Rate GPD large loads</h3><p class=\"layer-scope\">Selected Michigan utility large load protections. A tariff approval is not a connection approval, actual operating load or a guarantee of realized rate savings.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>approved<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293\">Michigan Public Service Commission</a>. Source: November 6, 2025. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Approval documented for this Michigan utility only. No individual customer service or savings outcome inferred. Locator: Final order and issued tariff.</p></dd><dt>Utility</dt><dd>Consumers Energy Company<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293\">Michigan Public Service Commission</a>. Source: November 6, 2025. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/consumer/rate-books/electric/consumers/Consumers_14_current.pdf?rev=b1cbb572f3294f91ac6fa56a1aa0a40a&amp;hash=656847480CFD7FFBC929E34152B64816\">Michigan Public Service Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Michigan service territory only, not the utility service territory in another state. Locator: Tariff heading and final order.</p></dd><dt>Docket</dt><dd>U-21859<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293\">Michigan Public Service Commission</a>. Source: November 6, 2025. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Michigan large load tariff case. Locator: Order page1.</p></dd><dt>Filed on</dt><dd>February 7, 2025<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293\">Michigan Public Service Commission</a>. Source: November 6, 2025. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Original application date. Locator: Order page1.</p></dd><dt>Approved on</dt><dd>November 6, 2025<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293\">Michigan Public Service Commission</a>. Source: November 6, 2025. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Final Commission decision date. Locator: Order pages1 and126.</p></dd><dt>Effective on</dt><dd>November 7, 2025<span class=\"layer-source\"><a href=\"https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001ZGWSKAA5\">Michigan Public Service Commission</a>. Source: December 29, 2025. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/consumer/rate-books/electric/consumers/Consumers_14_current.pdf?rev=b1cbb572f3294f91ac6fa56a1aa0a40a&amp;hash=656847480CFD7FFBC929E34152B64816\">Michigan Public Service Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Service effect expressly stated in issued sheets. It precedes their issue and acceptance dates. Locator: Compliance PDF8 and9; current book PDF214 and215.</p></dd><dt>Tariff issued on</dt><dd>December 3, 2025<span class=\"layer-source\"><a href=\"https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001ZGWSKAA5\">Michigan Public Service Commission</a>. Source: December 29, 2025. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Issue date of the reviewed large load compliance sheets. Locator: Compliance PDF8 and9.</p></dd><dt>Staff accepted on</dt><dd>December 23, 2025<span class=\"layer-source\"><a href=\"https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001ZGWSKAA5\">Michigan Public Service Commission</a>. Source: December 29, 2025. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Staff acceptance stamp, not approval order or service effect date. Locator: Compliance PDF8 and9.</p></dd><dt>Compliance filed on</dt><dd>December 29, 2025<span class=\"layer-source\"><a href=\"https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001ZGWSKAA5\">Michigan Public Service Commission</a>. Source: December 29, 2025. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Cover filing date of the accepted tariff sheets. Locator: Compliance PDF1.</p></dd><dt>Rehearing denied on</dt><dd>February 19, 2026<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27373\">Michigan Public Service Commission</a>. Source: February 19, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The Attorney General rehearing petition was denied. This does not establish a later judicial appeal outcome. Locator: Rehearing order page20.</p></dd><dt>Threshold</dt><dd>At least 100 MW at one site, or same owner sites each at least 20 MW and totaling at least 100 MW within the utility service territory.<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293\">Michigan Public Service Commission</a>. Source: November 6, 2025. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/consumer/rate-books/electric/consumers/Consumers_14_current.pdf?rev=b1cbb572f3294f91ac6fa56a1aa0a40a&amp;hash=656847480CFD7FFBC929E34152B64816\">Michigan Public Service Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">End use neutral. The final order rejects a load factor eligibility test. No statewide rule for other Michigan utilities inferred. Locator: Order pages106 and107; sheet D67.40, current book PDF214.</p></dd><dt>Contract length</dt><dd>At least fifteen years after a negotiated ramp of no more than five years. Five year automatic extensions apply unless four years advance written termination notice is given.<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293\">Michigan Public Service Commission</a>. Source: November 6, 2025. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/consumer/rate-books/electric/consumers/Consumers_14_current.pdf?rev=b1cbb572f3294f91ac6fa56a1aa0a40a&amp;hash=656847480CFD7FFBC929E34152B64816\">Michigan Public Service Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The ramp is additional to fifteen years. The generic one year GPD term does not replace the large load provision. Locator: Order pages107 and108; sheets D67.40 and D69.00, current book PDF214 and217.</p></dd><dt>Minimum bill</dt><dd>The final order requires an 80 percent minimum billing demand after the ramp, applied to maximum and peak billing demand including transmission charges.<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293\">Michigan Public Service Commission</a>. Source: November 6, 2025. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/consumer/rate-books/electric/consumers/Consumers_14_current.pdf?rev=b1cbb572f3294f91ac6fa56a1aa0a40a&amp;hash=656847480CFD7FFBC929E34152B64816\">Michigan Public Service Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Demand floor, not 80 percent of actual energy or the entire bill. No minimum operating load factor was adopted. Locator: Order pages108 and109; sheet D67.40, current book PDF214.</p></dd><dt>Capacity reduction</dt><dd>The utility may allow one reduction of no more than 10 percent on at least 48 months written notice when other customers are not harmed. Additional or larger reductions involve prorated exit charges or further Commission review.<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293\">Michigan Public Service Commission</a>. Source: November 6, 2025. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/consumer/rate-books/electric/consumers/Consumers_14_current.pdf?rev=b1cbb572f3294f91ac6fa56a1aa0a40a&amp;hash=656847480CFD7FFBC929E34152B64816\">Michigan Public Service Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">A discretionary reduction is not automatic. The order retains review for other reductions and alternative treatment without exit charges. Locator: Order page111; sheet D67.50, current book PDF215.</p></dd><dt>Exit fees</dt><dd>The order uses minimum billing demand and system access charge for the months remaining in the contract, including the ramp and extensions. It requires reasonable mitigation and rejects a five year cap. The issued sheet retains the wording minimum billing demand plus system access charge.<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293\">Michigan Public Service Commission</a>. Source: November 6, 2025. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/consumer/rate-books/electric/consumers/Consumers_14_current.pdf?rev=b1cbb572f3294f91ac6fa56a1aa0a40a&amp;hash=656847480CFD7FFBC929E34152B64816\">Michigan Public Service Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The source wording is retained without silently converting a demand measure into dollars. No individual dollar fee or guaranteed waiver is calculated. Locator: Order pages109 through111; sheet D67.50, current book PDF215.</p></dd><dt>Collateral</dt><dd>Default collateral is half the exit fee, recalculated annually or on material changes. Cash earning interest and qualifying bank letters of credit are default forms; different amounts or forms require Commission approval.<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293\">Michigan Public Service Commission</a>. Source: November 6, 2025. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/consumer/rate-books/electric/consumers/Consumers_14_current.pdf?rev=b1cbb572f3294f91ac6fa56a1aa0a40a&amp;hash=656847480CFD7FFBC929E34152B64816\">Michigan Public Service Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">A parent guarantee is not a default exemption. Customer creditworthiness and alternatives are reviewed individually. Locator: Order pages112 through114; sheet D67.40, current book PDF214.</p></dd><dt>Application costs</dt><dd>An upfront $100,000 project proposal amount is reconciled to actual costs without a cap. The order allows refunds or additional payments after reconciliation, while the issued fee clause also labels the fee nonrefundable.<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293\">Michigan Public Service Commission</a>. Source: November 6, 2025. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/consumer/rate-books/electric/consumers/Consumers_14_current.pdf?rev=b1cbb572f3294f91ac6fa56a1aa0a40a&amp;hash=656847480CFD7FFBC929E34152B64816\">Michigan Public Service Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Both source statements are retained. No individual refund, payment or legal resolution of wording is inferred. Locator: Order pages123 and124; sheet D67.50, current book PDF215.</p></dd><dt>Customer review</dt><dd>Before a large load customer takes service, Consumers must file a separate demonstration of tariff compliance and full cost coverage by that customer. The Commission endeavors to decide these filings within 90 days.<span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293\">Michigan Public Service Commission</a>. Source: November 6, 2025. Checked: October 23, 2026.</span> <p class=\"layer-scope\">A review objective is not automatic approval after 90 days. No completed individual filing or realized ratepayer savings is established. Locator: Order pages117 and125.</p></dd><dt>Individual outcomes</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27293\">Michigan Public Service Commission</a>. Source: November 6, 2025. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/consumer/rate-books/electric/consumers/Consumers_14_current.pdf?rev=b1cbb572f3294f91ac6fa56a1aa0a40a&amp;hash=656847480CFD7FFBC929E34152B64816\">Michigan Public Service Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27373\">Michigan Public Service Commission</a>. Source: February 19, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual agreement, actual load, customer dollar benefit or later court outcome is established in these sources. Locator: Review boundary.</p></dd></dl></article>"},{"id":"price-mi-202608","html":"<article><h3>Michigan</h3><p class=\"layer-scope\">Captured August residential comparison. The earlier July comparison remains in the source history. State average revenue per unit sold is not a household bill or evidence of a data center effect.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential comparison month. Locator: Table_5_06_A!B4:C4.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Same month in the preceding year. Locator: Table_5_06_A!B4:C4.</p></dd><dt>Price</dt><dd>22.99 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Preliminary August2026 residential state average, cents per kWh. Locator: Table_5_06_A!B19:C19.</p></dd><dt>Prior price</dt><dd>20.73 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Final August2025 residential state average, cents per kWh. Locator: Table_5_06_A!B19:C19.</p></dd><dt>Source context</dt><dd>The August table and public spreadsheet agree. The surrounding report header still identifies July and its older release date. The exact publication day of these August values is not established here.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The scheduled next release day is not treated as proof of actual publication. This review uses the periods stated in the two data tables and preserves the earlier July capture. Locator: HTML table heading and report header; spreadsheet rows1 through4 and67.</p></dd></dl></article>"},{"id":"grid-pjm-manual19-procedure-20260630","html":"<article><h3>PJM adopted forecast adjustment review procedure</h3><p class=\"layer-scope\">Regional procedure shown in the PJM state panels for context. Manual approval, utility submissions, final forecasts and actual load remain distinct.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>approved<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Approval concerns this manual revision only. Locator: Printed page 3.</p></dd><dt>Process basis</dt><dd>Forecast review procedure<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Regional process documentation, excluded from utility tariff status. Locator: Attachment B printed pages 26 through 32.</p></dd><dt>Revision</dt><dd>Revision 39<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Captured current clean version, separate from the earlier change presentation. Locator: Cover and printed page 4.</p></dd><dt>Approved on</dt><dd>June 29, 2026<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Manual approval day. Locator: Printed page 3.</p></dd><dt>Effective on</dt><dd>June 30, 2026<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Manual effect, separate from approval and original posting. Locator: Cover and printed page 3.</p></dd><dt>Threshold wording</dt><dd>Solicitation covers changes of at least 50 MW, positive or negative. Verification instead says category totals greater than 50 MW.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Both threshold descriptions retained; no silent resolution for exactly 50 MW. Locator: Printed pages 26 and 29.</p></dd><dt>Regulator review</dt><dd>Submitters must offer each relevant state regulator review before submission. Participation is voluntary, and submissions need not follow regulator feedback if both perspectives are provided.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Review opportunity and feedback are distinct from approval of forecasts or connections. Locator: Printed page 28.</p></dd><dt>Firm classification</dt><dd>Firm status requires a qualifying service, construction or supply commitment plus financial support. Nonfirm portions may enter forecast periods outside the capacity auction horizon.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Forecast classification only. Firm portions can still be reduced for growth constraints. Locator: Printed pages 28 through 30.</p></dd><dt>Duplicate requests</dt><dd>Customers must be asked about potentially duplicated requests lacking service or construction commitments. Silence counts toward duplication. Missing site, location and MW details can remove such requests; discounting can reflect project milestones.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No actual duplicate count or adjustment result is established. Locator: Printed pages 29 and 30.</p></dd><dt>Final determination</dt><dd>PJM reviews assumptions, regulator feedback and independent forecast uncertainty before determining the final adjustment. A submitter can retain its preliminary amount if the calculated final is higher.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">A submitted number or firm classification does not guarantee unchanged final inclusion. Locator: Printed pages 30 and 31.</p></dd><dt>Timing</dt><dd>The manual schedules final adjustments for November or December and independent forecast review for October or November.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">General schedule, not proof of a completed presentation or final 2027 forecast. Locator: Printed pages 26 and 30.</p></dd><dt>Utility tariff</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual utility tariff approval is established by this manual. Locator: Procedure review boundary.</p></dd><dt>Actual load</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No measured actual load quantity is established by this procedure. Locator: Procedure review boundary.</p></dd><dt>Approved capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No connection capacity approval is established. Locator: Procedure review boundary.</p></dd><dt>Individual approvals</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual customer decision is established. Locator: Procedure review boundary.</p></dd><dt>Requested capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No comparable regional queue total is established. Locator: Procedure review boundary.</p></dd><dt>Pjm final forecast</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No final amount for the current submitted forecast is established. Locator: Procedure review boundary.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No facility identity join is made. Locator: Procedure review boundary.</p></dd></dl></article>"},{"id":"grid-miso-epr-preliminary2026-20260130","html":"<article><h3>MISO dated preliminary regional large load submissions</h3><p class=\"layer-scope\">One historical regional EPR request chart repeated across partial footprint states. Requests are not load or approved projects.</p><dl class=\"layer-fields\"><dt>Miso epr history basis</dt><dd>Dated preliminary member submissions for MTEP Expedited Project Review.<span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Regional requests, not approved connections, installed load, a current October queue or data center only totals. Locator: Slide6 right chart.</p></dd><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Historical source snapshot, not operating status of requested projects. Locator: Slide1 and6.</p></dd><dt>Workshop on</dt><dd>January 30, 2026<span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Printed workshop day, not an inferred exact publication day or queue observation date. Locator: Slide1.</p></dd><dt>Snapshot period</dt><dd>Preliminary2026<span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Chart label only; no exact observation day inferred from workshop or checked date. Locator: Slide6 right axis.</p></dd><dt>Requested capacity</dt><dd>13.10 GW<span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Preliminary2026 EPR member submissions before studies and approvals; requests, not load. Locator: Slide6 right chart2026bar.</p></dd><dt>Earlier chart values</dt><dd>2020:0.1 GW;2021:0.2 GW;2022:0.3 GW;2023:0.9 GW;2024:2.7 GW;2025:9.7 GW.<span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Separate annual labels retained. No cumulative queue sum, completion total or data center only capacity inferred. Locator: Slide6 right chart.</p></dd><dt>Approval boundary</dt><dd>Footnote identifies preliminary MTEP data from MISO member submissions prior to studies and approvals.<span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No approved capacity or final interconnection agreements inferred. Locator: Slide6 footnote.</p></dd><dt>Forecast difference</dt><dd>Left chart is a separate OMS MISO survey forecast with122 GW actual2024 summer peak and future survey lines and forecast range.<span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not the13.1 GW EPR request basis. No arithmetic combination of forecast, actual summer peak and EPR request amounts. Locator: Slide6 left chart.</p></dd><dt>Region</dt><dd>MISO region includes all or portions of Arkansas, Illinois, Indiana, Iowa, Kentucky, Louisiana, Michigan, Minnesota, Mississippi, Missouri, Montana, North Dakota, South Dakota, Texas and Wisconsin, plus Manitoba.<span class=\"layer-source\"><a href=\"https://www.atcllc.com/\">American Transmission Company</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.misoenergy.org/meet-miso/about-miso/\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">State pages repeat one regional total, not each state share. Does not imply whole state service or exclusive territory. Locator: ATC member description; MISO introduction.</p></dd><dt>Source review boundary</dt><dd>Only workshop cover and slide6 chart frames inspected; selected extracted text on3,7,9and37 read.<span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No full deck review or admission of unreviewed slides, later policy status or current2026October queue. Locator: Review boundary.</p></dd><dt>Current requested capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No current queue, deduplicated total, state share, project actual or identity join established. Locator: Scope boundary.</p></dd><dt>Approved capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No current queue, deduplicated total, state share, project actual or identity join established. Locator: Scope boundary.</p></dd><dt>Actual load</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No current queue, deduplicated total, state share, project actual or identity join established. Locator: Scope boundary.</p></dd><dt>Actual energy</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No current queue, deduplicated total, state share, project actual or identity join established. Locator: Scope boundary.</p></dd><dt>Data center only capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No current queue, deduplicated total, state share, project actual or identity join established. Locator: Scope boundary.</p></dd><dt>Deduplicated capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No current queue, deduplicated total, state share, project actual or identity join established. Locator: Scope boundary.</p></dd><dt>Individual project approval</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No current queue, deduplicated total, state share, project actual or identity join established. Locator: Scope boundary.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://cdn.misoenergy.org/20260130%20Large%20Load%20Workshop%20Presentation738349.pdf\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No current queue, deduplicated total, state share, project actual or identity join established. Locator: Scope boundary.</p></dd><dt>Miso operational proposal scope</dt><dd>MISO introduction describes August27,2026 working group review of proposed BPM032 and BPM025 language, a forecast incentive proposal and a forecasting submission system. Feedback invitation is not evidence of final adoption or current enforceable requirements.<span class=\"layer-source\"><a href=\"https://www.misoenergy.org/engage/stakeholder-feedback/2026/llwg-large-load-operational-forecast-requirements-llwg-2026-4a-20260827/\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Dated proposal and source attribution only; no individual site association. Locator: Agency introduction before Submitted Feedback.</p></dd><dt>Miso feedback attribution boundary</dt><dd>Submitted stakeholder comments are attributed recommendations, not MISO findings or adopted settlement rules. This review does not establish final incentive amounts, penalties, approved project connections or measured load.<span class=\"layer-source\"><a href=\"https://www.misoenergy.org/engage/stakeholder-feedback/2026/llwg-large-load-operational-forecast-requirements-llwg-2026-4a-20260827/\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Dated proposal and source attribution only; no individual site association. Locator: Agency introduction before Submitted Feedback.</p></dd><dt>Miso forecast request separation</dt><dd>Operational forecast proposal is separate from historical preliminary2026 EPR member submissions. Neither stakeholder feedback nor an operational forecast submission system updates the13.1GW historical request chart or establishes operating demand.<span class=\"layer-source\"><a href=\"https://www.misoenergy.org/engage/stakeholder-feedback/2026/llwg-large-load-operational-forecast-requirements-llwg-2026-4a-20260827/\">Midcontinent Independent System Operator</a>. Source: Publication date not stated. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Dated proposal and source attribution only; no individual site association. Locator: Agency introduction before Submitted Feedback.</p></dd></dl></article>"},{"id":"sector-price-mi-202608","html":"<article><h3>Michigan commercial and industrial electricity prices</h3><p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Current preliminary comparison month. Locator: Table5.6.A header.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Final same month previous year. Locator: Table5.6.A header.</p></dd><dt>Sector price boundary</dt><dd>State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table5.6.A notes, including row67.</p></dd><dt>Commercial price</dt><dd>16.21 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!D19; matching HTML state row.</p></dd><dt>Prior commercial price</dt><dd>14.85 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!E19; matching HTML state row.</p></dd><dt>Industrial price</dt><dd>8.99 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!F19; matching HTML state row.</p></dd><dt>Prior industrial price</dt><dd>8.40 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!G19; matching HTML state row.</p></dd><dt>All sector price</dt><dd>16.71 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Michigan All Sectors August comparison.</p></dd><dt>Prior all sector price</dt><dd>15.23 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Michigan All Sectors August comparison.</p></dd><dt>All sector boundary</dt><dd>All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A sector headers and notes.</p></dd><dt>Ytd commercial price</dt><dd>15.80 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!D19; matching HTML state row.</p></dd><dt>Prior ytd commercial price</dt><dd>14.55 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!E19; matching HTML state row.</p></dd><dt>Ytd industrial price</dt><dd>9.29 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!F19; matching HTML state row.</p></dd><dt>Prior ytd industrial price</dt><dd>8.55 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!G19; matching HTML state row.</p></dd><dt>Ytd all sector price</dt><dd>16.07 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!J19; matching HTML state row.</p></dd><dt>Prior ytd all sector price</dt><dd>14.77 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!K19; matching HTML state row.</p></dd><dt>Ytd period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Prior ytd period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Ytd price boundary</dt><dd>January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Retail sales basis</dt><dd>Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail sales period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Retail sales prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Retail sales residential</dt><dd>3419.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Michigan row,column1.</p></dd><dt>Retail sales residential prior</dt><dd>3420.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Michigan row,column2.</p></dd><dt>Retail sales commercial</dt><dd>3632.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Michigan row,column3.</p></dd><dt>Retail sales commercial prior</dt><dd>3531.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Michigan row,column4.</p></dd><dt>Retail sales industrial</dt><dd>2544.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Michigan row,column5.</p></dd><dt>Retail sales industrial prior</dt><dd>2560.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Michigan row,column6.</p></dd><dt>Retail sales transportation</dt><dd>0.45 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Michigan row,column7.</p></dd><dt>Retail sales transportation prior</dt><dd>0.48 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Michigan row,column8.</p></dd><dt>Retail sales all</dt><dd>9595.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Michigan row,column9.</p></dd><dt>Retail sales all prior</dt><dd>9511.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Michigan row,column10.</p></dd><dt>Ytd retail sales basis</dt><dd>Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Ytd retail sales period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Ytd retail sales prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Ytd retail sales residential</dt><dd>23896.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Michigan row,column1.</p></dd><dt>Ytd retail sales residential prior</dt><dd>24014.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Michigan row,column2.</p></dd><dt>Ytd retail sales commercial</dt><dd>25501.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Michigan row,column3.</p></dd><dt>Ytd retail sales commercial prior</dt><dd>25356.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Michigan row,column4.</p></dd><dt>Ytd retail sales industrial</dt><dd>18989.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Michigan row,column5.</p></dd><dt>Ytd retail sales industrial prior</dt><dd>19080.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Michigan row,column6.</p></dd><dt>Ytd retail sales transportation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Michigan row,column7.</p></dd><dt>Ytd retail sales transportation prior</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Michigan row,column8.</p></dd><dt>Ytd retail sales all</dt><dd>68390.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Michigan row,column9.</p></dd><dt>Ytd retail sales all prior</dt><dd>68453.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Michigan row,column10.</p></dd><dt>Retail revenue basis</dt><dd>Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail revenue period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Retail revenue prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Retail revenue residential</dt><dd>786.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Michigan row,column1.</p></dd><dt>Retail revenue residential prior</dt><dd>709.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Michigan row,column2.</p></dd><dt>Retail revenue commercial</dt><dd>589.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Michigan row,column3.</p></dd><dt>Retail revenue commercial prior</dt><dd>524.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Michigan row,column4.</p></dd><dt>Retail revenue industrial</dt><dd>229.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Michigan row,column5.</p></dd><dt>Retail revenue industrial prior</dt><dd>215.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Michigan row,column6.</p></dd><dt>Retail revenue transportation</dt><dd>0.08 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Michigan row,column7.</p></dd><dt>Retail revenue transportation prior</dt><dd>0.07 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Michigan row,column8.</p></dd><dt>Retail revenue all</dt><dd>1604.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Michigan row,column9.</p></dd><dt>Retail revenue all prior</dt><dd>1449.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Michigan row,column10.</p></dd><dt>Ytd retail revenue basis</dt><dd>Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Ytd retail revenue period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Ytd retail revenue prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Ytd retail revenue residential</dt><dd>5194.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Michigan row,column1.</p></dd><dt>Ytd retail revenue residential prior</dt><dd>4788.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Michigan row,column2.</p></dd><dt>Ytd retail revenue commercial</dt><dd>4029.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Michigan row,column3.</p></dd><dt>Ytd retail revenue commercial prior</dt><dd>3689.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Michigan row,column4.</p></dd><dt>Ytd retail revenue industrial</dt><dd>1764.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Michigan row,column5.</p></dd><dt>Ytd retail revenue industrial prior</dt><dd>1631.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Michigan row,column6.</p></dd><dt>Ytd retail revenue transportation</dt><dd>1.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Michigan row,column7.</p></dd><dt>Ytd retail revenue transportation prior</dt><dd>1.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Michigan row,column8.</p></dd><dt>Ytd retail revenue all</dt><dd>10987.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Michigan row,column9.</p></dd><dt>Ytd retail revenue all prior</dt><dd>10109.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Michigan row,column10.</p></dd><dt>Retail customers basis</dt><dd>Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail customers period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Column headers.</p></dd><dt>Retail customers prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Column headers.</p></dd><dt>Retail customers residential</dt><dd>4,559,955 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Michigan row,column1.</p></dd><dt>Retail customers residential prior</dt><dd>4,538,415 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Michigan row,column2.</p></dd><dt>Retail customers commercial</dt><dd>573,979 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Michigan row,column3.</p></dd><dt>Retail customers commercial prior</dt><dd>567,906 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Michigan row,column4.</p></dd><dt>Retail customers industrial</dt><dd>5,846 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Michigan row,column5.</p></dd><dt>Retail customers industrial prior</dt><dd>5,835 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Michigan row,column6.</p></dd><dt>Retail customers transportation</dt><dd>2 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Michigan row,column7.</p></dd><dt>Retail customers transportation prior</dt><dd>2 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Michigan row,column8.</p></dd><dt>Retail customers all</dt><dd>5,139,782 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Michigan row,column9.</p></dd><dt>Retail customers all prior</dt><dd>5,112,158 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Michigan row,column10.</p></dd></dl></article>"},{"id":"sector-price-mi-202607","html":"<article><h3>Michigan historical commercial and industrial electricity prices</h3><p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>July 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Prior period</dt><dd>July 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Sector price boundary</dt><dd>Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Commercial price</dt><dd>16.46 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Michigan commercial_price.</p></dd><dt>Prior commercial price</dt><dd>14.96 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Michigan prior_commercial_price.</p></dd><dt>Industrial price</dt><dd>9.81 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Michigan industrial_price.</p></dd><dt>Prior industrial price</dt><dd>8.94 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Michigan prior_industrial_price.</p></dd><dt>All sector price</dt><dd>17.43 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Michigan All Sectors July comparison.</p></dd><dt>Prior all sector price</dt><dd>15.70 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Michigan All Sectors July comparison.</p></dd><dt>All sector boundary</dt><dd>All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A sector headers and notes.</p></dd></dl></article>"},{"id":"generation-mi-202608","html":"<article><h3>Michigan utility scale generation</h3><p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A period and source notes.</p></dd><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table title, producer sector headers and source notes.</p></dd><dt>All generation</dt><dd>12064.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Michigan row; column1.</p></dd><dt>Prior all generation</dt><dd>11575.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Michigan row; column2.</p></dd><dt>Published generation change</dt><dd>4.20 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Michigan row; column3.</p></dd><dt>Utility generation</dt><dd>8834.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Michigan row; column4.</p></dd><dt>Prior utility generation</dt><dd>8663.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Michigan row; column5.</p></dd><dt>Ipp generation</dt><dd>3050.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Michigan row; column6.</p></dd><dt>Prior ipp generation</dt><dd>2742.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Michigan row; column7.</p></dd><dt>Commercial generation</dt><dd>67.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Michigan row; column8.</p></dd><dt>Prior commercial generation</dt><dd>66.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Michigan row; column9.</p></dd><dt>Industrial generation</dt><dd>113.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Michigan row; column10.</p></dd><dt>Prior industrial generation</dt><dd>106.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Michigan row; column11.</p></dd><dt>Gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Gas period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas all generation</dt><dd>5777.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Michigan row; column1.</p></dd><dt>Gas prior all generation</dt><dd>5532.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Michigan row; column2.</p></dd><dt>Gas published generation change</dt><dd>4.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Michigan row; column3.</p></dd><dt>Gas utility generation</dt><dd>3302.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Michigan row; column4.</p></dd><dt>Gas prior utility generation</dt><dd>3284.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Michigan row; column5.</p></dd><dt>Gas ipp generation</dt><dd>2373.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Michigan row; column6.</p></dd><dt>Gas prior ipp generation</dt><dd>2145.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Michigan row; column7.</p></dd><dt>Gas commercial generation</dt><dd>58.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Michigan row; column8.</p></dd><dt>Gas prior commercial generation</dt><dd>56.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Michigan row; column9.</p></dd><dt>Gas industrial generation</dt><dd>45.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Michigan row; column10.</p></dd><dt>Gas prior industrial generation</dt><dd>47.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Michigan row; column11.</p></dd><dt>Nuclear generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nuclear period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear all generation</dt><dd>2448.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Michigan row; column1.</p></dd><dt>Nuclear prior all generation</dt><dd>2440.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Michigan row; column2.</p></dd><dt>Nuclear published generation change</dt><dd>0.30 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Michigan row; column3.</p></dd><dt>Nuclear utility generation</dt><dd>2448.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Michigan row; column4.</p></dd><dt>Nuclear prior utility generation</dt><dd>2440.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Michigan row; column5.</p></dd><dt>Nuclear ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Michigan row; column6.</p></dd><dt>Nuclear prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Michigan row; column7.</p></dd><dt>Nuclear commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Michigan row; column8.</p></dd><dt>Nuclear prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Michigan row; column9.</p></dd><dt>Nuclear industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Michigan row; column10.</p></dd><dt>Nuclear prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Michigan row; column11.</p></dd><dt>Coal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Coal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal all generation</dt><dd>2518.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Michigan row; column1.</p></dd><dt>Coal prior all generation</dt><dd>2477.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Michigan row; column2.</p></dd><dt>Coal published generation change</dt><dd>1.70 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Michigan row; column3.</p></dd><dt>Coal utility generation</dt><dd>2503.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Michigan row; column4.</p></dd><dt>Coal prior utility generation</dt><dd>2457.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Michigan row; column5.</p></dd><dt>Coal ipp generation</dt><dd>15.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Michigan row; column6.</p></dd><dt>Coal prior ipp generation</dt><dd>20.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Michigan row; column7.</p></dd><dt>Coal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Michigan row; column8.</p></dd><dt>Coal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Michigan row; column9.</p></dd><dt>Coal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Michigan row; column10.</p></dd><dt>Coal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Michigan row; column11.</p></dd><dt>Wind generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Wind period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind all generation</dt><dd>442.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Michigan row; column1.</p></dd><dt>Wind prior all generation</dt><dd>431.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Michigan row; column2.</p></dd><dt>Wind published generation change</dt><dd>2.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Michigan row; column3.</p></dd><dt>Wind utility generation</dt><dd>262.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Michigan row; column4.</p></dd><dt>Wind prior utility generation</dt><dd>254.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Michigan row; column5.</p></dd><dt>Wind ipp generation</dt><dd>180.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Michigan row; column6.</p></dd><dt>Wind prior ipp generation</dt><dd>177.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Michigan row; column7.</p></dd><dt>Wind commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Michigan row; column8.</p></dd><dt>Wind prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Michigan row; column9.</p></dd><dt>Wind industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Michigan row; column10.</p></dd><dt>Wind prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Michigan row; column11.</p></dd><dt>Hydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Hydro period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro all generation</dt><dd>92.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Michigan row; column1.</p></dd><dt>Hydro prior all generation</dt><dd>79.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Michigan row; column2.</p></dd><dt>Hydro published generation change</dt><dd>15.70 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Michigan row; column3.</p></dd><dt>Hydro utility generation</dt><dd>87.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Michigan row; column4.</p></dd><dt>Hydro prior utility generation</dt><dd>75.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Michigan row; column5.</p></dd><dt>Hydro ipp generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Michigan row; column6.</p></dd><dt>Hydro prior ipp generation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Michigan row; column7.</p></dd><dt>Hydro commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Michigan row; column8.</p></dd><dt>Hydro prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Michigan row; column9.</p></dd><dt>Hydro industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Michigan row; column10.</p></dd><dt>Hydro prior industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Michigan row; column11.</p></dd><dt>Pumped storage generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Pumped storage period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage all generation</dt><dd>-92.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Michigan row; column1.</p></dd><dt>Pumped storage prior all generation</dt><dd>-79.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Michigan row; column2.</p></dd><dt>Pumped storage published generation change</dt><dd>16.80 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Michigan row; column3.</p></dd><dt>Pumped storage utility generation</dt><dd>-92.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Michigan row; column4.</p></dd><dt>Pumped storage prior utility generation</dt><dd>-79.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Michigan row; column5.</p></dd><dt>Pumped storage ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Michigan row; column6.</p></dd><dt>Pumped storage prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Michigan row; column7.</p></dd><dt>Pumped storage commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Michigan row; column8.</p></dd><dt>Pumped storage prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Michigan row; column9.</p></dd><dt>Pumped storage industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Michigan row; column10.</p></dd><dt>Pumped storage prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Michigan row; column11.</p></dd><dt>Solar pv period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv generation basis</dt><dd>Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar pv all estimated generation</dt><dd>576.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column1.</p></dd><dt>Solar pv prior all estimated generation</dt><dd>417.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column2.</p></dd><dt>Solar pv published generation change</dt><dd>38.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column3.</p></dd><dt>Solar pv utility scale generation</dt><dd>521.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column4.</p></dd><dt>Solar pv utility scale prior generation</dt><dd>371.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column5.</p></dd><dt>Solar pv estimated small scale generation</dt><dd>55.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column6.</p></dd><dt>Solar pv estimated small scale prior generation</dt><dd>46.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column7.</p></dd><dt>Solar pv electric utilities generation</dt><dd>172.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column8.</p></dd><dt>Solar pv electric utilities prior generation</dt><dd>88.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column9.</p></dd><dt>Solar pv independent producers generation</dt><dd>349.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column10.</p></dd><dt>Solar pv independent producers prior generation</dt><dd>283.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column11.</p></dd><dt>Solar pv commercial estimated total generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column12.</p></dd><dt>Solar pv commercial estimated total prior generation</dt><dd>19.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column13.</p></dd><dt>Solar pv commercial utility scale generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column14.</p></dd><dt>Solar pv commercial utility scale prior generation</dt><dd>0.03 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column15.</p></dd><dt>Solar pv commercial estimated small scale generation</dt><dd>22.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column16.</p></dd><dt>Solar pv commercial estimated small scale prior generation</dt><dd>19.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column17.</p></dd><dt>Solar pv industrial estimated total generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column18.</p></dd><dt>Solar pv industrial estimated total prior generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column19.</p></dd><dt>Solar pv industrial utility scale generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column20.</p></dd><dt>Solar pv industrial utility scale prior generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column21.</p></dd><dt>Solar pv industrial estimated small scale generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column22.</p></dd><dt>Solar pv industrial estimated small scale prior generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column23.</p></dd><dt>Solar pv residential estimated small scale generation</dt><dd>31.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column24.</p></dd><dt>Solar pv residential estimated small scale prior generation</dt><dd>27.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Michigan row; column25.</p></dd><dt>Solar thermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar thermal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Michigan row; column1.</p></dd><dt>Solar thermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Michigan row; column2.</p></dd><dt>Solar thermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Michigan row; column3.</p></dd><dt>Solar thermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Michigan row; column4.</p></dd><dt>Solar thermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Michigan row; column5.</p></dd><dt>Solar thermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Michigan row; column6.</p></dd><dt>Solar thermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Michigan row; column7.</p></dd><dt>Solar thermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Michigan row; column8.</p></dd><dt>Solar thermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Michigan row; column9.</p></dd><dt>Solar thermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Michigan row; column10.</p></dd><dt>Solar thermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Michigan row; column11.</p></dd><dt>Other energy generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other energy period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy all generation</dt><dd>5.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Michigan row; column1.</p></dd><dt>Other energy prior all generation</dt><dd>5.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Michigan row; column2.</p></dd><dt>Other energy published generation change</dt><dd>8.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Michigan row; column3.</p></dd><dt>Other energy utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Michigan row; column4.</p></dd><dt>Other energy prior utility generation</dt><dd>-0.13 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Michigan row; column5.</p></dd><dt>Other energy ipp generation</dt><dd>0.33 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Michigan row; column6.</p></dd><dt>Other energy prior ipp generation</dt><dd>-0.19 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Michigan row; column7.</p></dd><dt>Other energy commercial generation</dt><dd>5.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Michigan row; column8.</p></dd><dt>Other energy prior commercial generation</dt><dd>5.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Michigan row; column9.</p></dd><dt>Other energy industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Michigan row; column10.</p></dd><dt>Other energy prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Michigan row; column11.</p></dd><dt>Geothermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Geothermal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Michigan row; column1.</p></dd><dt>Geothermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Michigan row; column2.</p></dd><dt>Geothermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Michigan row; column3.</p></dd><dt>Geothermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Michigan row; column4.</p></dd><dt>Geothermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Michigan row; column5.</p></dd><dt>Geothermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Michigan row; column6.</p></dd><dt>Geothermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Michigan row; column7.</p></dd><dt>Geothermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Michigan row; column8.</p></dd><dt>Geothermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Michigan row; column9.</p></dd><dt>Geothermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Michigan row; column10.</p></dd><dt>Geothermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Michigan row; column11.</p></dd><dt>Biomass generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Biomass period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass all generation</dt><dd>185.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Michigan row; column1.</p></dd><dt>Biomass prior all generation</dt><dd>162.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Michigan row; column2.</p></dd><dt>Biomass published generation change</dt><dd>14.10 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Michigan row; column3.</p></dd><dt>Biomass utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Michigan row; column4.</p></dd><dt>Biomass prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Michigan row; column5.</p></dd><dt>Biomass ipp generation</dt><dd>128.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Michigan row; column6.</p></dd><dt>Biomass prior ipp generation</dt><dd>113.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Michigan row; column7.</p></dd><dt>Biomass commercial generation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Michigan row; column8.</p></dd><dt>Biomass prior commercial generation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Michigan row; column9.</p></dd><dt>Biomass industrial generation</dt><dd>52.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Michigan row; column10.</p></dd><dt>Biomass prior industrial generation</dt><dd>45.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Michigan row; column11.</p></dd><dt>Petroleum liquids generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum liquids period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids all generation</dt><dd>7.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Michigan row; column1.</p></dd><dt>Petroleum liquids prior all generation</dt><dd>8.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Michigan row; column2.</p></dd><dt>Petroleum liquids published generation change</dt><dd>-6.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Michigan row; column3.</p></dd><dt>Petroleum liquids utility generation</dt><dd>6.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Michigan row; column4.</p></dd><dt>Petroleum liquids prior utility generation</dt><dd>7.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Michigan row; column5.</p></dd><dt>Petroleum liquids ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Michigan row; column6.</p></dd><dt>Petroleum liquids prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Michigan row; column7.</p></dd><dt>Petroleum liquids commercial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Michigan row; column8.</p></dd><dt>Petroleum liquids prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Michigan row; column9.</p></dd><dt>Petroleum liquids industrial generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Michigan row; column10.</p></dd><dt>Petroleum liquids prior industrial generation</dt><dd>0.44 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Michigan row; column11.</p></dd><dt>Petroleum coke generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum coke period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke all generation</dt><dd>162.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Michigan row; column1.</p></dd><dt>Petroleum coke prior all generation</dt><dd>149.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Michigan row; column2.</p></dd><dt>Petroleum coke published generation change</dt><dd>8.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Michigan row; column3.</p></dd><dt>Petroleum coke utility generation</dt><dd>147.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Michigan row; column4.</p></dd><dt>Petroleum coke prior utility generation</dt><dd>137.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Michigan row; column5.</p></dd><dt>Petroleum coke ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Michigan row; column6.</p></dd><dt>Petroleum coke prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Michigan row; column7.</p></dd><dt>Petroleum coke commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Michigan row; column8.</p></dd><dt>Petroleum coke prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Michigan row; column9.</p></dd><dt>Petroleum coke industrial generation</dt><dd>15.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Michigan row; column10.</p></dd><dt>Petroleum coke prior industrial generation</dt><dd>12.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Michigan row; column11.</p></dd><dt>Other fossil gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other fossil gas period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Michigan row; column1.</p></dd><dt>Other fossil gas prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Michigan row; column2.</p></dd><dt>Other fossil gas published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Michigan row; column3.</p></dd><dt>Other fossil gas utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Michigan row; column4.</p></dd><dt>Other fossil gas prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Michigan row; column5.</p></dd><dt>Other fossil gas ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Michigan row; column6.</p></dd><dt>Other fossil gas prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Michigan row; column7.</p></dd><dt>Other fossil gas commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Michigan row; column8.</p></dd><dt>Other fossil gas prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Michigan row; column9.</p></dd><dt>Other fossil gas industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Michigan row; column10.</p></dd><dt>Other fossil gas prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Michigan row; column11.</p></dd><dt>Nonhydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nonhydro period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro all generation</dt><dd>1148.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Michigan row; column1.</p></dd><dt>Nonhydro prior all generation</dt><dd>964.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Michigan row; column2.</p></dd><dt>Nonhydro published generation change</dt><dd>19.10 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Michigan row; column3.</p></dd><dt>Nonhydro utility generation</dt><dd>434.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Michigan row; column4.</p></dd><dt>Nonhydro prior utility generation</dt><dd>342.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Michigan row; column5.</p></dd><dt>Nonhydro ipp generation</dt><dd>658.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Michigan row; column6.</p></dd><dt>Nonhydro prior ipp generation</dt><dd>573.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Michigan row; column7.</p></dd><dt>Nonhydro commercial generation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Michigan row; column8.</p></dd><dt>Nonhydro prior commercial generation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Michigan row; column9.</p></dd><dt>Nonhydro industrial generation</dt><dd>52.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Michigan row; column10.</p></dd><dt>Nonhydro prior industrial generation</dt><dd>45.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Michigan row; column11.</p></dd></dl></article>"},{"id":"generation-mi-202608-ytd","html":"<article><h3>Michigan utility scale generation</h3><p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B period and source notes.</p></dd><dt>Period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table title, producer sector headers and source notes.</p></dd><dt>All generation</dt><dd>82669.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Michigan row; column1.</p></dd><dt>Prior all generation</dt><dd>85251.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Michigan row; column2.</p></dd><dt>Published generation change</dt><dd>-3.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Michigan row; column3.</p></dd><dt>Utility generation</dt><dd>58436.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Michigan row; column4.</p></dd><dt>Prior utility generation</dt><dd>65788.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Michigan row; column5.</p></dd><dt>Ipp generation</dt><dd>22825.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Michigan row; column6.</p></dd><dt>Prior ipp generation</dt><dd>18115.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Michigan row; column7.</p></dd><dt>Commercial generation</dt><dd>504.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Michigan row; column8.</p></dd><dt>Prior commercial generation</dt><dd>490.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Michigan row; column9.</p></dd><dt>Industrial generation</dt><dd>903.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Michigan row; column10.</p></dd><dt>Prior industrial generation</dt><dd>858.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Michigan row; column11.</p></dd><dt>Gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Gas period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas all generation</dt><dd>38097.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Michigan row; column1.</p></dd><dt>Gas prior all generation</dt><dd>34225.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Michigan row; column2.</p></dd><dt>Gas published generation change</dt><dd>11.30 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Michigan row; column3.</p></dd><dt>Gas utility generation</dt><dd>20476.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Michigan row; column4.</p></dd><dt>Gas prior utility generation</dt><dd>20863.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Michigan row; column5.</p></dd><dt>Gas ipp generation</dt><dd>16797.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Michigan row; column6.</p></dd><dt>Gas prior ipp generation</dt><dd>12599.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Michigan row; column7.</p></dd><dt>Gas commercial generation</dt><dd>459.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Michigan row; column8.</p></dd><dt>Gas prior commercial generation</dt><dd>424.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Michigan row; column9.</p></dd><dt>Gas industrial generation</dt><dd>365.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Michigan row; column10.</p></dd><dt>Gas prior industrial generation</dt><dd>339.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Michigan row; column11.</p></dd><dt>Nuclear generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nuclear period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear all generation</dt><dd>17226.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Michigan row; column1.</p></dd><dt>Nuclear prior all generation</dt><dd>18659.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Michigan row; column2.</p></dd><dt>Nuclear published generation change</dt><dd>-7.70 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Michigan row; column3.</p></dd><dt>Nuclear utility generation</dt><dd>17226.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Michigan row; column4.</p></dd><dt>Nuclear prior utility generation</dt><dd>18659.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Michigan row; column5.</p></dd><dt>Nuclear ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Michigan row; column6.</p></dd><dt>Nuclear prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Michigan row; column7.</p></dd><dt>Nuclear commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Michigan row; column8.</p></dd><dt>Nuclear prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Michigan row; column9.</p></dd><dt>Nuclear industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Michigan row; column10.</p></dd><dt>Nuclear prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Michigan row; column11.</p></dd><dt>Coal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Coal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal all generation</dt><dd>14350.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Michigan row; column1.</p></dd><dt>Coal prior all generation</dt><dd>20500.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Michigan row; column2.</p></dd><dt>Coal published generation change</dt><dd>-30.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Michigan row; column3.</p></dd><dt>Coal utility generation</dt><dd>14230.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Michigan row; column4.</p></dd><dt>Coal prior utility generation</dt><dd>20366.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Michigan row; column5.</p></dd><dt>Coal ipp generation</dt><dd>119.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Michigan row; column6.</p></dd><dt>Coal prior ipp generation</dt><dd>134.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Michigan row; column7.</p></dd><dt>Coal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Michigan row; column8.</p></dd><dt>Coal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Michigan row; column9.</p></dd><dt>Coal industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Michigan row; column10.</p></dd><dt>Coal prior industrial generation</dt><dd>0.21 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Michigan row; column11.</p></dd><dt>Wind generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Wind period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind all generation</dt><dd>6537.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Michigan row; column1.</p></dd><dt>Wind prior all generation</dt><dd>6754.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Michigan row; column2.</p></dd><dt>Wind published generation change</dt><dd>-3.20 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Michigan row; column3.</p></dd><dt>Wind utility generation</dt><dd>3943.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Michigan row; column4.</p></dd><dt>Wind prior utility generation</dt><dd>4092.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Michigan row; column5.</p></dd><dt>Wind ipp generation</dt><dd>2594.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Michigan row; column6.</p></dd><dt>Wind prior ipp generation</dt><dd>2663.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Michigan row; column7.</p></dd><dt>Wind commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Michigan row; column8.</p></dd><dt>Wind prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Michigan row; column9.</p></dd><dt>Wind industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Michigan row; column10.</p></dd><dt>Wind prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Michigan row; column11.</p></dd><dt>Hydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Hydro period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro all generation</dt><dd>1047.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Michigan row; column1.</p></dd><dt>Hydro prior all generation</dt><dd>912.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Michigan row; column2.</p></dd><dt>Hydro published generation change</dt><dd>14.70 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Michigan row; column3.</p></dd><dt>Hydro utility generation</dt><dd>994.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Michigan row; column4.</p></dd><dt>Hydro prior utility generation</dt><dd>861.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Michigan row; column5.</p></dd><dt>Hydro ipp generation</dt><dd>48.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Michigan row; column6.</p></dd><dt>Hydro prior ipp generation</dt><dd>46.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Michigan row; column7.</p></dd><dt>Hydro commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Michigan row; column8.</p></dd><dt>Hydro prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Michigan row; column9.</p></dd><dt>Hydro industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Michigan row; column10.</p></dd><dt>Hydro prior industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Michigan row; column11.</p></dd><dt>Pumped storage generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Pumped storage period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage all generation</dt><dd>-545.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Michigan row; column1.</p></dd><dt>Pumped storage prior all generation</dt><dd>-458.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Michigan row; column2.</p></dd><dt>Pumped storage published generation change</dt><dd>18.90 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Michigan row; column3.</p></dd><dt>Pumped storage utility generation</dt><dd>-545.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Michigan row; column4.</p></dd><dt>Pumped storage prior utility generation</dt><dd>-458.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Michigan row; column5.</p></dd><dt>Pumped storage ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Michigan row; column6.</p></dd><dt>Pumped storage prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Michigan row; column7.</p></dd><dt>Pumped storage commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Michigan row; column8.</p></dd><dt>Pumped storage prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Michigan row; column9.</p></dd><dt>Pumped storage industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Michigan row; column10.</p></dd><dt>Pumped storage prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Michigan row; column11.</p></dd><dt>Solar pv period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv generation basis</dt><dd>Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar pv all estimated generation</dt><dd>3842.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column1.</p></dd><dt>Solar pv prior all estimated generation</dt><dd>2355.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column2.</p></dd><dt>Solar pv published generation change</dt><dd>63.10 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column3.</p></dd><dt>Solar pv utility scale generation</dt><dd>3477.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column4.</p></dd><dt>Solar pv utility scale prior generation</dt><dd>2047.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column5.</p></dd><dt>Solar pv estimated small scale generation</dt><dd>365.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column6.</p></dd><dt>Solar pv estimated small scale prior generation</dt><dd>308.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column7.</p></dd><dt>Solar pv electric utilities generation</dt><dd>1149.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column8.</p></dd><dt>Solar pv electric utilities prior generation</dt><dd>345.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column9.</p></dd><dt>Solar pv independent producers generation</dt><dd>2327.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column10.</p></dd><dt>Solar pv independent producers prior generation</dt><dd>1702.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column11.</p></dd><dt>Solar pv commercial estimated total generation</dt><dd>149.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column12.</p></dd><dt>Solar pv commercial estimated total prior generation</dt><dd>122.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column13.</p></dd><dt>Solar pv commercial utility scale generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column14.</p></dd><dt>Solar pv commercial utility scale prior generation</dt><dd>0.20 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column15.</p></dd><dt>Solar pv commercial estimated small scale generation</dt><dd>149.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column16.</p></dd><dt>Solar pv commercial estimated small scale prior generation</dt><dd>122.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column17.</p></dd><dt>Solar pv industrial estimated total generation</dt><dd>8.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column18.</p></dd><dt>Solar pv industrial estimated total prior generation</dt><dd>5.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column19.</p></dd><dt>Solar pv industrial utility scale generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column20.</p></dd><dt>Solar pv industrial utility scale prior generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column21.</p></dd><dt>Solar pv industrial estimated small scale generation</dt><dd>8.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column22.</p></dd><dt>Solar pv industrial estimated small scale prior generation</dt><dd>5.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column23.</p></dd><dt>Solar pv residential estimated small scale generation</dt><dd>208.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column24.</p></dd><dt>Solar pv residential estimated small scale prior generation</dt><dd>181.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Michigan row; column25.</p></dd><dt>Solar thermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar thermal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Michigan row; column1.</p></dd><dt>Solar thermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Michigan row; column2.</p></dd><dt>Solar thermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Michigan row; column3.</p></dd><dt>Solar thermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Michigan row; column4.</p></dd><dt>Solar thermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Michigan row; column5.</p></dd><dt>Solar thermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Michigan row; column6.</p></dd><dt>Solar thermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Michigan row; column7.</p></dd><dt>Solar thermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Michigan row; column8.</p></dd><dt>Solar thermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Michigan row; column9.</p></dd><dt>Solar thermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Michigan row; column10.</p></dd><dt>Solar thermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Michigan row; column11.</p></dd><dt>Other energy generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other energy period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy all generation</dt><dd>28.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Michigan row; column1.</p></dd><dt>Other energy prior all generation</dt><dd>43.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Michigan row; column2.</p></dd><dt>Other energy published generation change</dt><dd>-36.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Michigan row; column3.</p></dd><dt>Other energy utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Michigan row; column4.</p></dd><dt>Other energy prior utility generation</dt><dd>-1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Michigan row; column5.</p></dd><dt>Other energy ipp generation</dt><dd>3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Michigan row; column6.</p></dd><dt>Other energy prior ipp generation</dt><dd>8.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Michigan row; column7.</p></dd><dt>Other energy commercial generation</dt><dd>24.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Michigan row; column8.</p></dd><dt>Other energy prior commercial generation</dt><dd>36.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Michigan row; column9.</p></dd><dt>Other energy industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Michigan row; column10.</p></dd><dt>Other energy prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Michigan row; column11.</p></dd><dt>Geothermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Geothermal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Michigan row; column1.</p></dd><dt>Geothermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Michigan row; column2.</p></dd><dt>Geothermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Michigan row; column3.</p></dd><dt>Geothermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Michigan row; column4.</p></dd><dt>Geothermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Michigan row; column5.</p></dd><dt>Geothermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Michigan row; column6.</p></dd><dt>Geothermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Michigan row; column7.</p></dd><dt>Geothermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Michigan row; column8.</p></dd><dt>Geothermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Michigan row; column9.</p></dd><dt>Geothermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Michigan row; column10.</p></dd><dt>Geothermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Michigan row; column11.</p></dd><dt>Biomass generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Biomass period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass all generation</dt><dd>1360.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Michigan row; column1.</p></dd><dt>Biomass prior all generation</dt><dd>1319.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Michigan row; column2.</p></dd><dt>Biomass published generation change</dt><dd>3.20 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Michigan row; column3.</p></dd><dt>Biomass utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Michigan row; column4.</p></dd><dt>Biomass prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Michigan row; column5.</p></dd><dt>Biomass ipp generation</dt><dd>937.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Michigan row; column6.</p></dd><dt>Biomass prior ipp generation</dt><dd>866.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Michigan row; column7.</p></dd><dt>Biomass commercial generation</dt><dd>20.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Michigan row; column8.</p></dd><dt>Biomass prior commercial generation</dt><dd>30.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Michigan row; column9.</p></dd><dt>Biomass industrial generation</dt><dd>403.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Michigan row; column10.</p></dd><dt>Biomass prior industrial generation</dt><dd>423.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Michigan row; column11.</p></dd><dt>Petroleum liquids generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum liquids period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids all generation</dt><dd>74.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Michigan row; column1.</p></dd><dt>Petroleum liquids prior all generation</dt><dd>64.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Michigan row; column2.</p></dd><dt>Petroleum liquids published generation change</dt><dd>16.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Michigan row; column3.</p></dd><dt>Petroleum liquids utility generation</dt><dd>72.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Michigan row; column4.</p></dd><dt>Petroleum liquids prior utility generation</dt><dd>62.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Michigan row; column5.</p></dd><dt>Petroleum liquids ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Michigan row; column6.</p></dd><dt>Petroleum liquids prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Michigan row; column7.</p></dd><dt>Petroleum liquids commercial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Michigan row; column8.</p></dd><dt>Petroleum liquids prior commercial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Michigan row; column9.</p></dd><dt>Petroleum liquids industrial generation</dt><dd>2.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Michigan row; column10.</p></dd><dt>Petroleum liquids prior industrial generation</dt><dd>2.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Michigan row; column11.</p></dd><dt>Petroleum coke generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum coke period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke all generation</dt><dd>1018.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Michigan row; column1.</p></dd><dt>Petroleum coke prior all generation</dt><dd>1088.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Michigan row; column2.</p></dd><dt>Petroleum coke published generation change</dt><dd>-6.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Michigan row; column3.</p></dd><dt>Petroleum coke utility generation</dt><dd>890.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Michigan row; column4.</p></dd><dt>Petroleum coke prior utility generation</dt><dd>998.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Michigan row; column5.</p></dd><dt>Petroleum coke ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Michigan row; column6.</p></dd><dt>Petroleum coke prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Michigan row; column7.</p></dd><dt>Petroleum coke commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Michigan row; column8.</p></dd><dt>Petroleum coke prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Michigan row; column9.</p></dd><dt>Petroleum coke industrial generation</dt><dd>128.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Michigan row; column10.</p></dd><dt>Petroleum coke prior industrial generation</dt><dd>90.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Michigan row; column11.</p></dd><dt>Other fossil gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other fossil gas period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Michigan row; column1.</p></dd><dt>Other fossil gas prior all generation</dt><dd>98.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Michigan row; column2.</p></dd><dt>Other fossil gas published generation change</dt><dd>-100.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Michigan row; column3.</p></dd><dt>Other fossil gas utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Michigan row; column4.</p></dd><dt>Other fossil gas prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Michigan row; column5.</p></dd><dt>Other fossil gas ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Michigan row; column6.</p></dd><dt>Other fossil gas prior ipp generation</dt><dd>98.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Michigan row; column7.</p></dd><dt>Other fossil gas commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Michigan row; column8.</p></dd><dt>Other fossil gas prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Michigan row; column9.</p></dd><dt>Other fossil gas industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Michigan row; column10.</p></dd><dt>Other fossil gas prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Michigan row; column11.</p></dd><dt>Nonhydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nonhydro period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro all generation</dt><dd>11374.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Michigan row; column1.</p></dd><dt>Nonhydro prior all generation</dt><dd>10120.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Michigan row; column2.</p></dd><dt>Nonhydro published generation change</dt><dd>12.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Michigan row; column3.</p></dd><dt>Nonhydro utility generation</dt><dd>5093.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Michigan row; column4.</p></dd><dt>Nonhydro prior utility generation</dt><dd>4436.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Michigan row; column5.</p></dd><dt>Nonhydro ipp generation</dt><dd>5858.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Michigan row; column6.</p></dd><dt>Nonhydro prior ipp generation</dt><dd>5231.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Michigan row; column7.</p></dd><dt>Nonhydro commercial generation</dt><dd>20.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Michigan row; column8.</p></dd><dt>Nonhydro prior commercial generation</dt><dd>30.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Michigan row; column9.</p></dd><dt>Nonhydro industrial generation</dt><dd>403.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Michigan row; column10.</p></dd><dt>Nonhydro prior industrial generation</dt><dd>423.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Michigan row; column11.</p></dd></dl></article>"},{"id":"capacity-state-utility-mi-202608","html":"<article><h3>Michigan utility scale net summer capacity</h3><p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.</p><dl class=\"layer-fields\"><dt>Utility capacity basis</dt><dd>Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Title,technology headers and exclusions.</p></dd><dt>Utility capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Column headers.</p></dd><dt>Utility capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Column headers.</p></dd><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Dated source period.</p></dd><dt>Utility capacity renewables</dt><dd>7602.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Michigan row,column1.</p></dd><dt>Utility capacity renewables prior</dt><dd>6283.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Michigan row,column2.</p></dd><dt>Utility capacity fossil</dt><dd>20166.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Michigan row,column3.</p></dd><dt>Utility capacity fossil prior</dt><dd>20208.80 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Michigan row,column4.</p></dd><dt>Utility capacity pumped storage</dt><dd>2179.80 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Michigan row,column5.</p></dd><dt>Utility capacity pumped storage prior</dt><dd>2179.80 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Michigan row,column6.</p></dd><dt>Utility capacity other storage</dt><dd>115.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Michigan row,column7.</p></dd><dt>Utility capacity other storage prior</dt><dd>115.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Michigan row,column8.</p></dd><dt>Utility capacity nuclear</dt><dd>4086.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Michigan row,column9.</p></dd><dt>Utility capacity nuclear prior</dt><dd>4086.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Michigan row,column10.</p></dd><dt>Utility capacity other sources</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Michigan row,column11.</p></dd><dt>Utility capacity other sources prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Michigan row,column12.</p></dd><dt>Utility capacity all</dt><dd>34150.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Michigan row,column13.</p></dd><dt>Utility capacity all prior</dt><dd>32873.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Michigan row,column14.</p></dd><dt>Renew capacity basis</dt><dd>Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Title,technology headers and exclusions.</p></dd><dt>Renew capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Column headers.</p></dd><dt>Renew capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Column headers.</p></dd><dt>Renew capacity status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Dated source period.</p></dd><dt>Renew capacity wind</dt><dd>3774.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column1.</p></dd><dt>Renew capacity wind prior</dt><dd>3774.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column2.</p></dd><dt>Renew capacity solar pv</dt><dd>3084.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column3.</p></dd><dt>Renew capacity solar pv prior</dt><dd>1765.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column4.</p></dd><dt>Renew capacity solar thermal</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column5.</p></dd><dt>Renew capacity solar thermal prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column6.</p></dd><dt>Renew capacity conventional hydro</dt><dd>263.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column7.</p></dd><dt>Renew capacity conventional hydro prior</dt><dd>263.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column8.</p></dd><dt>Renew capacity biomass</dt><dd>480.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column9.</p></dd><dt>Renew capacity biomass prior</dt><dd>480.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column10.</p></dd><dt>Renew capacity geothermal</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column11.</p></dd><dt>Renew capacity geothermal prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column12.</p></dd><dt>Renew capacity total utility</dt><dd>7602.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column13.</p></dd><dt>Renew capacity total utility prior</dt><dd>6283.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column14.</p></dd><dt>Renew capacity small pv estimated</dt><dd>354.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column15.</p></dd><dt>Renew capacity small pv estimated prior</dt><dd>299.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column16.</p></dd><dt>Renew capacity combined pv estimated</dt><dd>3438.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column17.</p></dd><dt>Renew capacity combined pv estimated prior</dt><dd>2064.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column18.</p></dd><dt>Renew capacity combined solar estimated</dt><dd>3438.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column19.</p></dd><dt>Renew capacity combined solar estimated prior</dt><dd>2064.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Michigan row,column20.</p></dd><dt>Fossil capacity basis</dt><dd>Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Title,technology headers and exclusions.</p></dd><dt>Fossil capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Column headers.</p></dd><dt>Fossil capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Column headers.</p></dd><dt>Fossil capacity status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Dated source period.</p></dd><dt>Fossil capacity gas combined cycle</dt><dd>7712.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column1.</p></dd><dt>Fossil capacity gas combined cycle prior</dt><dd>7712.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column2.</p></dd><dt>Fossil capacity gas combustion turbine</dt><dd>3547.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column3.</p></dd><dt>Fossil capacity gas combustion turbine prior</dt><dd>3547.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column4.</p></dd><dt>Fossil capacity gas other</dt><dd>2490.40 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column5.</p></dd><dt>Fossil capacity gas other prior</dt><dd>2532.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column6.</p></dd><dt>Fossil capacity coal</dt><dd>5732.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column7.</p></dd><dt>Fossil capacity coal prior</dt><dd>5732.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column8.</p></dd><dt>Fossil capacity petroleum coke</dt><dd>47.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column9.</p></dd><dt>Fossil capacity petroleum coke prior</dt><dd>47.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column10.</p></dd><dt>Fossil capacity petroleum liquids</dt><dd>385.80 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column11.</p></dd><dt>Fossil capacity petroleum liquids prior</dt><dd>385.80 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column12.</p></dd><dt>Fossil capacity other fossil gas</dt><dd>250.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column13.</p></dd><dt>Fossil capacity other fossil gas prior</dt><dd>250.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column14.</p></dd><dt>Fossil capacity total</dt><dd>20166.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column15.</p></dd><dt>Fossil capacity total prior</dt><dd>20208.80 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Michigan row,column16.</p></dd><dt>Reported new unit rows</dt><dd>7 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred. Locator: Calculated count of Table6.3 rows for MI.</p></dd><dt>Reported new unit capacity sum</dt><dd>1118.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred. Locator: Calculated sum of rounded Table6.3 Net Summer Capacity(MW) cells for MI.</p></dd><dt>Reported new unit basis</dt><dd>EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred. Locator: Table6.3 title,columns,notes and explicit calculation scope.</p></dd><dt>Reported retired unit rows</dt><dd>2 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_04\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference. Locator: Calculated count of Table6.4 rows for MI.</p></dd><dt>Reported retired unit capacity sum</dt><dd>42.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_04\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference. Locator: Calculated sum of rounded Table6.4 Net Summer Capacity(MW) cells for MI.</p></dd><dt>Reported retired unit basis</dt><dd>EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_04\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference. Locator: Table6.4 title,columns,notes and explicit calculation scope.</p></dd><dt>Reported planned unit rows</dt><dd>35 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for MI across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit capacity sum</dt><dd>5606.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for MI across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit nameplate sum</dt><dd>5748.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for MI across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit complete nonoperating rows</dt><dd>3 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for MI across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit basis</dt><dd>EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Table6.5 title,status/date/capacity columns,notes and explicit calculation boundary.</p></dd><dt>Reported retirement plan rows</dt><dd>29 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Calculated from Table6.6 reported rows for MI across all target dates,not simultaneous removal.</p></dd><dt>Reported retirement plan capacity sum</dt><dd>5702.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Calculated from Table6.6 reported rows for MI across all target dates,not simultaneous removal.</p></dd><dt>Reported retirement plan unknown month rows</dt><dd>0 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Calculated from Table6.6 reported rows for MI across all target dates,not simultaneous removal.</p></dd><dt>Reported retirement plan basis</dt><dd>EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Table6.6 title/date/capacity columns,notes and explicit calculation scope.</p></dd></dl></article>"},{"id":"power-ieee-reliability-2025-mi","html":"<article><h3>Michigan historical IEEE distribution reliability2025 and2024</h3><p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 years2025 and2024.</p></dd><dt>Ieee reliability basis</dt><dd>EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 header and definitions.</p></dd><dt>Ieee coverage 2025</dt><dd>94.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;coverage;Year 2025.</p></dd><dt>Ieee coverage 2024</dt><dd>94.30 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;coverage;Year 2024.</p></dd><dt>Ieee all events saidi 2025</dt><dd>608.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;all_events_saidi;Year 2025.</p></dd><dt>Ieee all events saidi 2024</dt><dd>481.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;all_events_saidi;Year 2024.</p></dd><dt>Ieee all events saifi 2025</dt><dd>1.42 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;all_events_saifi;Year 2025.</p></dd><dt>Ieee all events saifi 2024</dt><dd>1.36 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;all_events_saifi;Year 2024.</p></dd><dt>Ieee all events caidi 2025</dt><dd>429.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;all_events_caidi;Year 2025.</p></dd><dt>Ieee all events caidi 2024</dt><dd>353.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;all_events_caidi;Year 2024.</p></dd><dt>Ieee without major days saidi 2025</dt><dd>161.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;without_major_days_saidi;Year 2025.</p></dd><dt>Ieee without major days saidi 2024</dt><dd>161.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;without_major_days_saidi;Year 2024.</p></dd><dt>Ieee without major days saifi 2025</dt><dd>1.04 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;without_major_days_saifi;Year 2025.</p></dd><dt>Ieee without major days saifi 2024</dt><dd>0.98 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;without_major_days_saifi;Year 2024.</p></dd><dt>Ieee without major days caidi 2025</dt><dd>155.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;without_major_days_caidi;Year 2025.</p></dd><dt>Ieee without major days caidi 2024</dt><dd>164.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;without_major_days_caidi;Year 2024.</p></dd><dt>Ieee loss supply removed saidi 2025</dt><dd>476.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;loss_supply_removed_saidi;Year 2025.</p></dd><dt>Ieee loss supply removed saidi 2024</dt><dd>456.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;loss_supply_removed_saidi;Year 2024.</p></dd><dt>Ieee loss supply removed saifi 2025</dt><dd>1.22 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;loss_supply_removed_saifi;Year 2025.</p></dd><dt>Ieee loss supply removed saifi 2024</dt><dd>1.25 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;loss_supply_removed_saifi;Year 2024.</p></dd><dt>Ieee loss supply removed caidi 2025</dt><dd>389.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;loss_supply_removed_caidi;Year 2025.</p></dd><dt>Ieee loss supply removed caidi 2024</dt><dd>364.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Michigan row;loss_supply_removed_caidi;Year 2024.</p></dd><dt>Saidi history ieee all events 2023</dt><dd>1127.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_all_events;Year 2023.</p></dd><dt>Saidi history ieee all events 2022</dt><dd>520.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_all_events;Year 2022.</p></dd><dt>Saidi history ieee all events 2021</dt><dd>890.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_all_events;Year 2021.</p></dd><dt>Saidi history ieee all events 2020</dt><dd>416.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_all_events;Year 2020.</p></dd><dt>Saidi history ieee all events 2019</dt><dd>570.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_all_events;Year 2019.</p></dd><dt>Saidi history ieee all events 2018</dt><dd>450.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_all_events;Year 2018.</p></dd><dt>Saidi history ieee all events 2017</dt><dd>802.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_all_events;Year 2017.</p></dd><dt>Saidi history ieee all events 2016</dt><dd>268.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_all_events;Year 2016.</p></dd><dt>Saidi history ieee all events 2015</dt><dd>374.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_all_events;Year 2015.</p></dd><dt>Saidi history ieee without major days 2023</dt><dd>164.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_without_major_days;Year 2023.</p></dd><dt>Saidi history ieee without major days 2022</dt><dd>166.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_without_major_days;Year 2022.</p></dd><dt>Saidi history ieee without major days 2021</dt><dd>178.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_without_major_days;Year 2021.</p></dd><dt>Saidi history ieee without major days 2020</dt><dd>168.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_without_major_days;Year 2020.</p></dd><dt>Saidi history ieee without major days 2019</dt><dd>213.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_without_major_days;Year 2019.</p></dd><dt>Saidi history ieee without major days 2018</dt><dd>186.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_without_major_days;Year 2018.</p></dd><dt>Saidi history ieee without major days 2017</dt><dd>180.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_without_major_days;Year 2017.</p></dd><dt>Saidi history ieee without major days 2016</dt><dd>194.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_without_major_days;Year 2016.</p></dd><dt>Saidi history ieee without major days 2015</dt><dd>183.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_without_major_days;Year 2015.</p></dd><dt>Saidi history ieee loss supply removed 2023</dt><dd>1131.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Saidi history ieee loss supply removed 2022</dt><dd>519.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Saidi history ieee loss supply removed 2021</dt><dd>882.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Saidi history ieee loss supply removed 2020</dt><dd>414.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Saidi history ieee loss supply removed 2019</dt><dd>565.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Saidi history ieee loss supply removed 2018</dt><dd>448.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Saidi history ieee loss supply removed 2017</dt><dd>798.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Saidi history ieee loss supply removed 2016</dt><dd>262.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Saidi history ieee loss supply removed 2015</dt><dd>363.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Saidi history basis</dt><dd>EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution. Locator: Table11.4 header and method notes;2015-2023 supplemental history.</p></dd><dt>Saifi history ieee all events 2023</dt><dd>1.54 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_all_events;Year 2023.</p></dd><dt>Saifi history ieee all events 2022</dt><dd>1.34 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_all_events;Year 2022.</p></dd><dt>Saifi history ieee all events 2021</dt><dd>1.65 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_all_events;Year 2021.</p></dd><dt>Saifi history ieee all events 2020</dt><dd>1.38 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_all_events;Year 2020.</p></dd><dt>Saifi history ieee all events 2019</dt><dd>1.54 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_all_events;Year 2019.</p></dd><dt>Saifi history ieee all events 2018</dt><dd>1.37 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_all_events;Year 2018.</p></dd><dt>Saifi history ieee all events 2017</dt><dd>1.41 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_all_events;Year 2017.</p></dd><dt>Saifi history ieee all events 2016</dt><dd>1.13 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_all_events;Year 2016.</p></dd><dt>Saifi history ieee all events 2015</dt><dd>1.15 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_all_events;Year 2015.</p></dd><dt>Saifi history ieee without major days 2023</dt><dd>0.93 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_without_major_days;Year 2023.</p></dd><dt>Saifi history ieee without major days 2022</dt><dd>1.02 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_without_major_days;Year 2022.</p></dd><dt>Saifi history ieee without major days 2021</dt><dd>1.02 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_without_major_days;Year 2021.</p></dd><dt>Saifi history ieee without major days 2020</dt><dd>1.07 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_without_major_days;Year 2020.</p></dd><dt>Saifi history ieee without major days 2019</dt><dd>1.16 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_without_major_days;Year 2019.</p></dd><dt>Saifi history ieee without major days 2018</dt><dd>1.05 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_without_major_days;Year 2018.</p></dd><dt>Saifi history ieee without major days 2017</dt><dd>0.98 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_without_major_days;Year 2017.</p></dd><dt>Saifi history ieee without major days 2016</dt><dd>1.00 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_without_major_days;Year 2016.</p></dd><dt>Saifi history ieee without major days 2015</dt><dd>0.98 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_without_major_days;Year 2015.</p></dd><dt>Saifi history ieee loss supply removed 2023</dt><dd>1.53 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Saifi history ieee loss supply removed 2022</dt><dd>1.33 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Saifi history ieee loss supply removed 2021</dt><dd>1.61 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Saifi history ieee loss supply removed 2020</dt><dd>1.34 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Saifi history ieee loss supply removed 2019</dt><dd>1.50 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Saifi history ieee loss supply removed 2018</dt><dd>1.35 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Saifi history ieee loss supply removed 2017</dt><dd>1.39 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Saifi history ieee loss supply removed 2016</dt><dd>1.10 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Saifi history ieee loss supply removed 2015</dt><dd>1.12 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Saifi history basis</dt><dd>EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation. Locator: Table11.5 header and method notes;2015-2023 supplemental history.</p></dd><dt>Caidi history ieee all events 2023</dt><dd>730.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_all_events;Year 2023.</p></dd><dt>Caidi history ieee all events 2022</dt><dd>388.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_all_events;Year 2022.</p></dd><dt>Caidi history ieee all events 2021</dt><dd>540.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_all_events;Year 2021.</p></dd><dt>Caidi history ieee all events 2020</dt><dd>303.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_all_events;Year 2020.</p></dd><dt>Caidi history ieee all events 2019</dt><dd>369.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_all_events;Year 2019.</p></dd><dt>Caidi history ieee all events 2018</dt><dd>327.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_all_events;Year 2018.</p></dd><dt>Caidi history ieee all events 2017</dt><dd>567.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_all_events;Year 2017.</p></dd><dt>Caidi history ieee all events 2016</dt><dd>237.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_all_events;Year 2016.</p></dd><dt>Caidi history ieee all events 2015</dt><dd>325.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_all_events;Year 2015.</p></dd><dt>Caidi history ieee without major days 2023</dt><dd>177.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_without_major_days;Year 2023.</p></dd><dt>Caidi history ieee without major days 2022</dt><dd>164.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_without_major_days;Year 2022.</p></dd><dt>Caidi history ieee without major days 2021</dt><dd>175.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_without_major_days;Year 2021.</p></dd><dt>Caidi history ieee without major days 2020</dt><dd>157.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_without_major_days;Year 2020.</p></dd><dt>Caidi history ieee without major days 2019</dt><dd>184.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_without_major_days;Year 2019.</p></dd><dt>Caidi history ieee without major days 2018</dt><dd>176.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_without_major_days;Year 2018.</p></dd><dt>Caidi history ieee without major days 2017</dt><dd>183.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_without_major_days;Year 2017.</p></dd><dt>Caidi history ieee without major days 2016</dt><dd>193.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_without_major_days;Year 2016.</p></dd><dt>Caidi history ieee without major days 2015</dt><dd>187.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_without_major_days;Year 2015.</p></dd><dt>Caidi history ieee loss supply removed 2023</dt><dd>738.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Caidi history ieee loss supply removed 2022</dt><dd>391.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Caidi history ieee loss supply removed 2021</dt><dd>546.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Caidi history ieee loss supply removed 2020</dt><dd>309.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Caidi history ieee loss supply removed 2019</dt><dd>375.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Caidi history ieee loss supply removed 2018</dt><dd>332.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Caidi history ieee loss supply removed 2017</dt><dd>574.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Caidi history ieee loss supply removed 2016</dt><dd>237.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Caidi history ieee loss supply removed 2015</dt><dd>324.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Caidi history basis</dt><dd>EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution. Locator: Table11.6 header and method notes;2015-2023 supplemental history.</p></dd></dl></article>"},{"id":"power-any-reliability-2025-mi","html":"<article><h3>Michigan historical any-method distribution reliability2025 and2024</h3><p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 years2025 and2024.</p></dd><dt>Any reliability basis</dt><dd>EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 header and definitions.</p></dd><dt>Any coverage 2025</dt><dd>97.60 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Michigan row;coverage;Year 2025.</p></dd><dt>Any coverage 2024</dt><dd>97.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Michigan row;coverage;Year 2024.</p></dd><dt>Any all events saidi 2025</dt><dd>671.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Michigan row;all_events_saidi;Year 2025.</p></dd><dt>Any all events saidi 2024</dt><dd>470.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Michigan row;all_events_saidi;Year 2024.</p></dd><dt>Any all events saifi 2025</dt><dd>1.42 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Michigan row;all_events_saifi;Year 2025.</p></dd><dt>Any all events saifi 2024</dt><dd>1.36 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Michigan row;all_events_saifi;Year 2024.</p></dd><dt>Any all events caidi 2025</dt><dd>471.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Michigan row;all_events_caidi;Year 2025.</p></dd><dt>Any all events caidi 2024</dt><dd>346.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Michigan row;all_events_caidi;Year 2024.</p></dd><dt>Any without major events saidi 2025</dt><dd>160.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Michigan row;without_major_events_saidi;Year 2025.</p></dd><dt>Any without major events saidi 2024</dt><dd>160.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Michigan row;without_major_events_saidi;Year 2024.</p></dd><dt>Any without major events saifi 2025</dt><dd>1.04 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Michigan row;without_major_events_saifi;Year 2025.</p></dd><dt>Any without major events saifi 2024</dt><dd>0.99 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Michigan row;without_major_events_saifi;Year 2024.</p></dd><dt>Any without major events caidi 2025</dt><dd>154.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Michigan row;without_major_events_caidi;Year 2025.</p></dd><dt>Any without major events caidi 2024</dt><dd>162.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Michigan row;without_major_events_caidi;Year 2024.</p></dd><dt>Saidi history any all events 2023</dt><dd>1093.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_all_events;Year 2023.</p></dd><dt>Saidi history any all events 2022</dt><dd>513.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_all_events;Year 2022.</p></dd><dt>Saidi history any all events 2021</dt><dd>873.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_all_events;Year 2021.</p></dd><dt>Saidi history any all events 2020</dt><dd>410.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_all_events;Year 2020.</p></dd><dt>Saidi history any all events 2019</dt><dd>554.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_all_events;Year 2019.</p></dd><dt>Saidi history any all events 2018</dt><dd>442.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_all_events;Year 2018.</p></dd><dt>Saidi history any all events 2017</dt><dd>778.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_all_events;Year 2017.</p></dd><dt>Saidi history any all events 2016</dt><dd>267.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_all_events;Year 2016.</p></dd><dt>Saidi history any all events 2015</dt><dd>363.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_all_events;Year 2015.</p></dd><dt>Saidi history any without major events 2023</dt><dd>162.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_without_major_events;Year 2023.</p></dd><dt>Saidi history any without major events 2022</dt><dd>166.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_without_major_events;Year 2022.</p></dd><dt>Saidi history any without major events 2021</dt><dd>178.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_without_major_events;Year 2021.</p></dd><dt>Saidi history any without major events 2020</dt><dd>167.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_without_major_events;Year 2020.</p></dd><dt>Saidi history any without major events 2019</dt><dd>211.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_without_major_events;Year 2019.</p></dd><dt>Saidi history any without major events 2018</dt><dd>185.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_without_major_events;Year 2018.</p></dd><dt>Saidi history any without major events 2017</dt><dd>179.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_without_major_events;Year 2017.</p></dd><dt>Saidi history any without major events 2016</dt><dd>193.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_without_major_events;Year 2016.</p></dd><dt>Saidi history any without major events 2015</dt><dd>178.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Michigan row;any_without_major_events;Year 2015.</p></dd><dt>Saidi history basis</dt><dd>EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution. Locator: Table11.4 header and method notes;2015-2023 supplemental history.</p></dd><dt>Saifi history any all events 2023</dt><dd>1.51 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_all_events;Year 2023.</p></dd><dt>Saifi history any all events 2022</dt><dd>1.34 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_all_events;Year 2022.</p></dd><dt>Saifi history any all events 2021</dt><dd>1.66 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_all_events;Year 2021.</p></dd><dt>Saifi history any all events 2020</dt><dd>1.38 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_all_events;Year 2020.</p></dd><dt>Saifi history any all events 2019</dt><dd>1.53 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_all_events;Year 2019.</p></dd><dt>Saifi history any all events 2018</dt><dd>1.37 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_all_events;Year 2018.</p></dd><dt>Saifi history any all events 2017</dt><dd>1.41 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_all_events;Year 2017.</p></dd><dt>Saifi history any all events 2016</dt><dd>1.15 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_all_events;Year 2016.</p></dd><dt>Saifi history any all events 2015</dt><dd>1.14 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_all_events;Year 2015.</p></dd><dt>Saifi history any without major events 2023</dt><dd>0.92 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_without_major_events;Year 2023.</p></dd><dt>Saifi history any without major events 2022</dt><dd>1.01 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_without_major_events;Year 2022.</p></dd><dt>Saifi history any without major events 2021</dt><dd>1.03 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_without_major_events;Year 2021.</p></dd><dt>Saifi history any without major events 2020</dt><dd>1.08 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_without_major_events;Year 2020.</p></dd><dt>Saifi history any without major events 2019</dt><dd>1.16 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_without_major_events;Year 2019.</p></dd><dt>Saifi history any without major events 2018</dt><dd>1.05 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_without_major_events;Year 2018.</p></dd><dt>Saifi history any without major events 2017</dt><dd>0.99 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_without_major_events;Year 2017.</p></dd><dt>Saifi history any without major events 2016</dt><dd>1.01 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_without_major_events;Year 2016.</p></dd><dt>Saifi history any without major events 2015</dt><dd>0.97 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Michigan row;any_without_major_events;Year 2015.</p></dd><dt>Saifi history basis</dt><dd>EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation. Locator: Table11.5 header and method notes;2015-2023 supplemental history.</p></dd><dt>Caidi history any all events 2023</dt><dd>723.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_all_events;Year 2023.</p></dd><dt>Caidi history any all events 2022</dt><dd>383.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_all_events;Year 2022.</p></dd><dt>Caidi history any all events 2021</dt><dd>527.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_all_events;Year 2021.</p></dd><dt>Caidi history any all events 2020</dt><dd>296.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_all_events;Year 2020.</p></dd><dt>Caidi history any all events 2019</dt><dd>361.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_all_events;Year 2019.</p></dd><dt>Caidi history any all events 2018</dt><dd>322.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_all_events;Year 2018.</p></dd><dt>Caidi history any all events 2017</dt><dd>550.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_all_events;Year 2017.</p></dd><dt>Caidi history any all events 2016</dt><dd>233.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_all_events;Year 2016.</p></dd><dt>Caidi history any all events 2015</dt><dd>318.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_all_events;Year 2015.</p></dd><dt>Caidi history any without major events 2023</dt><dd>176.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_without_major_events;Year 2023.</p></dd><dt>Caidi history any without major events 2022</dt><dd>163.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_without_major_events;Year 2022.</p></dd><dt>Caidi history any without major events 2021</dt><dd>172.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_without_major_events;Year 2021.</p></dd><dt>Caidi history any without major events 2020</dt><dd>154.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_without_major_events;Year 2020.</p></dd><dt>Caidi history any without major events 2019</dt><dd>181.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_without_major_events;Year 2019.</p></dd><dt>Caidi history any without major events 2018</dt><dd>175.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_without_major_events;Year 2018.</p></dd><dt>Caidi history any without major events 2017</dt><dd>181.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_without_major_events;Year 2017.</p></dd><dt>Caidi history any without major events 2016</dt><dd>190.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_without_major_events;Year 2016.</p></dd><dt>Caidi history any without major events 2015</dt><dd>184.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Michigan row;any_without_major_events;Year 2015.</p></dd><dt>Caidi history basis</dt><dd>EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution. Locator: Table11.6 header and method notes;2015-2023 supplemental history.</p></dd></dl></article>"}]}
