{"schema_version":1,"layer":"power","reviewed_on":"2026-10-28","coverage_note":"Selected utility and state proceedings. Other utilities and states are not yet reviewed. One utility tariff does not establish statewide coverage. Current and earlier captured electricity comparisons retain separate periods and sources.","items":[{"id":"tariff-oh","kind":"tariff","subject":"AEP Ohio","state_codes":["oh"],"scope":"AEP Ohio territory. Subsequent court appeal is disclosed by the state source. No ruling on that appeal is inferred.","fields":{"utility":{"value":"AEP Ohio","source_ids":["oh-regulator"],"scope":"Named utility or proceeding.","locator":"Heading and named utility"},"status":{"value":"approved","source_ids":["oh-regulator"],"scope":"Documented outcome in this source; subsequent changes are not inferred.","locator":"Disposition or proposal section"},"docket":{"value":"24-0508-EL-ATA","source_ids":["oh-regulator"],"scope":"Specific PUCO proceeding.","locator":"Case heading"},"approved_on":{"value":"2025-07-09","source_ids":["oh-regulator"],"scope":"PUCO adoption date, not energization.","locator":"Update paragraph"},"threshold":{"value":"New facilities or expansions at 25 MW or greater enter the stated study process. Affiliated loads can aggregate.","source_ids":["oh-utility"],"scope":"Study threshold. Exact tariff applicability controls.","locator":"Mandatory process and aggregation"},"contract_length":{"value":"Eight years plus a ramp period of up to four years.","source_ids":["oh-utility"],"scope":"Maximum initial term can reach twelve years.","locator":"Contract term"},"exit_fees":{"value":"After five years following the ramp, early termination can require 36 months of minimum charges.","source_ids":["oh-utility"],"scope":"Notice, timing and contract conditions apply.","locator":"Exit fees"},"filed_on":{"value":null,"source_ids":["oh-regulator"],"scope":"Not established in this review.","locator":"Review scope","unknown_reason":"Not established in this review."},"effective_on":{"value":"2025-07-23","source_ids":["oh-utility"],"scope":"Utility states tariff effective date.","locator":"Opening paragraph"},"minimum_bill":{"value":"Tiered minimum billing demand, capped at 85 percent of contract capacity.","source_ids":["oh-utility"],"scope":"Billing demand is not metered energy consumption.","locator":"Minimum demand charges"}}},{"id":"grid-va","kind":"grid_context","subject":"PJM regional forecast adjustment process","state_codes":["de","dc","il","in","ky","md","mi","nj","nc","oh","pa","tn","va","wv"],"scope":"PJM regional context. A state assignment is not a quantitative allocation to Virginia.","fields":{"meaning":{"value":"Forecast adjustments, no load interconnection queue","source_ids":["pjm-process"],"scope":"Regional context for the PJM footprint, not a Virginia only total.","locator":"Named request or forecast discussion"},"observation_date":{"value":"2026-09-29","source_ids":["pjm-process"],"scope":"PJM publication date.","locator":"Named request or forecast discussion"},"requested_capacity":{"value":null,"source_ids":["pjm-process"],"scope":"No comparable regional queue total established in this review.","locator":"Named request or forecast discussion","unknown_reason":"No comparable regional queue total established in this review.","unit":"GW","measurement_role":"requested_capacity"}}},{"id":"price-oh","kind":"residential_price","subject":"Ohio","state_codes":["oh"],"scope":"A two point comparison, not a complete time series. State average revenue per unit sold is not a household bill. No causal attribution to data centers.","fields":{"period":{"value":"July 2026","source_ids":["eia-prices"],"scope":"Residential comparison month.","locator":"Table heading"},"prior_period":{"value":"July 2025","source_ids":["eia-prices"],"scope":"Same month in the preceding year.","locator":"Table heading"},"price":{"value":19.45,"source_ids":["eia-prices"],"scope":"Preliminary residential state average, cents per kWh.","locator":"Residential July 2026, Ohio","unit":"cents per kWh","measurement_role":"published_price"},"prior_price":{"value":17.38,"source_ids":["eia-prices"],"scope":"Residential state average for the comparison month.","locator":"Residential July 2025, Ohio","unit":"cents per kWh","measurement_role":"published_price"}}},{"id":"price-oh-202608","kind":"residential_price","subject":"Ohio","state_codes":["oh"],"scope":"Captured August residential comparison. The earlier July comparison remains in the source history. State average revenue per unit sold is not a household bill or evidence of a data center effect.","fields":{"period":{"value":"August 2026","source_ids":["eia-residential-xlsx-20261023"],"scope":"Residential comparison month.","locator":"Table_5_06_A!B4:C4"},"prior_period":{"value":"August 2025","source_ids":["eia-residential-xlsx-20261023"],"scope":"Same month in the preceding year.","locator":"Table_5_06_A!B4:C4"},"price":{"value":19.38,"source_ids":["eia-residential-xlsx-20261023"],"scope":"Preliminary August2026 residential state average, cents per kWh.","locator":"Table_5_06_A!B20:C20","unit":"cents per kWh","measurement_role":"published_price"},"prior_price":{"value":17.55,"source_ids":["eia-residential-xlsx-20261023"],"scope":"Final August2025 residential state average, cents per kWh.","locator":"Table_5_06_A!B20:C20","unit":"cents per kWh","measurement_role":"published_price"},"source_context":{"value":"The August table and public spreadsheet agree. The surrounding report header still identifies July and its older release date. The exact publication day of these August values is not established here.","source_ids":["eia-price-check-20261023-1645","eia-residential-xlsx-20261023"],"scope":"The scheduled next release day is not treated as proof of actual publication. This review uses the periods stated in the two data tables and preserves the earlier July capture.","locator":"HTML table heading and report header; spreadsheet rows1 through4 and67"}}},{"id":"grid-oh-aep-contract-report-20260212","kind":"grid_context","subject":"Ohio Power utility reported study and contract stages","state_codes":["oh"],"scope":"AEP Ohio territory only. Historical requested study capacity, reported binding contract capacity and future service schedules remain different measures. Not a state load census or an ISO queue.","fields":{"status":{"value":"historical","source_ids":["oh-aep-contract-news-20260213"],"scope":"Dated utility reported contract context, not a new tariff approval or currently energized load.","locator":"Publication heading and February12 as of paragraph"},"as_of":{"value":"2026-02-12","source_ids":["oh-aep-contract-news-20260213"],"scope":"Report cutoff, distinct from February13 publication and this source check.","locator":"Binding contracts paragraph"},"validation_basis":{"value":"Utility reported","source_ids":["oh-aep-contract-news-20260213"],"scope":"The utility is the reporting party. The linked PUCO filing returned a public verification page and its actual contents were not reviewed or admitted.","locator":"AEP Ohio news release and separate filing capture boundary"},"initial_interest":{"value":"The utility describes the initial interest as 30,000 MW and elsewhere more than 30,000 MW.","source_ids":["oh-aep-contract-news-20260213"],"scope":"Reported initial expressions of interest, not an exact queue count, actual load or a denominator for a conversion rate.","locator":"Prior requests and step one paragraphs"},"requested_capacity":{"value":13022.7,"source_ids":["oh-aep-contract-news-20260213"],"scope":"Study requests that the utility says asked and paid for study in the initial cohort. Not binding contracts, approved connections or actual demand.","locator":"Step one and step two paragraphs","unit":"MW","measurement_role":"requested_capacity","display_precision":1},"reported_contracted_capacity":{"value":5642,"source_ids":["oh-aep-contract-news-20260213"],"scope":"Binding contracts reported under the Data Center Tariff after the study and financial commitment stages. Not actual load or project specific regulatory approval.","locator":"February12 binding contracts paragraph and step two","unit":"MW","measurement_role":"utility_reported_contracted_capacity"},"reported_pre_tariff_contracted_capacity":{"value":12219,"source_ids":["oh-aep-contract-news-20260213"],"scope":"Separate contracts reported as signed before the Data Center Tariff. Not added to the study request figure or treated as current metered demand.","locator":"Preexisting contract paragraph","unit":"MW","measurement_role":"utility_reported_contracted_capacity"},"reported_total_contracted_capacity":{"value":17861,"source_ids":["oh-aep-contract-news-20260213"],"scope":"Total stated by the utility across its new tariff and preexisting contract cohorts. Copied from the source, not newly calculated or added to the study requests.","locator":"Total contracted projects paragraph","unit":"MW","measurement_role":"utility_reported_contracted_capacity"},"scheduled_service":{"value":"The utility schedules contracted projects progressively through 2035.","source_ids":["oh-aep-contract-news-20260213"],"scope":"A prospective service schedule, not evidence any particular contracted project is operating or a guaranteed completion date.","locator":"Total contracted projects paragraph"},"actual_load":{"value":null,"source_ids":["oh-aep-contract-news-20260213"],"scope":"No independently measured current demand or energized capacity established.","locator":"Dated utility report review boundary","unknown_reason":"No independently measured current demand or energized capacity established."},"individual_approvals":{"value":null,"source_ids":["oh-aep-contract-news-20260213"],"scope":"No individual project connection approval, collateral receipt or contract reviewed.","locator":"Dated utility report review boundary","unknown_reason":"No individual project connection approval, collateral receipt or contract reviewed."},"atlas_record_id":{"value":null,"source_ids":["oh-aep-contract-news-20260213"],"scope":"Utility territory aggregate has no exact individual building or parcel join.","locator":"Dated utility report review boundary","unknown_reason":"Utility territory aggregate has no exact individual building or parcel join."}}},{"id":"grid-pjm-aep-submission-20260929","kind":"grid_context","subject":"AEP submitted large load forecast adjustments with separate table bases","state_codes":["oh","in","ky","wv","va"],"scope":"Dated utility submission across operating companies and multiple load types. Existing plus planned adjustments and incremental planned comparisons remain distinct. Repeated state panels are context, not allocated totals or measured load.","fields":{"status":{"value":"historical","source_ids":["pjm-aep-adjustment-20260929"],"scope":"Dated utility submission documentation. Future values remain forecasts, not actual historical load or final PJM acceptance.","locator":"Presentation date and forecast tables"},"forecast_basis":{"value":"Utility forecast submission","source_ids":["pjm-aep-adjustment-20260929"],"scope":"AEP submission across Appalachian Power, Indiana and Michigan Power, AEP Ohio and Kentucky Power. Five states displayed in the source are Ohio, Indiana, Kentucky, West Virginia and Virginia; no company row is silently a state allocation.","locator":"Presentation caption and forecast table"},"submitted_on":{"value":"2026-09-29","source_ids":["pjm-aep-adjustment-20260929"],"scope":"Presentation day, separate from future forecast horizons, contract snapshots and any later PJM determination.","locator":"Title page"},"actual_load":{"value":null,"source_ids":["pjm-aep-adjustment-20260929"],"scope":"No measured actual load total for the future forecast horizons is established by these submitted series.","locator":"Forecast submission review boundary","unknown_reason":"No measured actual load total for the future forecast horizons is established by these submitted series."},"approved_capacity":{"value":null,"source_ids":["pjm-aep-adjustment-20260929"],"scope":"No approved connection capacity is established by these forecast tables.","locator":"Forecast submission review boundary","unknown_reason":"No approved connection capacity is established by these forecast tables."},"individual_approvals":{"value":null,"source_ids":["pjm-aep-adjustment-20260929"],"scope":"No individual approved connection or executed customer agreement is independently reviewed.","locator":"Forecast submission review boundary","unknown_reason":"No individual approved connection or executed customer agreement is independently reviewed."},"atlas_record_id":{"value":null,"source_ids":["pjm-aep-adjustment-20260929"],"scope":"No verified facility identity join is made from this aggregate forecast submission.","locator":"Forecast submission review boundary","unknown_reason":"No verified facility identity join is made from this aggregate forecast submission."},"requested_capacity":{"value":null,"source_ids":["pjm-aep-adjustment-20260929"],"scope":"No comparable load interconnection queue total is established. These submitted forecast values are not substituted for queue requests.","locator":"Forecast submission review boundary","unknown_reason":"No comparable load interconnection queue total is established. These submitted forecast values are not substituted for queue requests."},"pjm_final_forecast":{"value":null,"source_ids":["pjm-aep-adjustment-20260929"],"scope":"No final PJM adoption or final 2027 forecast is established from this utility submission.","locator":"Forecast submission review boundary","unknown_reason":"No final PJM adoption or final 2027 forecast is established from this utility submission."},"geographic_scope":{"value":"Named AEP operating company submission across Ohio, Indiana, Kentucky, West Virginia and Virginia","source_ids":["pjm-aep-adjustment-20260929"],"scope":"Shown in each named state panel for context. The same aggregate is not assigned in full to each state, and the company name Indiana and Michigan Power does not by itself establish a separate Michigan allocation.","locator":"Pages 2 and 6"},"included_load_types":{"value":"Industrial, crypto and data center large loads","source_ids":["pjm-aep-adjustment-20260929"],"scope":"Source includes three sectors. Its aggregate is not exclusively data centers and chart bar segments are not converted into invented precise sector totals.","locator":"Pages 2 and 6 chart legend"},"commitment_method":{"value":"Only load additions with signed service agreements or letters of agreement are included, using customer contract ramp schedules and checks against economic forecasts to limit double counting. The utility states 97 percent of projects through 2031 have service agreements and 3 percent have letters.","source_ids":["pjm-aep-adjustment-20260929"],"scope":"These percentages refer to projects, not a verified percentage of forecast MW. Signed commitment categories do not establish realized demand or independent approval.","locator":"Pages 2 and 3"},"table_bases":{"value":"Page 6 reports cumulative summer peak adjustments including existing and planned submissions. Page 7 instead reports incremental planned additions to compare with the prior submission.","source_ids":["pjm-aep-adjustment-20260929"],"scope":"The two bases remain separate. No difference between tables is presented as actual load, and no sum is made across years, company rows and their already included total. Ultimate is not assigned an invented calendar year.","locator":"Pages 6 and 7 footnotes"},"prior_comparison":{"value":"For 2031 the comparison table prints 13,625 MW in the 2025 submission and 19,675 MW in the 2026 incremental planned submission. For Ultimate it prints 22,272 and 22,095 MW respectively.","source_ids":["pjm-aep-adjustment-20260929"],"scope":"Source printed comparison values use the page 7 incremental planned basis. They are not compared silently with the different page 6 existing plus planned totals. No independently calculated regional growth total is added.","locator":"Page 7 total rows"},"regulatory_review":{"value":"The utility reports giving all five states an opportunity to review by August 28. By September 4, four had responded with either methodology endorsement or review without further comment.","source_ids":["pjm-aep-adjustment-20260929"],"scope":"Utility account of regulator feedback, not a named decision approving all contracts, a unanimous five state endorsement or final PJM forecast adoption.","locator":"Page 4"},"submitted_2027_adjustment":{"value":7071,"source_ids":["pjm-aep-adjustment-20260929"],"scope":"Source Total AEP cumulative summer peak adjustment for 2027, including existing and planned submissions across the named companies and sectors. Not a state allocation, actual load or solely data centers.","locator":"Page 6 Total AEP row and footnote","unit":"MW","measurement_role":"utility_submitted_forecast","forecast_year":2027,"forecast_horizon":"2027","forecast_metric":"adjustment"},"submitted_2027_incremental":{"value":4588,"source_ids":["pjm-aep-adjustment-20260929"],"scope":"Source Total AEP 2026 submission for 2027, incremental planned additions on the comparison table basis. Separate from the existing plus planned table. Not actual load or a final PJM adopted quantity.","locator":"Page 7 Total AEP 2026 Submission row and footnote","unit":"MW","measurement_role":"utility_submitted_forecast","forecast_year":2027,"forecast_horizon":"2027","forecast_metric":"incremental"},"submitted_2031_adjustment":{"value":22175,"source_ids":["pjm-aep-adjustment-20260929"],"scope":"Source Total AEP cumulative summer peak adjustment for 2031, including existing and planned submissions across the named companies and sectors. Not a state allocation, actual load or solely data centers.","locator":"Page 6 Total AEP row and footnote","unit":"MW","measurement_role":"utility_submitted_forecast","forecast_year":2031,"forecast_horizon":"2031","forecast_metric":"adjustment"},"submitted_2031_incremental":{"value":19675,"source_ids":["pjm-aep-adjustment-20260929"],"scope":"Source Total AEP 2026 submission for 2031, incremental planned additions on the comparison table basis. Separate from the existing plus planned table. Not actual load or a final PJM adopted quantity.","locator":"Page 7 Total AEP 2026 Submission row and footnote","unit":"MW","measurement_role":"utility_submitted_forecast","forecast_year":2031,"forecast_horizon":"2031","forecast_metric":"incremental"},"submitted_ultimate_adjustment":{"value":24596,"source_ids":["pjm-aep-adjustment-20260929"],"scope":"Source Total AEP cumulative summer peak adjustment for ultimate, including existing and planned submissions across the named companies and sectors. Not a state allocation, actual load or solely data centers.","locator":"Page 6 Total AEP row and footnote","unit":"MW","measurement_role":"utility_submitted_forecast","forecast_year":null,"forecast_horizon":"Ultimate, no calendar year stated","forecast_metric":"adjustment"},"submitted_ultimate_incremental":{"value":22095,"source_ids":["pjm-aep-adjustment-20260929"],"scope":"Source Total AEP 2026 submission for ultimate, incremental planned additions on the comparison table basis. Separate from the existing plus planned table. Not actual load or a final PJM adopted quantity.","locator":"Page 7 Total AEP 2026 Submission row and footnote","unit":"MW","measurement_role":"utility_submitted_forecast","forecast_year":null,"forecast_horizon":"Ultimate, no calendar year stated","forecast_metric":"incremental"}}},{"id":"grid-pjm-manual19-procedure-20260630","kind":"grid_context","subject":"PJM adopted forecast adjustment review procedure","state_codes":["de","dc","il","in","ky","md","mi","nj","nc","oh","pa","tn","va","wv"],"scope":"Regional procedure shown in the PJM state panels for context. Manual approval, utility submissions, final forecasts and actual load remain distinct.","fields":{"status":{"value":"approved","source_ids":["pjm-manual19-current-20261023"],"scope":"Approval concerns this manual revision only.","locator":"Printed page 3"},"process_basis":{"value":"Forecast review procedure","source_ids":["pjm-manual19-current-20261023"],"scope":"Regional process documentation, excluded from utility tariff status.","locator":"Attachment B printed pages 26 through 32"},"revision":{"value":"Revision 39","source_ids":["pjm-manual19-current-20261023"],"scope":"Captured current clean version, separate from the earlier change presentation.","locator":"Cover and printed page 4"},"approved_on":{"value":"2026-06-29","source_ids":["pjm-manual19-current-20261023"],"scope":"Manual approval day.","locator":"Printed page 3"},"effective_on":{"value":"2026-06-30","source_ids":["pjm-manual19-current-20261023"],"scope":"Manual effect, separate from approval and original posting.","locator":"Cover and printed page 3"},"threshold_wording":{"value":"Solicitation covers changes of at least 50 MW, positive or negative. Verification instead says category totals greater than 50 MW.","source_ids":["pjm-manual19-current-20261023"],"scope":"Both threshold descriptions retained; no silent resolution for exactly 50 MW.","locator":"Printed pages 26 and 29"},"regulator_review":{"value":"Submitters must offer each relevant state regulator review before submission. Participation is voluntary, and submissions need not follow regulator feedback if both perspectives are provided.","source_ids":["pjm-manual19-current-20261023"],"scope":"Review opportunity and feedback are distinct from approval of forecasts or connections.","locator":"Printed page 28"},"firm_classification":{"value":"Firm status requires a qualifying service, construction or supply commitment plus financial support. Nonfirm portions may enter forecast periods outside the capacity auction horizon.","source_ids":["pjm-manual19-current-20261023"],"scope":"Forecast classification only. Firm portions can still be reduced for growth constraints.","locator":"Printed pages 28 through 30"},"duplicate_requests":{"value":"Customers must be asked about potentially duplicated requests lacking service or construction commitments. Silence counts toward duplication. Missing site, location and MW details can remove such requests; discounting can reflect project milestones.","source_ids":["pjm-manual19-current-20261023"],"scope":"No actual duplicate count or adjustment result is established.","locator":"Printed pages 29 and 30"},"final_determination":{"value":"PJM reviews assumptions, regulator feedback and independent forecast uncertainty before determining the final adjustment. A submitter can retain its preliminary amount if the calculated final is higher.","source_ids":["pjm-manual19-current-20261023"],"scope":"A submitted number or firm classification does not guarantee unchanged final inclusion.","locator":"Printed pages 30 and 31"},"timing":{"value":"The manual schedules final adjustments for November or December and independent forecast review for October or November.","source_ids":["pjm-manual19-current-20261023"],"scope":"General schedule, not proof of a completed presentation or final 2027 forecast.","locator":"Printed pages 26 and 30"},"utility_tariff":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No individual utility tariff approval is established by this manual.","locator":"Procedure review boundary","unknown_reason":"No individual utility tariff approval is established by this manual."},"actual_load":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No measured actual load quantity is established by this procedure.","locator":"Procedure review boundary","unknown_reason":"No measured actual load quantity is established by this procedure."},"approved_capacity":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No connection capacity approval is established.","locator":"Procedure review boundary","unknown_reason":"No connection capacity approval is established."},"individual_approvals":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No individual customer decision is established.","locator":"Procedure review boundary","unknown_reason":"No individual customer decision is established."},"requested_capacity":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No comparable regional queue total is established.","locator":"Procedure review boundary","unknown_reason":"No comparable regional queue total is established."},"pjm_final_forecast":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No final amount for the current submitted forecast is established.","locator":"Procedure review boundary","unknown_reason":"No final amount for the current submitted forecast is established."},"atlas_record_id":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No facility identity join is made.","locator":"Procedure review boundary","unknown_reason":"No facility identity join is made."}}},{"id":"sector-price-oh-202608","kind":"sector_price_context","subject":"Ohio commercial and industrial electricity prices","state_codes":["oh"],"scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","fields":{"period":{"value":"August 2026","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A header","scope":"Current preliminary comparison month."},"prior_period":{"value":"August 2025","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A header","scope":"Final same month previous year."},"sector_price_boundary":{"value":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A notes, including row67","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class."},"commercial_price":{"value":12.31,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!D20; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"prior_commercial_price":{"value":11.42,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!E20; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"industrial_price":{"value":9.75,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!F20; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"prior_industrial_price":{"value":8.47,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!G20; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_price":{"value":13.93,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Ohio All Sectors August comparison","unit":"cents per kWh","measurement_role":"published_price"},"prior_all_sector_price":{"value":12.67,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Ohio All Sectors August comparison","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_boundary":{"value":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A sector headers and notes"},"ytd_commercial_price":{"value":13.61,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!D20; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_commercial_price":{"value":11.17,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!E20; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_industrial_price":{"value":10.23,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!F20; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_industrial_price":{"value":8.1,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!G20; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_all_sector_price":{"value":14.28,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!J20; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_all_sector_price":{"value":12.12,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!K20; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_period":{"value":"January through August 2026","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"prior_ytd_period":{"value":"January through August 2025","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"ytd_price_boundary":{"value":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"retail_sales_basis":{"value":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Title,end-use headers and source notes"},"retail_sales_period":{"value":"August 2026","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"retail_sales_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"retail_sales_residential":{"value":5272.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Ohio row,column1","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"5,272"},"retail_sales_residential_prior":{"value":5223.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Ohio row,column2","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"5,223"},"retail_sales_commercial":{"value":6010.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Ohio row,column3","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"6,010"},"retail_sales_commercial_prior":{"value":5544.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Ohio row,column4","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"5,544"},"retail_sales_industrial":{"value":4522.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Ohio row,column5","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"4,522"},"retail_sales_industrial_prior":{"value":4420.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Ohio row,column6","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"4,420"},"retail_sales_transportation":{"value":2.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Ohio row,column7","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"2"},"retail_sales_transportation_prior":{"value":2.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Ohio row,column8","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"2"},"retail_sales_all":{"value":15806.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Ohio row,column9","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"15,806"},"retail_sales_all_prior":{"value":15188.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Ohio row,column10","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"15,188"},"ytd_retail_sales_basis":{"value":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Title,end-use headers and source notes"},"ytd_retail_sales_period":{"value":"January through August 2026","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"ytd_retail_sales_prior_period":{"value":"January through August 2025","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"ytd_retail_sales_residential":{"value":37016.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Ohio row,column1","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"37,016"},"ytd_retail_sales_residential_prior":{"value":37732.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Ohio row,column2","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"37,732"},"ytd_retail_sales_commercial":{"value":43412.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Ohio row,column3","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"43,412"},"ytd_retail_sales_commercial_prior":{"value":37954.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Ohio row,column4","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"37,954"},"ytd_retail_sales_industrial":{"value":34134.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Ohio row,column5","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"34,134"},"ytd_retail_sales_industrial_prior":{"value":33584.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Ohio row,column6","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"33,584"},"ytd_retail_sales_transportation":{"value":22.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Ohio row,column7","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"22"},"ytd_retail_sales_transportation_prior":{"value":24.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Ohio row,column8","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"24"},"ytd_retail_sales_all":{"value":114584.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Ohio row,column9","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"114,584"},"ytd_retail_sales_all_prior":{"value":109293.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Ohio row,column10","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"109,293"},"retail_revenue_basis":{"value":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Title,end-use headers and source notes"},"retail_revenue_period":{"value":"August 2026","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"retail_revenue_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"retail_revenue_residential":{"value":1022.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Ohio row,column1","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1,022"},"retail_revenue_residential_prior":{"value":916.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Ohio row,column2","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"916"},"retail_revenue_commercial":{"value":740.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Ohio row,column3","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"740"},"retail_revenue_commercial_prior":{"value":633.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Ohio row,column4","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"633"},"retail_revenue_industrial":{"value":441.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Ohio row,column5","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"441"},"retail_revenue_industrial_prior":{"value":374.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Ohio row,column6","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"374"},"retail_revenue_transportation":{"value":0.22,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Ohio row,column7","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"0.22"},"retail_revenue_transportation_prior":{"value":0.19,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Ohio row,column8","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"0.19"},"retail_revenue_all":{"value":2202.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Ohio row,column9","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"2,202"},"retail_revenue_all_prior":{"value":1924.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Ohio row,column10","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1,924"},"ytd_retail_revenue_basis":{"value":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Title,end-use headers and source notes"},"ytd_retail_revenue_period":{"value":"January through August 2026","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"ytd_retail_revenue_prior_period":{"value":"January through August 2025","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"ytd_retail_revenue_residential":{"value":6963.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Ohio row,column1","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"6,963"},"ytd_retail_revenue_residential_prior":{"value":6279.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Ohio row,column2","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"6,279"},"ytd_retail_revenue_commercial":{"value":5910.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Ohio row,column3","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"5,910"},"ytd_retail_revenue_commercial_prior":{"value":4240.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Ohio row,column4","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"4,240"},"ytd_retail_revenue_industrial":{"value":3490.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Ohio row,column5","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"3,490"},"ytd_retail_revenue_industrial_prior":{"value":2721.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Ohio row,column6","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"2,721"},"ytd_retail_revenue_transportation":{"value":2.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Ohio row,column7","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"2"},"ytd_retail_revenue_transportation_prior":{"value":2.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Ohio row,column8","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"2"},"ytd_retail_revenue_all":{"value":16366.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Ohio row,column9","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"16,366"},"ytd_retail_revenue_all_prior":{"value":13243.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Ohio row,column10","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"13,243"},"retail_customers_basis":{"value":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Title,end-use headers and source notes"},"retail_customers_period":{"value":"August 2026","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Column headers"},"retail_customers_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Column headers"},"retail_customers_residential":{"value":5122483,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Ohio row,column1","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"5,122,483"},"retail_customers_residential_prior":{"value":5153998,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Ohio row,column2","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"5,153,998"},"retail_customers_commercial":{"value":625196,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Ohio row,column3","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"625,196"},"retail_customers_commercial_prior":{"value":627339,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Ohio row,column4","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"627,339"},"retail_customers_industrial":{"value":17245,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Ohio row,column5","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"17,245"},"retail_customers_industrial_prior":{"value":17742,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Ohio row,column6","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"17,742"},"retail_customers_transportation":{"value":2,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Ohio row,column7","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"2"},"retail_customers_transportation_prior":{"value":2,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Ohio row,column8","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"2"},"retail_customers_all":{"value":5764926,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Ohio row,column9","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"5,764,926"},"retail_customers_all_prior":{"value":5799081,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Ohio row,column10","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"5,799,081"}}},{"id":"sector-price-oh-202607","kind":"sector_price_context","subject":"Ohio historical commercial and industrial electricity prices","state_codes":["oh"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","fields":{"period":{"value":"July 2026","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"prior_period":{"value":"July 2025","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"sector_price_boundary":{"value":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"commercial_price":{"value":14.06,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Ohio commercial_price","unit":"cents per kWh","measurement_role":"published_price"},"prior_commercial_price":{"value":11.5,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Ohio prior_commercial_price","unit":"cents per kWh","measurement_role":"published_price"},"industrial_price":{"value":10.95,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Ohio industrial_price","unit":"cents per kWh","measurement_role":"published_price"},"prior_industrial_price":{"value":9.05,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Ohio prior_industrial_price","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_price":{"value":15.09,"source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Ohio All Sectors July comparison","unit":"cents per kWh","measurement_role":"published_price"},"prior_all_sector_price":{"value":13.1,"source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Ohio All Sectors July comparison","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_boundary":{"value":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A sector headers and notes"}}},{"id":"generation-oh-202608","subject":"Ohio utility scale generation","kind":"generation_context","state_codes":["oh"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","fields":{"status":{"value":"historical","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A period and source notes"},"period":{"value":"August 2026","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"prior_period":{"value":"August 2025","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table title, producer sector headers and source notes"},"all_generation":{"value":14448.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"14,448"},"prior_all_generation":{"value":13515.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"13,515"},"published_generation_change":{"value":6.9,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Ohio row; column3","unit":"percent","measurement_role":"published_net_generation_percentage_change","source_token":"6.9%"},"utility_generation":{"value":1684.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"1,684"},"prior_utility_generation":{"value":1466.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"1,466"},"ipp_generation":{"value":12695.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"12,695"},"prior_ipp_generation":{"value":11953.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"11,953"},"commercial_generation":{"value":31.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"31"},"prior_commercial_generation":{"value":29.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"29"},"industrial_generation":{"value":38.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"38"},"prior_industrial_generation":{"value":67.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"67"},"gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table title, producer sector headers and source notes"},"gas_period":{"value":"August 2026","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_prior_period":{"value":"August 2025","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_all_generation":{"value":9211.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"9,211"},"gas_prior_all_generation":{"value":7772.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"7,772"},"gas_published_generation_change":{"value":18.5,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Ohio row; column3","unit":"percent","measurement_role":"published_gas_generation_percentage_change","source_token":"18.5%"},"gas_utility_generation":{"value":1209.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"1,209"},"gas_prior_utility_generation":{"value":937.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"937"},"gas_ipp_generation":{"value":7955.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"7,955"},"gas_prior_ipp_generation":{"value":6775.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"6,775"},"gas_commercial_generation":{"value":29.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"29"},"gas_prior_commercial_generation":{"value":28.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"28"},"gas_industrial_generation":{"value":18.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"18"},"gas_prior_industrial_generation":{"value":32.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"32"},"nuclear_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table title, producer sector headers and source notes"},"nuclear_period":{"value":"August 2026","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_prior_period":{"value":"August 2025","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_all_generation":{"value":1566.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"1,566"},"nuclear_prior_all_generation":{"value":1441.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"1,441"},"nuclear_published_generation_change":{"value":8.7,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Ohio row; column3","unit":"percent","measurement_role":"published_nuclear_generation_percentage_change","source_token":"8.7%"},"nuclear_utility_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_ipp_generation":{"value":1566.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"1,566"},"nuclear_prior_ipp_generation":{"value":1441.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"1,441"},"nuclear_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"coal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table title, producer sector headers and source notes"},"coal_period":{"value":"August 2026","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_prior_period":{"value":"August 2025","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_all_generation":{"value":2355.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"2,355"},"coal_prior_all_generation":{"value":2897.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"2,897"},"coal_published_generation_change":{"value":-18.7,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Ohio row; column3","unit":"percent","measurement_role":"published_coal_generation_percentage_change","source_token":"-18.7%"},"coal_utility_generation":{"value":448.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"448"},"coal_prior_utility_generation":{"value":501.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"501"},"coal_ipp_generation":{"value":1906.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"1,906"},"coal_prior_ipp_generation":{"value":2396.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"2,396"},"coal_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_industrial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"wind_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table title, producer sector headers and source notes"},"wind_period":{"value":"August 2026","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_prior_period":{"value":"August 2025","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_all_generation":{"value":111.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"111"},"wind_prior_all_generation":{"value":96.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"96"},"wind_published_generation_change":{"value":15.3,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Ohio row; column3","unit":"percent","measurement_role":"published_wind_generation_percentage_change","source_token":"15.3%"},"wind_utility_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_ipp_generation":{"value":107.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"107"},"wind_prior_ipp_generation":{"value":94.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"94"},"wind_commercial_generation":{"value":0.1,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0.10"},"wind_prior_commercial_generation":{"value":0.12,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0.12"},"wind_industrial_generation":{"value":null,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"wind_prior_industrial_generation":{"value":null,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"hydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table title, producer sector headers and source notes"},"hydro_period":{"value":"August 2026","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_prior_period":{"value":"August 2025","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_all_generation":{"value":39.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"39"},"hydro_prior_all_generation":{"value":36.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"36"},"hydro_published_generation_change":{"value":9.6,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Ohio row; column3","unit":"percent","measurement_role":"published_hydro_generation_percentage_change","source_token":"9.6%"},"hydro_utility_generation":{"value":23.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"23"},"hydro_prior_utility_generation":{"value":24.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"24"},"hydro_ipp_generation":{"value":null,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"hydro_prior_ipp_generation":{"value":11.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"11"},"hydro_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"pumped_storage_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table title, producer sector headers and source notes"},"pumped_storage_period":{"value":"August 2026","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_prior_period":{"value":"August 2025","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_all_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_all_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_published_generation_change":{"value":null,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Ohio row; column3","unit":"percent","measurement_role":"published_pumped_storage_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"pumped_storage_utility_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"solar_pv_period":{"value":"August 2026","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_prior_period":{"value":"August 2025","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_generation_basis":{"value":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table title, producer sector headers and source notes"},"solar_pv_all_estimated_generation":{"value":1104.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column1","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"1,104"},"solar_pv_prior_all_estimated_generation":{"value":1123.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column2","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"1,123"},"solar_pv_published_generation_change":{"value":-1.7,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column3","unit":"percent","measurement_role":"published_solar_pv_generation_percentage_change","source_token":"-1.7%"},"solar_pv_utility_scale_generation":{"value":1024.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1,024"},"solar_pv_utility_scale_prior_generation":{"value":1057.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1,057"},"solar_pv_estimated_small_scale_generation":{"value":79.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column6","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"79"},"solar_pv_estimated_small_scale_prior_generation":{"value":66.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column7","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"66"},"solar_pv_electric_utilities_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_electric_utilities_prior_generation":{"value":1.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1"},"solar_pv_independent_producers_generation":{"value":1023.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1,023"},"solar_pv_independent_producers_prior_generation":{"value":1055.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1,055"},"solar_pv_commercial_estimated_total_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column12","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_commercial_estimated_total_prior_generation":{"value":27.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column13","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"27"},"solar_pv_commercial_utility_scale_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column14","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_commercial_utility_scale_prior_generation":{"value":1.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column15","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1"},"solar_pv_commercial_estimated_small_scale_generation":{"value":30.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column16","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"30"},"solar_pv_commercial_estimated_small_scale_prior_generation":{"value":26.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column17","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"26"},"solar_pv_industrial_estimated_total_generation":{"value":10.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column18","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"10"},"solar_pv_industrial_estimated_total_prior_generation":{"value":8.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column19","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"8"},"solar_pv_industrial_utility_scale_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column20","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_industrial_utility_scale_prior_generation":{"value":0.02,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column21","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0.02"},"solar_pv_industrial_estimated_small_scale_generation":{"value":10.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column22","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"10"},"solar_pv_industrial_estimated_small_scale_prior_generation":{"value":8.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column23","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"8"},"solar_pv_residential_estimated_small_scale_generation":{"value":39.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column24","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"39"},"solar_pv_residential_estimated_small_scale_prior_generation":{"value":33.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Ohio row; column25","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"33"},"solar_thermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table title, producer sector headers and source notes"},"solar_thermal_period":{"value":"August 2026","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_prior_period":{"value":"August 2025","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_published_generation_change":{"value":null,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Ohio row; column3","unit":"percent","measurement_role":"published_solar_thermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"solar_thermal_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"other_energy_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"other_energy_period":{"value":"August 2026","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_prior_period":{"value":"August 2025","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_all_generation":{"value":null,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"other_energy_prior_all_generation":{"value":-0.39,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"-0.39"},"other_energy_published_generation_change":{"value":null,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Ohio row; column3","unit":"percent","measurement_role":"published_other_energy_generation_percentage_change","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"other_energy_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_utility_generation":{"value":-0.01,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"-0.01"},"other_energy_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_ipp_generation":{"value":-0.38,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"-0.38"},"other_energy_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_industrial_generation":{"value":null,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"other_energy_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"geothermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table title, producer sector headers and source notes"},"geothermal_period":{"value":"August 2026","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_prior_period":{"value":"August 2025","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_published_generation_change":{"value":null,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Ohio row; column3","unit":"percent","measurement_role":"published_geothermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"geothermal_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"biomass_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"biomass_period":{"value":"August 2026","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_prior_period":{"value":"August 2025","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_all_generation":{"value":28.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"28"},"biomass_prior_all_generation":{"value":26.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"26"},"biomass_published_generation_change":{"value":6.4,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Ohio row; column3","unit":"percent","measurement_role":"published_biomass_generation_percentage_change","source_token":"6.4%"},"biomass_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_ipp_generation":{"value":12.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"12"},"biomass_prior_ipp_generation":{"value":12.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"12"},"biomass_commercial_generation":{"value":1.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"1"},"biomass_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_industrial_generation":{"value":15.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"15"},"biomass_prior_industrial_generation":{"value":14.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"14"},"petroleum_liquids_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_liquids_period":{"value":"August 2026","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_prior_period":{"value":"August 2025","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_all_generation":{"value":21.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"21"},"petroleum_liquids_prior_all_generation":{"value":13.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"13"},"petroleum_liquids_published_generation_change":{"value":67.3,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Ohio row; column3","unit":"percent","measurement_role":"published_petroleum_liquids_generation_percentage_change","source_token":"67.3%"},"petroleum_liquids_utility_generation":{"value":3.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"3"},"petroleum_liquids_prior_utility_generation":{"value":3.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"3"},"petroleum_liquids_ipp_generation":{"value":18.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"18"},"petroleum_liquids_prior_ipp_generation":{"value":9.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"9"},"petroleum_liquids_commercial_generation":{"value":0.14,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.14"},"petroleum_liquids_prior_commercial_generation":{"value":0.01,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.01"},"petroleum_liquids_industrial_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_prior_industrial_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_coke_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_coke_period":{"value":"August 2026","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_prior_period":{"value":"August 2025","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_all_generation":{"value":74.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"74"},"petroleum_coke_prior_all_generation":{"value":101.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"101"},"petroleum_coke_published_generation_change":{"value":-27.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Ohio row; column3","unit":"percent","measurement_role":"published_petroleum_coke_generation_percentage_change","source_token":"-27.0%"},"petroleum_coke_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_ipp_generation":{"value":74.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"74"},"petroleum_coke_prior_ipp_generation":{"value":101.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"101"},"petroleum_coke_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"other_fossil_gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table title, producer sector headers and source notes"},"other_fossil_gas_period":{"value":"August 2026","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_prior_period":{"value":"August 2025","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_all_generation":{"value":null,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"other_fossil_gas_prior_all_generation":{"value":77.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"77"},"other_fossil_gas_published_generation_change":{"value":null,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Ohio row; column3","unit":"percent","measurement_role":"published_other_fossil_gas_generation_percentage_change","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"other_fossil_gas_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_ipp_generation":{"value":null,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"other_fossil_gas_prior_ipp_generation":{"value":59.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"59"},"other_fossil_gas_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_industrial_generation":{"value":1.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"1"},"other_fossil_gas_prior_industrial_generation":{"value":18.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"18"},"nonhydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table title, producer sector headers and source notes"},"nonhydro_period":{"value":"August 2026","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_prior_period":{"value":"August 2025","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_all_generation":{"value":1163.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"1,163"},"nonhydro_prior_all_generation":{"value":1179.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"1,179"},"nonhydro_published_generation_change":{"value":-1.3,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Ohio row; column3","unit":"percent","measurement_role":"published_nonhydro_generation_percentage_change","source_token":"-1.3%"},"nonhydro_utility_generation":{"value":null,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"nonhydro_prior_utility_generation":{"value":1.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"1"},"nonhydro_ipp_generation":{"value":1141.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"1,141"},"nonhydro_prior_ipp_generation":{"value":1161.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"1,161"},"nonhydro_commercial_generation":{"value":2.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"2"},"nonhydro_prior_commercial_generation":{"value":1.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"1"},"nonhydro_industrial_generation":{"value":19.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"19"},"nonhydro_prior_industrial_generation":{"value":16.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"16"}}},{"id":"generation-oh-202608-ytd","subject":"Ohio utility scale generation","kind":"generation_context","state_codes":["oh"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","fields":{"status":{"value":"historical","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B period and source notes"},"period":{"value":"January through August 2026","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"prior_period":{"value":"January through August 2025","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table title, producer sector headers and source notes"},"all_generation":{"value":106705.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"106,705"},"prior_all_generation":{"value":98045.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"98,045"},"published_generation_change":{"value":8.8,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Ohio row; column3","unit":"percent","measurement_role":"published_net_generation_percentage_change","source_token":"8.8%"},"utility_generation":{"value":10834.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"10,834"},"prior_utility_generation":{"value":10782.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"10,782"},"ipp_generation":{"value":95241.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"95,241"},"prior_ipp_generation":{"value":86553.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"86,553"},"commercial_generation":{"value":193.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"193"},"prior_commercial_generation":{"value":180.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"180"},"industrial_generation":{"value":438.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"438"},"prior_industrial_generation":{"value":529.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"529"},"gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table title, producer sector headers and source notes"},"gas_period":{"value":"January through August 2026","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_prior_period":{"value":"January through August 2025","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_all_generation":{"value":61213.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"61,213"},"gas_prior_all_generation":{"value":52279.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"52,279"},"gas_published_generation_change":{"value":17.1,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Ohio row; column3","unit":"percent","measurement_role":"published_gas_generation_percentage_change","source_token":"17.1%"},"gas_utility_generation":{"value":7109.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"7,109"},"gas_prior_utility_generation":{"value":6737.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"6,737"},"gas_ipp_generation":{"value":53741.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"53,741"},"gas_prior_ipp_generation":{"value":45128.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"45,128"},"gas_commercial_generation":{"value":176.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"176"},"gas_prior_commercial_generation":{"value":167.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"167"},"gas_industrial_generation":{"value":187.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"187"},"gas_prior_industrial_generation":{"value":247.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"247"},"nuclear_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table title, producer sector headers and source notes"},"nuclear_period":{"value":"January through August 2026","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_prior_period":{"value":"January through August 2025","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_all_generation":{"value":11743.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"11,743"},"nuclear_prior_all_generation":{"value":10792.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"10,792"},"nuclear_published_generation_change":{"value":8.8,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Ohio row; column3","unit":"percent","measurement_role":"published_nuclear_generation_percentage_change","source_token":"8.8%"},"nuclear_utility_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_ipp_generation":{"value":11743.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"11,743"},"nuclear_prior_ipp_generation":{"value":10792.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"10,792"},"nuclear_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"coal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table title, producer sector headers and source notes"},"coal_period":{"value":"January through August 2026","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_all_generation":{"value":22733.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"22,733"},"coal_prior_all_generation":{"value":25307.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"25,307"},"coal_published_generation_change":{"value":-10.2,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Ohio row; column3","unit":"percent","measurement_role":"published_coal_generation_percentage_change","source_token":"-10.2%"},"coal_utility_generation":{"value":3500.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"3,500"},"coal_prior_utility_generation":{"value":3823.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"3,823"},"coal_ipp_generation":{"value":19233.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"19,233"},"coal_prior_ipp_generation":{"value":21484.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"21,484"},"coal_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_industrial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"wind_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table title, producer sector headers and source notes"},"wind_period":{"value":"January through August 2026","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_prior_period":{"value":"January through August 2025","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_all_generation":{"value":2119.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"2,119"},"wind_prior_all_generation":{"value":1963.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"1,963"},"wind_published_generation_change":{"value":7.9,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Ohio row; column3","unit":"percent","measurement_role":"published_wind_generation_percentage_change","source_token":"7.9%"},"wind_utility_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_utility_generation":{"value":1.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"1"},"wind_ipp_generation":{"value":2071.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"2,071"},"wind_prior_ipp_generation":{"value":1928.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"1,928"},"wind_commercial_generation":{"value":2.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"2"},"wind_prior_commercial_generation":{"value":2.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"2"},"wind_industrial_generation":{"value":45.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"45"},"wind_prior_industrial_generation":{"value":33.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"33"},"hydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table title, producer sector headers and source notes"},"hydro_period":{"value":"January through August 2026","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_prior_period":{"value":"January through August 2025","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_all_generation":{"value":303.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"303"},"hydro_prior_all_generation":{"value":333.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"333"},"hydro_published_generation_change":{"value":-9.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Ohio row; column3","unit":"percent","measurement_role":"published_hydro_generation_percentage_change","source_token":"-9.0%"},"hydro_utility_generation":{"value":181.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"181"},"hydro_prior_utility_generation":{"value":198.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"198"},"hydro_ipp_generation":{"value":122.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"122"},"hydro_prior_ipp_generation":{"value":135.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"135"},"hydro_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"pumped_storage_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table title, producer sector headers and source notes"},"pumped_storage_period":{"value":"January through August 2026","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_prior_period":{"value":"January through August 2025","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_all_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_all_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_published_generation_change":{"value":null,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Ohio row; column3","unit":"percent","measurement_role":"published_pumped_storage_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"pumped_storage_utility_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"solar_pv_period":{"value":"January through August 2026","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_prior_period":{"value":"January through August 2025","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_generation_basis":{"value":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table title, producer sector headers and source notes"},"solar_pv_all_estimated_generation":{"value":7719.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column1","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"7,719"},"solar_pv_prior_all_estimated_generation":{"value":6264.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column2","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"6,264"},"solar_pv_published_generation_change":{"value":23.2,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column3","unit":"percent","measurement_role":"published_solar_pv_generation_percentage_change","source_token":"23.2%"},"solar_pv_utility_scale_generation":{"value":7196.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"7,196"},"solar_pv_utility_scale_prior_generation":{"value":5828.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"5,828"},"solar_pv_estimated_small_scale_generation":{"value":523.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column6","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"523"},"solar_pv_estimated_small_scale_prior_generation":{"value":437.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column7","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"437"},"solar_pv_electric_utilities_generation":{"value":5.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"5"},"solar_pv_electric_utilities_prior_generation":{"value":5.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"5"},"solar_pv_independent_producers_generation":{"value":7185.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"7,185"},"solar_pv_independent_producers_prior_generation":{"value":5818.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"5,818"},"solar_pv_commercial_estimated_total_generation":{"value":204.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column12","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"204"},"solar_pv_commercial_estimated_total_prior_generation":{"value":178.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column13","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"178"},"solar_pv_commercial_utility_scale_generation":{"value":6.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column14","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"6"},"solar_pv_commercial_utility_scale_prior_generation":{"value":4.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column15","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"4"},"solar_pv_commercial_estimated_small_scale_generation":{"value":199.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column16","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"199"},"solar_pv_commercial_estimated_small_scale_prior_generation":{"value":174.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column17","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"174"},"solar_pv_industrial_estimated_total_generation":{"value":63.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column18","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"63"},"solar_pv_industrial_estimated_total_prior_generation":{"value":49.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column19","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"49"},"solar_pv_industrial_utility_scale_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column20","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_industrial_utility_scale_prior_generation":{"value":0.12,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column21","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0.12"},"solar_pv_industrial_estimated_small_scale_generation":{"value":63.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column22","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"63"},"solar_pv_industrial_estimated_small_scale_prior_generation":{"value":49.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column23","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"49"},"solar_pv_residential_estimated_small_scale_generation":{"value":262.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column24","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"262"},"solar_pv_residential_estimated_small_scale_prior_generation":{"value":214.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Ohio row; column25","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"214"},"solar_thermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table title, producer sector headers and source notes"},"solar_thermal_period":{"value":"January through August 2026","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_published_generation_change":{"value":null,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Ohio row; column3","unit":"percent","measurement_role":"published_solar_thermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"solar_thermal_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"other_energy_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"other_energy_period":{"value":"January through August 2026","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_prior_period":{"value":"January through August 2025","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_all_generation":{"value":null,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"other_energy_prior_all_generation":{"value":-1.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"-1"},"other_energy_published_generation_change":{"value":null,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Ohio row; column3","unit":"percent","measurement_role":"published_other_energy_generation_percentage_change","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"other_energy_utility_generation":{"value":-0.07,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"-0.07"},"other_energy_prior_utility_generation":{"value":-0.31,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"-0.31"},"other_energy_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_ipp_generation":{"value":-3.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"-3"},"other_energy_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_industrial_generation":{"value":null,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"other_energy_prior_industrial_generation":{"value":null,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"geothermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table title, producer sector headers and source notes"},"geothermal_period":{"value":"January through August 2026","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_published_generation_change":{"value":null,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Ohio row; column3","unit":"percent","measurement_role":"published_geothermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"geothermal_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"biomass_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"biomass_period":{"value":"January through August 2026","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_prior_period":{"value":"January through August 2025","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_all_generation":{"value":187.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"187"},"biomass_prior_all_generation":{"value":214.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"214"},"biomass_published_generation_change":{"value":-12.7,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Ohio row; column3","unit":"percent","measurement_role":"published_biomass_generation_percentage_change","source_token":"-12.7%"},"biomass_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_ipp_generation":{"value":90.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"90"},"biomass_prior_ipp_generation":{"value":92.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"92"},"biomass_commercial_generation":{"value":5.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"5"},"biomass_prior_commercial_generation":{"value":4.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"4"},"biomass_industrial_generation":{"value":92.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"92"},"biomass_prior_industrial_generation":{"value":118.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"118"},"petroleum_liquids_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_liquids_period":{"value":"January through August 2026","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_prior_period":{"value":"January through August 2025","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_all_generation":{"value":165.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"165"},"petroleum_liquids_prior_all_generation":{"value":114.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"114"},"petroleum_liquids_published_generation_change":{"value":44.8,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Ohio row; column3","unit":"percent","measurement_role":"published_petroleum_liquids_generation_percentage_change","source_token":"44.8%"},"petroleum_liquids_utility_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_prior_utility_generation":{"value":19.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"19"},"petroleum_liquids_ipp_generation":{"value":119.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"119"},"petroleum_liquids_prior_ipp_generation":{"value":90.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"90"},"petroleum_liquids_commercial_generation":{"value":3.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"3"},"petroleum_liquids_prior_commercial_generation":{"value":2.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"2"},"petroleum_liquids_industrial_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_prior_industrial_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_coke_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_coke_period":{"value":"January through August 2026","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_prior_period":{"value":"January through August 2025","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_all_generation":{"value":647.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"647"},"petroleum_coke_prior_all_generation":{"value":649.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"649"},"petroleum_coke_published_generation_change":{"value":-0.4,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Ohio row; column3","unit":"percent","measurement_role":"published_petroleum_coke_generation_percentage_change","source_token":"-0.4%"},"petroleum_coke_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_ipp_generation":{"value":647.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"647"},"petroleum_coke_prior_ipp_generation":{"value":649.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"649"},"petroleum_coke_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_industrial_generation":{"value":0.08,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0.08"},"petroleum_coke_prior_industrial_generation":{"value":0.01,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0.01"},"other_fossil_gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table title, producer sector headers and source notes"},"other_fossil_gas_period":{"value":"January through August 2026","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_prior_period":{"value":"January through August 2025","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_all_generation":{"value":400.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"400"},"other_fossil_gas_prior_all_generation":{"value":567.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"567"},"other_fossil_gas_published_generation_change":{"value":-29.4,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Ohio row; column3","unit":"percent","measurement_role":"published_other_fossil_gas_generation_percentage_change","source_token":"-29.4%"},"other_fossil_gas_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_ipp_generation":{"value":290.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"290"},"other_fossil_gas_prior_ipp_generation":{"value":441.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"441"},"other_fossil_gas_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_industrial_generation":{"value":110.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"110"},"other_fossil_gas_prior_industrial_generation":{"value":126.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"126"},"nonhydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table title, producer sector headers and source notes"},"nonhydro_period":{"value":"January through August 2026","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_prior_period":{"value":"January through August 2025","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_all_generation":{"value":9502.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Ohio row; column1","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"9,502"},"nonhydro_prior_all_generation":{"value":8005.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Ohio row; column2","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"8,005"},"nonhydro_published_generation_change":{"value":18.7,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Ohio row; column3","unit":"percent","measurement_role":"published_nonhydro_generation_percentage_change","source_token":"18.7%"},"nonhydro_utility_generation":{"value":5.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Ohio row; column4","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"5"},"nonhydro_prior_utility_generation":{"value":6.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Ohio row; column5","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"6"},"nonhydro_ipp_generation":{"value":9346.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Ohio row; column6","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"9,346"},"nonhydro_prior_ipp_generation":{"value":7838.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Ohio row; column7","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"7,838"},"nonhydro_commercial_generation":{"value":13.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Ohio row; column8","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"13"},"nonhydro_prior_commercial_generation":{"value":10.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Ohio row; column9","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"10"},"nonhydro_industrial_generation":{"value":137.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Ohio row; column10","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"137"},"nonhydro_prior_industrial_generation":{"value":151.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Ohio row; column11","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"151"}}},{"id":"capacity-state-utility-oh-202608","subject":"Ohio utility scale net summer capacity","kind":"capacity_context","state_codes":["oh"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","fields":{"utility_capacity_basis":{"value":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Title,technology headers and exclusions"},"utility_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Column headers"},"utility_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Column headers"},"status":{"value":"historical","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Dated source period"},"utility_capacity_renewables":{"value":6286.5,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Ohio row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"6,286.5"},"utility_capacity_renewables_prior":{"value":5547.1,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Ohio row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"5,547.1"},"utility_capacity_fossil":{"value":24701.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Ohio row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"24,701.0"},"utility_capacity_fossil_prior":{"value":23800.6,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Ohio row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"23,800.6"},"utility_capacity_pumped_storage":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Ohio row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_pumped_storage_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Ohio row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_other_storage":{"value":35.8,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Ohio row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"35.8"},"utility_capacity_other_storage_prior":{"value":46.8,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Ohio row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"46.8"},"utility_capacity_nuclear":{"value":2134.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Ohio row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"2,134.0"},"utility_capacity_nuclear_prior":{"value":2134.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Ohio row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"2,134.0"},"utility_capacity_other_sources":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Ohio row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_other_sources_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Ohio row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_all":{"value":33157.3,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Ohio row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"33,157.3"},"utility_capacity_all_prior":{"value":31528.5,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Ohio row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"31,528.5"},"renew_capacity_basis":{"value":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Title,technology headers and exclusions"},"renew_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Column headers"},"renew_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Column headers"},"renew_capacity_status":{"value":"historical","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Dated source period"},"renew_capacity_wind":{"value":1234.9,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,234.9"},"renew_capacity_wind_prior":{"value":1094.6,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,094.6"},"renew_capacity_solar_pv":{"value":4874.5,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"4,874.5"},"renew_capacity_solar_pv_prior":{"value":4271.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"4,271.0"},"renew_capacity_solar_thermal":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_solar_thermal_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_conventional_hydro":{"value":96.7,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"96.7"},"renew_capacity_conventional_hydro_prior":{"value":96.7,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"96.7"},"renew_capacity_biomass":{"value":80.4,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"80.4"},"renew_capacity_biomass_prior":{"value":84.8,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"84.8"},"renew_capacity_geothermal":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_geothermal_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_total_utility":{"value":6286.5,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"6,286.5"},"renew_capacity_total_utility_prior":{"value":5547.1,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"5,547.1"},"renew_capacity_small_pv_estimated":{"value":542.8,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column15","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"542.8"},"renew_capacity_small_pv_estimated_prior":{"value":451.1,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column16","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"451.1"},"renew_capacity_combined_pv_estimated":{"value":5417.3,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column17","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"5,417.3"},"renew_capacity_combined_pv_estimated_prior":{"value":4722.1,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column18","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"4,722.1"},"renew_capacity_combined_solar_estimated":{"value":5417.3,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column19","unit":"MW","measurement_role":"estimated_solar_net_summer_capacity","source_token":"5,417.3"},"renew_capacity_combined_solar_estimated_prior":{"value":4722.1,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Ohio row,column20","unit":"MW","measurement_role":"estimated_solar_net_summer_capacity","source_token":"4,722.1"},"fossil_capacity_basis":{"value":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Title,technology headers and exclusions"},"fossil_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Column headers"},"fossil_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Column headers"},"fossil_capacity_status":{"value":"historical","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Dated source period"},"fossil_capacity_gas_combined_cycle":{"value":11430.4,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"11,430.4"},"fossil_capacity_gas_combined_cycle_prior":{"value":10530.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"10,530.0"},"fossil_capacity_gas_combustion_turbine":{"value":5718.5,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"5,718.5"},"fossil_capacity_gas_combustion_turbine_prior":{"value":5718.5,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"5,718.5"},"fossil_capacity_gas_other":{"value":96.1,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"96.1"},"fossil_capacity_gas_other_prior":{"value":96.1,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"96.1"},"fossil_capacity_coal":{"value":6620.5,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"6,620.5"},"fossil_capacity_coal_prior":{"value":6620.5,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"6,620.5"},"fossil_capacity_petroleum_coke":{"value":145.5,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"145.5"},"fossil_capacity_petroleum_coke_prior":{"value":145.5,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"145.5"},"fossil_capacity_petroleum_liquids":{"value":506.6,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"506.6"},"fossil_capacity_petroleum_liquids_prior":{"value":506.6,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"506.6"},"fossil_capacity_other_fossil_gas":{"value":183.4,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"183.4"},"fossil_capacity_other_fossil_gas_prior":{"value":183.4,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"183.4"},"fossil_capacity_total":{"value":24701.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column15","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"24,701.0"},"fossil_capacity_total_prior":{"value":23800.6,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Ohio row,column16","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"23,800.6"},"reported_new_unit_rows":{"value":9,"source_ids":["eia-new-utility-units-aug2026"],"scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","locator":"Calculated count of Table6.3 rows for OH","unit":"generators","measurement_role":"calculated_count_reported_new_utility_unit_rows"},"reported_new_unit_capacity_sum":{"value":1432.5,"source_ids":["eia-new-utility-units-aug2026"],"scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","locator":"Calculated sum of rounded Table6.3 Net Summer Capacity(MW) cells for OH","unit":"MW","measurement_role":"calculated_sum_reported_unit_net_summer_capacity"},"reported_new_unit_basis":{"value":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","source_ids":["eia-new-utility-units-aug2026"],"scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","locator":"Table6.3 title,columns,notes and explicit calculation scope"},"reported_retired_unit_rows":{"value":1,"source_ids":["eia-retired-utility-units-aug2026"],"scope":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","locator":"Calculated count of Table6.4 rows for OH","unit":"generators","measurement_role":"calculated_count_reported_retired_utility_unit_rows"},"reported_retired_unit_capacity_sum":{"value":5.0,"source_ids":["eia-retired-utility-units-aug2026"],"scope":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","locator":"Calculated sum of rounded Table6.4 Net Summer Capacity(MW) cells for OH","unit":"MW","measurement_role":"calculated_sum_reported_retired_unit_net_summer_capacity"},"reported_retired_unit_basis":{"value":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","source_ids":["eia-retired-utility-units-aug2026"],"scope":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","locator":"Table6.4 title,columns,notes and explicit calculation scope"},"reported_planned_unit_rows":{"value":29,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for OH across all source target dates,not simultaneous supply","unit":"generators","measurement_role":"calculated_count_reported_planned_utility_unit_rows"},"reported_planned_unit_capacity_sum":{"value":3466.1,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for OH across all source target dates,not simultaneous supply","unit":"MW","measurement_role":"calculated_sum_planned_unit_net_summer_capacity"},"reported_planned_unit_nameplate_sum":{"value":3431.6,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for OH across all source target dates,not simultaneous supply","unit":"MW","measurement_role":"calculated_sum_planned_unit_nameplate_capacity"},"reported_planned_unit_complete_nonoperating_rows":{"value":2,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for OH across all source target dates,not simultaneous supply","unit":"generators","measurement_role":"calculated_count_reported_complete_nonoperating_planned_units"},"reported_planned_unit_basis":{"value":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Table6.5 title,status/date/capacity columns,notes and explicit calculation boundary"},"reported_retirement_plan_rows":{"value":1,"source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Calculated from Table6.6 reported rows for OH across all target dates,not simultaneous removal","unit":"generators","measurement_role":"calculated_count_reported_retirement_plan_units"},"reported_retirement_plan_capacity_sum":{"value":620.0,"source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Calculated from Table6.6 reported rows for OH across all target dates,not simultaneous removal","unit":"MW","measurement_role":"calculated_sum_retirement_plan_net_summer_capacity"},"reported_retirement_plan_unknown_month_rows":{"value":0,"source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Calculated from Table6.6 reported rows for OH across all target dates,not simultaneous removal","unit":"generators","measurement_role":"calculated_count_retirement_plan_missing_months"},"reported_retirement_plan_basis":{"value":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Table6.6 title/date/capacity columns,notes and explicit calculation scope"}}},{"id":"power-ieee-reliability-2025-oh","kind":"reliability_context","subject":"Ohio historical IEEE distribution reliability2025 and2024","state_codes":["oh"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","fields":{"status":{"value":"historical","source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 years2025 and2024"},"ieee_reliability_basis":{"value":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 header and definitions"},"ieee_coverage_2025":{"value":96.7,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;coverage;Year 2025","source_token":"96.7%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"ieee_coverage_2024":{"value":96.5,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;coverage;Year 2024","source_token":"96.5%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saidi_2025":{"value":205.5,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;all_events_saidi;Year 2025","source_token":"205.5","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saidi_2024":{"value":511.0,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;all_events_saidi;Year 2024","source_token":"511","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saifi_2025":{"value":1.275,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;all_events_saifi;Year 2025","source_token":"1.275","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saifi_2024":{"value":1.298,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;all_events_saifi;Year 2024","source_token":"1.298","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_caidi_2025":{"value":161.2,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;all_events_caidi;Year 2025","source_token":"161.2","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_caidi_2024":{"value":393.7,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;all_events_caidi;Year 2024","source_token":"393.7","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saidi_2025":{"value":130.1,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;without_major_days_saidi;Year 2025","source_token":"130.1","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saidi_2024":{"value":133.3,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;without_major_days_saidi;Year 2024","source_token":"133.3","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saifi_2025":{"value":1.082,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;without_major_days_saifi;Year 2025","source_token":"1.082","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saifi_2024":{"value":0.999,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;without_major_days_saifi;Year 2024","source_token":"0.999","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_caidi_2025":{"value":120.3,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;without_major_days_caidi;Year 2025","source_token":"120.3","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_caidi_2024":{"value":133.4,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;without_major_days_caidi;Year 2024","source_token":"133.4","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saidi_2025":{"value":187.5,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;loss_supply_removed_saidi;Year 2025","source_token":"187.5","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saidi_2024":{"value":500.3,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;loss_supply_removed_saidi;Year 2024","source_token":"500.3","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saifi_2025":{"value":1.117,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;loss_supply_removed_saifi;Year 2025","source_token":"1.117","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saifi_2024":{"value":1.124,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;loss_supply_removed_saifi;Year 2024","source_token":"1.124","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_caidi_2025":{"value":167.9,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;loss_supply_removed_caidi;Year 2025","source_token":"167.9","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_caidi_2024":{"value":445.1,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Ohio row;loss_supply_removed_caidi;Year 2024","source_token":"445.1","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"saidi_history_ieee_all_events_2023":{"value":366.6,"source_token":"366.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_all_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2022":{"value":413.6,"source_token":"413.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_all_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2021":{"value":244.9,"source_token":"244.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_all_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2020":{"value":283.6,"source_token":"283.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_all_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2019":{"value":303.8,"source_token":"303.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_all_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2018":{"value":240.3,"source_token":"240.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_all_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2017":{"value":246.8,"source_token":"246.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_all_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2016":{"value":169.5,"source_token":"169.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_all_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2015":{"value":167.5,"source_token":"167.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_all_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2023":{"value":127.1,"source_token":"127.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_without_major_days;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2022":{"value":144.1,"source_token":"144.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_without_major_days;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2021":{"value":136.0,"source_token":"136","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_without_major_days;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2020":{"value":129.2,"source_token":"129.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_without_major_days;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2019":{"value":145.2,"source_token":"145.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_without_major_days;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2018":{"value":150.1,"source_token":"150.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_without_major_days;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2017":{"value":141.8,"source_token":"141.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_without_major_days;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2016":{"value":127.1,"source_token":"127.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_without_major_days;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2015":{"value":139.4,"source_token":"139.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_without_major_days;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2023":{"value":336.0,"source_token":"336","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2022":{"value":318.9,"source_token":"318.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2021":{"value":191.7,"source_token":"191.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2020":{"value":261.5,"source_token":"261.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2019":{"value":277.4,"source_token":"277.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2018":{"value":210.4,"source_token":"210.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2017":{"value":225.1,"source_token":"225.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2016":{"value":142.1,"source_token":"142.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2015":{"value":149.8,"source_token":"149.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_basis":{"value":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","source_ids":["eia-epa2025-saidi-state-history"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","locator":"Table11.4 header and method notes;2015-2023 supplemental history"},"saifi_history_ieee_all_events_2023":{"value":1.252,"source_token":"1.252","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_all_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2022":{"value":1.518,"source_token":"1.518","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_all_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2021":{"value":1.33,"source_token":"1.33","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_all_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2020":{"value":1.356,"source_token":"1.356","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_all_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2019":{"value":1.475,"source_token":"1.475","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_all_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2018":{"value":1.408,"source_token":"1.408","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_all_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2017":{"value":1.351,"source_token":"1.351","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_all_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2016":{"value":1.181,"source_token":"1.181","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_all_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2015":{"value":1.193,"source_token":"1.193","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_all_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2023":{"value":0.918,"source_token":"0.918","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_without_major_days;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2022":{"value":1.122,"source_token":"1.122","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_without_major_days;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2021":{"value":1.12,"source_token":"1.12","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_without_major_days;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2020":{"value":1.073,"source_token":"1.073","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_without_major_days;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2019":{"value":1.136,"source_token":"1.136","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_without_major_days;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2018":{"value":1.174,"source_token":"1.174","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_without_major_days;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2017":{"value":1.134,"source_token":"1.134","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_without_major_days;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2016":{"value":1.058,"source_token":"1.058","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_without_major_days;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2015":{"value":1.128,"source_token":"1.128","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_without_major_days;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2023":{"value":1.075,"source_token":"1.075","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2022":{"value":1.204,"source_token":"1.204","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2021":{"value":1.099,"source_token":"1.099","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2020":{"value":1.168,"source_token":"1.168","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2019":{"value":1.224,"source_token":"1.224","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2018":{"value":1.16,"source_token":"1.16","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2017":{"value":1.149,"source_token":"1.149","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2016":{"value":0.989,"source_token":"0.989","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2015":{"value":1.021,"source_token":"1.021","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_basis":{"value":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","source_ids":["eia-epa2025-saifi-state-history"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","locator":"Table11.5 header and method notes;2015-2023 supplemental history"},"caidi_history_ieee_all_events_2023":{"value":292.7,"source_token":"292.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_all_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2022":{"value":272.4,"source_token":"272.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_all_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2021":{"value":184.1,"source_token":"184.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_all_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2020":{"value":209.1,"source_token":"209.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_all_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2019":{"value":206.1,"source_token":"206.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_all_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2018":{"value":170.7,"source_token":"170.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_all_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2017":{"value":182.7,"source_token":"182.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_all_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2016":{"value":143.5,"source_token":"143.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_all_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2015":{"value":140.4,"source_token":"140.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_all_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2023":{"value":138.4,"source_token":"138.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_without_major_days;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2022":{"value":128.5,"source_token":"128.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_without_major_days;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2021":{"value":121.4,"source_token":"121.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_without_major_days;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2020":{"value":120.5,"source_token":"120.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_without_major_days;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2019":{"value":127.8,"source_token":"127.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_without_major_days;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2018":{"value":127.9,"source_token":"127.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_without_major_days;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2017":{"value":125.0,"source_token":"125","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_without_major_days;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2016":{"value":120.2,"source_token":"120.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_without_major_days;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2015":{"value":123.6,"source_token":"123.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_without_major_days;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2023":{"value":312.6,"source_token":"312.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2022":{"value":264.8,"source_token":"264.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2021":{"value":174.5,"source_token":"174.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2020":{"value":224.0,"source_token":"224","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2019":{"value":226.7,"source_token":"226.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2018":{"value":181.3,"source_token":"181.3","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2017":{"value":195.9,"source_token":"195.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2016":{"value":143.7,"source_token":"143.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2015":{"value":146.8,"source_token":"146.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_basis":{"value":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","source_ids":["eia-epa2025-caidi-state-history"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","locator":"Table11.6 header and method notes;2015-2023 supplemental history"}}},{"id":"power-any-reliability-2025-oh","kind":"reliability_context","subject":"Ohio historical any-method distribution reliability2025 and2024","state_codes":["oh"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","fields":{"status":{"value":"historical","source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 years2025 and2024"},"any_reliability_basis":{"value":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 header and definitions"},"any_coverage_2025":{"value":96.8,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Ohio row;coverage;Year 2025","source_token":"96.8%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"any_coverage_2024":{"value":96.6,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Ohio row;coverage;Year 2024","source_token":"96.6%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saidi_2025":{"value":205.4,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Ohio row;all_events_saidi;Year 2025","source_token":"205.4","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saidi_2024":{"value":510.5,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Ohio row;all_events_saidi;Year 2024","source_token":"510.5","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saifi_2025":{"value":1.275,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Ohio row;all_events_saifi;Year 2025","source_token":"1.275","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saifi_2024":{"value":1.298,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Ohio row;all_events_saifi;Year 2024","source_token":"1.298","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_caidi_2025":{"value":161.1,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Ohio row;all_events_caidi;Year 2025","source_token":"161.1","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_caidi_2024":{"value":393.4,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Ohio row;all_events_caidi;Year 2024","source_token":"393.4","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saidi_2025":{"value":130.0,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Ohio row;without_major_events_saidi;Year 2025","source_token":"130","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saidi_2024":{"value":133.2,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Ohio row;without_major_events_saidi;Year 2024","source_token":"133.2","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saifi_2025":{"value":1.082,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Ohio row;without_major_events_saifi;Year 2025","source_token":"1.082","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saifi_2024":{"value":0.999,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Ohio row;without_major_events_saifi;Year 2024","source_token":"0.999","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_caidi_2025":{"value":120.2,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Ohio row;without_major_events_caidi;Year 2025","source_token":"120.2","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_caidi_2024":{"value":133.4,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Ohio row;without_major_events_caidi;Year 2024","source_token":"133.4","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"saidi_history_any_all_events_2023":{"value":366.2,"source_token":"366.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_all_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2022":{"value":413.2,"source_token":"413.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_all_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2021":{"value":244.2,"source_token":"244.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_all_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2020":{"value":283.4,"source_token":"283.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_all_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2019":{"value":305.2,"source_token":"305.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_all_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2018":{"value":242.0,"source_token":"242","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_all_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2017":{"value":248.4,"source_token":"248.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_all_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2016":{"value":174.1,"source_token":"174.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_all_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2015":{"value":172.1,"source_token":"172.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_all_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2023":{"value":127.0,"source_token":"127","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_without_major_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2022":{"value":144.0,"source_token":"144","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_without_major_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2021":{"value":135.9,"source_token":"135.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_without_major_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2020":{"value":129.2,"source_token":"129.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_without_major_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2019":{"value":146.0,"source_token":"146","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_without_major_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2018":{"value":151.5,"source_token":"151.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_without_major_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2017":{"value":143.4,"source_token":"143.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_without_major_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2016":{"value":128.9,"source_token":"128.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_without_major_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2015":{"value":141.0,"source_token":"141","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Ohio row;any_without_major_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_basis":{"value":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","source_ids":["eia-epa2025-saidi-state-history"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","locator":"Table11.4 header and method notes;2015-2023 supplemental history"},"saifi_history_any_all_events_2023":{"value":1.252,"source_token":"1.252","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_all_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2022":{"value":1.517,"source_token":"1.517","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_all_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2021":{"value":1.326,"source_token":"1.326","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_all_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2020":{"value":1.356,"source_token":"1.356","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_all_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2019":{"value":1.474,"source_token":"1.474","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_all_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2018":{"value":1.411,"source_token":"1.411","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_all_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2017":{"value":1.354,"source_token":"1.354","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_all_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2016":{"value":1.184,"source_token":"1.184","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_all_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2015":{"value":1.205,"source_token":"1.205","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_all_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2023":{"value":0.918,"source_token":"0.918","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_without_major_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2022":{"value":1.121,"source_token":"1.121","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_without_major_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2021":{"value":1.121,"source_token":"1.121","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_without_major_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2020":{"value":1.073,"source_token":"1.073","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_without_major_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2019":{"value":1.136,"source_token":"1.136","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_without_major_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2018":{"value":1.178,"source_token":"1.178","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_without_major_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2017":{"value":1.137,"source_token":"1.137","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_without_major_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2016":{"value":1.065,"source_token":"1.065","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_without_major_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2015":{"value":1.141,"source_token":"1.141","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Ohio row;any_without_major_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_basis":{"value":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","source_ids":["eia-epa2025-saifi-state-history"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","locator":"Table11.5 header and method notes;2015-2023 supplemental history"},"caidi_history_any_all_events_2023":{"value":292.5,"source_token":"292.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_all_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2022":{"value":272.4,"source_token":"272.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_all_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2021":{"value":184.1,"source_token":"184.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_all_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2020":{"value":209.0,"source_token":"209","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_all_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2019":{"value":207.1,"source_token":"207.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_all_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2018":{"value":171.6,"source_token":"171.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_all_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2017":{"value":183.6,"source_token":"183.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_all_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2016":{"value":147.1,"source_token":"147.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_all_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2015":{"value":142.8,"source_token":"142.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_all_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2023":{"value":138.4,"source_token":"138.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_without_major_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2022":{"value":128.4,"source_token":"128.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_without_major_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2021":{"value":121.2,"source_token":"121.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_without_major_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2020":{"value":120.4,"source_token":"120.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_without_major_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2019":{"value":128.5,"source_token":"128.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_without_major_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2018":{"value":128.6,"source_token":"128.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_without_major_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2017":{"value":126.1,"source_token":"126.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_without_major_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2016":{"value":121.0,"source_token":"121","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_without_major_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2015":{"value":123.6,"source_token":"123.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Ohio row;any_without_major_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_basis":{"value":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","source_ids":["eia-epa2025-caidi-state-history"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","locator":"Table11.6 header and method notes;2015-2023 supplemental history"}}}],"sources":{"oh-regulator":{"url":"https://occ.ohio.gov/content/data-center-costs-24-0508-el-ata","title":"Data center costs, case 24 0508 EL ATA","publisher":"Office of the Ohio Consumers Counsel","published_on":null,"date_note":"The captured page does not state a publication date.","checked_at":"2026-10-23T11:39:59.859257+00:00","sha256":"d18d41cf62e2175cc9a7f8481483a0f296a25d6fcb15351276f152b2a94f1920","scope":"State consumer agency summary of the 07-09-2025 PUCO adoption and subsequent appeal. This is not the full order.","tier":"A","establishes_status":["approved"]},"oh-utility":{"url":"https://www.aepohio.com/company/about/rates/data-center-tariff/","title":"Data center tariff and customer process","publisher":"AEP Ohio","published_on":null,"date_note":"The captured page does not state a publication date.","checked_at":"2026-10-23T11:36:34.650761+00:00","sha256":"92b959782680d49b80968b5f5b1c1b2f50acdae38d0c60f0e96db614e1616a2f","scope":"Utility summary of Schedule DCT terms, effective date and study process. Exact tariff controls.","tier":"B","establishes_status":[]},"pjm-process":{"url":"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/","title":"Annual process for vetting large load requests","publisher":"PJM Interconnection","published_on":"2026-09-29","date_note":null,"checked_at":"2026-10-23T11:36:35.258210+00:00","sha256":"fd217cefb4a51c7c12bc244d293d2933e95d84ac8115ceb58e7b1f76a192cae6","scope":"PJM says it does not have a load interconnection queue. Utilities submit forecast adjustments. No comparable queue total is established.","tier":"A","establishes_status":[]},"eia-prices":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"Electric Power Monthly, table 5.6.A","publisher":"U.S. Energy Information Administration","published_on":"2026-09-24","date_note":null,"checked_at":"2026-10-23T11:36:34.899891+00:00","sha256":"17ebeca2c90f3f0e5aa41062a2f90952c8ffdf396479281ce6b363ef2fcc1b90","scope":"Captured public table compares July 2026 and July 2025 residential average prices. Preliminary estimates, not bills or data center cost attribution. The next scheduled release is not treated as available.","tier":"A","establishes_status":[],"additional_review_scope":"October26additionalreview of retainedJulycommercialandindustrialcolumns,51states/DC. Originalresidentialscope,clocks,releaseidentityandhashpreserved;no newsourcecapture."},"eia-price-check-20261023-1645":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"EIA table5.6.A August2026 and2025 public HTML capture","publisher":"U.S. Energy Information Administration","published_on":null,"date_note":"Exact publication day is not established by these captures. The table and spreadsheet show August2026 and August2025, while the report page header and main index still identify July2026 with a September24 release and October23 scheduled next release. That older header date is not assigned to these new values.","checked_at":"2026-10-23T16:45:07.936393+00:00","sha256":"fbfc4385f5613eb8d2b118ef2603bd81d1162f33e5ffda2dc8f03a1a3bfeb813","scope":"Public table5.6.A residential state average prices in cents per kWh. All51 state and DC pairs agree across the retained HTML and spreadsheet at the displayed hundredth. 2026values are preliminary and2025values final. Regional divisions and the U.S.total are excluded.","tier":"A","establishes_status":[]},"eia-residential-xlsx-20261023":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx","title":"EIA table5.6.A August2026 and2025 public spreadsheet","publisher":"U.S. Energy Information Administration","published_on":null,"date_note":"Exact publication day is not established by these captures. The table and spreadsheet show August2026 and August2025, while the report page header and main index still identify July2026 with a September24 release and October23 scheduled next release. That older header date is not assigned to these new values.","checked_at":"2026-10-23T16:47:20.189135+00:00","sha256":"7830737eb277be4096b3c0eb491f53c71ff91ce7133e9869b76de61f64f679b9","scope":"Public table5.6.A residential state average prices in cents per kWh. All51 state and DC pairs agree across the retained HTML and spreadsheet at the displayed hundredth. 2026values are preliminary and2025values final. Regional divisions and the U.S.total are excluded.","tier":"A","establishes_status":[]},"oh-aep-contract-news-20260213":{"url":"https://www.aepohio.com/company/news/view?releaseID=10753","title":"AEP Ohio February13,2026 report of data center contract commitments","publisher":"AEP Ohio","published_on":"2026-02-13","date_note":null,"checked_at":"2026-10-23T17:22:06.983571+00:00","sha256":"5e4b7b654c1656245e15284e929b1f2f328d60c2f07a6282885c0d86fec13538","scope":"Utility report of historical study and contract stages as of February12. Not independent validation, actual energized demand, a statewide census or a PUCO approval of each project.","tier":"B","establishes_status":["historical"]},"pjm-aep-adjustment-20260929":{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf","title":"AEP September 2026 large load forecast adjustment submission","publisher":"PJM Load Analysis Subcommittee presentation by American Electric Power","published_on":"2026-09-29","date_note":null,"checked_at":"2026-10-23T20:02:40.416097+00:00","sha256":"c651295ac51b31fad78cfb3e9f4438167c47152ccc612958661a13b4656eebda","scope":"Actual utility submission across named operating companies and five displayed states. Page 6 includes existing and planned submissions; page 7 instead compares incremental planned additions. Includes industrial and crypto loads as well as data centers. No PJM final forecast, actual demand or per state allocation inferred.","tier":"A","establishes_status":["historical"]},"pjm-manual19-current-20261023":{"url":"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf","title":"PJM Manual 19 revision 39 and current forecast adjustment guidelines","publisher":"PJM Interconnection","published_on":null,"date_note":"Original public posting day is unknown. Approval June 29 and effect June 30, 2026 are separately documented, not substituted for publication.","checked_at":"2026-10-23T20:06:42.444133+00:00","sha256":"50434e43f309ae57ca33e49943552a46248ddd1f271086e9a45524c01dabc449","scope":"Actual current clean manual, cover, approval and full Attachment B. Supports adoption of this forecast review procedure only, not tariff approval, final adoption of any submitted forecast or actual connection and load.","tier":"A","establishes_status":["approved"]},"eia-sector-xlsx-20261026":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx","title":"EIA table5.6.A commercial and industrial state comparisons","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"CurrentcapturedHTMLexplicitlyReleaseDateOctober23,2026;nextNovember24isnotactualpublicationofnewdata.","scope":"Commercial/industrial columnsDthroughG XLSX and matchingHTMLrows for50statesandDC,notregionalorUSaggregate rows. State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","checked_at":"2026-10-26T12:25:57.117925+00:00","sha256":"7830737eb277be4096b3c0eb491f53c71ff91ce7133e9869b76de61f64f679b9","tier":"A","establishes_status":["historical"]},"eia-sector-html-20261026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"EIA August2026 price table and released report header","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"CurrentcapturedHTMLexplicitlyReleaseDateOctober23,2026;nextNovember24isnotactualpublicationofnewdata.","scope":"Commercial/industrial columnsDthroughG XLSX and matchingHTMLrows for50statesandDC,notregionalorUSaggregate rows. State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","checked_at":"2026-10-26T12:25:57.563354+00:00","sha256":"fd9538a038063f2ad2d62d799c6616392150c100da2e27001b409a7db61e43c0","tier":"A","establishes_status":["historical"]},"eia-ytd-xlsx-20261026":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx","title":"EIA Table5.6.B January through August cumulative sector prices","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"Report header explicitly releases August2026 data October23,2026. Next scheduled release is not actual publication.","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","checked_at":"2026-10-26T15:32:57.123492+00:00","sha256":"bddeeb6e562bf3c982d11ad990d3ea22285275d7d5a75b54039e19757876994e","tier":"A","establishes_status":["historical"]},"eia-ytd-html-20261026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b","title":"EIA Table5.6.B January through August cumulative sector prices","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"Report header explicitly releases August2026 data October23,2026. Next scheduled release is not actual publication.","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","checked_at":"2026-10-26T15:32:38.218526+00:00","sha256":"8c7409cacc21048b831d96d094400d3a7b2bbac0d4cbd78e84c3d4c99b334a29","tier":"A","establishes_status":["historical"]},"eia-state-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a","title":"EIA Electric Power Monthly Table1.3.A, utility scale facility net generation by state and sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T00:26:58.495431+00:00","sha256":"9a89406a41427b37eda8d8f18d214983c7f51834ebceeb528cdfdb4244f09990","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-net-generation-aug2026.html","tier":"A","scope":"Complete51state/DC utility scale generation rows, not Census division totals or USaggregate. August2026 preliminary versusAugust2025 final;commercial/industrial generator classification is not customer electricity use.","establishes_status":["historical"]},"eia-state-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b","title":"EIA Electric Power Monthly Table1.3.B utility scale facility net generation by state and sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T00:55:44.858242+00:00","sha256":"c8ba76926634a47f369116b1c7820b084eabb24d7d5f83bd1a4683a703f825d6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulative January throughAugust2026/2025 generation rows, not monthlyAugust, annualtotals orCensusdivision/USaggregates. Generatorsectors notcustomeruse.","establishes_status":["historical"]},"eia-state-gas-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a","title":"EIA Electric Power Monthly Table1.7.A utility scale facility net generation from natural gas by state and producer sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T01:25:59.736250+00:00","sha256":"6a32013bfbe60c7bb68a2c80aeadb72b7dd57a7f66a64e835f1ef62beff2fa3e","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-gas-generation-aug2026.html","tier":"A","scope":"Whole51state/DC list for natural gas fuel generation only. Not gasproduction/fuelconsumption/allfuelgeneration ordata-center electricityfuelmix. NM/-- andnegativezero source markers retained.","establishes_status":["historical"]},"eia-state-gas-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b","title":"EIA Electric Power Monthly Table1.7.B utility scale facility net generation from natural gas by state and producer sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T01:55:48.321070+00:00","sha256":"c306bd11fb76bc034b474ed8f06f7c29000d2b93b10afe14ee9a3563220db80c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-gas-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulativeJanthroughAug naturalgas generation rows,notmonthlyAugust/annualtotals,gasproduction/fuelconsumption ordata-centerfuelmix. Publishedpercentagescalculatedbeforerounding;NMand--retainliteralmeaning.","establishes_status":["historical"]},"eia-state-nuclear-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a","title":"EIA Electric Power Monthly Table1.9.A utility scale facility net generation from nuclear energy by state and producer sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T05:25:41.261720+00:00","sha256":"ae346eb0bc5140a0fe5e38187badd5ce334c10c1468707f4af5147d56dacdb28","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nuclear-generation-aug2026.html","tier":"A","scope":"Complete51state/DC nuclear generation rows,not installedcapacity/plantinventory,customerdemand,deliveredpowerfuelmix or emissions. Preliminary2026/final2025;sourcepercentagecalculatedbeforerounding. Zero generation notabsenceofnuclearcapacity.","establishes_status":["historical"]},"eia-state-nuclear-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b","title":"EIA Electric Power Monthly Table1.9.B utility scale facility net generation from nuclear energy by state and producer sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T05:55:38.727441+00:00","sha256":"159560c5a77a375a4c2f3ebb7aab21c2ecfb013d23fa7baa0781eddf7e642471","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nuclear-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulativeJanthroughAug nuclear netgeneration rows,notmonthlyAugust/annualtotals,capacity/plantinventory or data-center deliveredfuelmix. Preliminary2026/final2025;publishedpercentagebeforerounding,zero notplantabsence.","establishes_status":["historical"]},"eia-state-coal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a","title":"EIA Electric Power Monthly Table1.4.A August2026/2025 utility scale facility net generation from coal by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:26:07.500962+00:00","sha256":"fc35026730bc070c8b0094d7394bd496c2fed4e09aa42688371d0ca1a1246495","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-coal-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC coal netgeneration rows;monthlyAugust notYTD;notcoalreceipts/fuelconsumption/capacity/plantinventory/emissions ordata-centerfuelmix. Preliminary2026/final2025,sourceNM/--percentagesnotzero.","establishes_status":["historical"]},"eia-state-coal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b","title":"EIA Electric Power Monthly Table1.4.B cumulativeJanuarythroughAugust2026/2025 utility scale facility net generation from coal by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:26:07.859775+00:00","sha256":"69316d2a9768e8ff9285da375c444eb7b187c4caefbda6d753bf9cbbc5dca9d3","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-coal-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC coal netgeneration rows;cumulativeYTD notmonthly/annual;notcoalreceipts/fuelconsumption/capacity/plantinventory/emissions ordata-centerfuelmix. Preliminary2026/final2025,sourceNM/--percentagesnotzero.","establishes_status":["historical"]},"eia-state-wind-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a","title":"EIA Electric Power Monthly Table1.14.A August2026/2025 utility scale facility net generation from wind by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:56:02.206920+00:00","sha256":"e58a6e19a58949e89669f6a56b58918418a443c305a4ac8bcc1d37417abcb437","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-wind-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC wind netgeneration rows;monthAugust notYTD;notcapacity/turbineinventory,renewableprocurement/hourlymatching,deliveredpower oravoidedemissions. Preliminary2026/final2025;NM/--retained,zero notcapacityabsence.","establishes_status":["historical"]},"eia-state-wind-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b","title":"EIA Electric Power Monthly Table1.14.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from wind by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:56:02.511460+00:00","sha256":"ea80ce88a0eb5af674faa0e89b52b7a03a1af2fe547f6750160c5c895281a03c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-wind-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC wind netgeneration rows;cumulativeYTD notmonth/annual;notcapacity/turbineinventory,renewableprocurement/hourlymatching,deliveredpower oravoidedemissions. Preliminary2026/final2025;NM/--retained,zero notcapacityabsence.","establishes_status":["historical"]},"eia-state-hydro-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a","title":"EIA Electric Power Monthly Table1.10.A August2026/2025 utility scale facility net generation from conventional hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:30:06.432055+00:00","sha256":"9e12df2bd7d252a9fa01d46fc8457ba8ad61319a7eab99f9314316b04c3b3589","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-hydro-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC conventionalhydro generation rows,excludingpumpedstorage;monthAugust notYTD;notreservoirlevels/wateravailability/withdrawal,capacity/daminventory,deliveredpower/renewableprocurement oravoidedemissions. Preliminary2026/final2025;NM/--retained.","establishes_status":["historical"]},"eia-state-hydro-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b","title":"EIA Electric Power Monthly Table1.10.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from conventional hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:30:07.032975+00:00","sha256":"4b7f8c5f24097203262594ab1a5943139918233f3fe99b4eec3c6c40f7ec4565","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-hydro-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC conventionalhydro generation rows,excludingpumpedstorage;cumulativeYTD notmonth/annual;notreservoirlevels/wateravailability/withdrawal,capacity/daminventory,deliveredpower/renewableprocurement oravoidedemissions. Preliminary2026/final2025;NM/--retained.","establishes_status":["historical"]},"eia-state-pumped-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a","title":"EIA Electric Power Monthly Table1.12.A August2026/2025 utility scale facility net generation from pumped storage hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:55:51.178196+00:00","sha256":"f47cb6a724ad141bfef77dd1b93133635b60b03ef6f373012aeee441f3fd250b","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-pumped-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC pumpedstorage netgeneration rows,separatefromconventionalhydro;month notYTD;negativevalueskept,notstoragecapacity/grossdischargedenergy/efficiency/waterwithdrawal ordatacenterpower. Preliminary2026/final2025,undefinedpercentmarkersretained.","establishes_status":["historical"]},"eia-state-pumped-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b","title":"EIA Electric Power Monthly Table1.12.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from pumped storage hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:55:51.535361+00:00","sha256":"7adac72989762f18b744568df6258ad9a8ef9c26b3e6b3acee36d31948f85ec2","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-pumped-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC pumpedstorage netgeneration rows,separatefromconventionalhydro;YTD notmonth/annual;negativevalueskept,notstoragecapacity/grossdischargedenergy/efficiency/waterwithdrawal ordatacenterpower. Preliminary2026/final2025,undefinedpercentmarkersretained.","establishes_status":["historical"]},"eia-state-solar-pv-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a","title":"EIA Electric Power Monthly Table1.17.A solar photovoltaic state net generation: utility scale and estimated small scale, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:26:06.274803+00:00","sha256":"527d6c8a60272658c71f308929e0f68ee652fd8c922947fe574963371e6f2b56","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-pv-generation-month-aug2026.html","tier":"A","scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","establishes_status":["historical"]},"eia-state-solar-pv-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b","title":"EIA Electric Power Monthly Table1.17.B solar photovoltaic state net generation: utility scale and estimated small scale, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:26:06.616834+00:00","sha256":"6f6fce2d81012f27d144838cc41d611e8d7e5b75c472289c064f1934cdf6be4c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-pv-generation-ytd-aug2026.html","tier":"A","scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","establishes_status":["historical"]},"eia-state-solar-thermal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a","title":"EIA Electric Power Monthly Table1.18.A solar thermal utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:55:36.602781+00:00","sha256":"9741f9ca822bd33c5ed8414f2dc95dcfa451ac39975a3207e188104d9303f7aa","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-thermal-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","establishes_status":["historical"]},"eia-state-solar-thermal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b","title":"EIA Electric Power Monthly Table1.18.B solar thermal utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:55:36.899676+00:00","sha256":"522fb2bee7cace3160be662d153680672e3d07c3494ac1882b71561f7514e22e","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-thermal-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","establishes_status":["historical"]},"eia-state-other-energy-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a","title":"EIA Electric Power Monthly Table1.13.A Other Energy Sources utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:25:44.215156+00:00","sha256":"b8589b23d096be4e03c11bedffc6d7af0bed5fa2ec64fa89e2f21624909cc7b6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Capture filename initially called geothermal in error; exact source title is Other Energy Sources. Filename is not evidence of fuel identity.","establishes_status":["historical"]},"eia-state-other-energy-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b","title":"EIA Electric Power Monthly Table1.13.B Other Energy Sources utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:25:44.437082+00:00","sha256":"cc0d7f4a0db49596101f43d4cd1103a6b80dcb399ed620f52157ffa31e28269c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Capture filename initially called geothermal in error; exact source title is Other Energy Sources. Filename is not evidence of fuel identity.","establishes_status":["historical"]},"eia-state-geothermal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a","title":"EIA Electric Power Monthly Table1.16.A Geothermal utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:55:37.792695+00:00","sha256":"430765fda25b13841593833228c799f768849344f4e4645d5c29783c76b3a310","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-actual-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","establishes_status":["historical"]},"eia-state-geothermal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b","title":"EIA Electric Power Monthly Table1.16.B Geothermal utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:55:38.021096+00:00","sha256":"02b888bc082f02e9a803e89552c180df37b090ac4bb92376bcc69f668a9bc109","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-actual-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","establishes_status":["historical"]},"eia-state-biomass-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a","title":"EIA Electric Power Monthly Table1.15.A Biomass utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:25:40.960261+00:00","sha256":"1f5e6b6e275bacc2d88c3d2692efda69e80284e71dddfd1e5caca84dffae92d4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-biomass-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","establishes_status":["historical"]},"eia-state-biomass-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b","title":"EIA Electric Power Monthly Table1.15.B Biomass utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:25:41.153412+00:00","sha256":"f3f3f854afa04798193429529b13e82f74000ac95e7d1a2a12aa51662437eca2","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-biomass-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","establishes_status":["historical"]},"eia-state-petroleum-liquids-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a","title":"EIA Electric Power Monthly Table1.5.A Petroleum Liquids utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:44.484512+00:00","sha256":"a23eb87738ca68822004a0426eed58a8ea1b0ee0f5ae96170253a31cbd18942f","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-liquids-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-liquids-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b","title":"EIA Electric Power Monthly Table1.5.B Petroleum Liquids utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:44.728254+00:00","sha256":"5ee9f2be2884f3e256ce2a3e02c8270753ab2e5d7ab0507d54250638c00487a8","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-liquids-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-coke-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a","title":"EIA Electric Power Monthly Table1.6.A Petroleum Coke utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:45.070566+00:00","sha256":"64935012da6e62146d74425ac1c830a9c62e840901393f03f3ad363dad2f9d17","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-coke-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-coke-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b","title":"EIA Electric Power Monthly Table1.6.B Petroleum Coke utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:45.279055+00:00","sha256":"1e09b99b06270a93a8293578b1e47c67dcdddf03959878851a1ac453f2202f80","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-coke-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-other-fossil-gas-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a","title":"EIA Electric Power Monthly Table1.8.A Other Fossil Gas utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:25:42.932701+00:00","sha256":"ebc1838c0d9e26e1884695c95399f2793f7fa08d6de5762f9ab8c0a5daebda9c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-other-gases-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Index uses Other Gases; original table title specifies Other Fossil Gas, retained here without equating Natural Gas.","establishes_status":["historical"]},"eia-state-other-fossil-gas-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b","title":"EIA Electric Power Monthly Table1.8.B Other Fossil Gas utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:25:43.279403+00:00","sha256":"b273bf54a3b99a153e08448d69e5e56cf5496cc792125e6a73f9e4e915a27104","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-other-gases-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Index uses Other Gases; original table title specifies Other Fossil Gas, retained here without equating Natural Gas.","establishes_status":["historical"]},"eia-state-nonhydro-renewables-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a","title":"EIA Electric Power Monthly Table1.11.A Renewable Sources Excluding Hydroelectric utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:55:43.156505+00:00","sha256":"d98e7e79804a0ccd737e9ac399f64c210a141f7df3200368f3a2b0a6433f6f00","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nonhydro-renewables-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","establishes_status":["historical"]},"eia-state-nonhydro-renewables-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b","title":"EIA Electric Power Monthly Table1.11.B Renewable Sources Excluding Hydroelectric utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:55:43.340447+00:00","sha256":"3d4249d5d441323d0849b1fdb08845cb45ee2587311b84364aa75d52f0dce665","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nonhydro-renewables-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","establishes_status":["historical"]},"eia-state-retail-sales-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a","title":"EIA Electric Power Monthly Table5.4.A Sales of Electricity to Ultimate Customers by End-Use Sector,by State, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:01:02.155248+00:00","sha256":"f289ad1eb2b68b07f015bb846f8c19135fbbe9ff4a5aabead8de9796c354212f","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-sales-month-aug2026.html","tier":"A","scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","establishes_status":["historical"]},"eia-state-retail-sales-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b","title":"EIA Electric Power Monthly Table5.4.B Sales of Electricity to Ultimate Customers by End-Use Sector,by State, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:01:02.440305+00:00","sha256":"836b3186730666bcf3a4adcbe5fd29931786fffc3cd5663f22dfde4ee2389243","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-sales-ytd-aug2026.html","tier":"A","scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","establishes_status":["historical"]},"eia-state-retail-revenue-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a","title":"EIA Electric Power Monthly Table5.5.A Revenue from Sales of Electricity to Ultimate Customers by End-Use Sector,by State, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:30:48.417748+00:00","sha256":"67b465253fdf956455755bd3ca342eeee983672af9cf883ec12fc3bdacd8eba6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-revenue-month-aug2026.html","tier":"A","scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","establishes_status":["historical"]},"eia-state-retail-revenue-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b","title":"EIA Electric Power Monthly Table5.5.B Revenue from Sales of Electricity to Ultimate Customers by End-Use Sector,by State, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:30:49.025316+00:00","sha256":"f3630914ac0a13920af8b7afad9e321630c90d87731b7ca06b278312db06273b","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-revenue-ytd-aug2026.html","tier":"A","scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","establishes_status":["historical"]},"eia-state-retail-customers-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08","title":"EIA Electric Power Monthly Table5.8 Number of Ultimate Customers Served by Sector by State:August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T17:01:56.921729+00:00","sha256":"94daef9ec234f1151524adbc5a5a221aeaccc71a48d1c117663f50a52a89d2b7","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-customers-aug2026.html","tier":"A","scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","establishes_status":["historical"]},"eia-state-utility-capacity-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a","title":"EIA Electric Power Monthly Table6.2.A Net Summer Capacity of Utility Scale Units by Technology and State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:03:55.269501+00:00","sha256":"489bfa1db54aa8bebb976a2f1f0e9e6f85076837cdb16b785ce7727484a41ef4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-aug2026.html","tier":"A","scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","establishes_status":["historical"]},"eia-state-utility-capacity-b-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b","title":"EIA Electric Power Monthly Table6.2.B Net Summer Capacity Using Primarily Renewable Energy Sources and by State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:33:44.899891+00:00","sha256":"20f576441d75cc9a13b4fecd53baea7b9c348ce5a405db26a130ba9d907cd6e5","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-b-aug2026.html","tier":"A","scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","establishes_status":["historical"]},"eia-state-utility-capacity-c-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c","title":"EIA Electric Power Monthly Table6.2.C Net Summer Capacity of Utility Scale Units Using Primarily Fossil Fuels and by State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:33:45.187621+00:00","sha256":"c02ce3ee446a70f915c4a47e07e680b6b048cf2b1d7e51cb055c1a6beeab78a7","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-c-aug2026.html","tier":"A","scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","establishes_status":["historical"]},"eia-new-utility-units-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03","title":"EIA Electric Power Monthly Table6.3 New Utility Scale Generating Units by Operating Company,Plant,and Month,2026(January-August rows)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T19:04:07.797419+00:00","sha256":"051d48e2118d42562fccb54c91dc2e566cea1e24bf3dd2ccfff5094597e72f5f","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-new-utility-units-aug2026.html","tier":"A","scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","establishes_status":["historical"]},"eia-retired-utility-units-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_04","title":"EIA Electric Power Monthly Table6.4 Retired Utility Scale Generating Units by Operating Company,Plant,and Month,2026(January-August rows)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T19:33:44.657669+00:00","sha256":"082ac6feac8278666b21661a55d6546b8a3f45379be8727ffeed79c635c3f76a","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-retired-utility-units-aug2026.html","tier":"A","scope":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","establishes_status":["historical"]},"eia-planned-utility-additions-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05","title":"EIA Electric Power Monthly Table6.5 Planned U.S.Electric Generating Unit Additions(August2026 dataset)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T20:03:52.284370+00:00","sha256":"769a513425ec30e9bf6983fc4186d2f367e253fb6ed1072537ae44495c762912","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-planned-utility-additions-aug2026.html","tier":"A","scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","establishes_status":["historical"]},"eia-planned-utility-retirements-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06","title":"EIA Electric Power Monthly Table6.6 Planned U.S.Electric Generating Unit Retirements(August2026 dataset)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T20:33:47.123009+00:00","sha256":"41ddaac546510a68c479078c4a014eb477bf8d230f0a4a2c18e6596f4f2f1f71","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-planned-utility-retirements-aug2026.html","tier":"A","scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","establishes_status":["historical"]},"eia-epa2025-ieee-reliability-states":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.2 IEEE distribution reliability by state2025 and2024","published_on":"2026-10-21","checked_at":"2026-10-27T23:04:08.692385+00:00","sha256":"5709d427dc11697b35e5e04aa1a247483fe64906acac03437366504ec591003c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-reliability-ieee-20261027.html","tier":"A","establishes_status":["historical"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution."},"eia-epa2025-any-reliability-states":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.3 any-method distribution reliability by state2025 and2024","published_on":"2026-10-21","checked_at":"2026-10-27T23:33:56.041642+00:00","sha256":"40cf45b1731954b256ee1d6c79f2e29b126baf8012ba47794d6546dd6f239cb5","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-reliability-any-method-20261027.html","tier":"A","establishes_status":["historical"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins."},"eia-epa2025-saidi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.4 annual SAIDI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T00:04:10.386421+00:00","sha256":"52f619cdbec1026136cd0b2a0414cc6b551066272aebf2de3c6ddee772b1fc3d","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-saidi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution."},"eia-epa2025-saifi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.5 annual SAIFI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T00:34:19.009385+00:00","sha256":"6b41da37d3a8d7491eee3d7355e4625b385f362fb6c4796d0335b92f4d0b3ff4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-saifi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation."},"eia-epa2025-caidi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.6 annual CAIDI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T01:03:57.191681+00:00","sha256":"1b065b30dbde195e80079c282ba99411c62ead9d971e378dd03df0baae861675","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-caidi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution."}},"details":[{"id":"tariff-oh","html":"<article><h3>AEP Ohio</h3><p class=\"layer-scope\">AEP Ohio territory. Subsequent court appeal is disclosed by the state source. No ruling on that appeal is inferred.</p><dl class=\"layer-fields\"><dt>Utility</dt><dd>AEP Ohio<span class=\"layer-source\"><a href=\"https://occ.ohio.gov/content/data-center-costs-24-0508-el-ata\">Office of the Ohio Consumers Counsel</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Named utility or proceeding. Locator: Heading and named utility.</p></dd><dt>Status</dt><dd>approved<span class=\"layer-source\"><a href=\"https://occ.ohio.gov/content/data-center-costs-24-0508-el-ata\">Office of the Ohio Consumers Counsel</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Documented outcome in this source; subsequent changes are not inferred. Locator: Disposition or proposal section.</p></dd><dt>Docket</dt><dd>24-0508-EL-ATA<span class=\"layer-source\"><a href=\"https://occ.ohio.gov/content/data-center-costs-24-0508-el-ata\">Office of the Ohio Consumers Counsel</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Specific PUCO proceeding. Locator: Case heading.</p></dd><dt>Approved on</dt><dd>July 9, 2025<span class=\"layer-source\"><a href=\"https://occ.ohio.gov/content/data-center-costs-24-0508-el-ata\">Office of the Ohio Consumers Counsel</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">PUCO adoption date, not energization. Locator: Update paragraph.</p></dd><dt>Threshold</dt><dd>New facilities or expansions at 25 MW or greater enter the stated study process. Affiliated loads can aggregate.<span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/about/rates/data-center-tariff/\">AEP Ohio</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Study threshold. Exact tariff applicability controls. Locator: Mandatory process and aggregation.</p></dd><dt>Contract length</dt><dd>Eight years plus a ramp period of up to four years.<span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/about/rates/data-center-tariff/\">AEP Ohio</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Maximum initial term can reach twelve years. Locator: Contract term.</p></dd><dt>Exit fees</dt><dd>After five years following the ramp, early termination can require 36 months of minimum charges.<span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/about/rates/data-center-tariff/\">AEP Ohio</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Notice, timing and contract conditions apply. Locator: Exit fees.</p></dd><dt>Filed on</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://occ.ohio.gov/content/data-center-costs-24-0508-el-ata\">Office of the Ohio Consumers Counsel</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Not established in this review. Locator: Review scope.</p></dd><dt>Effective on</dt><dd>July 23, 2025<span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/about/rates/data-center-tariff/\">AEP Ohio</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Utility states tariff effective date. Locator: Opening paragraph.</p></dd><dt>Minimum bill</dt><dd>Tiered minimum billing demand, capped at 85 percent of contract capacity.<span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/about/rates/data-center-tariff/\">AEP Ohio</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Billing demand is not metered energy consumption. Locator: Minimum demand charges.</p></dd></dl></article>"},{"id":"grid-va","html":"<article><h3>PJM regional forecast adjustment process</h3><p class=\"layer-scope\">PJM regional context. A state assignment is not a quantitative allocation to Virginia.</p><dl class=\"layer-fields\"><dt>Meaning</dt><dd>Forecast adjustments, no load interconnection queue<span class=\"layer-source\"><a href=\"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/\">PJM Interconnection</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Regional context for the PJM footprint, not a Virginia only total. Locator: Named request or forecast discussion.</p></dd><dt>Observation date</dt><dd>September 29, 2026<span class=\"layer-source\"><a href=\"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/\">PJM Interconnection</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">PJM publication date. Locator: Named request or forecast discussion.</p></dd><dt>Requested capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/\">PJM Interconnection</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No comparable regional queue total established in this review. Locator: Named request or forecast discussion.</p></dd></dl></article>"},{"id":"price-oh","html":"<article><h3>Ohio</h3><p class=\"layer-scope\">A two point comparison, not a complete time series. State average revenue per unit sold is not a household bill. No causal attribution to data centers.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>July 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential comparison month. Locator: Table heading.</p></dd><dt>Prior period</dt><dd>July 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Same month in the preceding year. Locator: Table heading.</p></dd><dt>Price</dt><dd>19.45 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Preliminary residential state average, cents per kWh. Locator: Residential July 2026, Ohio.</p></dd><dt>Prior price</dt><dd>17.38 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential state average for the comparison month. Locator: Residential July 2025, Ohio.</p></dd></dl></article>"},{"id":"price-oh-202608","html":"<article><h3>Ohio</h3><p class=\"layer-scope\">Captured August residential comparison. The earlier July comparison remains in the source history. State average revenue per unit sold is not a household bill or evidence of a data center effect.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential comparison month. Locator: Table_5_06_A!B4:C4.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Same month in the preceding year. Locator: Table_5_06_A!B4:C4.</p></dd><dt>Price</dt><dd>19.38 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Preliminary August2026 residential state average, cents per kWh. Locator: Table_5_06_A!B20:C20.</p></dd><dt>Prior price</dt><dd>17.55 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Final August2025 residential state average, cents per kWh. Locator: Table_5_06_A!B20:C20.</p></dd><dt>Source context</dt><dd>The August table and public spreadsheet agree. The surrounding report header still identifies July and its older release date. The exact publication day of these August values is not established here.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The scheduled next release day is not treated as proof of actual publication. This review uses the periods stated in the two data tables and preserves the earlier July capture. Locator: HTML table heading and report header; spreadsheet rows1 through4 and67.</p></dd></dl></article>"},{"id":"grid-oh-aep-contract-report-20260212","html":"<article><h3>Ohio Power utility reported study and contract stages</h3><p class=\"layer-scope\">AEP Ohio territory only. Historical requested study capacity, reported binding contract capacity and future service schedules remain different measures. Not a state load census or an ISO queue.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/news/view?releaseID=10753\">AEP Ohio</a>. Source: February 13, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Dated utility reported contract context, not a new tariff approval or currently energized load. Locator: Publication heading and February12 as of paragraph.</p></dd><dt>As of</dt><dd>February 12, 2026<span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/news/view?releaseID=10753\">AEP Ohio</a>. Source: February 13, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Report cutoff, distinct from February13 publication and this source check. Locator: Binding contracts paragraph.</p></dd><dt>Validation basis</dt><dd>Utility reported<span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/news/view?releaseID=10753\">AEP Ohio</a>. Source: February 13, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The utility is the reporting party. The linked PUCO filing returned a public verification page and its actual contents were not reviewed or admitted. Locator: AEP Ohio news release and separate filing capture boundary.</p></dd><dt>Initial interest</dt><dd>The utility describes the initial interest as 30,000 MW and elsewhere more than 30,000 MW.<span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/news/view?releaseID=10753\">AEP Ohio</a>. Source: February 13, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Reported initial expressions of interest, not an exact queue count, actual load or a denominator for a conversion rate. Locator: Prior requests and step one paragraphs.</p></dd><dt>Requested capacity</dt><dd>13,022.7 MW<span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/news/view?releaseID=10753\">AEP Ohio</a>. Source: February 13, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Study requests that the utility says asked and paid for study in the initial cohort. Not binding contracts, approved connections or actual demand. Locator: Step one and step two paragraphs.</p></dd><dt>Reported contracted capacity</dt><dd>5,642 MW<span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/news/view?releaseID=10753\">AEP Ohio</a>. Source: February 13, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Binding contracts reported under the Data Center Tariff after the study and financial commitment stages. Not actual load or project specific regulatory approval. Locator: February12 binding contracts paragraph and step two.</p></dd><dt>Reported pre tariff contracted capacity</dt><dd>12,219 MW<span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/news/view?releaseID=10753\">AEP Ohio</a>. Source: February 13, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Separate contracts reported as signed before the Data Center Tariff. Not added to the study request figure or treated as current metered demand. Locator: Preexisting contract paragraph.</p></dd><dt>Reported total contracted capacity</dt><dd>17,861 MW<span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/news/view?releaseID=10753\">AEP Ohio</a>. Source: February 13, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Total stated by the utility across its new tariff and preexisting contract cohorts. Copied from the source, not newly calculated or added to the study requests. Locator: Total contracted projects paragraph.</p></dd><dt>Scheduled service</dt><dd>The utility schedules contracted projects progressively through 2035.<span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/news/view?releaseID=10753\">AEP Ohio</a>. Source: February 13, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">A prospective service schedule, not evidence any particular contracted project is operating or a guaranteed completion date. Locator: Total contracted projects paragraph.</p></dd><dt>Actual load</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/news/view?releaseID=10753\">AEP Ohio</a>. Source: February 13, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No independently measured current demand or energized capacity established. Locator: Dated utility report review boundary.</p></dd><dt>Individual approvals</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/news/view?releaseID=10753\">AEP Ohio</a>. Source: February 13, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual project connection approval, collateral receipt or contract reviewed. Locator: Dated utility report review boundary.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.aepohio.com/company/news/view?releaseID=10753\">AEP Ohio</a>. Source: February 13, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Utility territory aggregate has no exact individual building or parcel join. Locator: Dated utility report review boundary.</p></dd></dl></article>"},{"id":"grid-pjm-aep-submission-20260929","html":"<article><h3>AEP submitted large load forecast adjustments with separate table bases</h3><p class=\"layer-scope\">Dated utility submission across operating companies and multiple load types. Existing plus planned adjustments and incremental planned comparisons remain distinct. Repeated state panels are context, not allocated totals or measured load.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Dated utility submission documentation. Future values remain forecasts, not actual historical load or final PJM acceptance. Locator: Presentation date and forecast tables.</p></dd><dt>Forecast basis</dt><dd>Utility forecast submission<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">AEP submission across Appalachian Power, Indiana and Michigan Power, AEP Ohio and Kentucky Power. Five states displayed in the source are Ohio, Indiana, Kentucky, West Virginia and Virginia; no company row is silently a state allocation. Locator: Presentation caption and forecast table.</p></dd><dt>Submitted on</dt><dd>September 29, 2026<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Presentation day, separate from future forecast horizons, contract snapshots and any later PJM determination. Locator: Title page.</p></dd><dt>Actual load</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No measured actual load total for the future forecast horizons is established by these submitted series. Locator: Forecast submission review boundary.</p></dd><dt>Approved capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No approved connection capacity is established by these forecast tables. Locator: Forecast submission review boundary.</p></dd><dt>Individual approvals</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual approved connection or executed customer agreement is independently reviewed. Locator: Forecast submission review boundary.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No verified facility identity join is made from this aggregate forecast submission. Locator: Forecast submission review boundary.</p></dd><dt>Requested capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No comparable load interconnection queue total is established. These submitted forecast values are not substituted for queue requests. Locator: Forecast submission review boundary.</p></dd><dt>Pjm final forecast</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No final PJM adoption or final 2027 forecast is established from this utility submission. Locator: Forecast submission review boundary.</p></dd><dt>Geographic scope</dt><dd>Named AEP operating company submission across Ohio, Indiana, Kentucky, West Virginia and Virginia<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Shown in each named state panel for context. The same aggregate is not assigned in full to each state, and the company name Indiana and Michigan Power does not by itself establish a separate Michigan allocation. Locator: Pages 2 and 6.</p></dd><dt>Included load types</dt><dd>Industrial, crypto and data center large loads<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Source includes three sectors. Its aggregate is not exclusively data centers and chart bar segments are not converted into invented precise sector totals. Locator: Pages 2 and 6 chart legend.</p></dd><dt>Commitment method</dt><dd>Only load additions with signed service agreements or letters of agreement are included, using customer contract ramp schedules and checks against economic forecasts to limit double counting. The utility states 97 percent of projects through 2031 have service agreements and 3 percent have letters.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">These percentages refer to projects, not a verified percentage of forecast MW. Signed commitment categories do not establish realized demand or independent approval. Locator: Pages 2 and 3.</p></dd><dt>Table bases</dt><dd>Page 6 reports cumulative summer peak adjustments including existing and planned submissions. Page 7 instead reports incremental planned additions to compare with the prior submission.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The two bases remain separate. No difference between tables is presented as actual load, and no sum is made across years, company rows and their already included total. Ultimate is not assigned an invented calendar year. Locator: Pages 6 and 7 footnotes.</p></dd><dt>Prior comparison</dt><dd>For 2031 the comparison table prints 13,625 MW in the 2025 submission and 19,675 MW in the 2026 incremental planned submission. For Ultimate it prints 22,272 and 22,095 MW respectively.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Source printed comparison values use the page 7 incremental planned basis. They are not compared silently with the different page 6 existing plus planned totals. No independently calculated regional growth total is added. Locator: Page 7 total rows.</p></dd><dt>Regulatory review</dt><dd>The utility reports giving all five states an opportunity to review by August 28. By September 4, four had responded with either methodology endorsement or review without further comment.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Utility account of regulator feedback, not a named decision approving all contracts, a unanimous five state endorsement or final PJM forecast adoption. Locator: Page 4.</p></dd><dt>Submitted 2027 adjustment</dt><dd>7,071 MW<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Source Total AEP cumulative summer peak adjustment for 2027, including existing and planned submissions across the named companies and sectors. Not a state allocation, actual load or solely data centers. Locator: Page 6 Total AEP row and footnote.</p></dd><dt>Submitted 2027 incremental</dt><dd>4,588 MW<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Source Total AEP 2026 submission for 2027, incremental planned additions on the comparison table basis. Separate from the existing plus planned table. Not actual load or a final PJM adopted quantity. Locator: Page 7 Total AEP 2026 Submission row and footnote.</p></dd><dt>Submitted 2031 adjustment</dt><dd>22,175 MW<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Source Total AEP cumulative summer peak adjustment for 2031, including existing and planned submissions across the named companies and sectors. Not a state allocation, actual load or solely data centers. Locator: Page 6 Total AEP row and footnote.</p></dd><dt>Submitted 2031 incremental</dt><dd>19,675 MW<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Source Total AEP 2026 submission for 2031, incremental planned additions on the comparison table basis. Separate from the existing plus planned table. Not actual load or a final PJM adopted quantity. Locator: Page 7 Total AEP 2026 Submission row and footnote.</p></dd><dt>Submitted ultimate adjustment</dt><dd>24,596 MW<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Source Total AEP cumulative summer peak adjustment for ultimate, including existing and planned submissions across the named companies and sectors. Not a state allocation, actual load or solely data centers. Locator: Page 6 Total AEP row and footnote.</p></dd><dt>Submitted ultimate incremental</dt><dd>22,095 MW<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5f---aep.pdf\">PJM Load Analysis Subcommittee presentation by American Electric Power</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Source Total AEP 2026 submission for ultimate, incremental planned additions on the comparison table basis. Separate from the existing plus planned table. Not actual load or a final PJM adopted quantity. Locator: Page 7 Total AEP 2026 Submission row and footnote.</p></dd></dl></article>"},{"id":"grid-pjm-manual19-procedure-20260630","html":"<article><h3>PJM adopted forecast adjustment review procedure</h3><p class=\"layer-scope\">Regional procedure shown in the PJM state panels for context. Manual approval, utility submissions, final forecasts and actual load remain distinct.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>approved<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Approval concerns this manual revision only. Locator: Printed page 3.</p></dd><dt>Process basis</dt><dd>Forecast review procedure<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Regional process documentation, excluded from utility tariff status. Locator: Attachment B printed pages 26 through 32.</p></dd><dt>Revision</dt><dd>Revision 39<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Captured current clean version, separate from the earlier change presentation. Locator: Cover and printed page 4.</p></dd><dt>Approved on</dt><dd>June 29, 2026<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Manual approval day. Locator: Printed page 3.</p></dd><dt>Effective on</dt><dd>June 30, 2026<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Manual effect, separate from approval and original posting. Locator: Cover and printed page 3.</p></dd><dt>Threshold wording</dt><dd>Solicitation covers changes of at least 50 MW, positive or negative. Verification instead says category totals greater than 50 MW.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Both threshold descriptions retained; no silent resolution for exactly 50 MW. Locator: Printed pages 26 and 29.</p></dd><dt>Regulator review</dt><dd>Submitters must offer each relevant state regulator review before submission. Participation is voluntary, and submissions need not follow regulator feedback if both perspectives are provided.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Review opportunity and feedback are distinct from approval of forecasts or connections. Locator: Printed page 28.</p></dd><dt>Firm classification</dt><dd>Firm status requires a qualifying service, construction or supply commitment plus financial support. Nonfirm portions may enter forecast periods outside the capacity auction horizon.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Forecast classification only. Firm portions can still be reduced for growth constraints. Locator: Printed pages 28 through 30.</p></dd><dt>Duplicate requests</dt><dd>Customers must be asked about potentially duplicated requests lacking service or construction commitments. Silence counts toward duplication. Missing site, location and MW details can remove such requests; discounting can reflect project milestones.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No actual duplicate count or adjustment result is established. Locator: Printed pages 29 and 30.</p></dd><dt>Final determination</dt><dd>PJM reviews assumptions, regulator feedback and independent forecast uncertainty before determining the final adjustment. A submitter can retain its preliminary amount if the calculated final is higher.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">A submitted number or firm classification does not guarantee unchanged final inclusion. Locator: Printed pages 30 and 31.</p></dd><dt>Timing</dt><dd>The manual schedules final adjustments for November or December and independent forecast review for October or November.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">General schedule, not proof of a completed presentation or final 2027 forecast. Locator: Printed pages 26 and 30.</p></dd><dt>Utility tariff</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual utility tariff approval is established by this manual. Locator: Procedure review boundary.</p></dd><dt>Actual load</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No measured actual load quantity is established by this procedure. Locator: Procedure review boundary.</p></dd><dt>Approved capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No connection capacity approval is established. Locator: Procedure review boundary.</p></dd><dt>Individual approvals</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual customer decision is established. Locator: Procedure review boundary.</p></dd><dt>Requested capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No comparable regional queue total is established. Locator: Procedure review boundary.</p></dd><dt>Pjm final forecast</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No final amount for the current submitted forecast is established. Locator: Procedure review boundary.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No facility identity join is made. Locator: Procedure review boundary.</p></dd></dl></article>"},{"id":"sector-price-oh-202608","html":"<article><h3>Ohio commercial and industrial electricity prices</h3><p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Current preliminary comparison month. Locator: Table5.6.A header.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Final same month previous year. Locator: Table5.6.A header.</p></dd><dt>Sector price boundary</dt><dd>State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table5.6.A notes, including row67.</p></dd><dt>Commercial price</dt><dd>12.31 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!D20; matching HTML state row.</p></dd><dt>Prior commercial price</dt><dd>11.42 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!E20; matching HTML state row.</p></dd><dt>Industrial price</dt><dd>9.75 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!F20; matching HTML state row.</p></dd><dt>Prior industrial price</dt><dd>8.47 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!G20; matching HTML state row.</p></dd><dt>All sector price</dt><dd>13.93 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Ohio All Sectors August comparison.</p></dd><dt>Prior all sector price</dt><dd>12.67 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Ohio All Sectors August comparison.</p></dd><dt>All sector boundary</dt><dd>All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A sector headers and notes.</p></dd><dt>Ytd commercial price</dt><dd>13.61 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!D20; matching HTML state row.</p></dd><dt>Prior ytd commercial price</dt><dd>11.17 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!E20; matching HTML state row.</p></dd><dt>Ytd industrial price</dt><dd>10.23 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!F20; matching HTML state row.</p></dd><dt>Prior ytd industrial price</dt><dd>8.10 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!G20; matching HTML state row.</p></dd><dt>Ytd all sector price</dt><dd>14.28 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!J20; matching HTML state row.</p></dd><dt>Prior ytd all sector price</dt><dd>12.12 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!K20; matching HTML state row.</p></dd><dt>Ytd period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Prior ytd period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Ytd price boundary</dt><dd>January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Retail sales basis</dt><dd>Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail sales period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Retail sales prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Retail sales residential</dt><dd>5272.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Ohio row,column1.</p></dd><dt>Retail sales residential prior</dt><dd>5223.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Ohio row,column2.</p></dd><dt>Retail sales commercial</dt><dd>6010.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Ohio row,column3.</p></dd><dt>Retail sales commercial prior</dt><dd>5544.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Ohio row,column4.</p></dd><dt>Retail sales industrial</dt><dd>4522.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Ohio row,column5.</p></dd><dt>Retail sales industrial prior</dt><dd>4420.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Ohio row,column6.</p></dd><dt>Retail sales transportation</dt><dd>2.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Ohio row,column7.</p></dd><dt>Retail sales transportation prior</dt><dd>2.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Ohio row,column8.</p></dd><dt>Retail sales all</dt><dd>15806.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Ohio row,column9.</p></dd><dt>Retail sales all prior</dt><dd>15188.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Ohio row,column10.</p></dd><dt>Ytd retail sales basis</dt><dd>Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Ytd retail sales period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Ytd retail sales prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Ytd retail sales residential</dt><dd>37016.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Ohio row,column1.</p></dd><dt>Ytd retail sales residential prior</dt><dd>37732.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Ohio row,column2.</p></dd><dt>Ytd retail sales commercial</dt><dd>43412.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Ohio row,column3.</p></dd><dt>Ytd retail sales commercial prior</dt><dd>37954.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Ohio row,column4.</p></dd><dt>Ytd retail sales industrial</dt><dd>34134.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Ohio row,column5.</p></dd><dt>Ytd retail sales industrial prior</dt><dd>33584.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Ohio row,column6.</p></dd><dt>Ytd retail sales transportation</dt><dd>22.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Ohio row,column7.</p></dd><dt>Ytd retail sales transportation prior</dt><dd>24.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Ohio row,column8.</p></dd><dt>Ytd retail sales all</dt><dd>114584.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Ohio row,column9.</p></dd><dt>Ytd retail sales all prior</dt><dd>109293.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Ohio row,column10.</p></dd><dt>Retail revenue basis</dt><dd>Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail revenue period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Retail revenue prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Retail revenue residential</dt><dd>1022.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Ohio row,column1.</p></dd><dt>Retail revenue residential prior</dt><dd>916.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Ohio row,column2.</p></dd><dt>Retail revenue commercial</dt><dd>740.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Ohio row,column3.</p></dd><dt>Retail revenue commercial prior</dt><dd>633.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Ohio row,column4.</p></dd><dt>Retail revenue industrial</dt><dd>441.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Ohio row,column5.</p></dd><dt>Retail revenue industrial prior</dt><dd>374.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Ohio row,column6.</p></dd><dt>Retail revenue transportation</dt><dd>0.22 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Ohio row,column7.</p></dd><dt>Retail revenue transportation prior</dt><dd>0.19 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Ohio row,column8.</p></dd><dt>Retail revenue all</dt><dd>2202.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Ohio row,column9.</p></dd><dt>Retail revenue all prior</dt><dd>1924.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Ohio row,column10.</p></dd><dt>Ytd retail revenue basis</dt><dd>Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Ytd retail revenue period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Ytd retail revenue prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Ytd retail revenue residential</dt><dd>6963.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Ohio row,column1.</p></dd><dt>Ytd retail revenue residential prior</dt><dd>6279.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Ohio row,column2.</p></dd><dt>Ytd retail revenue commercial</dt><dd>5910.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Ohio row,column3.</p></dd><dt>Ytd retail revenue commercial prior</dt><dd>4240.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Ohio row,column4.</p></dd><dt>Ytd retail revenue industrial</dt><dd>3490.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Ohio row,column5.</p></dd><dt>Ytd retail revenue industrial prior</dt><dd>2721.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Ohio row,column6.</p></dd><dt>Ytd retail revenue transportation</dt><dd>2.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Ohio row,column7.</p></dd><dt>Ytd retail revenue transportation prior</dt><dd>2.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Ohio row,column8.</p></dd><dt>Ytd retail revenue all</dt><dd>16366.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Ohio row,column9.</p></dd><dt>Ytd retail revenue all prior</dt><dd>13243.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Ohio row,column10.</p></dd><dt>Retail customers basis</dt><dd>Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail customers period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Column headers.</p></dd><dt>Retail customers prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Column headers.</p></dd><dt>Retail customers residential</dt><dd>5,122,483 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Ohio row,column1.</p></dd><dt>Retail customers residential prior</dt><dd>5,153,998 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Ohio row,column2.</p></dd><dt>Retail customers commercial</dt><dd>625,196 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Ohio row,column3.</p></dd><dt>Retail customers commercial prior</dt><dd>627,339 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Ohio row,column4.</p></dd><dt>Retail customers industrial</dt><dd>17,245 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Ohio row,column5.</p></dd><dt>Retail customers industrial prior</dt><dd>17,742 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Ohio row,column6.</p></dd><dt>Retail customers transportation</dt><dd>2 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Ohio row,column7.</p></dd><dt>Retail customers transportation prior</dt><dd>2 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Ohio row,column8.</p></dd><dt>Retail customers all</dt><dd>5,764,926 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Ohio row,column9.</p></dd><dt>Retail customers all prior</dt><dd>5,799,081 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Ohio row,column10.</p></dd></dl></article>"},{"id":"sector-price-oh-202607","html":"<article><h3>Ohio historical commercial and industrial electricity prices</h3><p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>July 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Prior period</dt><dd>July 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Sector price boundary</dt><dd>Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Commercial price</dt><dd>14.06 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Ohio commercial_price.</p></dd><dt>Prior commercial price</dt><dd>11.50 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Ohio prior_commercial_price.</p></dd><dt>Industrial price</dt><dd>10.95 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Ohio industrial_price.</p></dd><dt>Prior industrial price</dt><dd>9.05 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Ohio prior_industrial_price.</p></dd><dt>All sector price</dt><dd>15.09 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Ohio All Sectors July comparison.</p></dd><dt>Prior all sector price</dt><dd>13.10 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Ohio All Sectors July comparison.</p></dd><dt>All sector boundary</dt><dd>All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A sector headers and notes.</p></dd></dl></article>"},{"id":"generation-oh-202608","html":"<article><h3>Ohio utility scale generation</h3><p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A period and source notes.</p></dd><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table title, producer sector headers and source notes.</p></dd><dt>All generation</dt><dd>14448.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Ohio row; column1.</p></dd><dt>Prior all generation</dt><dd>13515.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Ohio row; column2.</p></dd><dt>Published generation change</dt><dd>6.90 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Ohio row; column3.</p></dd><dt>Utility generation</dt><dd>1684.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Ohio row; column4.</p></dd><dt>Prior utility generation</dt><dd>1466.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Ohio row; column5.</p></dd><dt>Ipp generation</dt><dd>12695.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Ohio row; column6.</p></dd><dt>Prior ipp generation</dt><dd>11953.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Ohio row; column7.</p></dd><dt>Commercial generation</dt><dd>31.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Ohio row; column8.</p></dd><dt>Prior commercial generation</dt><dd>29.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Ohio row; column9.</p></dd><dt>Industrial generation</dt><dd>38.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Ohio row; column10.</p></dd><dt>Prior industrial generation</dt><dd>67.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Ohio row; column11.</p></dd><dt>Gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Gas period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas all generation</dt><dd>9211.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Ohio row; column1.</p></dd><dt>Gas prior all generation</dt><dd>7772.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Ohio row; column2.</p></dd><dt>Gas published generation change</dt><dd>18.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Ohio row; column3.</p></dd><dt>Gas utility generation</dt><dd>1209.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Ohio row; column4.</p></dd><dt>Gas prior utility generation</dt><dd>937.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Ohio row; column5.</p></dd><dt>Gas ipp generation</dt><dd>7955.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Ohio row; column6.</p></dd><dt>Gas prior ipp generation</dt><dd>6775.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Ohio row; column7.</p></dd><dt>Gas commercial generation</dt><dd>29.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Ohio row; column8.</p></dd><dt>Gas prior commercial generation</dt><dd>28.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Ohio row; column9.</p></dd><dt>Gas industrial generation</dt><dd>18.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Ohio row; column10.</p></dd><dt>Gas prior industrial generation</dt><dd>32.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Ohio row; column11.</p></dd><dt>Nuclear generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nuclear period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear all generation</dt><dd>1566.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Ohio row; column1.</p></dd><dt>Nuclear prior all generation</dt><dd>1441.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Ohio row; column2.</p></dd><dt>Nuclear published generation change</dt><dd>8.70 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Ohio row; column3.</p></dd><dt>Nuclear utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Ohio row; column4.</p></dd><dt>Nuclear prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Ohio row; column5.</p></dd><dt>Nuclear ipp generation</dt><dd>1566.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Ohio row; column6.</p></dd><dt>Nuclear prior ipp generation</dt><dd>1441.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Ohio row; column7.</p></dd><dt>Nuclear commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Ohio row; column8.</p></dd><dt>Nuclear prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Ohio row; column9.</p></dd><dt>Nuclear industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Ohio row; column10.</p></dd><dt>Nuclear prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Ohio row; column11.</p></dd><dt>Coal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Coal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal all generation</dt><dd>2355.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Ohio row; column1.</p></dd><dt>Coal prior all generation</dt><dd>2897.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Ohio row; column2.</p></dd><dt>Coal published generation change</dt><dd>-18.70 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Ohio row; column3.</p></dd><dt>Coal utility generation</dt><dd>448.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Ohio row; column4.</p></dd><dt>Coal prior utility generation</dt><dd>501.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Ohio row; column5.</p></dd><dt>Coal ipp generation</dt><dd>1906.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Ohio row; column6.</p></dd><dt>Coal prior ipp generation</dt><dd>2396.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Ohio row; column7.</p></dd><dt>Coal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Ohio row; column8.</p></dd><dt>Coal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Ohio row; column9.</p></dd><dt>Coal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Ohio row; column10.</p></dd><dt>Coal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Ohio row; column11.</p></dd><dt>Wind generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Wind period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind all generation</dt><dd>111.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Ohio row; column1.</p></dd><dt>Wind prior all generation</dt><dd>96.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Ohio row; column2.</p></dd><dt>Wind published generation change</dt><dd>15.30 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Ohio row; column3.</p></dd><dt>Wind utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Ohio row; column4.</p></dd><dt>Wind prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Ohio row; column5.</p></dd><dt>Wind ipp generation</dt><dd>107.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Ohio row; column6.</p></dd><dt>Wind prior ipp generation</dt><dd>94.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Ohio row; column7.</p></dd><dt>Wind commercial generation</dt><dd>0.10 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Ohio row; column8.</p></dd><dt>Wind prior commercial generation</dt><dd>0.12 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Ohio row; column9.</p></dd><dt>Wind industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Ohio row; column10.</p></dd><dt>Wind prior industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Ohio row; column11.</p></dd><dt>Hydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Hydro period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro all generation</dt><dd>39.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Ohio row; column1.</p></dd><dt>Hydro prior all generation</dt><dd>36.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Ohio row; column2.</p></dd><dt>Hydro published generation change</dt><dd>9.60 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Ohio row; column3.</p></dd><dt>Hydro utility generation</dt><dd>23.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Ohio row; column4.</p></dd><dt>Hydro prior utility generation</dt><dd>24.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Ohio row; column5.</p></dd><dt>Hydro ipp generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Ohio row; column6.</p></dd><dt>Hydro prior ipp generation</dt><dd>11.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Ohio row; column7.</p></dd><dt>Hydro commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Ohio row; column8.</p></dd><dt>Hydro prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Ohio row; column9.</p></dd><dt>Hydro industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Ohio row; column10.</p></dd><dt>Hydro prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Ohio row; column11.</p></dd><dt>Pumped storage generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Pumped storage period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Ohio row; column1.</p></dd><dt>Pumped storage prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Ohio row; column2.</p></dd><dt>Pumped storage published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Ohio row; column3.</p></dd><dt>Pumped storage utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Ohio row; column4.</p></dd><dt>Pumped storage prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Ohio row; column5.</p></dd><dt>Pumped storage ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Ohio row; column6.</p></dd><dt>Pumped storage prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Ohio row; column7.</p></dd><dt>Pumped storage commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Ohio row; column8.</p></dd><dt>Pumped storage prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Ohio row; column9.</p></dd><dt>Pumped storage industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Ohio row; column10.</p></dd><dt>Pumped storage prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Ohio row; column11.</p></dd><dt>Solar pv period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv generation basis</dt><dd>Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar pv all estimated generation</dt><dd>1104.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column1.</p></dd><dt>Solar pv prior all estimated generation</dt><dd>1123.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column2.</p></dd><dt>Solar pv published generation change</dt><dd>-1.70 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column3.</p></dd><dt>Solar pv utility scale generation</dt><dd>1024.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column4.</p></dd><dt>Solar pv utility scale prior generation</dt><dd>1057.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column5.</p></dd><dt>Solar pv estimated small scale generation</dt><dd>79.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column6.</p></dd><dt>Solar pv estimated small scale prior generation</dt><dd>66.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column7.</p></dd><dt>Solar pv electric utilities generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column8.</p></dd><dt>Solar pv electric utilities prior generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column9.</p></dd><dt>Solar pv independent producers generation</dt><dd>1023.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column10.</p></dd><dt>Solar pv independent producers prior generation</dt><dd>1055.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column11.</p></dd><dt>Solar pv commercial estimated total generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column12.</p></dd><dt>Solar pv commercial estimated total prior generation</dt><dd>27.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column13.</p></dd><dt>Solar pv commercial utility scale generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column14.</p></dd><dt>Solar pv commercial utility scale prior generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column15.</p></dd><dt>Solar pv commercial estimated small scale generation</dt><dd>30.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column16.</p></dd><dt>Solar pv commercial estimated small scale prior generation</dt><dd>26.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column17.</p></dd><dt>Solar pv industrial estimated total generation</dt><dd>10.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column18.</p></dd><dt>Solar pv industrial estimated total prior generation</dt><dd>8.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column19.</p></dd><dt>Solar pv industrial utility scale generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column20.</p></dd><dt>Solar pv industrial utility scale prior generation</dt><dd>0.02 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column21.</p></dd><dt>Solar pv industrial estimated small scale generation</dt><dd>10.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column22.</p></dd><dt>Solar pv industrial estimated small scale prior generation</dt><dd>8.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column23.</p></dd><dt>Solar pv residential estimated small scale generation</dt><dd>39.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column24.</p></dd><dt>Solar pv residential estimated small scale prior generation</dt><dd>33.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Ohio row; column25.</p></dd><dt>Solar thermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar thermal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Ohio row; column1.</p></dd><dt>Solar thermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Ohio row; column2.</p></dd><dt>Solar thermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Ohio row; column3.</p></dd><dt>Solar thermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Ohio row; column4.</p></dd><dt>Solar thermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Ohio row; column5.</p></dd><dt>Solar thermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Ohio row; column6.</p></dd><dt>Solar thermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Ohio row; column7.</p></dd><dt>Solar thermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Ohio row; column8.</p></dd><dt>Solar thermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Ohio row; column9.</p></dd><dt>Solar thermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Ohio row; column10.</p></dd><dt>Solar thermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Ohio row; column11.</p></dd><dt>Other energy generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other energy period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy all generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Ohio row; column1.</p></dd><dt>Other energy prior all generation</dt><dd>-0.39 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Ohio row; column2.</p></dd><dt>Other energy published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Ohio row; column3.</p></dd><dt>Other energy utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Ohio row; column4.</p></dd><dt>Other energy prior utility generation</dt><dd>-0.01 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Ohio row; column5.</p></dd><dt>Other energy ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Ohio row; column6.</p></dd><dt>Other energy prior ipp generation</dt><dd>-0.38 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Ohio row; column7.</p></dd><dt>Other energy commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Ohio row; column8.</p></dd><dt>Other energy prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Ohio row; column9.</p></dd><dt>Other energy industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Ohio row; column10.</p></dd><dt>Other energy prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Ohio row; column11.</p></dd><dt>Geothermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Geothermal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Ohio row; column1.</p></dd><dt>Geothermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Ohio row; column2.</p></dd><dt>Geothermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Ohio row; column3.</p></dd><dt>Geothermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Ohio row; column4.</p></dd><dt>Geothermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Ohio row; column5.</p></dd><dt>Geothermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Ohio row; column6.</p></dd><dt>Geothermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Ohio row; column7.</p></dd><dt>Geothermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Ohio row; column8.</p></dd><dt>Geothermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Ohio row; column9.</p></dd><dt>Geothermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Ohio row; column10.</p></dd><dt>Geothermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Ohio row; column11.</p></dd><dt>Biomass generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Biomass period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass all generation</dt><dd>28.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Ohio row; column1.</p></dd><dt>Biomass prior all generation</dt><dd>26.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Ohio row; column2.</p></dd><dt>Biomass published generation change</dt><dd>6.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Ohio row; column3.</p></dd><dt>Biomass utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Ohio row; column4.</p></dd><dt>Biomass prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Ohio row; column5.</p></dd><dt>Biomass ipp generation</dt><dd>12.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Ohio row; column6.</p></dd><dt>Biomass prior ipp generation</dt><dd>12.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Ohio row; column7.</p></dd><dt>Biomass commercial generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Ohio row; column8.</p></dd><dt>Biomass prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Ohio row; column9.</p></dd><dt>Biomass industrial generation</dt><dd>15.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Ohio row; column10.</p></dd><dt>Biomass prior industrial generation</dt><dd>14.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Ohio row; column11.</p></dd><dt>Petroleum liquids generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum liquids period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids all generation</dt><dd>21.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Ohio row; column1.</p></dd><dt>Petroleum liquids prior all generation</dt><dd>13.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Ohio row; column2.</p></dd><dt>Petroleum liquids published generation change</dt><dd>67.30 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Ohio row; column3.</p></dd><dt>Petroleum liquids utility generation</dt><dd>3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Ohio row; column4.</p></dd><dt>Petroleum liquids prior utility generation</dt><dd>3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Ohio row; column5.</p></dd><dt>Petroleum liquids ipp generation</dt><dd>18.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Ohio row; column6.</p></dd><dt>Petroleum liquids prior ipp generation</dt><dd>9.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Ohio row; column7.</p></dd><dt>Petroleum liquids commercial generation</dt><dd>0.14 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Ohio row; column8.</p></dd><dt>Petroleum liquids prior commercial generation</dt><dd>0.01 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Ohio row; column9.</p></dd><dt>Petroleum liquids industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Ohio row; column10.</p></dd><dt>Petroleum liquids prior industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Ohio row; column11.</p></dd><dt>Petroleum coke generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum coke period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke all generation</dt><dd>74.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Ohio row; column1.</p></dd><dt>Petroleum coke prior all generation</dt><dd>101.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Ohio row; column2.</p></dd><dt>Petroleum coke published generation change</dt><dd>-27.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Ohio row; column3.</p></dd><dt>Petroleum coke utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Ohio row; column4.</p></dd><dt>Petroleum coke prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Ohio row; column5.</p></dd><dt>Petroleum coke ipp generation</dt><dd>74.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Ohio row; column6.</p></dd><dt>Petroleum coke prior ipp generation</dt><dd>101.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Ohio row; column7.</p></dd><dt>Petroleum coke commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Ohio row; column8.</p></dd><dt>Petroleum coke prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Ohio row; column9.</p></dd><dt>Petroleum coke industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Ohio row; column10.</p></dd><dt>Petroleum coke prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Ohio row; column11.</p></dd><dt>Other fossil gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other fossil gas period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas all generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Ohio row; column1.</p></dd><dt>Other fossil gas prior all generation</dt><dd>77.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Ohio row; column2.</p></dd><dt>Other fossil gas published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Ohio row; column3.</p></dd><dt>Other fossil gas utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Ohio row; column4.</p></dd><dt>Other fossil gas prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Ohio row; column5.</p></dd><dt>Other fossil gas ipp generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Ohio row; column6.</p></dd><dt>Other fossil gas prior ipp generation</dt><dd>59.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Ohio row; column7.</p></dd><dt>Other fossil gas commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Ohio row; column8.</p></dd><dt>Other fossil gas prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Ohio row; column9.</p></dd><dt>Other fossil gas industrial generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Ohio row; column10.</p></dd><dt>Other fossil gas prior industrial generation</dt><dd>18.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Ohio row; column11.</p></dd><dt>Nonhydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nonhydro period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro all generation</dt><dd>1163.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Ohio row; column1.</p></dd><dt>Nonhydro prior all generation</dt><dd>1179.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Ohio row; column2.</p></dd><dt>Nonhydro published generation change</dt><dd>-1.30 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Ohio row; column3.</p></dd><dt>Nonhydro utility generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Ohio row; column4.</p></dd><dt>Nonhydro prior utility generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Ohio row; column5.</p></dd><dt>Nonhydro ipp generation</dt><dd>1141.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Ohio row; column6.</p></dd><dt>Nonhydro prior ipp generation</dt><dd>1161.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Ohio row; column7.</p></dd><dt>Nonhydro commercial generation</dt><dd>2.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Ohio row; column8.</p></dd><dt>Nonhydro prior commercial generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Ohio row; column9.</p></dd><dt>Nonhydro industrial generation</dt><dd>19.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Ohio row; column10.</p></dd><dt>Nonhydro prior industrial generation</dt><dd>16.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Ohio row; column11.</p></dd></dl></article>"},{"id":"generation-oh-202608-ytd","html":"<article><h3>Ohio utility scale generation</h3><p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B period and source notes.</p></dd><dt>Period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table title, producer sector headers and source notes.</p></dd><dt>All generation</dt><dd>106705.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Ohio row; column1.</p></dd><dt>Prior all generation</dt><dd>98045.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Ohio row; column2.</p></dd><dt>Published generation change</dt><dd>8.80 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Ohio row; column3.</p></dd><dt>Utility generation</dt><dd>10834.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Ohio row; column4.</p></dd><dt>Prior utility generation</dt><dd>10782.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Ohio row; column5.</p></dd><dt>Ipp generation</dt><dd>95241.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Ohio row; column6.</p></dd><dt>Prior ipp generation</dt><dd>86553.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Ohio row; column7.</p></dd><dt>Commercial generation</dt><dd>193.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Ohio row; column8.</p></dd><dt>Prior commercial generation</dt><dd>180.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Ohio row; column9.</p></dd><dt>Industrial generation</dt><dd>438.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Ohio row; column10.</p></dd><dt>Prior industrial generation</dt><dd>529.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Ohio row; column11.</p></dd><dt>Gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Gas period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas all generation</dt><dd>61213.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Ohio row; column1.</p></dd><dt>Gas prior all generation</dt><dd>52279.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Ohio row; column2.</p></dd><dt>Gas published generation change</dt><dd>17.10 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Ohio row; column3.</p></dd><dt>Gas utility generation</dt><dd>7109.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Ohio row; column4.</p></dd><dt>Gas prior utility generation</dt><dd>6737.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Ohio row; column5.</p></dd><dt>Gas ipp generation</dt><dd>53741.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Ohio row; column6.</p></dd><dt>Gas prior ipp generation</dt><dd>45128.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Ohio row; column7.</p></dd><dt>Gas commercial generation</dt><dd>176.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Ohio row; column8.</p></dd><dt>Gas prior commercial generation</dt><dd>167.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Ohio row; column9.</p></dd><dt>Gas industrial generation</dt><dd>187.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Ohio row; column10.</p></dd><dt>Gas prior industrial generation</dt><dd>247.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Ohio row; column11.</p></dd><dt>Nuclear generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nuclear period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear all generation</dt><dd>11743.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Ohio row; column1.</p></dd><dt>Nuclear prior all generation</dt><dd>10792.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Ohio row; column2.</p></dd><dt>Nuclear published generation change</dt><dd>8.80 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Ohio row; column3.</p></dd><dt>Nuclear utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Ohio row; column4.</p></dd><dt>Nuclear prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Ohio row; column5.</p></dd><dt>Nuclear ipp generation</dt><dd>11743.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Ohio row; column6.</p></dd><dt>Nuclear prior ipp generation</dt><dd>10792.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Ohio row; column7.</p></dd><dt>Nuclear commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Ohio row; column8.</p></dd><dt>Nuclear prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Ohio row; column9.</p></dd><dt>Nuclear industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Ohio row; column10.</p></dd><dt>Nuclear prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Ohio row; column11.</p></dd><dt>Coal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Coal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal all generation</dt><dd>22733.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Ohio row; column1.</p></dd><dt>Coal prior all generation</dt><dd>25307.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Ohio row; column2.</p></dd><dt>Coal published generation change</dt><dd>-10.20 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Ohio row; column3.</p></dd><dt>Coal utility generation</dt><dd>3500.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Ohio row; column4.</p></dd><dt>Coal prior utility generation</dt><dd>3823.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Ohio row; column5.</p></dd><dt>Coal ipp generation</dt><dd>19233.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Ohio row; column6.</p></dd><dt>Coal prior ipp generation</dt><dd>21484.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Ohio row; column7.</p></dd><dt>Coal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Ohio row; column8.</p></dd><dt>Coal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Ohio row; column9.</p></dd><dt>Coal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Ohio row; column10.</p></dd><dt>Coal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Ohio row; column11.</p></dd><dt>Wind generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Wind period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind all generation</dt><dd>2119.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Ohio row; column1.</p></dd><dt>Wind prior all generation</dt><dd>1963.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Ohio row; column2.</p></dd><dt>Wind published generation change</dt><dd>7.90 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Ohio row; column3.</p></dd><dt>Wind utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Ohio row; column4.</p></dd><dt>Wind prior utility generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Ohio row; column5.</p></dd><dt>Wind ipp generation</dt><dd>2071.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Ohio row; column6.</p></dd><dt>Wind prior ipp generation</dt><dd>1928.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Ohio row; column7.</p></dd><dt>Wind commercial generation</dt><dd>2.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Ohio row; column8.</p></dd><dt>Wind prior commercial generation</dt><dd>2.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Ohio row; column9.</p></dd><dt>Wind industrial generation</dt><dd>45.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Ohio row; column10.</p></dd><dt>Wind prior industrial generation</dt><dd>33.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Ohio row; column11.</p></dd><dt>Hydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Hydro period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro all generation</dt><dd>303.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Ohio row; column1.</p></dd><dt>Hydro prior all generation</dt><dd>333.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Ohio row; column2.</p></dd><dt>Hydro published generation change</dt><dd>-9.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Ohio row; column3.</p></dd><dt>Hydro utility generation</dt><dd>181.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Ohio row; column4.</p></dd><dt>Hydro prior utility generation</dt><dd>198.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Ohio row; column5.</p></dd><dt>Hydro ipp generation</dt><dd>122.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Ohio row; column6.</p></dd><dt>Hydro prior ipp generation</dt><dd>135.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Ohio row; column7.</p></dd><dt>Hydro commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Ohio row; column8.</p></dd><dt>Hydro prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Ohio row; column9.</p></dd><dt>Hydro industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Ohio row; column10.</p></dd><dt>Hydro prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Ohio row; column11.</p></dd><dt>Pumped storage generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Pumped storage period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Ohio row; column1.</p></dd><dt>Pumped storage prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Ohio row; column2.</p></dd><dt>Pumped storage published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Ohio row; column3.</p></dd><dt>Pumped storage utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Ohio row; column4.</p></dd><dt>Pumped storage prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Ohio row; column5.</p></dd><dt>Pumped storage ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Ohio row; column6.</p></dd><dt>Pumped storage prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Ohio row; column7.</p></dd><dt>Pumped storage commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Ohio row; column8.</p></dd><dt>Pumped storage prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Ohio row; column9.</p></dd><dt>Pumped storage industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Ohio row; column10.</p></dd><dt>Pumped storage prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Ohio row; column11.</p></dd><dt>Solar pv period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv generation basis</dt><dd>Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar pv all estimated generation</dt><dd>7719.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column1.</p></dd><dt>Solar pv prior all estimated generation</dt><dd>6264.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column2.</p></dd><dt>Solar pv published generation change</dt><dd>23.20 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column3.</p></dd><dt>Solar pv utility scale generation</dt><dd>7196.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column4.</p></dd><dt>Solar pv utility scale prior generation</dt><dd>5828.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column5.</p></dd><dt>Solar pv estimated small scale generation</dt><dd>523.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column6.</p></dd><dt>Solar pv estimated small scale prior generation</dt><dd>437.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column7.</p></dd><dt>Solar pv electric utilities generation</dt><dd>5.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column8.</p></dd><dt>Solar pv electric utilities prior generation</dt><dd>5.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column9.</p></dd><dt>Solar pv independent producers generation</dt><dd>7185.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column10.</p></dd><dt>Solar pv independent producers prior generation</dt><dd>5818.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column11.</p></dd><dt>Solar pv commercial estimated total generation</dt><dd>204.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column12.</p></dd><dt>Solar pv commercial estimated total prior generation</dt><dd>178.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column13.</p></dd><dt>Solar pv commercial utility scale generation</dt><dd>6.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column14.</p></dd><dt>Solar pv commercial utility scale prior generation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column15.</p></dd><dt>Solar pv commercial estimated small scale generation</dt><dd>199.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column16.</p></dd><dt>Solar pv commercial estimated small scale prior generation</dt><dd>174.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column17.</p></dd><dt>Solar pv industrial estimated total generation</dt><dd>63.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column18.</p></dd><dt>Solar pv industrial estimated total prior generation</dt><dd>49.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column19.</p></dd><dt>Solar pv industrial utility scale generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column20.</p></dd><dt>Solar pv industrial utility scale prior generation</dt><dd>0.12 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column21.</p></dd><dt>Solar pv industrial estimated small scale generation</dt><dd>63.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column22.</p></dd><dt>Solar pv industrial estimated small scale prior generation</dt><dd>49.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column23.</p></dd><dt>Solar pv residential estimated small scale generation</dt><dd>262.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column24.</p></dd><dt>Solar pv residential estimated small scale prior generation</dt><dd>214.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Ohio row; column25.</p></dd><dt>Solar thermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar thermal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Ohio row; column1.</p></dd><dt>Solar thermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Ohio row; column2.</p></dd><dt>Solar thermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Ohio row; column3.</p></dd><dt>Solar thermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Ohio row; column4.</p></dd><dt>Solar thermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Ohio row; column5.</p></dd><dt>Solar thermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Ohio row; column6.</p></dd><dt>Solar thermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Ohio row; column7.</p></dd><dt>Solar thermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Ohio row; column8.</p></dd><dt>Solar thermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Ohio row; column9.</p></dd><dt>Solar thermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Ohio row; column10.</p></dd><dt>Solar thermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Ohio row; column11.</p></dd><dt>Other energy generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other energy period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy all generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Ohio row; column1.</p></dd><dt>Other energy prior all generation</dt><dd>-1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Ohio row; column2.</p></dd><dt>Other energy published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Ohio row; column3.</p></dd><dt>Other energy utility generation</dt><dd>-0.07 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Ohio row; column4.</p></dd><dt>Other energy prior utility generation</dt><dd>-0.31 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Ohio row; column5.</p></dd><dt>Other energy ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Ohio row; column6.</p></dd><dt>Other energy prior ipp generation</dt><dd>-3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Ohio row; column7.</p></dd><dt>Other energy commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Ohio row; column8.</p></dd><dt>Other energy prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Ohio row; column9.</p></dd><dt>Other energy industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Ohio row; column10.</p></dd><dt>Other energy prior industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Ohio row; column11.</p></dd><dt>Geothermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Geothermal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Ohio row; column1.</p></dd><dt>Geothermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Ohio row; column2.</p></dd><dt>Geothermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Ohio row; column3.</p></dd><dt>Geothermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Ohio row; column4.</p></dd><dt>Geothermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Ohio row; column5.</p></dd><dt>Geothermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Ohio row; column6.</p></dd><dt>Geothermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Ohio row; column7.</p></dd><dt>Geothermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Ohio row; column8.</p></dd><dt>Geothermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Ohio row; column9.</p></dd><dt>Geothermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Ohio row; column10.</p></dd><dt>Geothermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Ohio row; column11.</p></dd><dt>Biomass generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Biomass period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass all generation</dt><dd>187.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Ohio row; column1.</p></dd><dt>Biomass prior all generation</dt><dd>214.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Ohio row; column2.</p></dd><dt>Biomass published generation change</dt><dd>-12.70 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Ohio row; column3.</p></dd><dt>Biomass utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Ohio row; column4.</p></dd><dt>Biomass prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Ohio row; column5.</p></dd><dt>Biomass ipp generation</dt><dd>90.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Ohio row; column6.</p></dd><dt>Biomass prior ipp generation</dt><dd>92.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Ohio row; column7.</p></dd><dt>Biomass commercial generation</dt><dd>5.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Ohio row; column8.</p></dd><dt>Biomass prior commercial generation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Ohio row; column9.</p></dd><dt>Biomass industrial generation</dt><dd>92.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Ohio row; column10.</p></dd><dt>Biomass prior industrial generation</dt><dd>118.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Ohio row; column11.</p></dd><dt>Petroleum liquids generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum liquids period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids all generation</dt><dd>165.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Ohio row; column1.</p></dd><dt>Petroleum liquids prior all generation</dt><dd>114.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Ohio row; column2.</p></dd><dt>Petroleum liquids published generation change</dt><dd>44.80 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Ohio row; column3.</p></dd><dt>Petroleum liquids utility generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Ohio row; column4.</p></dd><dt>Petroleum liquids prior utility generation</dt><dd>19.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Ohio row; column5.</p></dd><dt>Petroleum liquids ipp generation</dt><dd>119.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Ohio row; column6.</p></dd><dt>Petroleum liquids prior ipp generation</dt><dd>90.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Ohio row; column7.</p></dd><dt>Petroleum liquids commercial generation</dt><dd>3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Ohio row; column8.</p></dd><dt>Petroleum liquids prior commercial generation</dt><dd>2.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Ohio row; column9.</p></dd><dt>Petroleum liquids industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Ohio row; column10.</p></dd><dt>Petroleum liquids prior industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Ohio row; column11.</p></dd><dt>Petroleum coke generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum coke period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke all generation</dt><dd>647.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Ohio row; column1.</p></dd><dt>Petroleum coke prior all generation</dt><dd>649.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Ohio row; column2.</p></dd><dt>Petroleum coke published generation change</dt><dd>-0.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Ohio row; column3.</p></dd><dt>Petroleum coke utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Ohio row; column4.</p></dd><dt>Petroleum coke prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Ohio row; column5.</p></dd><dt>Petroleum coke ipp generation</dt><dd>647.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Ohio row; column6.</p></dd><dt>Petroleum coke prior ipp generation</dt><dd>649.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Ohio row; column7.</p></dd><dt>Petroleum coke commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Ohio row; column8.</p></dd><dt>Petroleum coke prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Ohio row; column9.</p></dd><dt>Petroleum coke industrial generation</dt><dd>0.08 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Ohio row; column10.</p></dd><dt>Petroleum coke prior industrial generation</dt><dd>0.01 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Ohio row; column11.</p></dd><dt>Other fossil gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other fossil gas period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas all generation</dt><dd>400.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Ohio row; column1.</p></dd><dt>Other fossil gas prior all generation</dt><dd>567.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Ohio row; column2.</p></dd><dt>Other fossil gas published generation change</dt><dd>-29.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Ohio row; column3.</p></dd><dt>Other fossil gas utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Ohio row; column4.</p></dd><dt>Other fossil gas prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Ohio row; column5.</p></dd><dt>Other fossil gas ipp generation</dt><dd>290.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Ohio row; column6.</p></dd><dt>Other fossil gas prior ipp generation</dt><dd>441.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Ohio row; column7.</p></dd><dt>Other fossil gas commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Ohio row; column8.</p></dd><dt>Other fossil gas prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Ohio row; column9.</p></dd><dt>Other fossil gas industrial generation</dt><dd>110.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Ohio row; column10.</p></dd><dt>Other fossil gas prior industrial generation</dt><dd>126.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Ohio row; column11.</p></dd><dt>Nonhydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nonhydro period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro all generation</dt><dd>9502.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Ohio row; column1.</p></dd><dt>Nonhydro prior all generation</dt><dd>8005.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Ohio row; column2.</p></dd><dt>Nonhydro published generation change</dt><dd>18.70 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Ohio row; column3.</p></dd><dt>Nonhydro utility generation</dt><dd>5.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Ohio row; column4.</p></dd><dt>Nonhydro prior utility generation</dt><dd>6.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Ohio row; column5.</p></dd><dt>Nonhydro ipp generation</dt><dd>9346.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Ohio row; column6.</p></dd><dt>Nonhydro prior ipp generation</dt><dd>7838.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Ohio row; column7.</p></dd><dt>Nonhydro commercial generation</dt><dd>13.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Ohio row; column8.</p></dd><dt>Nonhydro prior commercial generation</dt><dd>10.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Ohio row; column9.</p></dd><dt>Nonhydro industrial generation</dt><dd>137.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Ohio row; column10.</p></dd><dt>Nonhydro prior industrial generation</dt><dd>151.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Ohio row; column11.</p></dd></dl></article>"},{"id":"capacity-state-utility-oh-202608","html":"<article><h3>Ohio utility scale net summer capacity</h3><p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.</p><dl class=\"layer-fields\"><dt>Utility capacity basis</dt><dd>Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Title,technology headers and exclusions.</p></dd><dt>Utility capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Column headers.</p></dd><dt>Utility capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Column headers.</p></dd><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Dated source period.</p></dd><dt>Utility capacity renewables</dt><dd>6286.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Ohio row,column1.</p></dd><dt>Utility capacity renewables prior</dt><dd>5547.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Ohio row,column2.</p></dd><dt>Utility capacity fossil</dt><dd>24701.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Ohio row,column3.</p></dd><dt>Utility capacity fossil prior</dt><dd>23800.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Ohio row,column4.</p></dd><dt>Utility capacity pumped storage</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Ohio row,column5.</p></dd><dt>Utility capacity pumped storage prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Ohio row,column6.</p></dd><dt>Utility capacity other storage</dt><dd>35.80 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Ohio row,column7.</p></dd><dt>Utility capacity other storage prior</dt><dd>46.80 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Ohio row,column8.</p></dd><dt>Utility capacity nuclear</dt><dd>2134.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Ohio row,column9.</p></dd><dt>Utility capacity nuclear prior</dt><dd>2134.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Ohio row,column10.</p></dd><dt>Utility capacity other sources</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Ohio row,column11.</p></dd><dt>Utility capacity other sources prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Ohio row,column12.</p></dd><dt>Utility capacity all</dt><dd>33157.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Ohio row,column13.</p></dd><dt>Utility capacity all prior</dt><dd>31528.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Ohio row,column14.</p></dd><dt>Renew capacity basis</dt><dd>Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Title,technology headers and exclusions.</p></dd><dt>Renew capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Column headers.</p></dd><dt>Renew capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Column headers.</p></dd><dt>Renew capacity status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Dated source period.</p></dd><dt>Renew capacity wind</dt><dd>1234.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column1.</p></dd><dt>Renew capacity wind prior</dt><dd>1094.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column2.</p></dd><dt>Renew capacity solar pv</dt><dd>4874.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column3.</p></dd><dt>Renew capacity solar pv prior</dt><dd>4271.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column4.</p></dd><dt>Renew capacity solar thermal</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column5.</p></dd><dt>Renew capacity solar thermal prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column6.</p></dd><dt>Renew capacity conventional hydro</dt><dd>96.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column7.</p></dd><dt>Renew capacity conventional hydro prior</dt><dd>96.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column8.</p></dd><dt>Renew capacity biomass</dt><dd>80.40 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column9.</p></dd><dt>Renew capacity biomass prior</dt><dd>84.80 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column10.</p></dd><dt>Renew capacity geothermal</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column11.</p></dd><dt>Renew capacity geothermal prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column12.</p></dd><dt>Renew capacity total utility</dt><dd>6286.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column13.</p></dd><dt>Renew capacity total utility prior</dt><dd>5547.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column14.</p></dd><dt>Renew capacity small pv estimated</dt><dd>542.80 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column15.</p></dd><dt>Renew capacity small pv estimated prior</dt><dd>451.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column16.</p></dd><dt>Renew capacity combined pv estimated</dt><dd>5417.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column17.</p></dd><dt>Renew capacity combined pv estimated prior</dt><dd>4722.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column18.</p></dd><dt>Renew capacity combined solar estimated</dt><dd>5417.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column19.</p></dd><dt>Renew capacity combined solar estimated prior</dt><dd>4722.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Ohio row,column20.</p></dd><dt>Fossil capacity basis</dt><dd>Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Title,technology headers and exclusions.</p></dd><dt>Fossil capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Column headers.</p></dd><dt>Fossil capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Column headers.</p></dd><dt>Fossil capacity status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Dated source period.</p></dd><dt>Fossil capacity gas combined cycle</dt><dd>11430.40 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column1.</p></dd><dt>Fossil capacity gas combined cycle prior</dt><dd>10530.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column2.</p></dd><dt>Fossil capacity gas combustion turbine</dt><dd>5718.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column3.</p></dd><dt>Fossil capacity gas combustion turbine prior</dt><dd>5718.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column4.</p></dd><dt>Fossil capacity gas other</dt><dd>96.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column5.</p></dd><dt>Fossil capacity gas other prior</dt><dd>96.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column6.</p></dd><dt>Fossil capacity coal</dt><dd>6620.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column7.</p></dd><dt>Fossil capacity coal prior</dt><dd>6620.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column8.</p></dd><dt>Fossil capacity petroleum coke</dt><dd>145.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column9.</p></dd><dt>Fossil capacity petroleum coke prior</dt><dd>145.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column10.</p></dd><dt>Fossil capacity petroleum liquids</dt><dd>506.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column11.</p></dd><dt>Fossil capacity petroleum liquids prior</dt><dd>506.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column12.</p></dd><dt>Fossil capacity other fossil gas</dt><dd>183.40 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column13.</p></dd><dt>Fossil capacity other fossil gas prior</dt><dd>183.40 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column14.</p></dd><dt>Fossil capacity total</dt><dd>24701.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column15.</p></dd><dt>Fossil capacity total prior</dt><dd>23800.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Ohio row,column16.</p></dd><dt>Reported new unit rows</dt><dd>9 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred. Locator: Calculated count of Table6.3 rows for OH.</p></dd><dt>Reported new unit capacity sum</dt><dd>1432.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred. Locator: Calculated sum of rounded Table6.3 Net Summer Capacity(MW) cells for OH.</p></dd><dt>Reported new unit basis</dt><dd>EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred. Locator: Table6.3 title,columns,notes and explicit calculation scope.</p></dd><dt>Reported retired unit rows</dt><dd>1 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_04\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference. Locator: Calculated count of Table6.4 rows for OH.</p></dd><dt>Reported retired unit capacity sum</dt><dd>5.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_04\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference. Locator: Calculated sum of rounded Table6.4 Net Summer Capacity(MW) cells for OH.</p></dd><dt>Reported retired unit basis</dt><dd>EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_04\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference. Locator: Table6.4 title,columns,notes and explicit calculation scope.</p></dd><dt>Reported planned unit rows</dt><dd>29 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for OH across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit capacity sum</dt><dd>3466.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for OH across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit nameplate sum</dt><dd>3431.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for OH across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit complete nonoperating rows</dt><dd>2 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for OH across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit basis</dt><dd>EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Table6.5 title,status/date/capacity columns,notes and explicit calculation boundary.</p></dd><dt>Reported retirement plan rows</dt><dd>1 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Calculated from Table6.6 reported rows for OH across all target dates,not simultaneous removal.</p></dd><dt>Reported retirement plan capacity sum</dt><dd>620.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Calculated from Table6.6 reported rows for OH across all target dates,not simultaneous removal.</p></dd><dt>Reported retirement plan unknown month rows</dt><dd>0 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Calculated from Table6.6 reported rows for OH across all target dates,not simultaneous removal.</p></dd><dt>Reported retirement plan basis</dt><dd>EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Table6.6 title/date/capacity columns,notes and explicit calculation scope.</p></dd></dl></article>"},{"id":"power-ieee-reliability-2025-oh","html":"<article><h3>Ohio historical IEEE distribution reliability2025 and2024</h3><p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 years2025 and2024.</p></dd><dt>Ieee reliability basis</dt><dd>EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 header and definitions.</p></dd><dt>Ieee coverage 2025</dt><dd>96.70 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;coverage;Year 2025.</p></dd><dt>Ieee coverage 2024</dt><dd>96.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;coverage;Year 2024.</p></dd><dt>Ieee all events saidi 2025</dt><dd>205.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;all_events_saidi;Year 2025.</p></dd><dt>Ieee all events saidi 2024</dt><dd>511.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;all_events_saidi;Year 2024.</p></dd><dt>Ieee all events saifi 2025</dt><dd>1.27 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;all_events_saifi;Year 2025.</p></dd><dt>Ieee all events saifi 2024</dt><dd>1.30 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;all_events_saifi;Year 2024.</p></dd><dt>Ieee all events caidi 2025</dt><dd>161.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;all_events_caidi;Year 2025.</p></dd><dt>Ieee all events caidi 2024</dt><dd>393.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;all_events_caidi;Year 2024.</p></dd><dt>Ieee without major days saidi 2025</dt><dd>130.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;without_major_days_saidi;Year 2025.</p></dd><dt>Ieee without major days saidi 2024</dt><dd>133.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;without_major_days_saidi;Year 2024.</p></dd><dt>Ieee without major days saifi 2025</dt><dd>1.08 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;without_major_days_saifi;Year 2025.</p></dd><dt>Ieee without major days saifi 2024</dt><dd>1.00 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;without_major_days_saifi;Year 2024.</p></dd><dt>Ieee without major days caidi 2025</dt><dd>120.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;without_major_days_caidi;Year 2025.</p></dd><dt>Ieee without major days caidi 2024</dt><dd>133.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;without_major_days_caidi;Year 2024.</p></dd><dt>Ieee loss supply removed saidi 2025</dt><dd>187.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;loss_supply_removed_saidi;Year 2025.</p></dd><dt>Ieee loss supply removed saidi 2024</dt><dd>500.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;loss_supply_removed_saidi;Year 2024.</p></dd><dt>Ieee loss supply removed saifi 2025</dt><dd>1.12 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;loss_supply_removed_saifi;Year 2025.</p></dd><dt>Ieee loss supply removed saifi 2024</dt><dd>1.12 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;loss_supply_removed_saifi;Year 2024.</p></dd><dt>Ieee loss supply removed caidi 2025</dt><dd>167.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;loss_supply_removed_caidi;Year 2025.</p></dd><dt>Ieee loss supply removed caidi 2024</dt><dd>445.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Ohio row;loss_supply_removed_caidi;Year 2024.</p></dd><dt>Saidi history ieee all events 2023</dt><dd>366.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_all_events;Year 2023.</p></dd><dt>Saidi history ieee all events 2022</dt><dd>413.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_all_events;Year 2022.</p></dd><dt>Saidi history ieee all events 2021</dt><dd>244.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_all_events;Year 2021.</p></dd><dt>Saidi history ieee all events 2020</dt><dd>283.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_all_events;Year 2020.</p></dd><dt>Saidi history ieee all events 2019</dt><dd>303.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_all_events;Year 2019.</p></dd><dt>Saidi history ieee all events 2018</dt><dd>240.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_all_events;Year 2018.</p></dd><dt>Saidi history ieee all events 2017</dt><dd>246.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_all_events;Year 2017.</p></dd><dt>Saidi history ieee all events 2016</dt><dd>169.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_all_events;Year 2016.</p></dd><dt>Saidi history ieee all events 2015</dt><dd>167.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_all_events;Year 2015.</p></dd><dt>Saidi history ieee without major days 2023</dt><dd>127.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_without_major_days;Year 2023.</p></dd><dt>Saidi history ieee without major days 2022</dt><dd>144.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_without_major_days;Year 2022.</p></dd><dt>Saidi history ieee without major days 2021</dt><dd>136.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_without_major_days;Year 2021.</p></dd><dt>Saidi history ieee without major days 2020</dt><dd>129.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_without_major_days;Year 2020.</p></dd><dt>Saidi history ieee without major days 2019</dt><dd>145.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_without_major_days;Year 2019.</p></dd><dt>Saidi history ieee without major days 2018</dt><dd>150.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_without_major_days;Year 2018.</p></dd><dt>Saidi history ieee without major days 2017</dt><dd>141.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_without_major_days;Year 2017.</p></dd><dt>Saidi history ieee without major days 2016</dt><dd>127.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_without_major_days;Year 2016.</p></dd><dt>Saidi history ieee without major days 2015</dt><dd>139.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_without_major_days;Year 2015.</p></dd><dt>Saidi history ieee loss supply removed 2023</dt><dd>336.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Saidi history ieee loss supply removed 2022</dt><dd>318.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Saidi history ieee loss supply removed 2021</dt><dd>191.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Saidi history ieee loss supply removed 2020</dt><dd>261.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Saidi history ieee loss supply removed 2019</dt><dd>277.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Saidi history ieee loss supply removed 2018</dt><dd>210.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Saidi history ieee loss supply removed 2017</dt><dd>225.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Saidi history ieee loss supply removed 2016</dt><dd>142.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Saidi history ieee loss supply removed 2015</dt><dd>149.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Saidi history basis</dt><dd>EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution. Locator: Table11.4 header and method notes;2015-2023 supplemental history.</p></dd><dt>Saifi history ieee all events 2023</dt><dd>1.25 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_all_events;Year 2023.</p></dd><dt>Saifi history ieee all events 2022</dt><dd>1.52 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_all_events;Year 2022.</p></dd><dt>Saifi history ieee all events 2021</dt><dd>1.33 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_all_events;Year 2021.</p></dd><dt>Saifi history ieee all events 2020</dt><dd>1.36 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_all_events;Year 2020.</p></dd><dt>Saifi history ieee all events 2019</dt><dd>1.48 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_all_events;Year 2019.</p></dd><dt>Saifi history ieee all events 2018</dt><dd>1.41 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_all_events;Year 2018.</p></dd><dt>Saifi history ieee all events 2017</dt><dd>1.35 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_all_events;Year 2017.</p></dd><dt>Saifi history ieee all events 2016</dt><dd>1.18 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_all_events;Year 2016.</p></dd><dt>Saifi history ieee all events 2015</dt><dd>1.19 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_all_events;Year 2015.</p></dd><dt>Saifi history ieee without major days 2023</dt><dd>0.92 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_without_major_days;Year 2023.</p></dd><dt>Saifi history ieee without major days 2022</dt><dd>1.12 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_without_major_days;Year 2022.</p></dd><dt>Saifi history ieee without major days 2021</dt><dd>1.12 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_without_major_days;Year 2021.</p></dd><dt>Saifi history ieee without major days 2020</dt><dd>1.07 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_without_major_days;Year 2020.</p></dd><dt>Saifi history ieee without major days 2019</dt><dd>1.14 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_without_major_days;Year 2019.</p></dd><dt>Saifi history ieee without major days 2018</dt><dd>1.17 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_without_major_days;Year 2018.</p></dd><dt>Saifi history ieee without major days 2017</dt><dd>1.13 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_without_major_days;Year 2017.</p></dd><dt>Saifi history ieee without major days 2016</dt><dd>1.06 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_without_major_days;Year 2016.</p></dd><dt>Saifi history ieee without major days 2015</dt><dd>1.13 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_without_major_days;Year 2015.</p></dd><dt>Saifi history ieee loss supply removed 2023</dt><dd>1.07 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Saifi history ieee loss supply removed 2022</dt><dd>1.20 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Saifi history ieee loss supply removed 2021</dt><dd>1.10 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Saifi history ieee loss supply removed 2020</dt><dd>1.17 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Saifi history ieee loss supply removed 2019</dt><dd>1.22 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Saifi history ieee loss supply removed 2018</dt><dd>1.16 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Saifi history ieee loss supply removed 2017</dt><dd>1.15 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Saifi history ieee loss supply removed 2016</dt><dd>0.99 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Saifi history ieee loss supply removed 2015</dt><dd>1.02 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Saifi history basis</dt><dd>EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation. Locator: Table11.5 header and method notes;2015-2023 supplemental history.</p></dd><dt>Caidi history ieee all events 2023</dt><dd>292.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_all_events;Year 2023.</p></dd><dt>Caidi history ieee all events 2022</dt><dd>272.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_all_events;Year 2022.</p></dd><dt>Caidi history ieee all events 2021</dt><dd>184.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_all_events;Year 2021.</p></dd><dt>Caidi history ieee all events 2020</dt><dd>209.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_all_events;Year 2020.</p></dd><dt>Caidi history ieee all events 2019</dt><dd>206.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_all_events;Year 2019.</p></dd><dt>Caidi history ieee all events 2018</dt><dd>170.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_all_events;Year 2018.</p></dd><dt>Caidi history ieee all events 2017</dt><dd>182.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_all_events;Year 2017.</p></dd><dt>Caidi history ieee all events 2016</dt><dd>143.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_all_events;Year 2016.</p></dd><dt>Caidi history ieee all events 2015</dt><dd>140.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_all_events;Year 2015.</p></dd><dt>Caidi history ieee without major days 2023</dt><dd>138.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_without_major_days;Year 2023.</p></dd><dt>Caidi history ieee without major days 2022</dt><dd>128.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_without_major_days;Year 2022.</p></dd><dt>Caidi history ieee without major days 2021</dt><dd>121.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_without_major_days;Year 2021.</p></dd><dt>Caidi history ieee without major days 2020</dt><dd>120.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_without_major_days;Year 2020.</p></dd><dt>Caidi history ieee without major days 2019</dt><dd>127.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_without_major_days;Year 2019.</p></dd><dt>Caidi history ieee without major days 2018</dt><dd>127.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_without_major_days;Year 2018.</p></dd><dt>Caidi history ieee without major days 2017</dt><dd>125.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_without_major_days;Year 2017.</p></dd><dt>Caidi history ieee without major days 2016</dt><dd>120.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_without_major_days;Year 2016.</p></dd><dt>Caidi history ieee without major days 2015</dt><dd>123.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_without_major_days;Year 2015.</p></dd><dt>Caidi history ieee loss supply removed 2023</dt><dd>312.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Caidi history ieee loss supply removed 2022</dt><dd>264.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Caidi history ieee loss supply removed 2021</dt><dd>174.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Caidi history ieee loss supply removed 2020</dt><dd>224.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Caidi history ieee loss supply removed 2019</dt><dd>226.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Caidi history ieee loss supply removed 2018</dt><dd>181.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Caidi history ieee loss supply removed 2017</dt><dd>195.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Caidi history ieee loss supply removed 2016</dt><dd>143.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Caidi history ieee loss supply removed 2015</dt><dd>146.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Caidi history basis</dt><dd>EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution. Locator: Table11.6 header and method notes;2015-2023 supplemental history.</p></dd></dl></article>"},{"id":"power-any-reliability-2025-oh","html":"<article><h3>Ohio historical any-method distribution reliability2025 and2024</h3><p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 years2025 and2024.</p></dd><dt>Any reliability basis</dt><dd>EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 header and definitions.</p></dd><dt>Any coverage 2025</dt><dd>96.80 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Ohio row;coverage;Year 2025.</p></dd><dt>Any coverage 2024</dt><dd>96.60 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Ohio row;coverage;Year 2024.</p></dd><dt>Any all events saidi 2025</dt><dd>205.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Ohio row;all_events_saidi;Year 2025.</p></dd><dt>Any all events saidi 2024</dt><dd>510.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Ohio row;all_events_saidi;Year 2024.</p></dd><dt>Any all events saifi 2025</dt><dd>1.27 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Ohio row;all_events_saifi;Year 2025.</p></dd><dt>Any all events saifi 2024</dt><dd>1.30 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Ohio row;all_events_saifi;Year 2024.</p></dd><dt>Any all events caidi 2025</dt><dd>161.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Ohio row;all_events_caidi;Year 2025.</p></dd><dt>Any all events caidi 2024</dt><dd>393.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Ohio row;all_events_caidi;Year 2024.</p></dd><dt>Any without major events saidi 2025</dt><dd>130.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Ohio row;without_major_events_saidi;Year 2025.</p></dd><dt>Any without major events saidi 2024</dt><dd>133.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Ohio row;without_major_events_saidi;Year 2024.</p></dd><dt>Any without major events saifi 2025</dt><dd>1.08 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Ohio row;without_major_events_saifi;Year 2025.</p></dd><dt>Any without major events saifi 2024</dt><dd>1.00 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Ohio row;without_major_events_saifi;Year 2024.</p></dd><dt>Any without major events caidi 2025</dt><dd>120.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Ohio row;without_major_events_caidi;Year 2025.</p></dd><dt>Any without major events caidi 2024</dt><dd>133.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Ohio row;without_major_events_caidi;Year 2024.</p></dd><dt>Saidi history any all events 2023</dt><dd>366.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_all_events;Year 2023.</p></dd><dt>Saidi history any all events 2022</dt><dd>413.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_all_events;Year 2022.</p></dd><dt>Saidi history any all events 2021</dt><dd>244.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_all_events;Year 2021.</p></dd><dt>Saidi history any all events 2020</dt><dd>283.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_all_events;Year 2020.</p></dd><dt>Saidi history any all events 2019</dt><dd>305.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_all_events;Year 2019.</p></dd><dt>Saidi history any all events 2018</dt><dd>242.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_all_events;Year 2018.</p></dd><dt>Saidi history any all events 2017</dt><dd>248.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_all_events;Year 2017.</p></dd><dt>Saidi history any all events 2016</dt><dd>174.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_all_events;Year 2016.</p></dd><dt>Saidi history any all events 2015</dt><dd>172.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_all_events;Year 2015.</p></dd><dt>Saidi history any without major events 2023</dt><dd>127.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_without_major_events;Year 2023.</p></dd><dt>Saidi history any without major events 2022</dt><dd>144.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_without_major_events;Year 2022.</p></dd><dt>Saidi history any without major events 2021</dt><dd>135.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_without_major_events;Year 2021.</p></dd><dt>Saidi history any without major events 2020</dt><dd>129.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_without_major_events;Year 2020.</p></dd><dt>Saidi history any without major events 2019</dt><dd>146.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_without_major_events;Year 2019.</p></dd><dt>Saidi history any without major events 2018</dt><dd>151.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_without_major_events;Year 2018.</p></dd><dt>Saidi history any without major events 2017</dt><dd>143.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_without_major_events;Year 2017.</p></dd><dt>Saidi history any without major events 2016</dt><dd>128.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_without_major_events;Year 2016.</p></dd><dt>Saidi history any without major events 2015</dt><dd>141.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Ohio row;any_without_major_events;Year 2015.</p></dd><dt>Saidi history basis</dt><dd>EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution. Locator: Table11.4 header and method notes;2015-2023 supplemental history.</p></dd><dt>Saifi history any all events 2023</dt><dd>1.25 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_all_events;Year 2023.</p></dd><dt>Saifi history any all events 2022</dt><dd>1.52 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_all_events;Year 2022.</p></dd><dt>Saifi history any all events 2021</dt><dd>1.33 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_all_events;Year 2021.</p></dd><dt>Saifi history any all events 2020</dt><dd>1.36 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_all_events;Year 2020.</p></dd><dt>Saifi history any all events 2019</dt><dd>1.47 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_all_events;Year 2019.</p></dd><dt>Saifi history any all events 2018</dt><dd>1.41 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_all_events;Year 2018.</p></dd><dt>Saifi history any all events 2017</dt><dd>1.35 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_all_events;Year 2017.</p></dd><dt>Saifi history any all events 2016</dt><dd>1.18 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_all_events;Year 2016.</p></dd><dt>Saifi history any all events 2015</dt><dd>1.21 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_all_events;Year 2015.</p></dd><dt>Saifi history any without major events 2023</dt><dd>0.92 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_without_major_events;Year 2023.</p></dd><dt>Saifi history any without major events 2022</dt><dd>1.12 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_without_major_events;Year 2022.</p></dd><dt>Saifi history any without major events 2021</dt><dd>1.12 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_without_major_events;Year 2021.</p></dd><dt>Saifi history any without major events 2020</dt><dd>1.07 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_without_major_events;Year 2020.</p></dd><dt>Saifi history any without major events 2019</dt><dd>1.14 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_without_major_events;Year 2019.</p></dd><dt>Saifi history any without major events 2018</dt><dd>1.18 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_without_major_events;Year 2018.</p></dd><dt>Saifi history any without major events 2017</dt><dd>1.14 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_without_major_events;Year 2017.</p></dd><dt>Saifi history any without major events 2016</dt><dd>1.06 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_without_major_events;Year 2016.</p></dd><dt>Saifi history any without major events 2015</dt><dd>1.14 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Ohio row;any_without_major_events;Year 2015.</p></dd><dt>Saifi history basis</dt><dd>EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation. Locator: Table11.5 header and method notes;2015-2023 supplemental history.</p></dd><dt>Caidi history any all events 2023</dt><dd>292.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_all_events;Year 2023.</p></dd><dt>Caidi history any all events 2022</dt><dd>272.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_all_events;Year 2022.</p></dd><dt>Caidi history any all events 2021</dt><dd>184.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_all_events;Year 2021.</p></dd><dt>Caidi history any all events 2020</dt><dd>209.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_all_events;Year 2020.</p></dd><dt>Caidi history any all events 2019</dt><dd>207.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_all_events;Year 2019.</p></dd><dt>Caidi history any all events 2018</dt><dd>171.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_all_events;Year 2018.</p></dd><dt>Caidi history any all events 2017</dt><dd>183.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_all_events;Year 2017.</p></dd><dt>Caidi history any all events 2016</dt><dd>147.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_all_events;Year 2016.</p></dd><dt>Caidi history any all events 2015</dt><dd>142.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_all_events;Year 2015.</p></dd><dt>Caidi history any without major events 2023</dt><dd>138.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_without_major_events;Year 2023.</p></dd><dt>Caidi history any without major events 2022</dt><dd>128.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_without_major_events;Year 2022.</p></dd><dt>Caidi history any without major events 2021</dt><dd>121.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_without_major_events;Year 2021.</p></dd><dt>Caidi history any without major events 2020</dt><dd>120.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_without_major_events;Year 2020.</p></dd><dt>Caidi history any without major events 2019</dt><dd>128.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_without_major_events;Year 2019.</p></dd><dt>Caidi history any without major events 2018</dt><dd>128.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_without_major_events;Year 2018.</p></dd><dt>Caidi history any without major events 2017</dt><dd>126.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_without_major_events;Year 2017.</p></dd><dt>Caidi history any without major events 2016</dt><dd>121.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_without_major_events;Year 2016.</p></dd><dt>Caidi history any without major events 2015</dt><dd>123.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Ohio row;any_without_major_events;Year 2015.</p></dd><dt>Caidi history basis</dt><dd>EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution. Locator: Table11.6 header and method notes;2015-2023 supplemental history.</p></dd></dl></article>"}]}