{"schema_version":1,"layer":"power","reviewed_on":"2026-10-28","coverage_note":"Selected utility and state proceedings. Other utilities and states are not yet reviewed. One utility tariff does not establish statewide coverage. Current and earlier captured electricity comparisons retain separate periods and sources.","items":[{"id":"grid-va","kind":"grid_context","subject":"PJM regional forecast adjustment process","state_codes":["de","dc","il","in","ky","md","mi","nj","nc","oh","pa","tn","va","wv"],"scope":"PJM regional context. A state assignment is not a quantitative allocation to Virginia.","fields":{"meaning":{"value":"Forecast adjustments, no load interconnection queue","source_ids":["pjm-process"],"scope":"Regional context for the PJM footprint, not a Virginia only total.","locator":"Named request or forecast discussion"},"observation_date":{"value":"2026-09-29","source_ids":["pjm-process"],"scope":"PJM publication date.","locator":"Named request or forecast discussion"},"requested_capacity":{"value":null,"source_ids":["pjm-process"],"scope":"No comparable regional queue total established in this review.","locator":"Named request or forecast discussion","unknown_reason":"No comparable regional queue total established in this review.","unit":"GW","measurement_role":"requested_capacity"}}},{"id":"price-pa","kind":"residential_price","subject":"Pennsylvania","state_codes":["pa"],"scope":"A two point comparison, not a complete time series. State average revenue per unit sold is not a household bill. No causal attribution to data centers.","fields":{"period":{"value":"July 2026","source_ids":["eia-prices"],"scope":"Residential comparison month.","locator":"Table heading"},"prior_period":{"value":"July 2025","source_ids":["eia-prices"],"scope":"Same month in the preceding year.","locator":"Table heading"},"price":{"value":21.72,"source_ids":["eia-prices"],"scope":"Preliminary residential state average, cents per kWh.","locator":"Residential July 2026, Pennsylvania","unit":"cents per kWh","measurement_role":"published_price"},"prior_price":{"value":19.51,"source_ids":["eia-prices"],"scope":"Residential state average for the comparison month.","locator":"Residential July 2025, Pennsylvania","unit":"cents per kWh","measurement_role":"published_price"}}},{"id":"price-pa-202608","kind":"residential_price","subject":"Pennsylvania","state_codes":["pa"],"scope":"Captured August residential comparison. The earlier July comparison remains in the source history. State average revenue per unit sold is not a household bill or evidence of a data center effect.","fields":{"period":{"value":"August 2026","source_ids":["eia-residential-xlsx-20261023"],"scope":"Residential comparison month.","locator":"Table_5_06_A!B4:C4"},"prior_period":{"value":"August 2025","source_ids":["eia-residential-xlsx-20261023"],"scope":"Same month in the preceding year.","locator":"Table_5_06_A!B4:C4"},"price":{"value":21.77,"source_ids":["eia-residential-xlsx-20261023"],"scope":"Preliminary August2026 residential state average, cents per kWh.","locator":"Table_5_06_A!B15:C15","unit":"cents per kWh","measurement_role":"published_price"},"prior_price":{"value":19.93,"source_ids":["eia-residential-xlsx-20261023"],"scope":"Final August2025 residential state average, cents per kWh.","locator":"Table_5_06_A!B15:C15","unit":"cents per kWh","measurement_role":"published_price"},"source_context":{"value":"The August table and public spreadsheet agree. The surrounding report header still identifies July and its older release date. The exact publication day of these August values is not established here.","source_ids":["eia-price-check-20261023-1645","eia-residential-xlsx-20261023"],"scope":"The scheduled next release day is not treated as proof of actual publication. This review uses the periods stated in the two data tables and preserves the earlier July capture.","locator":"HTML table heading and report header; spreadsheet rows1 through4 and67"}}},{"id":"tariff-framework-pa-puc-20260430","kind":"tariff_framework","subject":"Pennsylvania adopted model tariff framework","state_codes":["pa"],"scope":"State commission model only, with dates, conditional safeguards and source differences. Individual utility tariffs for Pennsylvania remain unreviewed in this layer.","fields":{"status":{"value":"approved","source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"Approval of a model framework only. No individual utility tariff approval is established.","locator":"Operative paragraph 1 and appendix placeholders"},"framework_basis":{"value":"Model framework only","source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"A separate evidence category. This model does not color the utility tariff evidence map as approved.","locator":"Operative paragraph 1 and appendix heading"},"adopted_on":{"value":"2026-04-30","source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"Commission adoption date, distinct from entry and Bulletin publication.","locator":"Order adopted line"},"entered_on":{"value":"2026-05-12","source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"Commission entry date, distinct from adoption and May 30 publication.","locator":"Order entered line"},"threshold":{"value":"The adopted heading and applicability use at least 50 MW individually or 100 MW in aggregate. The definition instead says over 50 MW individually.","source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"The source boundary difference is retained. Utilities may apply the model below those thresholds individually. No customer eligibility ruling is inferred.","locator":"Operative paragraph 1; appendix Applicability and Large Load Customer definition"},"generation_and_existing_load":{"value":"Behind the meter generation is excluded from the threshold calculation. New interconnections and new incremental load of existing customers are covered, including an increase that brings total site load to the threshold.","source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"Existing contracts remain under their existing terms, with optional entry under the model at utility discretion. No net load deduction or current customer contract is established.","locator":"Appendix Applicability and Existing Large Load Customer Contracts"},"contract_length":{"value":"The initial contract term is at least five years after any optional three to five year ramp. A longer initial term may be needed to recover utility investment.","source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"The ramp is additional to the initial term. Longer terms discussed by commenters are not adopted universal minimums.","locator":"Appendix Terms of Contract and definitions"},"minimum_demand":{"value":"The monthly billing demand floor is the greater of 80 percent of contract capacity or 80 percent of the highest monthly billing demand in the previous eleven months. The model also states an 80 percent minimum monthly demand charge, with higher charges possible for fixed cost recovery.","source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"Demand safeguards are not an 80 percent energy purchase guarantee, actual electricity consumption or a stated rate per kWh.","locator":"Appendix Monthly Billing Demand and Minimum Demand Charge"},"collateral":{"value":"Collateral covers network improvement and interconnection facility costs, with reductions as construction and ramp milestones reduce risk. Cash, a qualifying letter of credit or a qualifying parent guarantee are permitted.","source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"The guarantee requires both stated credit ratings and liquidity above ten times the collateral requirement. No actual customer credit finding, deposit or refund is established.","locator":"Appendix Collateral Requirements"},"continuation_and_notice":{"value":"After the initial term, contracts continue unless either party provides at least 48 months of written termination notice. Modification requests after the initial term also require 48 months of notice.","source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"These general continuation terms are separate from the specific PJM delivery year alignment and exit fee conditions.","locator":"Appendix Terms of Contract"},"conditional_reduction":{"value":"A total reduction up to 20 percent without an exit fee requires five years or the initial contract term, whichever is longer, and at least 48 months of written notice before the relevant PJM delivery year.","source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"This is conditional flexibility, not a fee free exit after five years or a new reduction allowance every year.","locator":"Appendix Contractual Flexibility, Exit Fee"},"exit_fee":{"value":"Termination or a reduction beyond 20 percent after the first five years requires the specified 48 month notice and an exit fee. The fee is the greater of unrecovered network and interconnection costs, after revenues received, or the remaining minimum charges for the relevant reduced capacity beyond the allowed reduction.","source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"The exit fee period is the remaining initial term or agreed extension, with a one year minimum and five year maximum. Reasonable mitigation is required, not a guaranteed full refund.","locator":"Appendix Exit Fee and Exit Fee Period definition"},"queue_transparency":{"value":"The model calls for an anonymized public interconnection queue with ZIP code, application acceptance date, requested MW and study stage.","source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"A model disclosure requirement is not a reviewed published queue, an approved connection or actual load.","locator":"Appendix Public Interconnection Queue"},"source_difference":{"value":"The docket heading is M-2025-3054271. The closing directive instead prints A-2025-3054271. The individual threshold is inclusive in applicability but strict in the definition.","source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"Both differences are retained without inventing a second case or silently resolving the exact 50 MW boundary.","locator":"Bulletin heading, operative paragraph 4, applicability and definition"},"utility_effective_on":{"value":null,"source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"The appendix issue and effective dates are placeholders. No individual utility effective date reviewed.","locator":"Appendix issue and effective date placeholders","unknown_reason":"The appendix issue and effective dates are placeholders. No individual utility effective date reviewed."},"individual_outcomes":{"value":null,"source_ids":["pa-puc-model-order-bulletin-20260530"],"scope":"No utility filing approval, individual customer contract, actual collateral, approved connection or actual load reviewed.","locator":"Model framework review boundary","unknown_reason":"No utility filing approval, individual customer contract, actual collateral, approved connection or actual load reviewed."}}},{"id":"grid-pjm-manual19-procedure-20260630","kind":"grid_context","subject":"PJM adopted forecast adjustment review procedure","state_codes":["de","dc","il","in","ky","md","mi","nj","nc","oh","pa","tn","va","wv"],"scope":"Regional procedure shown in the PJM state panels for context. Manual approval, utility submissions, final forecasts and actual load remain distinct.","fields":{"status":{"value":"approved","source_ids":["pjm-manual19-current-20261023"],"scope":"Approval concerns this manual revision only.","locator":"Printed page 3"},"process_basis":{"value":"Forecast review procedure","source_ids":["pjm-manual19-current-20261023"],"scope":"Regional process documentation, excluded from utility tariff status.","locator":"Attachment B printed pages 26 through 32"},"revision":{"value":"Revision 39","source_ids":["pjm-manual19-current-20261023"],"scope":"Captured current clean version, separate from the earlier change presentation.","locator":"Cover and printed page 4"},"approved_on":{"value":"2026-06-29","source_ids":["pjm-manual19-current-20261023"],"scope":"Manual approval day.","locator":"Printed page 3"},"effective_on":{"value":"2026-06-30","source_ids":["pjm-manual19-current-20261023"],"scope":"Manual effect, separate from approval and original posting.","locator":"Cover and printed page 3"},"threshold_wording":{"value":"Solicitation covers changes of at least 50 MW, positive or negative. Verification instead says category totals greater than 50 MW.","source_ids":["pjm-manual19-current-20261023"],"scope":"Both threshold descriptions retained; no silent resolution for exactly 50 MW.","locator":"Printed pages 26 and 29"},"regulator_review":{"value":"Submitters must offer each relevant state regulator review before submission. Participation is voluntary, and submissions need not follow regulator feedback if both perspectives are provided.","source_ids":["pjm-manual19-current-20261023"],"scope":"Review opportunity and feedback are distinct from approval of forecasts or connections.","locator":"Printed page 28"},"firm_classification":{"value":"Firm status requires a qualifying service, construction or supply commitment plus financial support. Nonfirm portions may enter forecast periods outside the capacity auction horizon.","source_ids":["pjm-manual19-current-20261023"],"scope":"Forecast classification only. Firm portions can still be reduced for growth constraints.","locator":"Printed pages 28 through 30"},"duplicate_requests":{"value":"Customers must be asked about potentially duplicated requests lacking service or construction commitments. Silence counts toward duplication. Missing site, location and MW details can remove such requests; discounting can reflect project milestones.","source_ids":["pjm-manual19-current-20261023"],"scope":"No actual duplicate count or adjustment result is established.","locator":"Printed pages 29 and 30"},"final_determination":{"value":"PJM reviews assumptions, regulator feedback and independent forecast uncertainty before determining the final adjustment. A submitter can retain its preliminary amount if the calculated final is higher.","source_ids":["pjm-manual19-current-20261023"],"scope":"A submitted number or firm classification does not guarantee unchanged final inclusion.","locator":"Printed pages 30 and 31"},"timing":{"value":"The manual schedules final adjustments for November or December and independent forecast review for October or November.","source_ids":["pjm-manual19-current-20261023"],"scope":"General schedule, not proof of a completed presentation or final 2027 forecast.","locator":"Printed pages 26 and 30"},"utility_tariff":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No individual utility tariff approval is established by this manual.","locator":"Procedure review boundary","unknown_reason":"No individual utility tariff approval is established by this manual."},"actual_load":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No measured actual load quantity is established by this procedure.","locator":"Procedure review boundary","unknown_reason":"No measured actual load quantity is established by this procedure."},"approved_capacity":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No connection capacity approval is established.","locator":"Procedure review boundary","unknown_reason":"No connection capacity approval is established."},"individual_approvals":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No individual customer decision is established.","locator":"Procedure review boundary","unknown_reason":"No individual customer decision is established."},"requested_capacity":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No comparable regional queue total is established.","locator":"Procedure review boundary","unknown_reason":"No comparable regional queue total is established."},"pjm_final_forecast":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No final amount for the current submitted forecast is established.","locator":"Procedure review boundary","unknown_reason":"No final amount for the current submitted forecast is established."},"atlas_record_id":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No facility identity join is made.","locator":"Procedure review boundary","unknown_reason":"No facility identity join is made."}}},{"id":"tariff-pa-ppl-lp6","kind":"tariff","subject":"PPL LP 6 security dependent demand guarantees","state_codes":["pa"],"scope":"Utility specific approved tariff with dated compliance and corrected sheets. Separate statewide framework, demand guarantees, security, direct costs, requests and actual service retain different scopes.","fields":{"utility":{"value":"PPL Electric Utilities","source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"Utility specific retail LP 6 schedule, not a statewide implementation census or supplier coordination tariff.","locator":"Schedule caption"},"status":{"value":"approved","source_ids":["pa-ppl-final-order-20260611","pa-ppl-compliance-approval-20260707"],"scope":"Actual adopted and entered settlement approval plus subsequent staff compliance effectiveness letter. No individual customer approval or finding about later appeals, stays or complaints is made.","locator":"Order operative paragraphs 3 and 8; signed compliance letter"},"docket":{"value":"R-2025-3057164","source_ids":["pa-ppl-final-order-20260611","pa-ppl-corrected-retail-tariff-20261023"],"scope":"PPL electric base rate case, distinct from the separate statewide model proceeding.","locator":"Order and tariff captions"},"conditional_demand_basis":{"value":"Security dependent demand payment rules","source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"Demand guarantees, security satisfaction and optional interruption retain separate conditions. None is measured electrical use.","locator":"LP 6, Electric Service Agreement paragraphs 7 through 9 and voluntary option"},"threshold":{"value":"Data center customers commencing service on or after October 1, 2025, at 69 kV or above, with at least 50 MW at one facility or at least 75 MW in aggregate within a ten mile radius.","source_ids":["pa-ppl-corrected-retail-tariff-20261023","pa-ppl-final-order-20260611"],"scope":"PPL facilities at the stated voltage and radius only. Inclusive thresholds do not establish actual load or an Atlas campus identity. The 75 MW aggregation is not replaced by the statewide model threshold.","locator":"Page 35C Application"},"conditional_exception":{"value":"A single facility with 50 through 75 MW at 69 kV or above and no transmission network upgrade costs may be proposed for LP 5 by utility petition, subject to Commission review and approval.","source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"Both inclusive endpoints and both conditions retained. An exception is not automatic. The petition must be served on the rate case parties; if approved, the facility demand is excluded from the described aggregate. No actual petition outcome is reviewed.","locator":"Page 35C Application"},"adopted_on":{"value":"2026-06-04","source_ids":["pa-ppl-final-order-20260611"],"scope":"Actual adoption or vote date, separate from entry.","locator":"Order final page 229"},"approved_on":{"value":"2026-06-11","source_ids":["pa-ppl-final-order-20260611"],"scope":"Actual final order entered date. The earlier June 4 adoption does not change this entry date.","locator":"Order final page 229 and operative paragraph 3"},"issued_on":{"value":"2026-06-30","source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"Printed issue date of the current retained LP6 pages, separate from the later correction filing.","locator":"Pages 35C through 35F footers"},"effective_on":{"value":"2026-07-01","source_ids":["pa-ppl-corrected-retail-tariff-20261023","pa-ppl-compliance-approval-20260707"],"scope":"Printed service effective date and staff confirmation of effectiveness by operation of law. Not an observed customer service start.","locator":"LP6 footers; compliance letter"},"compliance_review_on":{"value":"2026-07-07","source_ids":["pa-ppl-compliance-approval-20260707"],"scope":"Staff letter says suspension or further investigation does not appear warranted at that time, without prejudice to timely formal complaints. This is not a new merits order dated July 7.","locator":"Signed one page letter"},"replacement_filed_on":{"value":"2026-08-27","source_ids":["pa-ppl-replacement-tariff-20260827","pa-ppl-corrected-retail-tariff-20261023"],"scope":"Replacement filing cover date; the filed corrections are described as typographical or formatting. Current clean four page LP6 text matches the agency clean version after whitespace normalization.","locator":"Replacement cover page 1 and clean pages 243 through 246"},"contract_length":{"value":"Initial electric service agreement term of at least ten years. The ramp is within that term.","source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"No automatic fifteen year minimum or additional five year term is inferred. No individual agreement or its renewal terms is reviewed.","locator":"Page 35D ESA paragraphs 1 and 2"},"ramp_length":{"value":"The schedule requests a ramp for up to the first five years, then expressly allows a ramp period that does not exceed the initial agreement term.","source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"Both clauses retained. This is not a universal five year maximum, an additional term, or an actual customer ramp.","locator":"Page 35D ESA paragraph 2"},"minimum_bill":{"value":"Until the Rate Base Security Obligation is satisfied, applicable rates use the greater of actual peak demand or 80 percent of scheduled ramp load. After satisfaction, the stated floor is 80 percent in the first five years and 50 percent in the second five years.","source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"The unpaid security condition remains relevant beyond year five. These are demand payment rules, not actual energy use, total bill discounts, or proof that security has been satisfied. Page 35C separately states the monthly minimum distribution charge is the customer charge.","locator":"Pages 35C and 35E, ESA paragraphs 7 and 8"},"voluntary_interruptible_option":{"value":"If the customer elects voluntary interruptible service instead of firm service, the option states a 60 percent minimum load guarantee for the first five years and 30 percent for the second five years.","source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"No customer election is established. The option does not explicitly resolve every interaction with the unsatisfied security condition, so no individual security release, unrestricted interruption right or universal combined bill formula is inferred.","locator":"Page 35E voluntary interruptible option"},"collateral":{"value":"Security covers customer caused upgrades placed into transmission rate base and recovered through transmission rates. A letter of credit, parent guarantee or other acceptable instrument secures the outstanding revenue guarantee.","source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"No fixed deposit in dollars per MW or fixed number of years is stated here. Security satisfaction requires transmission revenue equal to the Rate Base Security Obligation, not merely the passage of five years. Default draw applies to remaining line extension costs not directly charged.","locator":"Page 35D ESA paragraphs 3 through 6"},"direct_construction_costs":{"value":"Directly assignable transmission and distribution upgrades require construction contributions as milestone payments ahead of work.","source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"Separate direct cost contribution and rate base security mechanisms are not added as duplicate actual expenditures or assumed paid amounts.","locator":"Page 35E ESA paragraph 10"},"exit_fees":{"value":"The exit fee is the greater of the remaining minimum load guarantee during the agreement term and the remaining Rate Base Security Obligation.","source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"This is a comparison, not addition of both amounts. Funds first reduce transmission rate base security, with the remainder credited to the FERC transmission formula revenue requirement. No actual payment or customer savings is established.","locator":"Page 35E ESA paragraph 9 and allocation paragraph"},"critical_load":{"value":"Where critical load exists, the agreement requires infrastructure that permits noncritical load to be shed without affecting critical load operations.","source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"A tariff design requirement is not proof that any site installed, tested or used that capability.","locator":"Page 35E ESA paragraph 11"},"reporting":{"value":"The utility must submit compliant agreements and upgrade cost allocations, notify early termination and relevant exit fee credits, and provide annual forecast breakdowns for agreements, letters of authorization and inquiries.","source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"Required filings are not verified submissions. Forecast cohorts and requests are not approved or actual load and are not summed into a statewide queue.","locator":"Pages 35E and 35F reporting provisions"},"model_comparison":{"value":"The order retains this utility specific 75 MW aggregation threshold and separately notes the statewide model uses 100 MW in aggregate. Parties reserve a route to propose later LP 6 modifications after the model proceeding.","source_ids":["pa-ppl-final-order-20260611"],"scope":"The model framework remains a separate record, with its own dates and unknown utility implementation. No later reconciliation, amendment, appeal outcome or state coverage conclusion is inferred.","locator":"Order pages 39 and 40 paragraph 97, page 106 footnote26"},"individual_project_approval":{"value":null,"source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"No named customer agreement or project approval is reviewed.","locator":"Review boundary","unknown_reason":"No named customer agreement or project approval is reviewed."},"actual_load":{"value":null,"source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"No observed operating electrical load is established.","locator":"Review boundary","unknown_reason":"No observed operating electrical load is established."},"actual_service_on":{"value":null,"source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"No named customer physical service date is established.","locator":"Review boundary","unknown_reason":"No named customer physical service date is established."},"security_satisfied_on":{"value":null,"source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"No individual security satisfaction date is established.","locator":"Review boundary","unknown_reason":"No individual security satisfaction date is established."},"interruptible_election":{"value":null,"source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"No customer interruptible service election is established.","locator":"Review boundary","unknown_reason":"No customer interruptible service election is established."},"actual_customer_savings":{"value":null,"source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"No realized customer or household savings is established.","locator":"Review boundary","unknown_reason":"No realized customer or household savings is established."},"atlas_record_id":{"value":null,"source_ids":["pa-ppl-corrected-retail-tariff-20261023"],"scope":"No independently verified Atlas building or campus identity join is made.","locator":"Review boundary","unknown_reason":"No independently verified Atlas building or campus identity join is made."}}},{"id":"grid-pjm-ppl-submission-20260929","kind":"grid_context","subject":"PPL submitted forecast and initial request context","state_codes":["pa"],"scope":"Dated PPL Zone submission including new and existing data centers. Initial requests, agreement stages, modeled capacity and demand and future years remain distinct. Source table conflict retained; no state total, actual load, individual approval or final PJM adoption inferred.","fields":{"status":{"value":"historical","source_ids":["pjm-ppl-adjustment-20260929"],"scope":"Dated utility proposal documentation. The projected quantities are not actual historical load or final PJM acceptance.","locator":"Actual presentation date and proposal captions"},"forecast_basis":{"value":"Utility forecast submission","source_ids":["pjm-ppl-adjustment-20260929"],"scope":"PPL Zone Pennsylvania data center forecast, including new and existing customers. Shown in Pennsylvania for zone context, not an allocation to all state utilities or a state total.","locator":"Actual presentation geography and scope"},"submitted_on":{"value":"2026-09-29","source_ids":["pjm-ppl-adjustment-20260929"],"scope":"Presentation day, separate from forecast years, hypothetical customer ramp dates and final regional adoption.","locator":"Presentation title page"},"actual_load":{"value":null,"source_ids":["pjm-ppl-adjustment-20260929"],"scope":"No measured operating total is established from the submitted future forecast or pipeline.","locator":"Utility submission and regional review boundary","unknown_reason":"No measured operating total is established from the submitted future forecast or pipeline."},"approved_capacity":{"value":null,"source_ids":["pjm-ppl-adjustment-20260929"],"scope":"No approved connection capacity is established by the submitted forecast or reported project list.","locator":"Utility submission and regional review boundary","unknown_reason":"No approved connection capacity is established by the submitted forecast or reported project list."},"individual_approvals":{"value":null,"source_ids":["pjm-ppl-adjustment-20260929"],"scope":"No individual connection approval or executed customer agreement is independently reviewed.","locator":"Utility submission and regional review boundary","unknown_reason":"No individual connection approval or executed customer agreement is independently reviewed."},"atlas_record_id":{"value":null,"source_ids":["pjm-ppl-adjustment-20260929"],"scope":"No independently verified facility identity join is made.","locator":"Utility submission and regional review boundary","unknown_reason":"No independently verified facility identity join is made."},"requested_capacity":{"value":null,"source_ids":["pjm-ppl-adjustment-20260929"],"scope":"No comparable normalized regional load queue total is admitted. Utility project lists and forecast submissions are distinct.","locator":"Utility submission and regional review boundary","unknown_reason":"No comparable normalized regional load queue total is admitted. Utility project lists and forecast submissions are distinct."},"pjm_final_forecast":{"value":null,"source_ids":["pjm-ppl-adjustment-20260929"],"scope":"No final PJM adoption is established by this dated utility proposal or the announcement of later review steps.","locator":"Utility submission and regional review boundary","unknown_reason":"No final PJM adoption is established by this dated utility proposal or the announcement of later review steps."},"regional_queue_context":{"value":"PJM explained on September 29 that it does not have a load interconnection queue and relies on load serving entities to submit large load forecast adjustments. Twelve utilities presented proposals for review.","source_ids":["pjm-annual-vetting-context-20260929"],"scope":"The count refers to utilities, not distinct presentation files, approved projects or actual connections. Announced later review milestones in this historical article are not verified completed actions. Generation interconnection queues have a different scope.","locator":"PJM September 29 article body"},"initial_request_context":{"value":"PPL reports receiving more than 240 GW of large load interconnection requests since September 2024. Initial study requests without an executed agreement are excluded from this forecast.","source_ids":["pjm-ppl-adjustment-20260929"],"scope":"Utility reported requests in an initial inquiry or assessment phase, not 240 GW of approved, contracted, forecast or operating load. No conversion, deduplication, project count or regional queue sum is calculated.","locator":"Page 3 and page 5"},"agreement_stages":{"value":"PPL describes a Letter of Authorization as a preliminary development commitment with an upfront cash deposit and letter of credit. Service or construction agreements are described as longer term commitments with financial guarantees, minimum load and exit terms.","source_ids":["pjm-ppl-adjustment-20260929"],"scope":"These are utility attributed stage descriptions, not independent review or approval of individual agreements or universal tariff terms. A transmission planning presentation is not approval of the project.","locator":"Pages 3 and 4"},"probability_method":{"value":"For signed authorization letters the utility assumes zero probability of commercial operation during the first three forecast years, then a combined utilization and probability assumption of 50 percent. For signed service or construction agreements it assumes 70 percent demand utilization and 100 percent probability for forecasting.","source_ids":["pjm-ppl-adjustment-20260929"],"scope":"The 50 percent is a combined assumption, not two separate 50 percent factors. The utility compares earlier 80 percent utilization and probability assumptions in its prior submission. None of these percentages establishes measured utilization, a guaranteed customer ramp, commercial operation or an approved tariff minimum.","locator":"Pages 5 and 6"},"ramp_method":{"value":"The utility uses project specific service dates and expected ramp schedules, transmission upgrade timing, construction and development schedules, and typical ramp characteristics.","source_ids":["pjm-ppl-adjustment-20260929"],"scope":"Expected dates and planned infrastructure do not establish customer energization or measured load. No universal fixed ramp duration is inferred.","locator":"Page 6"},"regulator_feedback":{"value":"The utility reports meeting Pennsylvania commission staff on July 17 and receiving feedback on August 31 about its proposed methodology and results.","source_ids":["pjm-ppl-adjustment-20260929"],"scope":"Utility reported staff engagement is not Commission approval of the forecast, all individual projects or final PJM adoption.","locator":"Page 7"},"submitted_2027_demand":{"value":539,"source_ids":["pjm-ppl-adjustment-20260929"],"scope":"Utility submitted 2027 demand forecast for PPL Zone data centers. Capacity and demand are separate source rows, not actual load, connection approvals, requests or a Pennsylvania state total.","locator":"Page 8 2027 column, demand row","unit":"MW","measurement_role":"utility_submitted_forecast","forecast_year":2027,"forecast_horizon":"2027","forecast_metric":"demand"},"submitted_2027_capacity":{"value":771,"source_ids":["pjm-ppl-adjustment-20260929"],"scope":"Utility submitted 2027 capacity forecast for PPL Zone data centers. Capacity and demand are separate source rows, not actual load, connection approvals, requests or a Pennsylvania state total.","locator":"Page 8 2027 column, capacity row","unit":"MW","measurement_role":"utility_submitted_forecast","forecast_year":2027,"forecast_horizon":"2027","forecast_metric":"capacity"},"submitted_2031_demand":{"value":15722,"source_ids":["pjm-ppl-adjustment-20260929"],"scope":"Utility submitted 2031 demand forecast for PPL Zone data centers. Capacity and demand are separate source rows, not actual load, connection approvals, requests or a Pennsylvania state total.","locator":"Page 8 2031 column, demand row","unit":"MW","measurement_role":"utility_submitted_forecast","forecast_year":2031,"forecast_horizon":"2031","forecast_metric":"demand"},"submitted_2031_capacity":{"value":27247,"source_ids":["pjm-ppl-adjustment-20260929"],"scope":"Utility submitted 2031 capacity forecast for PPL Zone data centers. Capacity and demand are separate source rows, not actual load, connection approvals, requests or a Pennsylvania state total.","locator":"Page 8 2031 column, capacity row","unit":"MW","measurement_role":"utility_submitted_forecast","forecast_year":2031,"forecast_horizon":"2031","forecast_metric":"capacity"},"forecast_table_conflict":{"value":"Source table conflict retained","source_ids":["pjm-ppl-adjustment-20260929"],"scope":"The 2029 capacity entry is not normalized from inconsistent tables in the same deck. Other selected year cells retain their source table scope.","locator":"Pages 8 and 9"},"capacity_table_difference":{"value":"The summary table prints 6,599 for 2029 capacity. The contract breakdown prints 6,559 for service or construction agreement capacity and zero for authorization letter capacity in that column.","source_ids":["pjm-ppl-adjustment-20260929"],"scope":"Both source values are retained. No authoritative correction, combined total or calculated difference is asserted. This mismatch does not establish actual load.","locator":"Page 8 capacity row and page 9 2029 column"},"submitted_2029_capacity":{"value":null,"source_ids":["pjm-ppl-adjustment-20260929"],"scope":"The two source tables disagree. No single authoritative 2029 capacity is admitted.","locator":"Pages 8 and 9","unknown_reason":"The two source tables disagree. No single authoritative 2029 capacity is admitted."},"long_horizon_context":{"value":"The source groups 2034 through 2047 into one column, with capacity 32,089 and demand 18,227 under the chart MW basis.","source_ids":["pjm-ppl-adjustment-20260929"],"scope":"This is a grouped forecast horizon, not an independently modeled value for every separate year, an operating total or an approved request. No curve or sum is reconstructed.","locator":"Page 8 last column"}}},{"id":"grid-pjm-exelon-submission-20260929","kind":"grid_context","subject":"Exelon submitted forecast with published unit conflict","state_codes":["il","pa"],"scope":"Dated Exelon proposal for ComEd and PECO data centers, including existing customers. Reported pipeline labels, future demand, capacity and assumed utilization are separate. Raw detailed table numerals retain an unresolved unit conflict and are not normalized or summed. No state totals, actual load, customer approval or final PJM adoption inferred.","fields":{"status":{"value":"historical","source_ids":["pjm-exelon-adjustment-20260929"],"scope":"Dated utility proposal documentation. The projected quantities are not actual historical load or final PJM acceptance.","locator":"Actual presentation date and proposal captions"},"forecast_basis":{"value":"Utility forecast submission","source_ids":["pjm-exelon-adjustment-20260929"],"scope":"Exelon submitted forecast for the ComEd and PECO zones, including existing and new data centers. Illinois and Pennsylvania panels supply zone context only, not state totals or an allocation across every Exelon service territory.","locator":"Actual presentation geography and scope"},"submitted_on":{"value":"2026-09-29","source_ids":["pjm-exelon-adjustment-20260929"],"scope":"Presentation day, separate from forecast years, hypothetical customer ramp dates and final regional adoption.","locator":"Presentation title page"},"actual_load":{"value":null,"source_ids":["pjm-exelon-adjustment-20260929"],"scope":"No measured operating total is established from the submitted future forecast or pipeline.","locator":"Utility submission and regional review boundary","unknown_reason":"No measured operating total is established from the submitted future forecast or pipeline."},"approved_capacity":{"value":null,"source_ids":["pjm-exelon-adjustment-20260929"],"scope":"No approved connection capacity is established by the submitted forecast or reported project list.","locator":"Utility submission and regional review boundary","unknown_reason":"No approved connection capacity is established by the submitted forecast or reported project list."},"individual_approvals":{"value":null,"source_ids":["pjm-exelon-adjustment-20260929"],"scope":"No individual connection approval or executed customer agreement is independently reviewed.","locator":"Utility submission and regional review boundary","unknown_reason":"No individual connection approval or executed customer agreement is independently reviewed."},"atlas_record_id":{"value":null,"source_ids":["pjm-exelon-adjustment-20260929"],"scope":"No independently verified facility identity join is made.","locator":"Utility submission and regional review boundary","unknown_reason":"No independently verified facility identity join is made."},"requested_capacity":{"value":null,"source_ids":["pjm-exelon-adjustment-20260929"],"scope":"No comparable normalized regional load queue total is admitted. Utility project lists and forecast submissions are distinct.","locator":"Utility submission and regional review boundary","unknown_reason":"No comparable normalized regional load queue total is admitted. Utility project lists and forecast submissions are distinct."},"pjm_final_forecast":{"value":null,"source_ids":["pjm-exelon-adjustment-20260929"],"scope":"No final PJM adoption is established by this dated utility proposal or the announcement of later review steps.","locator":"Utility submission and regional review boundary","unknown_reason":"No final PJM adoption is established by this dated utility proposal or the announcement of later review steps."},"regional_queue_context":{"value":"PJM explained on September 29 that it does not have a load interconnection queue and relies on load serving entities to submit large load forecast adjustments. Twelve utilities presented proposals for review.","source_ids":["pjm-annual-vetting-context-20260929"],"scope":"The count refers to utilities, not distinct presentation files, approved projects or actual connections. Announced later review milestones in this historical article are not verified completed actions. Generation interconnection queues have a different scope.","locator":"PJM September 29 article body"},"geographic_scope":{"value":"The forecasting team covers six named zones, but this submitted data center adjustment includes ComEd and PECO.","source_ids":["pjm-exelon-adjustment-20260929"],"scope":"The list of forecasting team territories does not extend these submitted quantities to BGE, ACE, DPL or PEPCO, all of Exelon, or every load in Illinois and Pennsylvania.","locator":"Page 2"},"reported_pipeline_context":{"value":"The deck presents an approximately 37 GW large load list, about 25 GW excluded and about 12 GW of included high probability capacity, including existing service. Its rounded included zone labels are 10.5 GW for ComEd and 1.6 GW for PECO.","source_ids":["pjm-exelon-adjustment-20260929"],"scope":"These are separately reported rounded context labels, not actual operating demand or a new combined total. The source warns that amounts may not sum because of rounding. No sum, subtraction or correction is calculated from those labels.","locator":"Pages 2, 3 and 5"},"commitment_method":{"value":"Where offered, forecast inclusion requires a signed transmission security agreement or comparable binding agreement and a submitted letter of credit. Other projects must have entered initial engineering with a customer financial deposit and approved engineering design costs.","source_ids":["pjm-exelon-adjustment-20260929"],"scope":"Utility attributed forecast screening is not regulatory connection approval or independent verification of actual posted collateral or customer agreement terms.","locator":"Pages 2 and 3"},"ramp_method":{"value":"The utility describes an approximately four year ramp with transmission security agreements and an eight year default, with 80 percent and 70 percent utilization assumptions respectively.","source_ids":["pjm-exelon-adjustment-20260929"],"scope":"Model assumptions are distinct from actual load, service dates or a universally approved tariff contract term. The deck also describes customer supplied schedules and revisions to project lists.","locator":"Pages 2, 3 and 5"},"regulator_feedback":{"value":"The utility reports meeting Pennsylvania staff on August 17 and Illinois staff on August 26, and says both found the methods reasonable without suggested changes.","source_ids":["pjm-exelon-adjustment-20260929"],"scope":"This is the utility account of staff feedback, not an independently reviewed commission order, final forecast adoption or approval of individual projects.","locator":"Page 3"},"forecast_unit_conflict":{"value":"Published unit conflict, not normalized","source_ids":["pjm-exelon-adjustment-20260929"],"scope":"The actual page 6 headings label capacity and demand MW while its footnote says June through August average GW and includes existing customers. Neither wording is silently rewritten.","locator":"Page 6 full original table and footnote"},"raw_2027_table_context":{"value":"In the 2027 column the printed capacity entries are ComEd 2,070 and PECO 135; printed demand entries are ComEd 1,378 and PECO 105.","source_ids":["pjm-exelon-adjustment-20260929"],"scope":"Raw source numerals under headings labeled MW; the same page footnote says average GW. No normalized scalar quantity, sum, state allocation or actual load is admitted from this unresolved unit wording.","locator":"Page 6 2027 column and footnote"},"raw_2031_table_context":{"value":"In the 2031 column the printed capacity entries are ComEd 7,670 and PECO 1,105; printed demand entries are ComEd 5,418 and PECO 848.","source_ids":["pjm-exelon-adjustment-20260929"],"scope":"Raw source numerals with the same unresolved MW heading versus average GW footnote. No normalization, combined total or measured quantity is inferred.","locator":"Page 6 2031 column and footnote"},"raw_2047_table_context":{"value":"In the 2047 column the printed capacity entries are ComEd 10,475 and PECO 1,550; printed demand entries are ComEd 7,482 and PECO 1,195.","source_ids":["pjm-exelon-adjustment-20260929"],"scope":"Raw source numerals with the same unresolved MW heading versus average GW footnote. No normalization, combined total or actual future operating load is inferred.","locator":"Page 6 2047 column and footnote"},"chart_vintage_context":{"value":"Page 2 labels 2027 proposed capacity. The page 5 chart legend labels a 2025 accepted demand series and a 2026 proposed demand series while that page narrative describes the 2027 submission.","source_ids":["pjm-exelon-adjustment-20260929"],"scope":"These published labels are retained without rewriting the earlier chart vintages or promoting any chart series to final 2027 PJM acceptance.","locator":"Pages 2 and 5"},"normalized_forecast":{"value":null,"source_ids":["pjm-exelon-adjustment-20260929"],"scope":"The page 6 unit wording is unresolved. No scalar MW or GW forecast is entered from those detailed table numerals.","locator":"Page 6 headings and footnote","unknown_reason":"The page 6 unit wording is unresolved. No scalar MW or GW forecast is entered from those detailed table numerals."}}},{"id":"sector-price-pa-202608","kind":"sector_price_context","subject":"Pennsylvania commercial and industrial electricity prices","state_codes":["pa"],"scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","fields":{"period":{"value":"August 2026","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A header","scope":"Current preliminary comparison month."},"prior_period":{"value":"August 2025","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A header","scope":"Final same month previous year."},"sector_price_boundary":{"value":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A notes, including row67","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class."},"commercial_price":{"value":13.93,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!D15; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"prior_commercial_price":{"value":12.68,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!E15; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"industrial_price":{"value":10.47,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!F15; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"prior_industrial_price":{"value":9.66,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!G15; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_price":{"value":15.99,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Pennsylvania All Sectors August comparison","unit":"cents per kWh","measurement_role":"published_price"},"prior_all_sector_price":{"value":14.62,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Pennsylvania All Sectors August comparison","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_boundary":{"value":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A sector headers and notes"},"ytd_commercial_price":{"value":13.9,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!D15; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_commercial_price":{"value":12.18,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!E15; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_industrial_price":{"value":10.82,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!F15; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_industrial_price":{"value":9.11,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!G15; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_all_sector_price":{"value":15.77,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!J15; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_all_sector_price":{"value":13.83,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!K15; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_period":{"value":"January through August 2026","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"prior_ytd_period":{"value":"January through August 2025","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"ytd_price_boundary":{"value":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"retail_sales_basis":{"value":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Title,end-use headers and source notes"},"retail_sales_period":{"value":"August 2026","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"retail_sales_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"retail_sales_residential":{"value":5092.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Pennsylvania row,column1","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"5,092"},"retail_sales_residential_prior":{"value":5131.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Pennsylvania row,column2","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"5,131"},"retail_sales_commercial":{"value":3517.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Pennsylvania row,column3","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"3,517"},"retail_sales_commercial_prior":{"value":3688.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Pennsylvania row,column4","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"3,688"},"retail_sales_industrial":{"value":3984.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Pennsylvania row,column5","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"3,984"},"retail_sales_industrial_prior":{"value":4005.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Pennsylvania row,column6","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"4,005"},"retail_sales_transportation":{"value":42.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Pennsylvania row,column7","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"42"},"retail_sales_transportation_prior":{"value":45.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Pennsylvania row,column8","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"45"},"retail_sales_all":{"value":12635.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Pennsylvania row,column9","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"12,635"},"retail_sales_all_prior":{"value":12870.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Pennsylvania row,column10","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"12,870"},"ytd_retail_sales_basis":{"value":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Title,end-use headers and source notes"},"ytd_retail_sales_period":{"value":"January through August 2026","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"ytd_retail_sales_prior_period":{"value":"January through August 2025","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"ytd_retail_sales_residential":{"value":38610.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Pennsylvania row,column1","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"38,610"},"ytd_retail_sales_residential_prior":{"value":38780.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Pennsylvania row,column2","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"38,780"},"ytd_retail_sales_commercial":{"value":27335.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Pennsylvania row,column3","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"27,335"},"ytd_retail_sales_commercial_prior":{"value":27389.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Pennsylvania row,column4","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"27,389"},"ytd_retail_sales_industrial":{"value":31091.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Pennsylvania row,column5","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"31,091"},"ytd_retail_sales_industrial_prior":{"value":31384.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Pennsylvania row,column6","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"31,384"},"ytd_retail_sales_transportation":{"value":359.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Pennsylvania row,column7","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"359"},"ytd_retail_sales_transportation_prior":{"value":365.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Pennsylvania row,column8","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"365"},"ytd_retail_sales_all":{"value":97394.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Pennsylvania row,column9","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"97,394"},"ytd_retail_sales_all_prior":{"value":97917.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Pennsylvania row,column10","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"97,917"},"retail_revenue_basis":{"value":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Title,end-use headers and source notes"},"retail_revenue_period":{"value":"August 2026","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"retail_revenue_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"retail_revenue_residential":{"value":1108.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Pennsylvania row,column1","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1,108"},"retail_revenue_residential_prior":{"value":1022.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Pennsylvania row,column2","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1,022"},"retail_revenue_commercial":{"value":490.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Pennsylvania row,column3","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"490"},"retail_revenue_commercial_prior":{"value":468.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Pennsylvania row,column4","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"468"},"retail_revenue_industrial":{"value":417.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Pennsylvania row,column5","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"417"},"retail_revenue_industrial_prior":{"value":387.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Pennsylvania row,column6","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"387"},"retail_revenue_transportation":{"value":5.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Pennsylvania row,column7","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"5"},"retail_revenue_transportation_prior":{"value":5.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Pennsylvania row,column8","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"5"},"retail_revenue_all":{"value":2020.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Pennsylvania row,column9","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"2,020"},"retail_revenue_all_prior":{"value":1882.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Pennsylvania row,column10","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1,882"},"ytd_retail_revenue_basis":{"value":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Title,end-use headers and source notes"},"ytd_retail_revenue_period":{"value":"January through August 2026","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"ytd_retail_revenue_prior_period":{"value":"January through August 2025","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"ytd_retail_revenue_residential":{"value":8160.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Pennsylvania row,column1","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"8,160"},"ytd_retail_revenue_residential_prior":{"value":7314.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Pennsylvania row,column2","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"7,314"},"ytd_retail_revenue_commercial":{"value":3799.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Pennsylvania row,column3","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"3,799"},"ytd_retail_revenue_commercial_prior":{"value":3337.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Pennsylvania row,column4","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"3,337"},"ytd_retail_revenue_industrial":{"value":3364.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Pennsylvania row,column5","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"3,364"},"ytd_retail_revenue_industrial_prior":{"value":2858.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Pennsylvania row,column6","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"2,858"},"ytd_retail_revenue_transportation":{"value":41.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Pennsylvania row,column7","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"41"},"ytd_retail_revenue_transportation_prior":{"value":33.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Pennsylvania row,column8","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"33"},"ytd_retail_revenue_all":{"value":15363.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Pennsylvania row,column9","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"15,363"},"ytd_retail_revenue_all_prior":{"value":13542.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Pennsylvania row,column10","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"13,542"},"retail_customers_basis":{"value":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Title,end-use headers and source notes"},"retail_customers_period":{"value":"August 2026","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Column headers"},"retail_customers_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Column headers"},"retail_customers_residential":{"value":5589846,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Pennsylvania row,column1","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"5,589,846"},"retail_customers_residential_prior":{"value":5591309,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Pennsylvania row,column2","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"5,591,309"},"retail_customers_commercial":{"value":747670,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Pennsylvania row,column3","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"747,670"},"retail_customers_commercial_prior":{"value":743243,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Pennsylvania row,column4","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"743,243"},"retail_customers_industrial":{"value":10941,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Pennsylvania row,column5","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"10,941"},"retail_customers_industrial_prior":{"value":11096,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Pennsylvania row,column6","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"11,096"},"retail_customers_transportation":{"value":5,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Pennsylvania row,column7","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"5"},"retail_customers_transportation_prior":{"value":5,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Pennsylvania row,column8","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"5"},"retail_customers_all":{"value":6348462,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Pennsylvania row,column9","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"6,348,462"},"retail_customers_all_prior":{"value":6345653,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Pennsylvania row,column10","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"6,345,653"}}},{"id":"sector-price-pa-202607","kind":"sector_price_context","subject":"Pennsylvania historical commercial and industrial electricity prices","state_codes":["pa"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","fields":{"period":{"value":"July 2026","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"prior_period":{"value":"July 2025","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"sector_price_boundary":{"value":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"commercial_price":{"value":13.86,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Pennsylvania commercial_price","unit":"cents per kWh","measurement_role":"published_price"},"prior_commercial_price":{"value":12.63,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Pennsylvania prior_commercial_price","unit":"cents per kWh","measurement_role":"published_price"},"industrial_price":{"value":11.04,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Pennsylvania industrial_price","unit":"cents per kWh","measurement_role":"published_price"},"prior_industrial_price":{"value":9.87,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Pennsylvania prior_industrial_price","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_price":{"value":16.22,"source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Pennsylvania All Sectors July comparison","unit":"cents per kWh","measurement_role":"published_price"},"prior_all_sector_price":{"value":14.61,"source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Pennsylvania All Sectors July comparison","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_boundary":{"value":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A sector headers and notes"}}},{"id":"generation-pa-202608","subject":"Pennsylvania utility scale generation","kind":"generation_context","state_codes":["pa"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","fields":{"status":{"value":"historical","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A period and source notes"},"period":{"value":"August 2026","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"prior_period":{"value":"August 2025","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table title, producer sector headers and source notes"},"all_generation":{"value":23773.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"23,773"},"prior_all_generation":{"value":22439.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"22,439"},"published_generation_change":{"value":5.9,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_net_generation_percentage_change","source_token":"5.9%"},"utility_generation":{"value":9.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"9"},"prior_utility_generation":{"value":5.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"5"},"ipp_generation":{"value":23347.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"23,347"},"prior_ipp_generation":{"value":22019.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"22,019"},"commercial_generation":{"value":56.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"56"},"prior_commercial_generation":{"value":55.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"55"},"industrial_generation":{"value":361.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"361"},"prior_industrial_generation":{"value":359.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"359"},"gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table title, producer sector headers and source notes"},"gas_period":{"value":"August 2026","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_prior_period":{"value":"August 2025","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_all_generation":{"value":14887.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"14,887"},"gas_prior_all_generation":{"value":13390.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"13,390"},"gas_published_generation_change":{"value":11.2,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_gas_generation_percentage_change","source_token":"11.2%"},"gas_utility_generation":{"value":4.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"4"},"gas_prior_utility_generation":{"value":3.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"3"},"gas_ipp_generation":{"value":14566.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"14,566"},"gas_prior_ipp_generation":{"value":13109.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"13,109"},"gas_commercial_generation":{"value":17.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"17"},"gas_prior_commercial_generation":{"value":14.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"14"},"gas_industrial_generation":{"value":300.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"300"},"gas_prior_industrial_generation":{"value":265.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"265"},"nuclear_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table title, producer sector headers and source notes"},"nuclear_period":{"value":"August 2026","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_prior_period":{"value":"August 2025","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_all_generation":{"value":6733.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"6,733"},"nuclear_prior_all_generation":{"value":6671.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"6,671"},"nuclear_published_generation_change":{"value":0.9,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_nuclear_generation_percentage_change","source_token":"0.9%"},"nuclear_utility_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_ipp_generation":{"value":6733.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"6,733"},"nuclear_prior_ipp_generation":{"value":6671.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"6,671"},"nuclear_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"coal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table title, producer sector headers and source notes"},"coal_period":{"value":"August 2026","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_prior_period":{"value":"August 2025","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_all_generation":{"value":1376.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"1,376"},"coal_prior_all_generation":{"value":1790.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"1,790"},"coal_published_generation_change":{"value":-23.1,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_coal_generation_percentage_change","source_token":"-23.1%"},"coal_utility_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_ipp_generation":{"value":1368.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"1,368"},"coal_prior_ipp_generation":{"value":1782.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"1,782"},"coal_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_industrial_generation":{"value":8.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"8"},"coal_prior_industrial_generation":{"value":8.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"8"},"wind_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table title, producer sector headers and source notes"},"wind_period":{"value":"August 2026","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_prior_period":{"value":"August 2025","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_all_generation":{"value":187.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"187"},"wind_prior_all_generation":{"value":128.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"128"},"wind_published_generation_change":{"value":45.9,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_wind_generation_percentage_change","source_token":"45.9%"},"wind_utility_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_ipp_generation":{"value":187.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"187"},"wind_prior_ipp_generation":{"value":128.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"128"},"wind_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"hydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table title, producer sector headers and source notes"},"hydro_period":{"value":"August 2026","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_prior_period":{"value":"August 2025","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_all_generation":{"value":207.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"207"},"hydro_prior_all_generation":{"value":70.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"70"},"hydro_published_generation_change":{"value":194.5,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_hydro_generation_percentage_change","source_token":"194.5%"},"hydro_utility_generation":{"value":5.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"5"},"hydro_prior_utility_generation":{"value":2.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"2"},"hydro_ipp_generation":{"value":202.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"202"},"hydro_prior_ipp_generation":{"value":68.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"68"},"hydro_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"pumped_storage_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table title, producer sector headers and source notes"},"pumped_storage_period":{"value":"August 2026","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_prior_period":{"value":"August 2025","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_all_generation":{"value":-96.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-96"},"pumped_storage_prior_all_generation":{"value":-85.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-85"},"pumped_storage_published_generation_change":{"value":12.5,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_pumped_storage_generation_percentage_change","source_token":"12.5%"},"pumped_storage_utility_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_ipp_generation":{"value":-96.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-96"},"pumped_storage_prior_ipp_generation":{"value":-85.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-85"},"pumped_storage_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"solar_pv_period":{"value":"August 2026","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_prior_period":{"value":"August 2025","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_generation_basis":{"value":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table title, producer sector headers and source notes"},"solar_pv_all_estimated_generation":{"value":430.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"430"},"solar_pv_prior_all_estimated_generation":{"value":367.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"367"},"solar_pv_published_generation_change":{"value":17.2,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_solar_pv_generation_percentage_change","source_token":"17.2%"},"solar_pv_utility_scale_generation":{"value":225.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"225"},"solar_pv_utility_scale_prior_generation":{"value":212.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"212"},"solar_pv_estimated_small_scale_generation":{"value":205.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"205"},"solar_pv_estimated_small_scale_prior_generation":{"value":155.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"155"},"solar_pv_electric_utilities_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_electric_utilities_prior_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_independent_producers_generation":{"value":223.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"223"},"solar_pv_independent_producers_prior_generation":{"value":211.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"211"},"solar_pv_commercial_estimated_total_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column12","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_commercial_estimated_total_prior_generation":{"value":46.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column13","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"46"},"solar_pv_commercial_utility_scale_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column14","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_commercial_utility_scale_prior_generation":{"value":1.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column15","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1"},"solar_pv_commercial_estimated_small_scale_generation":{"value":63.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column16","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"63"},"solar_pv_commercial_estimated_small_scale_prior_generation":{"value":46.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column17","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"46"},"solar_pv_industrial_estimated_total_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column18","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_industrial_estimated_total_prior_generation":{"value":15.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column19","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"15"},"solar_pv_industrial_utility_scale_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column20","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_industrial_utility_scale_prior_generation":{"value":1.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column21","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1"},"solar_pv_industrial_estimated_small_scale_generation":{"value":16.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column22","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"16"},"solar_pv_industrial_estimated_small_scale_prior_generation":{"value":14.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column23","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"14"},"solar_pv_residential_estimated_small_scale_generation":{"value":126.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column24","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"126"},"solar_pv_residential_estimated_small_scale_prior_generation":{"value":95.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Pennsylvania row; column25","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"95"},"solar_thermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table title, producer sector headers and source notes"},"solar_thermal_period":{"value":"August 2026","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_prior_period":{"value":"August 2025","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_published_generation_change":{"value":null,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_solar_thermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"solar_thermal_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"other_energy_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"other_energy_period":{"value":"August 2026","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_prior_period":{"value":"August 2025","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_all_generation":{"value":82.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"82"},"other_energy_prior_all_generation":{"value":69.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"69"},"other_energy_published_generation_change":{"value":18.5,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_other_energy_generation_percentage_change","source_token":"18.5%"},"other_energy_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_ipp_generation":{"value":62.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"62"},"other_energy_prior_ipp_generation":{"value":49.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"49"},"other_energy_commercial_generation":{"value":20.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"20"},"other_energy_prior_commercial_generation":{"value":20.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"20"},"other_energy_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"geothermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table title, producer sector headers and source notes"},"geothermal_period":{"value":"August 2026","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_prior_period":{"value":"August 2025","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_published_generation_change":{"value":null,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_geothermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"geothermal_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"biomass_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"biomass_period":{"value":"August 2026","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_prior_period":{"value":"August 2025","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_all_generation":{"value":139.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"139"},"biomass_prior_all_generation":{"value":126.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"126"},"biomass_published_generation_change":{"value":9.6,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_biomass_generation_percentage_change","source_token":"9.6%"},"biomass_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_ipp_generation":{"value":85.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"85"},"biomass_prior_ipp_generation":{"value":74.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"74"},"biomass_commercial_generation":{"value":17.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"17"},"biomass_prior_commercial_generation":{"value":20.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"20"},"biomass_industrial_generation":{"value":36.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"36"},"biomass_prior_industrial_generation":{"value":33.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"33"},"petroleum_liquids_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_liquids_period":{"value":"August 2026","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_prior_period":{"value":"August 2025","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_all_generation":{"value":14.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"14"},"petroleum_liquids_prior_all_generation":{"value":14.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"14"},"petroleum_liquids_published_generation_change":{"value":2.2,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_petroleum_liquids_generation_percentage_change","source_token":"2.2%"},"petroleum_liquids_utility_generation":{"value":0.25,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.25"},"petroleum_liquids_prior_utility_generation":{"value":0.17,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.17"},"petroleum_liquids_ipp_generation":{"value":14.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"14"},"petroleum_liquids_prior_ipp_generation":{"value":12.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"12"},"petroleum_liquids_commercial_generation":{"value":0.38,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.38"},"petroleum_liquids_prior_commercial_generation":{"value":0.37,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.37"},"petroleum_liquids_industrial_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_prior_industrial_generation":{"value":1.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"1"},"petroleum_coke_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_coke_period":{"value":"August 2026","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_prior_period":{"value":"August 2025","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_all_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_all_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_published_generation_change":{"value":null,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_petroleum_coke_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"petroleum_coke_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"other_fossil_gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table title, producer sector headers and source notes"},"other_fossil_gas_period":{"value":"August 2026","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_prior_period":{"value":"August 2025","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_all_generation":{"value":null,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"other_fossil_gas_prior_all_generation":{"value":52.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"52"},"other_fossil_gas_published_generation_change":{"value":null,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_other_fossil_gas_generation_percentage_change","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"other_fossil_gas_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_ipp_generation":{"value":3.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"3"},"other_fossil_gas_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_industrial_generation":{"value":null,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"other_fossil_gas_prior_industrial_generation":{"value":52.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"52"},"nonhydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table title, producer sector headers and source notes"},"nonhydro_period":{"value":"August 2026","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_prior_period":{"value":"August 2025","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_all_generation":{"value":551.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"551"},"nonhydro_prior_all_generation":{"value":467.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"467"},"nonhydro_published_generation_change":{"value":18.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Pennsylvania row; column3","unit":"percent","measurement_role":"published_nonhydro_generation_percentage_change","source_token":"18.0%"},"nonhydro_utility_generation":{"value":0.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"0"},"nonhydro_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"0"},"nonhydro_ipp_generation":{"value":495.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"495"},"nonhydro_prior_ipp_generation":{"value":413.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"413"},"nonhydro_commercial_generation":{"value":19.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"19"},"nonhydro_prior_commercial_generation":{"value":20.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"20"},"nonhydro_industrial_generation":{"value":37.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"37"},"nonhydro_prior_industrial_generation":{"value":34.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"34"}}},{"id":"generation-pa-202608-ytd","subject":"Pennsylvania utility scale generation","kind":"generation_context","state_codes":["pa"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","fields":{"status":{"value":"historical","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B period and source notes"},"period":{"value":"January through August 2026","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"prior_period":{"value":"January through August 2025","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table title, producer sector headers and source notes"},"all_generation":{"value":167936.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"167,936"},"prior_all_generation":{"value":170114.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"170,114"},"published_generation_change":{"value":-1.3,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_net_generation_percentage_change","source_token":"-1.3%"},"utility_generation":{"value":73.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"73"},"prior_utility_generation":{"value":102.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"102"},"ipp_generation":{"value":164682.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"164,682"},"prior_ipp_generation":{"value":166908.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"166,908"},"commercial_generation":{"value":395.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"395"},"prior_commercial_generation":{"value":411.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"411"},"industrial_generation":{"value":2786.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"2,786"},"prior_industrial_generation":{"value":2693.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"2,693"},"gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table title, producer sector headers and source notes"},"gas_period":{"value":"January through August 2026","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_prior_period":{"value":"January through August 2025","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_all_generation":{"value":97951.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"97,951"},"gas_prior_all_generation":{"value":99720.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"99,720"},"gas_published_generation_change":{"value":-1.8,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_gas_generation_percentage_change","source_token":"-1.8%"},"gas_utility_generation":{"value":27.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"27"},"gas_prior_utility_generation":{"value":27.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"27"},"gas_ipp_generation":{"value":95630.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"95,630"},"gas_prior_ipp_generation":{"value":97589.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"97,589"},"gas_commercial_generation":{"value":109.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"109"},"gas_prior_commercial_generation":{"value":106.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"106"},"gas_industrial_generation":{"value":2186.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"2,186"},"gas_prior_industrial_generation":{"value":1997.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"1,997"},"nuclear_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table title, producer sector headers and source notes"},"nuclear_period":{"value":"January through August 2026","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_prior_period":{"value":"January through August 2025","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_all_generation":{"value":50653.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"50,653"},"nuclear_prior_all_generation":{"value":50089.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"50,089"},"nuclear_published_generation_change":{"value":1.1,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_nuclear_generation_percentage_change","source_token":"1.1%"},"nuclear_utility_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_ipp_generation":{"value":50653.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"50,653"},"nuclear_prior_ipp_generation":{"value":50089.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"50,089"},"nuclear_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"coal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table title, producer sector headers and source notes"},"coal_period":{"value":"January through August 2026","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_all_generation":{"value":11806.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"11,806"},"coal_prior_all_generation":{"value":12854.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"12,854"},"coal_published_generation_change":{"value":-8.2,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_coal_generation_percentage_change","source_token":"-8.2%"},"coal_utility_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_ipp_generation":{"value":11755.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"11,755"},"coal_prior_ipp_generation":{"value":12790.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"12,790"},"coal_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_industrial_generation":{"value":51.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"51"},"coal_prior_industrial_generation":{"value":64.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"64"},"wind_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table title, producer sector headers and source notes"},"wind_period":{"value":"January through August 2026","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_prior_period":{"value":"January through August 2025","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_all_generation":{"value":2540.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"2,540"},"wind_prior_all_generation":{"value":2582.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"2,582"},"wind_published_generation_change":{"value":-1.6,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_wind_generation_percentage_change","source_token":"-1.6%"},"wind_utility_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_ipp_generation":{"value":2540.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"2,540"},"wind_prior_ipp_generation":{"value":2582.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"2,582"},"wind_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"hydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table title, producer sector headers and source notes"},"hydro_period":{"value":"January through August 2026","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_prior_period":{"value":"January through August 2025","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_all_generation":{"value":1628.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"1,628"},"hydro_prior_all_generation":{"value":2170.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"2,170"},"hydro_published_generation_change":{"value":-25.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_hydro_generation_percentage_change","source_token":"-25.0%"},"hydro_utility_generation":{"value":43.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"43"},"hydro_prior_utility_generation":{"value":71.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"71"},"hydro_ipp_generation":{"value":1585.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"1,585"},"hydro_prior_ipp_generation":{"value":2099.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"2,099"},"hydro_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"pumped_storage_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table title, producer sector headers and source notes"},"pumped_storage_period":{"value":"January through August 2026","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_prior_period":{"value":"January through August 2025","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_all_generation":{"value":-644.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-644"},"pumped_storage_prior_all_generation":{"value":-653.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-653"},"pumped_storage_published_generation_change":{"value":-1.4,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_pumped_storage_generation_percentage_change","source_token":"-1.4%"},"pumped_storage_utility_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_ipp_generation":{"value":-644.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-644"},"pumped_storage_prior_ipp_generation":{"value":-653.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-653"},"pumped_storage_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"solar_pv_period":{"value":"January through August 2026","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_prior_period":{"value":"January through August 2025","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_generation_basis":{"value":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table title, producer sector headers and source notes"},"solar_pv_all_estimated_generation":{"value":2897.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"2,897"},"solar_pv_prior_all_estimated_generation":{"value":2279.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"2,279"},"solar_pv_published_generation_change":{"value":27.2,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_solar_pv_generation_percentage_change","source_token":"27.2%"},"solar_pv_utility_scale_generation":{"value":1494.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1,494"},"solar_pv_utility_scale_prior_generation":{"value":1204.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1,204"},"solar_pv_estimated_small_scale_generation":{"value":1404.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"1,404"},"solar_pv_estimated_small_scale_prior_generation":{"value":1074.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"1,074"},"solar_pv_electric_utilities_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_electric_utilities_prior_generation":{"value":0.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0"},"solar_pv_independent_producers_generation":{"value":1482.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1,482"},"solar_pv_independent_producers_prior_generation":{"value":1194.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1,194"},"solar_pv_commercial_estimated_total_generation":{"value":432.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column12","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"432"},"solar_pv_commercial_estimated_total_prior_generation":{"value":320.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column13","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"320"},"solar_pv_commercial_utility_scale_generation":{"value":7.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column14","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"7"},"solar_pv_commercial_utility_scale_prior_generation":{"value":6.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column15","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"6"},"solar_pv_commercial_estimated_small_scale_generation":{"value":425.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column16","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"425"},"solar_pv_commercial_estimated_small_scale_prior_generation":{"value":314.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column17","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"314"},"solar_pv_industrial_estimated_total_generation":{"value":119.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column18","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"119"},"solar_pv_industrial_estimated_total_prior_generation":{"value":101.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column19","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"101"},"solar_pv_industrial_utility_scale_generation":{"value":5.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column20","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"5"},"solar_pv_industrial_utility_scale_prior_generation":{"value":5.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column21","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"5"},"solar_pv_industrial_estimated_small_scale_generation":{"value":114.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column22","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"114"},"solar_pv_industrial_estimated_small_scale_prior_generation":{"value":96.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column23","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"96"},"solar_pv_residential_estimated_small_scale_generation":{"value":865.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column24","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"865"},"solar_pv_residential_estimated_small_scale_prior_generation":{"value":664.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Pennsylvania row; column25","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"664"},"solar_thermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table title, producer sector headers and source notes"},"solar_thermal_period":{"value":"January through August 2026","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_published_generation_change":{"value":null,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_solar_thermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"solar_thermal_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"other_energy_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"other_energy_period":{"value":"January through August 2026","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_prior_period":{"value":"January through August 2025","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_all_generation":{"value":591.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"591"},"other_energy_prior_all_generation":{"value":537.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"537"},"other_energy_published_generation_change":{"value":9.9,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_other_energy_generation_percentage_change","source_token":"9.9%"},"other_energy_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_ipp_generation":{"value":450.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"450"},"other_energy_prior_ipp_generation":{"value":389.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"389"},"other_energy_commercial_generation":{"value":140.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"140"},"other_energy_prior_commercial_generation":{"value":149.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"149"},"other_energy_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"geothermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table title, producer sector headers and source notes"},"geothermal_period":{"value":"January through August 2026","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_published_generation_change":{"value":null,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_geothermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"geothermal_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"biomass_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"biomass_period":{"value":"January through August 2026","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_prior_period":{"value":"January through August 2025","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_all_generation":{"value":979.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"979"},"biomass_prior_all_generation":{"value":955.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"955"},"biomass_published_generation_change":{"value":2.6,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_biomass_generation_percentage_change","source_token":"2.6%"},"biomass_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_ipp_generation":{"value":633.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"633"},"biomass_prior_ipp_generation":{"value":582.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"582"},"biomass_commercial_generation":{"value":136.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"136"},"biomass_prior_commercial_generation":{"value":147.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"147"},"biomass_industrial_generation":{"value":210.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"210"},"biomass_prior_industrial_generation":{"value":226.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"226"},"petroleum_liquids_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_liquids_period":{"value":"January through August 2026","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_prior_period":{"value":"January through August 2025","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_all_generation":{"value":600.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"600"},"petroleum_liquids_prior_all_generation":{"value":262.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"262"},"petroleum_liquids_published_generation_change":{"value":129.3,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_petroleum_liquids_generation_percentage_change","source_token":"129.3%"},"petroleum_liquids_utility_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_prior_utility_generation":{"value":4.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"4"},"petroleum_liquids_ipp_generation":{"value":591.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"591"},"petroleum_liquids_prior_ipp_generation":{"value":248.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"248"},"petroleum_liquids_commercial_generation":{"value":2.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"2"},"petroleum_liquids_prior_commercial_generation":{"value":4.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"4"},"petroleum_liquids_industrial_generation":{"value":null,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"petroleum_liquids_prior_industrial_generation":{"value":6.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"6"},"petroleum_coke_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_coke_period":{"value":"January through August 2026","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_prior_period":{"value":"January through August 2025","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_all_generation":{"value":-0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"-0.00"},"petroleum_coke_prior_all_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_published_generation_change":{"value":null,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_petroleum_coke_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"petroleum_coke_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_ipp_generation":{"value":-0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"-0.00"},"petroleum_coke_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"other_fossil_gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table title, producer sector headers and source notes"},"other_fossil_gas_period":{"value":"January through August 2026","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_prior_period":{"value":"January through August 2025","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_all_generation":{"value":337.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"337"},"other_fossil_gas_prior_all_generation":{"value":395.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"395"},"other_fossil_gas_published_generation_change":{"value":-14.6,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_other_fossil_gas_generation_percentage_change","source_token":"-14.6%"},"other_fossil_gas_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_ipp_generation":{"value":6.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"6"},"other_fossil_gas_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_industrial_generation":{"value":331.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"331"},"other_fossil_gas_prior_industrial_generation":{"value":395.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"395"},"nonhydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table title, producer sector headers and source notes"},"nonhydro_period":{"value":"January through August 2026","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_prior_period":{"value":"January through August 2025","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_all_generation":{"value":5013.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Pennsylvania row; column1","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"5,013"},"nonhydro_prior_all_generation":{"value":4741.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Pennsylvania row; column2","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"4,741"},"nonhydro_published_generation_change":{"value":5.8,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Pennsylvania row; column3","unit":"percent","measurement_role":"published_nonhydro_generation_percentage_change","source_token":"5.8%"},"nonhydro_utility_generation":{"value":0.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Pennsylvania row; column4","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"0"},"nonhydro_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Pennsylvania row; column5","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"0"},"nonhydro_ipp_generation":{"value":4655.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Pennsylvania row; column6","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"4,655"},"nonhydro_prior_ipp_generation":{"value":4357.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Pennsylvania row; column7","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"4,357"},"nonhydro_commercial_generation":{"value":143.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Pennsylvania row; column8","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"143"},"nonhydro_prior_commercial_generation":{"value":152.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Pennsylvania row; column9","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"152"},"nonhydro_industrial_generation":{"value":215.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Pennsylvania row; column10","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"215"},"nonhydro_prior_industrial_generation":{"value":231.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Pennsylvania row; column11","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"231"}}},{"id":"capacity-state-utility-pa-202608","subject":"Pennsylvania utility scale net summer capacity","kind":"capacity_context","state_codes":["pa"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","fields":{"utility_capacity_basis":{"value":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Title,technology headers and exclusions"},"utility_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Column headers"},"utility_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Column headers"},"status":{"value":"historical","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Dated source period"},"utility_capacity_renewables":{"value":4226.6,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Pennsylvania row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"4,226.6"},"utility_capacity_renewables_prior":{"value":4039.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Pennsylvania row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"4,039.0"},"utility_capacity_fossil":{"value":33777.5,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Pennsylvania row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"33,777.5"},"utility_capacity_fossil_prior":{"value":33716.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Pennsylvania row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"33,716.0"},"utility_capacity_pumped_storage":{"value":1491.5,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Pennsylvania row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,491.5"},"utility_capacity_pumped_storage_prior":{"value":1491.5,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Pennsylvania row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,491.5"},"utility_capacity_other_storage":{"value":54.6,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Pennsylvania row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"54.6"},"utility_capacity_other_storage_prior":{"value":54.6,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Pennsylvania row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"54.6"},"utility_capacity_nuclear":{"value":9896.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Pennsylvania row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"9,896.0"},"utility_capacity_nuclear_prior":{"value":9896.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Pennsylvania row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"9,896.0"},"utility_capacity_other_sources":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Pennsylvania row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_other_sources_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Pennsylvania row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_all":{"value":49446.2,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Pennsylvania row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"49,446.2"},"utility_capacity_all_prior":{"value":49197.1,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Pennsylvania row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"49,197.1"},"renew_capacity_basis":{"value":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Title,technology headers and exclusions"},"renew_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Column headers"},"renew_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Column headers"},"renew_capacity_status":{"value":"historical","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Dated source period"},"renew_capacity_wind":{"value":1662.3,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,662.3"},"renew_capacity_wind_prior":{"value":1552.6,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,552.6"},"renew_capacity_solar_pv":{"value":1206.2,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,206.2"},"renew_capacity_solar_pv_prior":{"value":1125.1,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,125.1"},"renew_capacity_solar_thermal":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_solar_thermal_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_conventional_hydro":{"value":929.5,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"929.5"},"renew_capacity_conventional_hydro_prior":{"value":929.5,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"929.5"},"renew_capacity_biomass":{"value":428.6,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"428.6"},"renew_capacity_biomass_prior":{"value":431.8,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"431.8"},"renew_capacity_geothermal":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_geothermal_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_total_utility":{"value":4226.6,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"4,226.6"},"renew_capacity_total_utility_prior":{"value":4039.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"4,039.0"},"renew_capacity_small_pv_estimated":{"value":1380.4,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column15","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"1,380.4"},"renew_capacity_small_pv_estimated_prior":{"value":1079.7,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column16","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"1,079.7"},"renew_capacity_combined_pv_estimated":{"value":2586.6,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column17","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"2,586.6"},"renew_capacity_combined_pv_estimated_prior":{"value":2204.8,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column18","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"2,204.8"},"renew_capacity_combined_solar_estimated":{"value":2586.6,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column19","unit":"MW","measurement_role":"estimated_solar_net_summer_capacity","source_token":"2,586.6"},"renew_capacity_combined_solar_estimated_prior":{"value":2204.8,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Pennsylvania row,column20","unit":"MW","measurement_role":"estimated_solar_net_summer_capacity","source_token":"2,204.8"},"fossil_capacity_basis":{"value":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Title,technology headers and exclusions"},"fossil_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Column headers"},"fossil_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Column headers"},"fossil_capacity_status":{"value":"historical","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Dated source period"},"fossil_capacity_gas_combined_cycle":{"value":19145.9,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"19,145.9"},"fossil_capacity_gas_combined_cycle_prior":{"value":19085.9,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"19,085.9"},"fossil_capacity_gas_combustion_turbine":{"value":1913.5,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,913.5"},"fossil_capacity_gas_combustion_turbine_prior":{"value":1913.5,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,913.5"},"fossil_capacity_gas_other":{"value":6666.2,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"6,666.2"},"fossil_capacity_gas_other_prior":{"value":6664.7,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"6,664.7"},"fossil_capacity_coal":{"value":4631.9,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"4,631.9"},"fossil_capacity_coal_prior":{"value":4631.9,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"4,631.9"},"fossil_capacity_petroleum_coke":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_petroleum_coke_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_petroleum_liquids":{"value":1334.1,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,334.1"},"fossil_capacity_petroleum_liquids_prior":{"value":1334.1,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,334.1"},"fossil_capacity_other_fossil_gas":{"value":85.9,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"85.9"},"fossil_capacity_other_fossil_gas_prior":{"value":85.9,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"85.9"},"fossil_capacity_total":{"value":33777.5,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column15","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"33,777.5"},"fossil_capacity_total_prior":{"value":33716.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Pennsylvania row,column16","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"33,716.0"},"reported_new_unit_rows":{"value":8,"source_ids":["eia-new-utility-units-aug2026"],"scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","locator":"Calculated count of Table6.3 rows for PA","unit":"generators","measurement_role":"calculated_count_reported_new_utility_unit_rows"},"reported_new_unit_capacity_sum":{"value":186.7,"source_ids":["eia-new-utility-units-aug2026"],"scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","locator":"Calculated sum of rounded Table6.3 Net Summer Capacity(MW) cells for PA","unit":"MW","measurement_role":"calculated_sum_reported_unit_net_summer_capacity"},"reported_new_unit_basis":{"value":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","source_ids":["eia-new-utility-units-aug2026"],"scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","locator":"Table6.3 title,columns,notes and explicit calculation scope"},"reported_retired_unit_rows":{"value":2,"source_ids":["eia-retired-utility-units-aug2026"],"scope":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","locator":"Calculated count of Table6.4 rows for PA","unit":"generators","measurement_role":"calculated_count_reported_retired_utility_unit_rows"},"reported_retired_unit_capacity_sum":{"value":3.2,"source_ids":["eia-retired-utility-units-aug2026"],"scope":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","locator":"Calculated sum of rounded Table6.4 Net Summer Capacity(MW) cells for PA","unit":"MW","measurement_role":"calculated_sum_reported_retired_unit_net_summer_capacity"},"reported_retired_unit_basis":{"value":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","source_ids":["eia-retired-utility-units-aug2026"],"scope":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","locator":"Table6.4 title,columns,notes and explicit calculation scope"},"reported_planned_unit_rows":{"value":116,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for PA across all source target dates,not simultaneous supply","unit":"generators","measurement_role":"calculated_count_reported_planned_utility_unit_rows"},"reported_planned_unit_capacity_sum":{"value":6540.3,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for PA across all source target dates,not simultaneous supply","unit":"MW","measurement_role":"calculated_sum_planned_unit_net_summer_capacity"},"reported_planned_unit_nameplate_sum":{"value":6571.4,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for PA across all source target dates,not simultaneous supply","unit":"MW","measurement_role":"calculated_sum_planned_unit_nameplate_capacity"},"reported_planned_unit_complete_nonoperating_rows":{"value":2,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for PA across all source target dates,not simultaneous supply","unit":"generators","measurement_role":"calculated_count_reported_complete_nonoperating_planned_units"},"reported_planned_unit_basis":{"value":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Table6.5 title,status/date/capacity columns,notes and explicit calculation boundary"},"reported_retirement_plan_rows":{"value":9,"source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Calculated from Table6.6 reported rows for PA across all target dates,not simultaneous removal","unit":"generators","measurement_role":"calculated_count_reported_retirement_plan_units"},"reported_retirement_plan_capacity_sum":{"value":3875.0,"source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Calculated from Table6.6 reported rows for PA across all target dates,not simultaneous removal","unit":"MW","measurement_role":"calculated_sum_retirement_plan_net_summer_capacity"},"reported_retirement_plan_unknown_month_rows":{"value":0,"source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Calculated from Table6.6 reported rows for PA across all target dates,not simultaneous removal","unit":"generators","measurement_role":"calculated_count_retirement_plan_missing_months"},"reported_retirement_plan_basis":{"value":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Table6.6 title/date/capacity columns,notes and explicit calculation scope"}}},{"id":"power-ieee-reliability-2025-pa","kind":"reliability_context","subject":"Pennsylvania historical IEEE distribution reliability2025 and2024","state_codes":["pa"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","fields":{"status":{"value":"historical","source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 years2025 and2024"},"ieee_reliability_basis":{"value":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 header and definitions"},"ieee_coverage_2025":{"value":84.4,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;coverage;Year 2025","source_token":"84.4%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"ieee_coverage_2024":{"value":84.4,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;coverage;Year 2024","source_token":"84.4%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saidi_2025":{"value":413.0,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;all_events_saidi;Year 2025","source_token":"413","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saidi_2024":{"value":353.1,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;all_events_saidi;Year 2024","source_token":"353.1","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saifi_2025":{"value":1.424,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;all_events_saifi;Year 2025","source_token":"1.424","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saifi_2024":{"value":1.393,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;all_events_saifi;Year 2024","source_token":"1.393","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_caidi_2025":{"value":290.0,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;all_events_caidi;Year 2025","source_token":"290","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_caidi_2024":{"value":253.5,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;all_events_caidi;Year 2024","source_token":"253.5","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saidi_2025":{"value":136.3,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;without_major_days_saidi;Year 2025","source_token":"136.3","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saidi_2024":{"value":131.5,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;without_major_days_saidi;Year 2024","source_token":"131.5","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saifi_2025":{"value":1.04,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;without_major_days_saifi;Year 2025","source_token":"1.04","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saifi_2024":{"value":0.989,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;without_major_days_saifi;Year 2024","source_token":"0.989","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_caidi_2025":{"value":131.1,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;without_major_days_caidi;Year 2025","source_token":"131.1","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_caidi_2024":{"value":133.0,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;without_major_days_caidi;Year 2024","source_token":"133","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saidi_2025":{"value":384.6,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;loss_supply_removed_saidi;Year 2025","source_token":"384.6","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saidi_2024":{"value":340.9,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;loss_supply_removed_saidi;Year 2024","source_token":"340.9","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saifi_2025":{"value":1.282,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;loss_supply_removed_saifi;Year 2025","source_token":"1.282","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saifi_2024":{"value":1.278,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;loss_supply_removed_saifi;Year 2024","source_token":"1.278","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_caidi_2025":{"value":300.0,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;loss_supply_removed_caidi;Year 2025","source_token":"300","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_caidi_2024":{"value":266.7,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Pennsylvania row;loss_supply_removed_caidi;Year 2024","source_token":"266.7","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"saidi_history_ieee_all_events_2023":{"value":265.1,"source_token":"265.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_all_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2022":{"value":207.5,"source_token":"207.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_all_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2021":{"value":222.6,"source_token":"222.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_all_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2020":{"value":355.4,"source_token":"355.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_all_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2019":{"value":252.5,"source_token":"252.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_all_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2018":{"value":564.0,"source_token":"564","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_all_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2017":{"value":184.5,"source_token":"184.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_all_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2016":{"value":132.3,"source_token":"132.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_all_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2015":{"value":166.2,"source_token":"166.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_all_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2023":{"value":125.9,"source_token":"125.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_without_major_days;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2022":{"value":125.4,"source_token":"125.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_without_major_days;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2021":{"value":125.2,"source_token":"125.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_without_major_days;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2020":{"value":107.5,"source_token":"107.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_without_major_days;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2019":{"value":130.5,"source_token":"130.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_without_major_days;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2018":{"value":122.8,"source_token":"122.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_without_major_days;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2017":{"value":108.4,"source_token":"108.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_without_major_days;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2016":{"value":105.1,"source_token":"105.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_without_major_days;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2015":{"value":102.1,"source_token":"102.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_without_major_days;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2023":{"value":248.3,"source_token":"248.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2022":{"value":195.1,"source_token":"195.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2021":{"value":209.6,"source_token":"209.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2020":{"value":343.6,"source_token":"343.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2019":{"value":240.3,"source_token":"240.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2018":{"value":551.3,"source_token":"551.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2017":{"value":169.1,"source_token":"169.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2016":{"value":122.1,"source_token":"122.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2015":{"value":157.4,"source_token":"157.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_basis":{"value":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","source_ids":["eia-epa2025-saidi-state-history"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","locator":"Table11.4 header and method notes;2015-2023 supplemental history"},"saifi_history_ieee_all_events_2023":{"value":1.143,"source_token":"1.143","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_all_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2022":{"value":1.163,"source_token":"1.163","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_all_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2021":{"value":1.227,"source_token":"1.227","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_all_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2020":{"value":1.336,"source_token":"1.336","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_all_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2019":{"value":1.312,"source_token":"1.312","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_all_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2018":{"value":1.489,"source_token":"1.489","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_all_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2017":{"value":1.126,"source_token":"1.126","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_all_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2016":{"value":1.092,"source_token":"1.092","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_all_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2015":{"value":1.02,"source_token":"1.02","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_all_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2023":{"value":0.914,"source_token":"0.914","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_without_major_days;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2022":{"value":0.975,"source_token":"0.975","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_without_major_days;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2021":{"value":0.967,"source_token":"0.967","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_without_major_days;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2020":{"value":0.939,"source_token":"0.939","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_without_major_days;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2019":{"value":1.029,"source_token":"1.029","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_without_major_days;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2018":{"value":1.044,"source_token":"1.044","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_without_major_days;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2017":{"value":0.935,"source_token":"0.935","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_without_major_days;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2016":{"value":0.973,"source_token":"0.973","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_without_major_days;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2015":{"value":0.909,"source_token":"0.909","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_without_major_days;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2023":{"value":1.025,"source_token":"1.025","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2022":{"value":1.059,"source_token":"1.059","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2021":{"value":1.11,"source_token":"1.11","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2020":{"value":1.215,"source_token":"1.215","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2019":{"value":1.187,"source_token":"1.187","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2018":{"value":1.35,"source_token":"1.35","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2017":{"value":0.998,"source_token":"0.998","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2016":{"value":1.011,"source_token":"1.011","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2015":{"value":0.909,"source_token":"0.909","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_basis":{"value":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","source_ids":["eia-epa2025-saifi-state-history"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","locator":"Table11.5 header and method notes;2015-2023 supplemental history"},"caidi_history_ieee_all_events_2023":{"value":232.0,"source_token":"232","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_all_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2022":{"value":178.3,"source_token":"178.3","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_all_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2021":{"value":181.4,"source_token":"181.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_all_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2020":{"value":266.1,"source_token":"266.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_all_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2019":{"value":192.6,"source_token":"192.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_all_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2018":{"value":378.8,"source_token":"378.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_all_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2017":{"value":163.8,"source_token":"163.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_all_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2016":{"value":121.2,"source_token":"121.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_all_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2015":{"value":162.9,"source_token":"162.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_all_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2023":{"value":137.7,"source_token":"137.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_without_major_days;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2022":{"value":128.6,"source_token":"128.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_without_major_days;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2021":{"value":129.5,"source_token":"129.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_without_major_days;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2020":{"value":114.5,"source_token":"114.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_without_major_days;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2019":{"value":126.9,"source_token":"126.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_without_major_days;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2018":{"value":117.6,"source_token":"117.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_without_major_days;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2017":{"value":115.9,"source_token":"115.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_without_major_days;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2016":{"value":107.9,"source_token":"107.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_without_major_days;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2015":{"value":112.3,"source_token":"112.3","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_without_major_days;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2023":{"value":242.3,"source_token":"242.3","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2022":{"value":184.2,"source_token":"184.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2021":{"value":188.8,"source_token":"188.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2020":{"value":282.8,"source_token":"282.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2019":{"value":202.4,"source_token":"202.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2018":{"value":408.3,"source_token":"408.3","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2017":{"value":169.4,"source_token":"169.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2016":{"value":120.7,"source_token":"120.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2015":{"value":173.0,"source_token":"173","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_basis":{"value":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","source_ids":["eia-epa2025-caidi-state-history"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","locator":"Table11.6 header and method notes;2015-2023 supplemental history"}}},{"id":"power-any-reliability-2025-pa","kind":"reliability_context","subject":"Pennsylvania historical any-method distribution reliability2025 and2024","state_codes":["pa"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","fields":{"status":{"value":"historical","source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 years2025 and2024"},"any_reliability_basis":{"value":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 header and definitions"},"any_coverage_2025":{"value":94.5,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Pennsylvania row;coverage;Year 2025","source_token":"94.5%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"any_coverage_2024":{"value":94.5,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Pennsylvania row;coverage;Year 2024","source_token":"94.5%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saidi_2025":{"value":458.1,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Pennsylvania row;all_events_saidi;Year 2025","source_token":"458.1","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saidi_2024":{"value":336.1,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Pennsylvania row;all_events_saidi;Year 2024","source_token":"336.1","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saifi_2025":{"value":1.408,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Pennsylvania row;all_events_saifi;Year 2025","source_token":"1.408","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saifi_2024":{"value":1.353,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Pennsylvania row;all_events_saifi;Year 2024","source_token":"1.353","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_caidi_2025":{"value":325.4,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Pennsylvania row;all_events_caidi;Year 2025","source_token":"325.4","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_caidi_2024":{"value":248.3,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Pennsylvania row;all_events_caidi;Year 2024","source_token":"248.3","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saidi_2025":{"value":132.8,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Pennsylvania row;without_major_events_saidi;Year 2025","source_token":"132.8","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saidi_2024":{"value":131.0,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Pennsylvania row;without_major_events_saidi;Year 2024","source_token":"131","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saifi_2025":{"value":1.018,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Pennsylvania row;without_major_events_saifi;Year 2025","source_token":"1.018","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saifi_2024":{"value":0.971,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Pennsylvania row;without_major_events_saifi;Year 2024","source_token":"0.971","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_caidi_2025":{"value":130.4,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Pennsylvania row;without_major_events_caidi;Year 2025","source_token":"130.4","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_caidi_2024":{"value":134.9,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Pennsylvania row;without_major_events_caidi;Year 2024","source_token":"134.9","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"saidi_history_any_all_events_2023":{"value":252.7,"source_token":"252.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_all_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2022":{"value":200.4,"source_token":"200.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_all_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2021":{"value":217.8,"source_token":"217.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_all_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2020":{"value":334.2,"source_token":"334.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_all_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2019":{"value":249.1,"source_token":"249.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_all_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2018":{"value":518.0,"source_token":"518","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_all_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2017":{"value":176.8,"source_token":"176.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_all_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2016":{"value":126.2,"source_token":"126.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_all_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2015":{"value":156.7,"source_token":"156.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_all_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2023":{"value":119.2,"source_token":"119.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_without_major_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2022":{"value":126.1,"source_token":"126.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_without_major_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2021":{"value":130.2,"source_token":"130.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_without_major_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2020":{"value":107.8,"source_token":"107.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_without_major_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2019":{"value":127.7,"source_token":"127.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_without_major_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2018":{"value":119.3,"source_token":"119.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_without_major_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2017":{"value":108.7,"source_token":"108.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_without_major_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2016":{"value":101.4,"source_token":"101.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_without_major_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2015":{"value":98.8,"source_token":"98.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Pennsylvania row;any_without_major_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_basis":{"value":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","source_ids":["eia-epa2025-saidi-state-history"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","locator":"Table11.4 header and method notes;2015-2023 supplemental history"},"saifi_history_any_all_events_2023":{"value":1.108,"source_token":"1.108","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_all_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2022":{"value":1.139,"source_token":"1.139","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_all_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2021":{"value":1.2,"source_token":"1.2","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_all_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2020":{"value":1.297,"source_token":"1.297","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_all_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2019":{"value":1.309,"source_token":"1.309","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_all_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2018":{"value":1.431,"source_token":"1.431","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_all_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2017":{"value":1.109,"source_token":"1.109","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_all_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2016":{"value":1.067,"source_token":"1.067","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_all_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2015":{"value":0.994,"source_token":"0.994","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_all_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2023":{"value":0.878,"source_token":"0.878","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_without_major_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2022":{"value":0.968,"source_token":"0.968","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_without_major_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2021":{"value":0.963,"source_token":"0.963","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_without_major_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2020":{"value":0.928,"source_token":"0.928","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_without_major_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2019":{"value":1.025,"source_token":"1.025","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_without_major_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2018":{"value":1.022,"source_token":"1.022","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_without_major_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2017":{"value":0.938,"source_token":"0.938","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_without_major_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2016":{"value":0.96,"source_token":"0.96","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_without_major_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2015":{"value":0.891,"source_token":"0.891","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Pennsylvania row;any_without_major_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_basis":{"value":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","source_ids":["eia-epa2025-saifi-state-history"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","locator":"Table11.5 header and method notes;2015-2023 supplemental history"},"caidi_history_any_all_events_2023":{"value":228.0,"source_token":"228","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_all_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2022":{"value":175.9,"source_token":"175.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_all_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2021":{"value":181.5,"source_token":"181.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_all_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2020":{"value":257.6,"source_token":"257.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_all_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2019":{"value":190.4,"source_token":"190.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_all_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2018":{"value":362.0,"source_token":"362","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_all_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2017":{"value":159.3,"source_token":"159.3","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_all_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2016":{"value":118.2,"source_token":"118.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_all_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2015":{"value":157.7,"source_token":"157.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_all_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2023":{"value":135.8,"source_token":"135.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_without_major_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2022":{"value":130.4,"source_token":"130.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_without_major_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2021":{"value":135.2,"source_token":"135.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_without_major_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2020":{"value":116.1,"source_token":"116.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_without_major_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2019":{"value":124.6,"source_token":"124.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_without_major_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2018":{"value":116.7,"source_token":"116.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_without_major_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2017":{"value":115.9,"source_token":"115.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_without_major_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2016":{"value":105.6,"source_token":"105.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_without_major_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2015":{"value":110.8,"source_token":"110.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Pennsylvania row;any_without_major_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_basis":{"value":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","source_ids":["eia-epa2025-caidi-state-history"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","locator":"Table11.6 header and method notes;2015-2023 supplemental history"}}}],"sources":{"pjm-process":{"url":"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/","title":"Annual process for vetting large load requests","publisher":"PJM Interconnection","published_on":"2026-09-29","date_note":null,"checked_at":"2026-10-23T11:36:35.258210+00:00","sha256":"fd217cefb4a51c7c12bc244d293d2933e95d84ac8115ceb58e7b1f76a192cae6","scope":"PJM says it does not have a load interconnection queue. Utilities submit forecast adjustments. No comparable queue total is established.","tier":"A","establishes_status":[]},"eia-prices":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"Electric Power Monthly, table 5.6.A","publisher":"U.S. Energy Information Administration","published_on":"2026-09-24","date_note":null,"checked_at":"2026-10-23T11:36:34.899891+00:00","sha256":"17ebeca2c90f3f0e5aa41062a2f90952c8ffdf396479281ce6b363ef2fcc1b90","scope":"Captured public table compares July 2026 and July 2025 residential average prices. Preliminary estimates, not bills or data center cost attribution. The next scheduled release is not treated as available.","tier":"A","establishes_status":[],"additional_review_scope":"October26additionalreview of retainedJulycommercialandindustrialcolumns,51states/DC. Originalresidentialscope,clocks,releaseidentityandhashpreserved;no newsourcecapture."},"eia-price-check-20261023-1645":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"EIA table5.6.A August2026 and2025 public HTML capture","publisher":"U.S. Energy Information Administration","published_on":null,"date_note":"Exact publication day is not established by these captures. The table and spreadsheet show August2026 and August2025, while the report page header and main index still identify July2026 with a September24 release and October23 scheduled next release. That older header date is not assigned to these new values.","checked_at":"2026-10-23T16:45:07.936393+00:00","sha256":"fbfc4385f5613eb8d2b118ef2603bd81d1162f33e5ffda2dc8f03a1a3bfeb813","scope":"Public table5.6.A residential state average prices in cents per kWh. All51 state and DC pairs agree across the retained HTML and spreadsheet at the displayed hundredth. 2026values are preliminary and2025values final. Regional divisions and the U.S.total are excluded.","tier":"A","establishes_status":[]},"eia-residential-xlsx-20261023":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx","title":"EIA table5.6.A August2026 and2025 public spreadsheet","publisher":"U.S. Energy Information Administration","published_on":null,"date_note":"Exact publication day is not established by these captures. The table and spreadsheet show August2026 and August2025, while the report page header and main index still identify July2026 with a September24 release and October23 scheduled next release. That older header date is not assigned to these new values.","checked_at":"2026-10-23T16:47:20.189135+00:00","sha256":"7830737eb277be4096b3c0eb491f53c71ff91ce7133e9869b76de61f64f679b9","scope":"Public table5.6.A residential state average prices in cents per kWh. All51 state and DC pairs agree across the retained HTML and spreadsheet at the displayed hundredth. 2026values are preliminary and2025values final. Regional divisions and the U.S.total are excluded.","tier":"A","establishes_status":[]},"pa-puc-model-order-bulletin-20260530":{"url":"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html","title":"Pennsylvania PUC final model tariff order, 56 Pa.B. 3271","publisher":"Pennsylvania Public Utility Commission via Pennsylvania Bulletin","published_on":"2026-05-30","date_note":null,"checked_at":"2026-10-23T18:28:25.982389+00:00","sha256":"73fcc333d1e347e7ca094e6b84dce350d77c350a905f134e7e8d46daaf8333d7","scope":"Final model tariff adopted April 30 and entered May 12, 2026. Bulletin publication May 30. Appendix retains company, issue and effective date placeholders. Establishes model adoption only, not an individual utility tariff, rate, customer contract or connection.","tier":"A","establishes_status":["approved"]},"pjm-manual19-current-20261023":{"url":"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf","title":"PJM Manual 19 revision 39 and current forecast adjustment guidelines","publisher":"PJM Interconnection","published_on":null,"date_note":"Original public posting day is unknown. Approval June 29 and effect June 30, 2026 are separately documented, not substituted for publication.","checked_at":"2026-10-23T20:06:42.444133+00:00","sha256":"50434e43f309ae57ca33e49943552a46248ddd1f271086e9a45524c01dabc449","scope":"Actual current clean manual, cover, approval and full Attachment B. Supports adoption of this forecast review procedure only, not tariff approval, final adoption of any submitted forecast or actual connection and load.","tier":"A","establishes_status":["approved"]},"pa-ppl-final-order-20260611":{"url":"https://www.puc.pa.gov/pcdocs/1934703.pdf","title":"PPL final Opinion and Order entered June 11, 2026","publisher":"Pennsylvania Public Utility Commission","published_on":null,"date_note":"Original public posting day not independently established for this retained copy. Actual order adoption, entry, letter, filing, sheet issue and service effect dates are separate cited cells.","checked_at":"2026-10-23T21:43:30.297858+00:00","sha256":"ea94921b4f30e99ad87c3f8910fa916bf18f659f98a9cf90a08c36a98c86f571","scope":"Actual 229 page order. Focused large load provisions at PDF34 through40, stakeholder discussion104 through110, conclusion and operative orders225 through229 read. Adoption June4 and entry June11 are distinct. Entire general rate case is not certified by this focused review.","tier":"A","establishes_status":["approved"]},"pa-ppl-corrected-retail-tariff-20261023":{"url":"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf","title":"PPL posted corrected retail tariff, LP 6 schedule","publisher":"PPL Electric Utilities","published_on":null,"date_note":"Original public posting day not independently established for this retained copy. Actual order adoption, entry, letter, filing, sheet issue and service effect dates are separate cited cells.","checked_at":"2026-10-23T21:40:47.654377+00:00","sha256":"11f17918eec0f63fabf01cfbd4c4344690e0a0c61a6e521a0cb053e689c33f07","scope":"Actual 131 page clean tariff. Full four page LP6 schedule at PDF109 through112 read and visually verified, not entire book. IssueJune30 and effectJuly1 retained. Exact whitespace normalized four page text matches clean agency replacement pages243 through246.","tier":"A","establishes_status":["historical"]},"pa-ppl-compliance-approval-20260707":{"url":"https://www.puc.pa.gov/pcdocs/1938452.pdf","title":"PPL compliance supplement effectiveness letter July 7, 2026","publisher":"Pennsylvania Public Utility Commission","published_on":null,"date_note":"Original public posting day not independently established for this retained copy. Actual order adoption, entry, letter, filing, sheet issue and service effect dates are separate cited cells.","checked_at":"2026-10-23T21:43:30.179601+00:00","sha256":"752fde11d74318d82f8427862c987fd64cad711eb40c00596e4540f1d41f908b","scope":"Actual one page signed staff review letter, fully read and visually verified. Supplements effective by operation of law on printed page dates, without prejudice to timely formal complaints. Not a July7 initial tariff approval or customer project approval.","tier":"A","establishes_status":["approved"]},"pa-ppl-replacement-tariff-20260827":{"url":"https://www.puc.pa.gov/pcdocs/1946790.pdf","title":"PPL replacement retail tariff filing August 27, 2026","publisher":"PPL Electric Utilities filing with Pennsylvania Public Utility Commission","published_on":null,"date_note":"Original public posting day not independently established for this retained copy. Actual order adoption, entry, letter, filing, sheet issue and service effect dates are separate cited cells.","checked_at":"2026-10-23T21:43:30.664635+00:00","sha256":"623e9f14efecf69bec389fb69a6736f8195b79897699bbf7626c5ca868f20a55","scope":"Actual 265 page filing containing cover, redline and clean copies. Cover and clean LP6 four pages243 through246 read, cover viewed. Filing calls corrections typographical or formatting; not a newly reviewed merits approval or entire265page review.","tier":"A","establishes_status":["historical"]},"pjm-ppl-adjustment-20260929":{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf","title":"PPL September 29 utility submitted 2027 large load adjustment","publisher":"PPL presentation hosted by PJM","published_on":"2026-09-29","date_note":"","checked_at":"2026-10-23T23:36:15.474910+00:00","sha256":"e72eb103fded0984c7133b8d2bbdec6a389b1a5ba2fa10cdcd1dec61cb51f9cc","scope":"Complete ten page utility deck read. Original pages 3, 5, 6, 8 and 9 visually checked. Scope is PPL Zone Pennsylvania data centers, new and existing. Page 8 and 9 disagree on 2029 capacity, retained without correction. Forecast probabilities, utilization and planned ramps are assumptions, not measured load or connection approval.","tier":"A","establishes_status":["historical"]},"pjm-exelon-adjustment-20260929":{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf","title":"Exelon September 29 utility submitted 2027 large load proposal","publisher":"Exelon presentation hosted by PJM","published_on":"2026-09-29","date_note":"","checked_at":"2026-10-23T23:36:15.836859+00:00","sha256":"77dc8929c5d3a82e67ebd0db18582fa4810c9f3e6898f10815f4aac356525355","scope":"Complete six page utility deck read. Original pages 2, 3, 5 and 6 viewed. Full page 6 table headings say MW while its footnote says average GW; both are retained without silent conversion. Earlier chart year labels also differ from the stated 2027 submission context. Proposed capacity, pipeline and demand include distinct scopes and existing customers, not new actual load.","tier":"A","establishes_status":["historical"]},"pjm-annual-vetting-context-20260929":{"url":"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/","title":"PJM September 29 explanation of annual large load vetting","publisher":"PJM Inside Lines","published_on":"2026-09-29","date_note":"","checked_at":"2026-10-23T23:36:15.039561+00:00","sha256":"8893866cc4bbcb7917be18b5c520321b088ad9773b3a056e98897b32b59f6304","scope":"Actual dated September 29 agency article body fully read. Explains that PJM has no load interconnection queue and reviews LSE forecast adjustment requests. Its announced later October, November and January steps are plans as published, not verified accomplished actions or proof of current final forecast status.","tier":"A","establishes_status":["historical"]},"eia-sector-xlsx-20261026":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx","title":"EIA table5.6.A commercial and industrial state comparisons","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"CurrentcapturedHTMLexplicitlyReleaseDateOctober23,2026;nextNovember24isnotactualpublicationofnewdata.","scope":"Commercial/industrial columnsDthroughG XLSX and matchingHTMLrows for50statesandDC,notregionalorUSaggregate rows. State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","checked_at":"2026-10-26T12:25:57.117925+00:00","sha256":"7830737eb277be4096b3c0eb491f53c71ff91ce7133e9869b76de61f64f679b9","tier":"A","establishes_status":["historical"]},"eia-sector-html-20261026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"EIA August2026 price table and released report header","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"CurrentcapturedHTMLexplicitlyReleaseDateOctober23,2026;nextNovember24isnotactualpublicationofnewdata.","scope":"Commercial/industrial columnsDthroughG XLSX and matchingHTMLrows for50statesandDC,notregionalorUSaggregate rows. State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","checked_at":"2026-10-26T12:25:57.563354+00:00","sha256":"fd9538a038063f2ad2d62d799c6616392150c100da2e27001b409a7db61e43c0","tier":"A","establishes_status":["historical"]},"eia-ytd-xlsx-20261026":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx","title":"EIA Table5.6.B January through August cumulative sector prices","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"Report header explicitly releases August2026 data October23,2026. Next scheduled release is not actual publication.","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","checked_at":"2026-10-26T15:32:57.123492+00:00","sha256":"bddeeb6e562bf3c982d11ad990d3ea22285275d7d5a75b54039e19757876994e","tier":"A","establishes_status":["historical"]},"eia-ytd-html-20261026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b","title":"EIA Table5.6.B January through August cumulative sector prices","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"Report header explicitly releases August2026 data October23,2026. Next scheduled release is not actual publication.","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","checked_at":"2026-10-26T15:32:38.218526+00:00","sha256":"8c7409cacc21048b831d96d094400d3a7b2bbac0d4cbd78e84c3d4c99b334a29","tier":"A","establishes_status":["historical"]},"eia-state-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a","title":"EIA Electric Power Monthly Table1.3.A, utility scale facility net generation by state and sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T00:26:58.495431+00:00","sha256":"9a89406a41427b37eda8d8f18d214983c7f51834ebceeb528cdfdb4244f09990","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-net-generation-aug2026.html","tier":"A","scope":"Complete51state/DC utility scale generation rows, not Census division totals or USaggregate. August2026 preliminary versusAugust2025 final;commercial/industrial generator classification is not customer electricity use.","establishes_status":["historical"]},"eia-state-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b","title":"EIA Electric Power Monthly Table1.3.B utility scale facility net generation by state and sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T00:55:44.858242+00:00","sha256":"c8ba76926634a47f369116b1c7820b084eabb24d7d5f83bd1a4683a703f825d6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulative January throughAugust2026/2025 generation rows, not monthlyAugust, annualtotals orCensusdivision/USaggregates. Generatorsectors notcustomeruse.","establishes_status":["historical"]},"eia-state-gas-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a","title":"EIA Electric Power Monthly Table1.7.A utility scale facility net generation from natural gas by state and producer sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T01:25:59.736250+00:00","sha256":"6a32013bfbe60c7bb68a2c80aeadb72b7dd57a7f66a64e835f1ef62beff2fa3e","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-gas-generation-aug2026.html","tier":"A","scope":"Whole51state/DC list for natural gas fuel generation only. Not gasproduction/fuelconsumption/allfuelgeneration ordata-center electricityfuelmix. NM/-- andnegativezero source markers retained.","establishes_status":["historical"]},"eia-state-gas-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b","title":"EIA Electric Power Monthly Table1.7.B utility scale facility net generation from natural gas by state and producer sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T01:55:48.321070+00:00","sha256":"c306bd11fb76bc034b474ed8f06f7c29000d2b93b10afe14ee9a3563220db80c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-gas-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulativeJanthroughAug naturalgas generation rows,notmonthlyAugust/annualtotals,gasproduction/fuelconsumption ordata-centerfuelmix. Publishedpercentagescalculatedbeforerounding;NMand--retainliteralmeaning.","establishes_status":["historical"]},"eia-state-nuclear-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a","title":"EIA Electric Power Monthly Table1.9.A utility scale facility net generation from nuclear energy by state and producer sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T05:25:41.261720+00:00","sha256":"ae346eb0bc5140a0fe5e38187badd5ce334c10c1468707f4af5147d56dacdb28","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nuclear-generation-aug2026.html","tier":"A","scope":"Complete51state/DC nuclear generation rows,not installedcapacity/plantinventory,customerdemand,deliveredpowerfuelmix or emissions. Preliminary2026/final2025;sourcepercentagecalculatedbeforerounding. Zero generation notabsenceofnuclearcapacity.","establishes_status":["historical"]},"eia-state-nuclear-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b","title":"EIA Electric Power Monthly Table1.9.B utility scale facility net generation from nuclear energy by state and producer sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T05:55:38.727441+00:00","sha256":"159560c5a77a375a4c2f3ebb7aab21c2ecfb013d23fa7baa0781eddf7e642471","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nuclear-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulativeJanthroughAug nuclear netgeneration rows,notmonthlyAugust/annualtotals,capacity/plantinventory or data-center deliveredfuelmix. Preliminary2026/final2025;publishedpercentagebeforerounding,zero notplantabsence.","establishes_status":["historical"]},"eia-state-coal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a","title":"EIA Electric Power Monthly Table1.4.A August2026/2025 utility scale facility net generation from coal by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:26:07.500962+00:00","sha256":"fc35026730bc070c8b0094d7394bd496c2fed4e09aa42688371d0ca1a1246495","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-coal-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC coal netgeneration rows;monthlyAugust notYTD;notcoalreceipts/fuelconsumption/capacity/plantinventory/emissions ordata-centerfuelmix. Preliminary2026/final2025,sourceNM/--percentagesnotzero.","establishes_status":["historical"]},"eia-state-coal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b","title":"EIA Electric Power Monthly Table1.4.B cumulativeJanuarythroughAugust2026/2025 utility scale facility net generation from coal by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:26:07.859775+00:00","sha256":"69316d2a9768e8ff9285da375c444eb7b187c4caefbda6d753bf9cbbc5dca9d3","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-coal-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC coal netgeneration rows;cumulativeYTD notmonthly/annual;notcoalreceipts/fuelconsumption/capacity/plantinventory/emissions ordata-centerfuelmix. Preliminary2026/final2025,sourceNM/--percentagesnotzero.","establishes_status":["historical"]},"eia-state-wind-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a","title":"EIA Electric Power Monthly Table1.14.A August2026/2025 utility scale facility net generation from wind by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:56:02.206920+00:00","sha256":"e58a6e19a58949e89669f6a56b58918418a443c305a4ac8bcc1d37417abcb437","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-wind-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC wind netgeneration rows;monthAugust notYTD;notcapacity/turbineinventory,renewableprocurement/hourlymatching,deliveredpower oravoidedemissions. Preliminary2026/final2025;NM/--retained,zero notcapacityabsence.","establishes_status":["historical"]},"eia-state-wind-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b","title":"EIA Electric Power Monthly Table1.14.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from wind by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:56:02.511460+00:00","sha256":"ea80ce88a0eb5af674faa0e89b52b7a03a1af2fe547f6750160c5c895281a03c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-wind-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC wind netgeneration rows;cumulativeYTD notmonth/annual;notcapacity/turbineinventory,renewableprocurement/hourlymatching,deliveredpower oravoidedemissions. Preliminary2026/final2025;NM/--retained,zero notcapacityabsence.","establishes_status":["historical"]},"eia-state-hydro-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a","title":"EIA Electric Power Monthly Table1.10.A August2026/2025 utility scale facility net generation from conventional hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:30:06.432055+00:00","sha256":"9e12df2bd7d252a9fa01d46fc8457ba8ad61319a7eab99f9314316b04c3b3589","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-hydro-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC conventionalhydro generation rows,excludingpumpedstorage;monthAugust notYTD;notreservoirlevels/wateravailability/withdrawal,capacity/daminventory,deliveredpower/renewableprocurement oravoidedemissions. Preliminary2026/final2025;NM/--retained.","establishes_status":["historical"]},"eia-state-hydro-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b","title":"EIA Electric Power Monthly Table1.10.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from conventional hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:30:07.032975+00:00","sha256":"4b7f8c5f24097203262594ab1a5943139918233f3fe99b4eec3c6c40f7ec4565","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-hydro-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC conventionalhydro generation rows,excludingpumpedstorage;cumulativeYTD notmonth/annual;notreservoirlevels/wateravailability/withdrawal,capacity/daminventory,deliveredpower/renewableprocurement oravoidedemissions. Preliminary2026/final2025;NM/--retained.","establishes_status":["historical"]},"eia-state-pumped-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a","title":"EIA Electric Power Monthly Table1.12.A August2026/2025 utility scale facility net generation from pumped storage hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:55:51.178196+00:00","sha256":"f47cb6a724ad141bfef77dd1b93133635b60b03ef6f373012aeee441f3fd250b","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-pumped-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC pumpedstorage netgeneration rows,separatefromconventionalhydro;month notYTD;negativevalueskept,notstoragecapacity/grossdischargedenergy/efficiency/waterwithdrawal ordatacenterpower. Preliminary2026/final2025,undefinedpercentmarkersretained.","establishes_status":["historical"]},"eia-state-pumped-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b","title":"EIA Electric Power Monthly Table1.12.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from pumped storage hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:55:51.535361+00:00","sha256":"7adac72989762f18b744568df6258ad9a8ef9c26b3e6b3acee36d31948f85ec2","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-pumped-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC pumpedstorage netgeneration rows,separatefromconventionalhydro;YTD notmonth/annual;negativevalueskept,notstoragecapacity/grossdischargedenergy/efficiency/waterwithdrawal ordatacenterpower. Preliminary2026/final2025,undefinedpercentmarkersretained.","establishes_status":["historical"]},"eia-state-solar-pv-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a","title":"EIA Electric Power Monthly Table1.17.A solar photovoltaic state net generation: utility scale and estimated small scale, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:26:06.274803+00:00","sha256":"527d6c8a60272658c71f308929e0f68ee652fd8c922947fe574963371e6f2b56","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-pv-generation-month-aug2026.html","tier":"A","scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","establishes_status":["historical"]},"eia-state-solar-pv-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b","title":"EIA Electric Power Monthly Table1.17.B solar photovoltaic state net generation: utility scale and estimated small scale, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:26:06.616834+00:00","sha256":"6f6fce2d81012f27d144838cc41d611e8d7e5b75c472289c064f1934cdf6be4c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-pv-generation-ytd-aug2026.html","tier":"A","scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","establishes_status":["historical"]},"eia-state-solar-thermal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a","title":"EIA Electric Power Monthly Table1.18.A solar thermal utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:55:36.602781+00:00","sha256":"9741f9ca822bd33c5ed8414f2dc95dcfa451ac39975a3207e188104d9303f7aa","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-thermal-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","establishes_status":["historical"]},"eia-state-solar-thermal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b","title":"EIA Electric Power Monthly Table1.18.B solar thermal utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:55:36.899676+00:00","sha256":"522fb2bee7cace3160be662d153680672e3d07c3494ac1882b71561f7514e22e","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-thermal-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","establishes_status":["historical"]},"eia-state-other-energy-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a","title":"EIA Electric Power Monthly Table1.13.A Other Energy Sources utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:25:44.215156+00:00","sha256":"b8589b23d096be4e03c11bedffc6d7af0bed5fa2ec64fa89e2f21624909cc7b6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Capture filename initially called geothermal in error; exact source title is Other Energy Sources. Filename is not evidence of fuel identity.","establishes_status":["historical"]},"eia-state-other-energy-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b","title":"EIA Electric Power Monthly Table1.13.B Other Energy Sources utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:25:44.437082+00:00","sha256":"cc0d7f4a0db49596101f43d4cd1103a6b80dcb399ed620f52157ffa31e28269c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Capture filename initially called geothermal in error; exact source title is Other Energy Sources. Filename is not evidence of fuel identity.","establishes_status":["historical"]},"eia-state-geothermal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a","title":"EIA Electric Power Monthly Table1.16.A Geothermal utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:55:37.792695+00:00","sha256":"430765fda25b13841593833228c799f768849344f4e4645d5c29783c76b3a310","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-actual-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","establishes_status":["historical"]},"eia-state-geothermal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b","title":"EIA Electric Power Monthly Table1.16.B Geothermal utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:55:38.021096+00:00","sha256":"02b888bc082f02e9a803e89552c180df37b090ac4bb92376bcc69f668a9bc109","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-actual-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","establishes_status":["historical"]},"eia-state-biomass-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a","title":"EIA Electric Power Monthly Table1.15.A Biomass utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:25:40.960261+00:00","sha256":"1f5e6b6e275bacc2d88c3d2692efda69e80284e71dddfd1e5caca84dffae92d4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-biomass-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","establishes_status":["historical"]},"eia-state-biomass-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b","title":"EIA Electric Power Monthly Table1.15.B Biomass utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:25:41.153412+00:00","sha256":"f3f3f854afa04798193429529b13e82f74000ac95e7d1a2a12aa51662437eca2","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-biomass-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","establishes_status":["historical"]},"eia-state-petroleum-liquids-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a","title":"EIA Electric Power Monthly Table1.5.A Petroleum Liquids utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:44.484512+00:00","sha256":"a23eb87738ca68822004a0426eed58a8ea1b0ee0f5ae96170253a31cbd18942f","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-liquids-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-liquids-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b","title":"EIA Electric Power Monthly Table1.5.B Petroleum Liquids utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:44.728254+00:00","sha256":"5ee9f2be2884f3e256ce2a3e02c8270753ab2e5d7ab0507d54250638c00487a8","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-liquids-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-coke-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a","title":"EIA Electric Power Monthly Table1.6.A Petroleum Coke utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:45.070566+00:00","sha256":"64935012da6e62146d74425ac1c830a9c62e840901393f03f3ad363dad2f9d17","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-coke-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-coke-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b","title":"EIA Electric Power Monthly Table1.6.B Petroleum Coke utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:45.279055+00:00","sha256":"1e09b99b06270a93a8293578b1e47c67dcdddf03959878851a1ac453f2202f80","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-coke-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-other-fossil-gas-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a","title":"EIA Electric Power Monthly Table1.8.A Other Fossil Gas utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:25:42.932701+00:00","sha256":"ebc1838c0d9e26e1884695c95399f2793f7fa08d6de5762f9ab8c0a5daebda9c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-other-gases-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Index uses Other Gases; original table title specifies Other Fossil Gas, retained here without equating Natural Gas.","establishes_status":["historical"]},"eia-state-other-fossil-gas-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b","title":"EIA Electric Power Monthly Table1.8.B Other Fossil Gas utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:25:43.279403+00:00","sha256":"b273bf54a3b99a153e08448d69e5e56cf5496cc792125e6a73f9e4e915a27104","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-other-gases-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Index uses Other Gases; original table title specifies Other Fossil Gas, retained here without equating Natural Gas.","establishes_status":["historical"]},"eia-state-nonhydro-renewables-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a","title":"EIA Electric Power Monthly Table1.11.A Renewable Sources Excluding Hydroelectric utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:55:43.156505+00:00","sha256":"d98e7e79804a0ccd737e9ac399f64c210a141f7df3200368f3a2b0a6433f6f00","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nonhydro-renewables-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","establishes_status":["historical"]},"eia-state-nonhydro-renewables-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b","title":"EIA Electric Power Monthly Table1.11.B Renewable Sources Excluding Hydroelectric utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:55:43.340447+00:00","sha256":"3d4249d5d441323d0849b1fdb08845cb45ee2587311b84364aa75d52f0dce665","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nonhydro-renewables-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","establishes_status":["historical"]},"eia-state-retail-sales-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a","title":"EIA Electric Power Monthly Table5.4.A Sales of Electricity to Ultimate Customers by End-Use Sector,by State, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:01:02.155248+00:00","sha256":"f289ad1eb2b68b07f015bb846f8c19135fbbe9ff4a5aabead8de9796c354212f","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-sales-month-aug2026.html","tier":"A","scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","establishes_status":["historical"]},"eia-state-retail-sales-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b","title":"EIA Electric Power Monthly Table5.4.B Sales of Electricity to Ultimate Customers by End-Use Sector,by State, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:01:02.440305+00:00","sha256":"836b3186730666bcf3a4adcbe5fd29931786fffc3cd5663f22dfde4ee2389243","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-sales-ytd-aug2026.html","tier":"A","scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","establishes_status":["historical"]},"eia-state-retail-revenue-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a","title":"EIA Electric Power Monthly Table5.5.A Revenue from Sales of Electricity to Ultimate Customers by End-Use Sector,by State, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:30:48.417748+00:00","sha256":"67b465253fdf956455755bd3ca342eeee983672af9cf883ec12fc3bdacd8eba6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-revenue-month-aug2026.html","tier":"A","scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","establishes_status":["historical"]},"eia-state-retail-revenue-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b","title":"EIA Electric Power Monthly Table5.5.B Revenue from Sales of Electricity to Ultimate Customers by End-Use Sector,by State, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:30:49.025316+00:00","sha256":"f3630914ac0a13920af8b7afad9e321630c90d87731b7ca06b278312db06273b","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-revenue-ytd-aug2026.html","tier":"A","scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","establishes_status":["historical"]},"eia-state-retail-customers-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08","title":"EIA Electric Power Monthly Table5.8 Number of Ultimate Customers Served by Sector by State:August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T17:01:56.921729+00:00","sha256":"94daef9ec234f1151524adbc5a5a221aeaccc71a48d1c117663f50a52a89d2b7","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-customers-aug2026.html","tier":"A","scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","establishes_status":["historical"]},"eia-state-utility-capacity-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a","title":"EIA Electric Power Monthly Table6.2.A Net Summer Capacity of Utility Scale Units by Technology and State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:03:55.269501+00:00","sha256":"489bfa1db54aa8bebb976a2f1f0e9e6f85076837cdb16b785ce7727484a41ef4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-aug2026.html","tier":"A","scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","establishes_status":["historical"]},"eia-state-utility-capacity-b-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b","title":"EIA Electric Power Monthly Table6.2.B Net Summer Capacity Using Primarily Renewable Energy Sources and by State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:33:44.899891+00:00","sha256":"20f576441d75cc9a13b4fecd53baea7b9c348ce5a405db26a130ba9d907cd6e5","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-b-aug2026.html","tier":"A","scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","establishes_status":["historical"]},"eia-state-utility-capacity-c-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c","title":"EIA Electric Power Monthly Table6.2.C Net Summer Capacity of Utility Scale Units Using Primarily Fossil Fuels and by State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:33:45.187621+00:00","sha256":"c02ce3ee446a70f915c4a47e07e680b6b048cf2b1d7e51cb055c1a6beeab78a7","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-c-aug2026.html","tier":"A","scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","establishes_status":["historical"]},"eia-new-utility-units-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03","title":"EIA Electric Power Monthly Table6.3 New Utility Scale Generating Units by Operating Company,Plant,and Month,2026(January-August rows)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T19:04:07.797419+00:00","sha256":"051d48e2118d42562fccb54c91dc2e566cea1e24bf3dd2ccfff5094597e72f5f","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-new-utility-units-aug2026.html","tier":"A","scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","establishes_status":["historical"]},"eia-retired-utility-units-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_04","title":"EIA Electric Power Monthly Table6.4 Retired Utility Scale Generating Units by Operating Company,Plant,and Month,2026(January-August rows)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T19:33:44.657669+00:00","sha256":"082ac6feac8278666b21661a55d6546b8a3f45379be8727ffeed79c635c3f76a","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-retired-utility-units-aug2026.html","tier":"A","scope":"EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.","establishes_status":["historical"]},"eia-planned-utility-additions-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05","title":"EIA Electric Power Monthly Table6.5 Planned U.S.Electric Generating Unit Additions(August2026 dataset)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T20:03:52.284370+00:00","sha256":"769a513425ec30e9bf6983fc4186d2f367e253fb6ed1072537ae44495c762912","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-planned-utility-additions-aug2026.html","tier":"A","scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","establishes_status":["historical"]},"eia-planned-utility-retirements-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06","title":"EIA Electric Power Monthly Table6.6 Planned U.S.Electric Generating Unit Retirements(August2026 dataset)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T20:33:47.123009+00:00","sha256":"41ddaac546510a68c479078c4a014eb477bf8d230f0a4a2c18e6596f4f2f1f71","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-planned-utility-retirements-aug2026.html","tier":"A","scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","establishes_status":["historical"]},"eia-epa2025-ieee-reliability-states":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.2 IEEE distribution reliability by state2025 and2024","published_on":"2026-10-21","checked_at":"2026-10-27T23:04:08.692385+00:00","sha256":"5709d427dc11697b35e5e04aa1a247483fe64906acac03437366504ec591003c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-reliability-ieee-20261027.html","tier":"A","establishes_status":["historical"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution."},"eia-epa2025-any-reliability-states":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.3 any-method distribution reliability by state2025 and2024","published_on":"2026-10-21","checked_at":"2026-10-27T23:33:56.041642+00:00","sha256":"40cf45b1731954b256ee1d6c79f2e29b126baf8012ba47794d6546dd6f239cb5","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-reliability-any-method-20261027.html","tier":"A","establishes_status":["historical"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins."},"eia-epa2025-saidi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.4 annual SAIDI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T00:04:10.386421+00:00","sha256":"52f619cdbec1026136cd0b2a0414cc6b551066272aebf2de3c6ddee772b1fc3d","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-saidi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution."},"eia-epa2025-saifi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.5 annual SAIFI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T00:34:19.009385+00:00","sha256":"6b41da37d3a8d7491eee3d7355e4625b385f362fb6c4796d0335b92f4d0b3ff4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-saifi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation."},"eia-epa2025-caidi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.6 annual CAIDI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T01:03:57.191681+00:00","sha256":"1b065b30dbde195e80079c282ba99411c62ead9d971e378dd03df0baae861675","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-caidi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution."}},"details":[{"id":"grid-va","html":"<article><h3>PJM regional forecast adjustment process</h3><p class=\"layer-scope\">PJM regional context. A state assignment is not a quantitative allocation to Virginia.</p><dl class=\"layer-fields\"><dt>Meaning</dt><dd>Forecast adjustments, no load interconnection queue<span class=\"layer-source\"><a href=\"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/\">PJM Interconnection</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Regional context for the PJM footprint, not a Virginia only total. Locator: Named request or forecast discussion.</p></dd><dt>Observation date</dt><dd>September 29, 2026<span class=\"layer-source\"><a href=\"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/\">PJM Interconnection</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">PJM publication date. Locator: Named request or forecast discussion.</p></dd><dt>Requested capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/\">PJM Interconnection</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No comparable regional queue total established in this review. Locator: Named request or forecast discussion.</p></dd></dl></article>"},{"id":"price-pa","html":"<article><h3>Pennsylvania</h3><p class=\"layer-scope\">A two point comparison, not a complete time series. State average revenue per unit sold is not a household bill. No causal attribution to data centers.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>July 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential comparison month. Locator: Table heading.</p></dd><dt>Prior period</dt><dd>July 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Same month in the preceding year. Locator: Table heading.</p></dd><dt>Price</dt><dd>21.72 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Preliminary residential state average, cents per kWh. Locator: Residential July 2026, Pennsylvania.</p></dd><dt>Prior price</dt><dd>19.51 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential state average for the comparison month. Locator: Residential July 2025, Pennsylvania.</p></dd></dl></article>"},{"id":"price-pa-202608","html":"<article><h3>Pennsylvania</h3><p class=\"layer-scope\">Captured August residential comparison. The earlier July comparison remains in the source history. State average revenue per unit sold is not a household bill or evidence of a data center effect.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential comparison month. Locator: Table_5_06_A!B4:C4.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Same month in the preceding year. Locator: Table_5_06_A!B4:C4.</p></dd><dt>Price</dt><dd>21.77 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Preliminary August2026 residential state average, cents per kWh. Locator: Table_5_06_A!B15:C15.</p></dd><dt>Prior price</dt><dd>19.93 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Final August2025 residential state average, cents per kWh. Locator: Table_5_06_A!B15:C15.</p></dd><dt>Source context</dt><dd>The August table and public spreadsheet agree. The surrounding report header still identifies July and its older release date. The exact publication day of these August values is not established here.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The scheduled next release day is not treated as proof of actual publication. This review uses the periods stated in the two data tables and preserves the earlier July capture. Locator: HTML table heading and report header; spreadsheet rows1 through4 and67.</p></dd></dl></article>"},{"id":"tariff-framework-pa-puc-20260430","html":"<article><h3>Pennsylvania adopted model tariff framework</h3><p class=\"layer-scope\">State commission model only, with dates, conditional safeguards and source differences. Individual utility tariffs for Pennsylvania remain unreviewed in this layer.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>approved<span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Approval of a model framework only. No individual utility tariff approval is established. Locator: Operative paragraph 1 and appendix placeholders.</p></dd><dt>Framework basis</dt><dd>Model framework only<span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">A separate evidence category. This model does not color the utility tariff evidence map as approved. Locator: Operative paragraph 1 and appendix heading.</p></dd><dt>Adopted on</dt><dd>April 30, 2026<span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Commission adoption date, distinct from entry and Bulletin publication. Locator: Order adopted line.</p></dd><dt>Entered on</dt><dd>May 12, 2026<span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Commission entry date, distinct from adoption and May 30 publication. Locator: Order entered line.</p></dd><dt>Threshold</dt><dd>The adopted heading and applicability use at least 50 MW individually or 100 MW in aggregate. The definition instead says over 50 MW individually.<span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The source boundary difference is retained. Utilities may apply the model below those thresholds individually. No customer eligibility ruling is inferred. Locator: Operative paragraph 1; appendix Applicability and Large Load Customer definition.</p></dd><dt>Generation and existing load</dt><dd>Behind the meter generation is excluded from the threshold calculation. New interconnections and new incremental load of existing customers are covered, including an increase that brings total site load to the threshold.<span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Existing contracts remain under their existing terms, with optional entry under the model at utility discretion. No net load deduction or current customer contract is established. Locator: Appendix Applicability and Existing Large Load Customer Contracts.</p></dd><dt>Contract length</dt><dd>The initial contract term is at least five years after any optional three to five year ramp. A longer initial term may be needed to recover utility investment.<span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The ramp is additional to the initial term. Longer terms discussed by commenters are not adopted universal minimums. Locator: Appendix Terms of Contract and definitions.</p></dd><dt>Minimum demand</dt><dd>The monthly billing demand floor is the greater of 80 percent of contract capacity or 80 percent of the highest monthly billing demand in the previous eleven months. The model also states an 80 percent minimum monthly demand charge, with higher charges possible for fixed cost recovery.<span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Demand safeguards are not an 80 percent energy purchase guarantee, actual electricity consumption or a stated rate per kWh. Locator: Appendix Monthly Billing Demand and Minimum Demand Charge.</p></dd><dt>Collateral</dt><dd>Collateral covers network improvement and interconnection facility costs, with reductions as construction and ramp milestones reduce risk. Cash, a qualifying letter of credit or a qualifying parent guarantee are permitted.<span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The guarantee requires both stated credit ratings and liquidity above ten times the collateral requirement. No actual customer credit finding, deposit or refund is established. Locator: Appendix Collateral Requirements.</p></dd><dt>Continuation and notice</dt><dd>After the initial term, contracts continue unless either party provides at least 48 months of written termination notice. Modification requests after the initial term also require 48 months of notice.<span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">These general continuation terms are separate from the specific PJM delivery year alignment and exit fee conditions. Locator: Appendix Terms of Contract.</p></dd><dt>Conditional reduction</dt><dd>A total reduction up to 20 percent without an exit fee requires five years or the initial contract term, whichever is longer, and at least 48 months of written notice before the relevant PJM delivery year.<span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">This is conditional flexibility, not a fee free exit after five years or a new reduction allowance every year. Locator: Appendix Contractual Flexibility, Exit Fee.</p></dd><dt>Exit fee</dt><dd>Termination or a reduction beyond 20 percent after the first five years requires the specified 48 month notice and an exit fee. The fee is the greater of unrecovered network and interconnection costs, after revenues received, or the remaining minimum charges for the relevant reduced capacity beyond the allowed reduction.<span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The exit fee period is the remaining initial term or agreed extension, with a one year minimum and five year maximum. Reasonable mitigation is required, not a guaranteed full refund. Locator: Appendix Exit Fee and Exit Fee Period definition.</p></dd><dt>Queue transparency</dt><dd>The model calls for an anonymized public interconnection queue with ZIP code, application acceptance date, requested MW and study stage.<span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">A model disclosure requirement is not a reviewed published queue, an approved connection or actual load. Locator: Appendix Public Interconnection Queue.</p></dd><dt>Source difference</dt><dd>The docket heading is M-2025-3054271. The closing directive instead prints A-2025-3054271. The individual threshold is inclusive in applicability but strict in the definition.<span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Both differences are retained without inventing a second case or silently resolving the exact 50 MW boundary. Locator: Bulletin heading, operative paragraph 4, applicability and definition.</p></dd><dt>Utility effective on</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The appendix issue and effective dates are placeholders. No individual utility effective date reviewed. Locator: Appendix issue and effective date placeholders.</p></dd><dt>Individual outcomes</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-22/790.html\">Pennsylvania Public Utility Commission via Pennsylvania Bulletin</a>. Source: May 30, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No utility filing approval, individual customer contract, actual collateral, approved connection or actual load reviewed. Locator: Model framework review boundary.</p></dd></dl></article>"},{"id":"grid-pjm-manual19-procedure-20260630","html":"<article><h3>PJM adopted forecast adjustment review procedure</h3><p class=\"layer-scope\">Regional procedure shown in the PJM state panels for context. Manual approval, utility submissions, final forecasts and actual load remain distinct.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>approved<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Approval concerns this manual revision only. Locator: Printed page 3.</p></dd><dt>Process basis</dt><dd>Forecast review procedure<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Regional process documentation, excluded from utility tariff status. Locator: Attachment B printed pages 26 through 32.</p></dd><dt>Revision</dt><dd>Revision 39<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Captured current clean version, separate from the earlier change presentation. Locator: Cover and printed page 4.</p></dd><dt>Approved on</dt><dd>June 29, 2026<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Manual approval day. Locator: Printed page 3.</p></dd><dt>Effective on</dt><dd>June 30, 2026<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Manual effect, separate from approval and original posting. Locator: Cover and printed page 3.</p></dd><dt>Threshold wording</dt><dd>Solicitation covers changes of at least 50 MW, positive or negative. Verification instead says category totals greater than 50 MW.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Both threshold descriptions retained; no silent resolution for exactly 50 MW. Locator: Printed pages 26 and 29.</p></dd><dt>Regulator review</dt><dd>Submitters must offer each relevant state regulator review before submission. Participation is voluntary, and submissions need not follow regulator feedback if both perspectives are provided.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Review opportunity and feedback are distinct from approval of forecasts or connections. Locator: Printed page 28.</p></dd><dt>Firm classification</dt><dd>Firm status requires a qualifying service, construction or supply commitment plus financial support. Nonfirm portions may enter forecast periods outside the capacity auction horizon.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Forecast classification only. Firm portions can still be reduced for growth constraints. Locator: Printed pages 28 through 30.</p></dd><dt>Duplicate requests</dt><dd>Customers must be asked about potentially duplicated requests lacking service or construction commitments. Silence counts toward duplication. Missing site, location and MW details can remove such requests; discounting can reflect project milestones.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No actual duplicate count or adjustment result is established. Locator: Printed pages 29 and 30.</p></dd><dt>Final determination</dt><dd>PJM reviews assumptions, regulator feedback and independent forecast uncertainty before determining the final adjustment. A submitter can retain its preliminary amount if the calculated final is higher.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">A submitted number or firm classification does not guarantee unchanged final inclusion. Locator: Printed pages 30 and 31.</p></dd><dt>Timing</dt><dd>The manual schedules final adjustments for November or December and independent forecast review for October or November.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">General schedule, not proof of a completed presentation or final 2027 forecast. Locator: Printed pages 26 and 30.</p></dd><dt>Utility tariff</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual utility tariff approval is established by this manual. Locator: Procedure review boundary.</p></dd><dt>Actual load</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No measured actual load quantity is established by this procedure. Locator: Procedure review boundary.</p></dd><dt>Approved capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No connection capacity approval is established. Locator: Procedure review boundary.</p></dd><dt>Individual approvals</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual customer decision is established. Locator: Procedure review boundary.</p></dd><dt>Requested capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No comparable regional queue total is established. Locator: Procedure review boundary.</p></dd><dt>Pjm final forecast</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No final amount for the current submitted forecast is established. Locator: Procedure review boundary.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No facility identity join is made. Locator: Procedure review boundary.</p></dd></dl></article>"},{"id":"tariff-pa-ppl-lp6","html":"<article><h3>PPL LP 6 security dependent demand guarantees</h3><p class=\"layer-scope\">Utility specific approved tariff with dated compliance and corrected sheets. Separate statewide framework, demand guarantees, security, direct costs, requests and actual service retain different scopes.</p><dl class=\"layer-fields\"><dt>Utility</dt><dd>PPL Electric Utilities<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Utility specific retail LP 6 schedule, not a statewide implementation census or supplier coordination tariff. Locator: Schedule caption.</p></dd><dt>Status</dt><dd>approved<span class=\"layer-source\"><a href=\"https://www.puc.pa.gov/pcdocs/1934703.pdf\">Pennsylvania Public Utility Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.puc.pa.gov/pcdocs/1938452.pdf\">Pennsylvania Public Utility Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Actual adopted and entered settlement approval plus subsequent staff compliance effectiveness letter. No individual customer approval or finding about later appeals, stays or complaints is made. Locator: Order operative paragraphs 3 and 8; signed compliance letter.</p></dd><dt>Docket</dt><dd>R-2025-3057164<span class=\"layer-source\"><a href=\"https://www.puc.pa.gov/pcdocs/1934703.pdf\">Pennsylvania Public Utility Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">PPL electric base rate case, distinct from the separate statewide model proceeding. Locator: Order and tariff captions.</p></dd><dt>Conditional demand basis</dt><dd>Security dependent demand payment rules<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Demand guarantees, security satisfaction and optional interruption retain separate conditions. None is measured electrical use. Locator: LP 6, Electric Service Agreement paragraphs 7 through 9 and voluntary option.</p></dd><dt>Threshold</dt><dd>Data center customers commencing service on or after October 1, 2025, at 69 kV or above, with at least 50 MW at one facility or at least 75 MW in aggregate within a ten mile radius.<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.puc.pa.gov/pcdocs/1934703.pdf\">Pennsylvania Public Utility Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">PPL facilities at the stated voltage and radius only. Inclusive thresholds do not establish actual load or an Atlas campus identity. The 75 MW aggregation is not replaced by the statewide model threshold. Locator: Page 35C Application.</p></dd><dt>Conditional exception</dt><dd>A single facility with 50 through 75 MW at 69 kV or above and no transmission network upgrade costs may be proposed for LP 5 by utility petition, subject to Commission review and approval.<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Both inclusive endpoints and both conditions retained. An exception is not automatic. The petition must be served on the rate case parties; if approved, the facility demand is excluded from the described aggregate. No actual petition outcome is reviewed. Locator: Page 35C Application.</p></dd><dt>Adopted on</dt><dd>June 4, 2026<span class=\"layer-source\"><a href=\"https://www.puc.pa.gov/pcdocs/1934703.pdf\">Pennsylvania Public Utility Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Actual adoption or vote date, separate from entry. Locator: Order final page 229.</p></dd><dt>Approved on</dt><dd>June 11, 2026<span class=\"layer-source\"><a href=\"https://www.puc.pa.gov/pcdocs/1934703.pdf\">Pennsylvania Public Utility Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Actual final order entered date. The earlier June 4 adoption does not change this entry date. Locator: Order final page 229 and operative paragraph 3.</p></dd><dt>Issued on</dt><dd>June 30, 2026<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Printed issue date of the current retained LP6 pages, separate from the later correction filing. Locator: Pages 35C through 35F footers.</p></dd><dt>Effective on</dt><dd>July 1, 2026<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.puc.pa.gov/pcdocs/1938452.pdf\">Pennsylvania Public Utility Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Printed service effective date and staff confirmation of effectiveness by operation of law. Not an observed customer service start. Locator: LP6 footers; compliance letter.</p></dd><dt>Compliance review on</dt><dd>July 7, 2026<span class=\"layer-source\"><a href=\"https://www.puc.pa.gov/pcdocs/1938452.pdf\">Pennsylvania Public Utility Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Staff letter says suspension or further investigation does not appear warranted at that time, without prejudice to timely formal complaints. This is not a new merits order dated July 7. Locator: Signed one page letter.</p></dd><dt>Replacement filed on</dt><dd>August 27, 2026<span class=\"layer-source\"><a href=\"https://www.puc.pa.gov/pcdocs/1946790.pdf\">PPL Electric Utilities filing with Pennsylvania Public Utility Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Replacement filing cover date; the filed corrections are described as typographical or formatting. Current clean four page LP6 text matches the agency clean version after whitespace normalization. Locator: Replacement cover page 1 and clean pages 243 through 246.</p></dd><dt>Contract length</dt><dd>Initial electric service agreement term of at least ten years. The ramp is within that term.<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No automatic fifteen year minimum or additional five year term is inferred. No individual agreement or its renewal terms is reviewed. Locator: Page 35D ESA paragraphs 1 and 2.</p></dd><dt>Ramp length</dt><dd>The schedule requests a ramp for up to the first five years, then expressly allows a ramp period that does not exceed the initial agreement term.<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Both clauses retained. This is not a universal five year maximum, an additional term, or an actual customer ramp. Locator: Page 35D ESA paragraph 2.</p></dd><dt>Minimum bill</dt><dd>Until the Rate Base Security Obligation is satisfied, applicable rates use the greater of actual peak demand or 80 percent of scheduled ramp load. After satisfaction, the stated floor is 80 percent in the first five years and 50 percent in the second five years.<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The unpaid security condition remains relevant beyond year five. These are demand payment rules, not actual energy use, total bill discounts, or proof that security has been satisfied. Page 35C separately states the monthly minimum distribution charge is the customer charge. Locator: Pages 35C and 35E, ESA paragraphs 7 and 8.</p></dd><dt>Voluntary interruptible option</dt><dd>If the customer elects voluntary interruptible service instead of firm service, the option states a 60 percent minimum load guarantee for the first five years and 30 percent for the second five years.<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No customer election is established. The option does not explicitly resolve every interaction with the unsatisfied security condition, so no individual security release, unrestricted interruption right or universal combined bill formula is inferred. Locator: Page 35E voluntary interruptible option.</p></dd><dt>Collateral</dt><dd>Security covers customer caused upgrades placed into transmission rate base and recovered through transmission rates. A letter of credit, parent guarantee or other acceptable instrument secures the outstanding revenue guarantee.<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No fixed deposit in dollars per MW or fixed number of years is stated here. Security satisfaction requires transmission revenue equal to the Rate Base Security Obligation, not merely the passage of five years. Default draw applies to remaining line extension costs not directly charged. Locator: Page 35D ESA paragraphs 3 through 6.</p></dd><dt>Direct construction costs</dt><dd>Directly assignable transmission and distribution upgrades require construction contributions as milestone payments ahead of work.<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Separate direct cost contribution and rate base security mechanisms are not added as duplicate actual expenditures or assumed paid amounts. Locator: Page 35E ESA paragraph 10.</p></dd><dt>Exit fees</dt><dd>The exit fee is the greater of the remaining minimum load guarantee during the agreement term and the remaining Rate Base Security Obligation.<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">This is a comparison, not addition of both amounts. Funds first reduce transmission rate base security, with the remainder credited to the FERC transmission formula revenue requirement. No actual payment or customer savings is established. Locator: Page 35E ESA paragraph 9 and allocation paragraph.</p></dd><dt>Critical load</dt><dd>Where critical load exists, the agreement requires infrastructure that permits noncritical load to be shed without affecting critical load operations.<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">A tariff design requirement is not proof that any site installed, tested or used that capability. Locator: Page 35E ESA paragraph 11.</p></dd><dt>Reporting</dt><dd>The utility must submit compliant agreements and upgrade cost allocations, notify early termination and relevant exit fee credits, and provide annual forecast breakdowns for agreements, letters of authorization and inquiries.<span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Required filings are not verified submissions. Forecast cohorts and requests are not approved or actual load and are not summed into a statewide queue. Locator: Pages 35E and 35F reporting provisions.</p></dd><dt>Model comparison</dt><dd>The order retains this utility specific 75 MW aggregation threshold and separately notes the statewide model uses 100 MW in aggregate. Parties reserve a route to propose later LP 6 modifications after the model proceeding.<span class=\"layer-source\"><a href=\"https://www.puc.pa.gov/pcdocs/1934703.pdf\">Pennsylvania Public Utility Commission</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The model framework remains a separate record, with its own dates and unknown utility implementation. No later reconciliation, amendment, appeal outcome or state coverage conclusion is inferred. Locator: Order pages 39 and 40 paragraph 97, page 106 footnote26.</p></dd><dt>Individual project approval</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No named customer agreement or project approval is reviewed. Locator: Review boundary.</p></dd><dt>Actual load</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No observed operating electrical load is established. Locator: Review boundary.</p></dd><dt>Actual service on</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No named customer physical service date is established. Locator: Review boundary.</p></dd><dt>Security satisfied on</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual security satisfaction date is established. Locator: Review boundary.</p></dd><dt>Interruptible election</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No customer interruptible service election is established. Locator: Review boundary.</p></dd><dt>Actual customer savings</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No realized customer or household savings is established. Locator: Review boundary.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pplelectric.com/site/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/2026/September/PPL-2025-Rate-Case--Corrected-Retail-Tariff-Pages-82726-Clean.pdf\">PPL Electric Utilities</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No independently verified Atlas building or campus identity join is made. Locator: Review boundary.</p></dd></dl></article>"},{"id":"grid-pjm-ppl-submission-20260929","html":"<article><h3>PPL submitted forecast and initial request context</h3><p class=\"layer-scope\">Dated PPL Zone submission including new and existing data centers. Initial requests, agreement stages, modeled capacity and demand and future years remain distinct. Source table conflict retained; no state total, actual load, individual approval or final PJM adoption inferred.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Dated utility proposal documentation. The projected quantities are not actual historical load or final PJM acceptance. Locator: Actual presentation date and proposal captions.</p></dd><dt>Forecast basis</dt><dd>Utility forecast submission<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">PPL Zone Pennsylvania data center forecast, including new and existing customers. Shown in Pennsylvania for zone context, not an allocation to all state utilities or a state total. Locator: Actual presentation geography and scope.</p></dd><dt>Submitted on</dt><dd>September 29, 2026<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Presentation day, separate from forecast years, hypothetical customer ramp dates and final regional adoption. Locator: Presentation title page.</p></dd><dt>Actual load</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No measured operating total is established from the submitted future forecast or pipeline. Locator: Utility submission and regional review boundary.</p></dd><dt>Approved capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No approved connection capacity is established by the submitted forecast or reported project list. Locator: Utility submission and regional review boundary.</p></dd><dt>Individual approvals</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual connection approval or executed customer agreement is independently reviewed. Locator: Utility submission and regional review boundary.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No independently verified facility identity join is made. Locator: Utility submission and regional review boundary.</p></dd><dt>Requested capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No comparable normalized regional load queue total is admitted. Utility project lists and forecast submissions are distinct. Locator: Utility submission and regional review boundary.</p></dd><dt>Pjm final forecast</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No final PJM adoption is established by this dated utility proposal or the announcement of later review steps. Locator: Utility submission and regional review boundary.</p></dd><dt>Regional queue context</dt><dd>PJM explained on September 29 that it does not have a load interconnection queue and relies on load serving entities to submit large load forecast adjustments. Twelve utilities presented proposals for review.<span class=\"layer-source\"><a href=\"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/\">PJM Inside Lines</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The count refers to utilities, not distinct presentation files, approved projects or actual connections. Announced later review milestones in this historical article are not verified completed actions. Generation interconnection queues have a different scope. Locator: PJM September 29 article body.</p></dd><dt>Initial request context</dt><dd>PPL reports receiving more than 240 GW of large load interconnection requests since September 2024. Initial study requests without an executed agreement are excluded from this forecast.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Utility reported requests in an initial inquiry or assessment phase, not 240 GW of approved, contracted, forecast or operating load. No conversion, deduplication, project count or regional queue sum is calculated. Locator: Page 3 and page 5.</p></dd><dt>Agreement stages</dt><dd>PPL describes a Letter of Authorization as a preliminary development commitment with an upfront cash deposit and letter of credit. Service or construction agreements are described as longer term commitments with financial guarantees, minimum load and exit terms.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">These are utility attributed stage descriptions, not independent review or approval of individual agreements or universal tariff terms. A transmission planning presentation is not approval of the project. Locator: Pages 3 and 4.</p></dd><dt>Probability method</dt><dd>For signed authorization letters the utility assumes zero probability of commercial operation during the first three forecast years, then a combined utilization and probability assumption of 50 percent. For signed service or construction agreements it assumes 70 percent demand utilization and 100 percent probability for forecasting.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The 50 percent is a combined assumption, not two separate 50 percent factors. The utility compares earlier 80 percent utilization and probability assumptions in its prior submission. None of these percentages establishes measured utilization, a guaranteed customer ramp, commercial operation or an approved tariff minimum. Locator: Pages 5 and 6.</p></dd><dt>Ramp method</dt><dd>The utility uses project specific service dates and expected ramp schedules, transmission upgrade timing, construction and development schedules, and typical ramp characteristics.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Expected dates and planned infrastructure do not establish customer energization or measured load. No universal fixed ramp duration is inferred. Locator: Page 6.</p></dd><dt>Regulator feedback</dt><dd>The utility reports meeting Pennsylvania commission staff on July 17 and receiving feedback on August 31 about its proposed methodology and results.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Utility reported staff engagement is not Commission approval of the forecast, all individual projects or final PJM adoption. Locator: Page 7.</p></dd><dt>Submitted 2027 demand</dt><dd>539 MW<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Utility submitted 2027 demand forecast for PPL Zone data centers. Capacity and demand are separate source rows, not actual load, connection approvals, requests or a Pennsylvania state total. Locator: Page 8 2027 column, demand row.</p></dd><dt>Submitted 2027 capacity</dt><dd>771 MW<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Utility submitted 2027 capacity forecast for PPL Zone data centers. Capacity and demand are separate source rows, not actual load, connection approvals, requests or a Pennsylvania state total. Locator: Page 8 2027 column, capacity row.</p></dd><dt>Submitted 2031 demand</dt><dd>15,722 MW<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Utility submitted 2031 demand forecast for PPL Zone data centers. Capacity and demand are separate source rows, not actual load, connection approvals, requests or a Pennsylvania state total. Locator: Page 8 2031 column, demand row.</p></dd><dt>Submitted 2031 capacity</dt><dd>27,247 MW<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Utility submitted 2031 capacity forecast for PPL Zone data centers. Capacity and demand are separate source rows, not actual load, connection approvals, requests or a Pennsylvania state total. Locator: Page 8 2031 column, capacity row.</p></dd><dt>Forecast table conflict</dt><dd>Source table conflict retained<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The 2029 capacity entry is not normalized from inconsistent tables in the same deck. Other selected year cells retain their source table scope. Locator: Pages 8 and 9.</p></dd><dt>Capacity table difference</dt><dd>The summary table prints 6,599 for 2029 capacity. The contract breakdown prints 6,559 for service or construction agreement capacity and zero for authorization letter capacity in that column.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Both source values are retained. No authoritative correction, combined total or calculated difference is asserted. This mismatch does not establish actual load. Locator: Page 8 capacity row and page 9 2029 column.</p></dd><dt>Submitted 2029 capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The two source tables disagree. No single authoritative 2029 capacity is admitted. Locator: Pages 8 and 9.</p></dd><dt>Long horizon context</dt><dd>The source groups 2034 through 2047 into one column, with capacity 32,089 and demand 18,227 under the chart MW basis.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5e---ppl.pdf\">PPL presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">This is a grouped forecast horizon, not an independently modeled value for every separate year, an operating total or an approved request. No curve or sum is reconstructed. Locator: Page 8 last column.</p></dd></dl></article>"},{"id":"grid-pjm-exelon-submission-20260929","html":"<article><h3>Exelon submitted forecast with published unit conflict</h3><p class=\"layer-scope\">Dated Exelon proposal for ComEd and PECO data centers, including existing customers. Reported pipeline labels, future demand, capacity and assumed utilization are separate. Raw detailed table numerals retain an unresolved unit conflict and are not normalized or summed. No state totals, actual load, customer approval or final PJM adoption inferred.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Dated utility proposal documentation. The projected quantities are not actual historical load or final PJM acceptance. Locator: Actual presentation date and proposal captions.</p></dd><dt>Forecast basis</dt><dd>Utility forecast submission<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Exelon submitted forecast for the ComEd and PECO zones, including existing and new data centers. Illinois and Pennsylvania panels supply zone context only, not state totals or an allocation across every Exelon service territory. Locator: Actual presentation geography and scope.</p></dd><dt>Submitted on</dt><dd>September 29, 2026<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Presentation day, separate from forecast years, hypothetical customer ramp dates and final regional adoption. Locator: Presentation title page.</p></dd><dt>Actual load</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No measured operating total is established from the submitted future forecast or pipeline. Locator: Utility submission and regional review boundary.</p></dd><dt>Approved capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No approved connection capacity is established by the submitted forecast or reported project list. Locator: Utility submission and regional review boundary.</p></dd><dt>Individual approvals</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual connection approval or executed customer agreement is independently reviewed. Locator: Utility submission and regional review boundary.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No independently verified facility identity join is made. Locator: Utility submission and regional review boundary.</p></dd><dt>Requested capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No comparable normalized regional load queue total is admitted. Utility project lists and forecast submissions are distinct. Locator: Utility submission and regional review boundary.</p></dd><dt>Pjm final forecast</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No final PJM adoption is established by this dated utility proposal or the announcement of later review steps. Locator: Utility submission and regional review boundary.</p></dd><dt>Regional queue context</dt><dd>PJM explained on September 29 that it does not have a load interconnection queue and relies on load serving entities to submit large load forecast adjustments. Twelve utilities presented proposals for review.<span class=\"layer-source\"><a href=\"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/\">PJM Inside Lines</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The count refers to utilities, not distinct presentation files, approved projects or actual connections. Announced later review milestones in this historical article are not verified completed actions. Generation interconnection queues have a different scope. Locator: PJM September 29 article body.</p></dd><dt>Geographic scope</dt><dd>The forecasting team covers six named zones, but this submitted data center adjustment includes ComEd and PECO.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The list of forecasting team territories does not extend these submitted quantities to BGE, ACE, DPL or PEPCO, all of Exelon, or every load in Illinois and Pennsylvania. Locator: Page 2.</p></dd><dt>Reported pipeline context</dt><dd>The deck presents an approximately 37 GW large load list, about 25 GW excluded and about 12 GW of included high probability capacity, including existing service. Its rounded included zone labels are 10.5 GW for ComEd and 1.6 GW for PECO.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">These are separately reported rounded context labels, not actual operating demand or a new combined total. The source warns that amounts may not sum because of rounding. No sum, subtraction or correction is calculated from those labels. Locator: Pages 2, 3 and 5.</p></dd><dt>Commitment method</dt><dd>Where offered, forecast inclusion requires a signed transmission security agreement or comparable binding agreement and a submitted letter of credit. Other projects must have entered initial engineering with a customer financial deposit and approved engineering design costs.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Utility attributed forecast screening is not regulatory connection approval or independent verification of actual posted collateral or customer agreement terms. Locator: Pages 2 and 3.</p></dd><dt>Ramp method</dt><dd>The utility describes an approximately four year ramp with transmission security agreements and an eight year default, with 80 percent and 70 percent utilization assumptions respectively.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Model assumptions are distinct from actual load, service dates or a universally approved tariff contract term. The deck also describes customer supplied schedules and revisions to project lists. Locator: Pages 2, 3 and 5.</p></dd><dt>Regulator feedback</dt><dd>The utility reports meeting Pennsylvania staff on August 17 and Illinois staff on August 26, and says both found the methods reasonable without suggested changes.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">This is the utility account of staff feedback, not an independently reviewed commission order, final forecast adoption or approval of individual projects. Locator: Page 3.</p></dd><dt>Forecast unit conflict</dt><dd>Published unit conflict, not normalized<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The actual page 6 headings label capacity and demand MW while its footnote says June through August average GW and includes existing customers. Neither wording is silently rewritten. Locator: Page 6 full original table and footnote.</p></dd><dt>Raw 2027 table context</dt><dd>In the 2027 column the printed capacity entries are ComEd 2,070 and PECO 135; printed demand entries are ComEd 1,378 and PECO 105.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Raw source numerals under headings labeled MW; the same page footnote says average GW. No normalized scalar quantity, sum, state allocation or actual load is admitted from this unresolved unit wording. Locator: Page 6 2027 column and footnote.</p></dd><dt>Raw 2031 table context</dt><dd>In the 2031 column the printed capacity entries are ComEd 7,670 and PECO 1,105; printed demand entries are ComEd 5,418 and PECO 848.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Raw source numerals with the same unresolved MW heading versus average GW footnote. No normalization, combined total or measured quantity is inferred. Locator: Page 6 2031 column and footnote.</p></dd><dt>Raw 2047 table context</dt><dd>In the 2047 column the printed capacity entries are ComEd 10,475 and PECO 1,550; printed demand entries are ComEd 7,482 and PECO 1,195.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Raw source numerals with the same unresolved MW heading versus average GW footnote. No normalization, combined total or actual future operating load is inferred. Locator: Page 6 2047 column and footnote.</p></dd><dt>Chart vintage context</dt><dd>Page 2 labels 2027 proposed capacity. The page 5 chart legend labels a 2025 accepted demand series and a 2026 proposed demand series while that page narrative describes the 2027 submission.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">These published labels are retained without rewriting the earlier chart vintages or promoting any chart series to final 2027 PJM acceptance. Locator: Pages 2 and 5.</p></dd><dt>Normalized forecast</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260929/20260929-item-5i---exelon.pdf\">Exelon presentation hosted by PJM</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The page 6 unit wording is unresolved. No scalar MW or GW forecast is entered from those detailed table numerals. Locator: Page 6 headings and footnote.</p></dd></dl></article>"},{"id":"sector-price-pa-202608","html":"<article><h3>Pennsylvania commercial and industrial electricity prices</h3><p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Current preliminary comparison month. Locator: Table5.6.A header.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Final same month previous year. Locator: Table5.6.A header.</p></dd><dt>Sector price boundary</dt><dd>State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table5.6.A notes, including row67.</p></dd><dt>Commercial price</dt><dd>13.93 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!D15; matching HTML state row.</p></dd><dt>Prior commercial price</dt><dd>12.68 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!E15; matching HTML state row.</p></dd><dt>Industrial price</dt><dd>10.47 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!F15; matching HTML state row.</p></dd><dt>Prior industrial price</dt><dd>9.66 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!G15; matching HTML state row.</p></dd><dt>All sector price</dt><dd>15.99 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Pennsylvania All Sectors August comparison.</p></dd><dt>Prior all sector price</dt><dd>14.62 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Pennsylvania All Sectors August comparison.</p></dd><dt>All sector boundary</dt><dd>All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A sector headers and notes.</p></dd><dt>Ytd commercial price</dt><dd>13.90 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!D15; matching HTML state row.</p></dd><dt>Prior ytd commercial price</dt><dd>12.18 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!E15; matching HTML state row.</p></dd><dt>Ytd industrial price</dt><dd>10.82 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!F15; matching HTML state row.</p></dd><dt>Prior ytd industrial price</dt><dd>9.11 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!G15; matching HTML state row.</p></dd><dt>Ytd all sector price</dt><dd>15.77 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!J15; matching HTML state row.</p></dd><dt>Prior ytd all sector price</dt><dd>13.83 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!K15; matching HTML state row.</p></dd><dt>Ytd period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Prior ytd period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Ytd price boundary</dt><dd>January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Retail sales basis</dt><dd>Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail sales period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Retail sales prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Retail sales residential</dt><dd>5092.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Pennsylvania row,column1.</p></dd><dt>Retail sales residential prior</dt><dd>5131.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Pennsylvania row,column2.</p></dd><dt>Retail sales commercial</dt><dd>3517.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Pennsylvania row,column3.</p></dd><dt>Retail sales commercial prior</dt><dd>3688.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Pennsylvania row,column4.</p></dd><dt>Retail sales industrial</dt><dd>3984.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Pennsylvania row,column5.</p></dd><dt>Retail sales industrial prior</dt><dd>4005.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Pennsylvania row,column6.</p></dd><dt>Retail sales transportation</dt><dd>42.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Pennsylvania row,column7.</p></dd><dt>Retail sales transportation prior</dt><dd>45.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Pennsylvania row,column8.</p></dd><dt>Retail sales all</dt><dd>12635.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Pennsylvania row,column9.</p></dd><dt>Retail sales all prior</dt><dd>12870.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Pennsylvania row,column10.</p></dd><dt>Ytd retail sales basis</dt><dd>Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Ytd retail sales period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Ytd retail sales prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Ytd retail sales residential</dt><dd>38610.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Pennsylvania row,column1.</p></dd><dt>Ytd retail sales residential prior</dt><dd>38780.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Pennsylvania row,column2.</p></dd><dt>Ytd retail sales commercial</dt><dd>27335.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Pennsylvania row,column3.</p></dd><dt>Ytd retail sales commercial prior</dt><dd>27389.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Pennsylvania row,column4.</p></dd><dt>Ytd retail sales industrial</dt><dd>31091.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Pennsylvania row,column5.</p></dd><dt>Ytd retail sales industrial prior</dt><dd>31384.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Pennsylvania row,column6.</p></dd><dt>Ytd retail sales transportation</dt><dd>359.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Pennsylvania row,column7.</p></dd><dt>Ytd retail sales transportation prior</dt><dd>365.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Pennsylvania row,column8.</p></dd><dt>Ytd retail sales all</dt><dd>97394.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Pennsylvania row,column9.</p></dd><dt>Ytd retail sales all prior</dt><dd>97917.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Pennsylvania row,column10.</p></dd><dt>Retail revenue basis</dt><dd>Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail revenue period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Retail revenue prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Retail revenue residential</dt><dd>1108.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Pennsylvania row,column1.</p></dd><dt>Retail revenue residential prior</dt><dd>1022.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Pennsylvania row,column2.</p></dd><dt>Retail revenue commercial</dt><dd>490.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Pennsylvania row,column3.</p></dd><dt>Retail revenue commercial prior</dt><dd>468.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Pennsylvania row,column4.</p></dd><dt>Retail revenue industrial</dt><dd>417.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Pennsylvania row,column5.</p></dd><dt>Retail revenue industrial prior</dt><dd>387.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Pennsylvania row,column6.</p></dd><dt>Retail revenue transportation</dt><dd>5.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Pennsylvania row,column7.</p></dd><dt>Retail revenue transportation prior</dt><dd>5.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Pennsylvania row,column8.</p></dd><dt>Retail revenue all</dt><dd>2020.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Pennsylvania row,column9.</p></dd><dt>Retail revenue all prior</dt><dd>1882.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Pennsylvania row,column10.</p></dd><dt>Ytd retail revenue basis</dt><dd>Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Ytd retail revenue period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Ytd retail revenue prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Ytd retail revenue residential</dt><dd>8160.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Pennsylvania row,column1.</p></dd><dt>Ytd retail revenue residential prior</dt><dd>7314.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Pennsylvania row,column2.</p></dd><dt>Ytd retail revenue commercial</dt><dd>3799.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Pennsylvania row,column3.</p></dd><dt>Ytd retail revenue commercial prior</dt><dd>3337.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Pennsylvania row,column4.</p></dd><dt>Ytd retail revenue industrial</dt><dd>3364.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Pennsylvania row,column5.</p></dd><dt>Ytd retail revenue industrial prior</dt><dd>2858.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Pennsylvania row,column6.</p></dd><dt>Ytd retail revenue transportation</dt><dd>41.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Pennsylvania row,column7.</p></dd><dt>Ytd retail revenue transportation prior</dt><dd>33.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Pennsylvania row,column8.</p></dd><dt>Ytd retail revenue all</dt><dd>15363.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Pennsylvania row,column9.</p></dd><dt>Ytd retail revenue all prior</dt><dd>13542.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Pennsylvania row,column10.</p></dd><dt>Retail customers basis</dt><dd>Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail customers period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Column headers.</p></dd><dt>Retail customers prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Column headers.</p></dd><dt>Retail customers residential</dt><dd>5,589,846 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Pennsylvania row,column1.</p></dd><dt>Retail customers residential prior</dt><dd>5,591,309 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Pennsylvania row,column2.</p></dd><dt>Retail customers commercial</dt><dd>747,670 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Pennsylvania row,column3.</p></dd><dt>Retail customers commercial prior</dt><dd>743,243 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Pennsylvania row,column4.</p></dd><dt>Retail customers industrial</dt><dd>10,941 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Pennsylvania row,column5.</p></dd><dt>Retail customers industrial prior</dt><dd>11,096 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Pennsylvania row,column6.</p></dd><dt>Retail customers transportation</dt><dd>5 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Pennsylvania row,column7.</p></dd><dt>Retail customers transportation prior</dt><dd>5 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Pennsylvania row,column8.</p></dd><dt>Retail customers all</dt><dd>6,348,462 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Pennsylvania row,column9.</p></dd><dt>Retail customers all prior</dt><dd>6,345,653 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Pennsylvania row,column10.</p></dd></dl></article>"},{"id":"sector-price-pa-202607","html":"<article><h3>Pennsylvania historical commercial and industrial electricity prices</h3><p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>July 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Prior period</dt><dd>July 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Sector price boundary</dt><dd>Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Commercial price</dt><dd>13.86 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Pennsylvania commercial_price.</p></dd><dt>Prior commercial price</dt><dd>12.63 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Pennsylvania prior_commercial_price.</p></dd><dt>Industrial price</dt><dd>11.04 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Pennsylvania industrial_price.</p></dd><dt>Prior industrial price</dt><dd>9.87 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Pennsylvania prior_industrial_price.</p></dd><dt>All sector price</dt><dd>16.22 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Pennsylvania All Sectors July comparison.</p></dd><dt>Prior all sector price</dt><dd>14.61 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Pennsylvania All Sectors July comparison.</p></dd><dt>All sector boundary</dt><dd>All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A sector headers and notes.</p></dd></dl></article>"},{"id":"generation-pa-202608","html":"<article><h3>Pennsylvania utility scale generation</h3><p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A period and source notes.</p></dd><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table title, producer sector headers and source notes.</p></dd><dt>All generation</dt><dd>23773.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Pennsylvania row; column1.</p></dd><dt>Prior all generation</dt><dd>22439.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Pennsylvania row; column2.</p></dd><dt>Published generation change</dt><dd>5.90 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Pennsylvania row; column3.</p></dd><dt>Utility generation</dt><dd>9.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Pennsylvania row; column4.</p></dd><dt>Prior utility generation</dt><dd>5.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Pennsylvania row; column5.</p></dd><dt>Ipp generation</dt><dd>23347.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Pennsylvania row; column6.</p></dd><dt>Prior ipp generation</dt><dd>22019.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Pennsylvania row; column7.</p></dd><dt>Commercial generation</dt><dd>56.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Pennsylvania row; column8.</p></dd><dt>Prior commercial generation</dt><dd>55.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Pennsylvania row; column9.</p></dd><dt>Industrial generation</dt><dd>361.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Pennsylvania row; column10.</p></dd><dt>Prior industrial generation</dt><dd>359.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Pennsylvania row; column11.</p></dd><dt>Gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Gas period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas all generation</dt><dd>14887.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Pennsylvania row; column1.</p></dd><dt>Gas prior all generation</dt><dd>13390.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Pennsylvania row; column2.</p></dd><dt>Gas published generation change</dt><dd>11.20 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Pennsylvania row; column3.</p></dd><dt>Gas utility generation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Pennsylvania row; column4.</p></dd><dt>Gas prior utility generation</dt><dd>3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Pennsylvania row; column5.</p></dd><dt>Gas ipp generation</dt><dd>14566.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Pennsylvania row; column6.</p></dd><dt>Gas prior ipp generation</dt><dd>13109.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Pennsylvania row; column7.</p></dd><dt>Gas commercial generation</dt><dd>17.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Pennsylvania row; column8.</p></dd><dt>Gas prior commercial generation</dt><dd>14.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Pennsylvania row; column9.</p></dd><dt>Gas industrial generation</dt><dd>300.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Pennsylvania row; column10.</p></dd><dt>Gas prior industrial generation</dt><dd>265.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Pennsylvania row; column11.</p></dd><dt>Nuclear generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nuclear period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear all generation</dt><dd>6733.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Pennsylvania row; column1.</p></dd><dt>Nuclear prior all generation</dt><dd>6671.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Pennsylvania row; column2.</p></dd><dt>Nuclear published generation change</dt><dd>0.90 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Pennsylvania row; column3.</p></dd><dt>Nuclear utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Pennsylvania row; column4.</p></dd><dt>Nuclear prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Pennsylvania row; column5.</p></dd><dt>Nuclear ipp generation</dt><dd>6733.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Pennsylvania row; column6.</p></dd><dt>Nuclear prior ipp generation</dt><dd>6671.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Pennsylvania row; column7.</p></dd><dt>Nuclear commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Pennsylvania row; column8.</p></dd><dt>Nuclear prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Pennsylvania row; column9.</p></dd><dt>Nuclear industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Pennsylvania row; column10.</p></dd><dt>Nuclear prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Pennsylvania row; column11.</p></dd><dt>Coal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Coal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal all generation</dt><dd>1376.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Pennsylvania row; column1.</p></dd><dt>Coal prior all generation</dt><dd>1790.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Pennsylvania row; column2.</p></dd><dt>Coal published generation change</dt><dd>-23.10 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Pennsylvania row; column3.</p></dd><dt>Coal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Pennsylvania row; column4.</p></dd><dt>Coal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Pennsylvania row; column5.</p></dd><dt>Coal ipp generation</dt><dd>1368.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Pennsylvania row; column6.</p></dd><dt>Coal prior ipp generation</dt><dd>1782.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Pennsylvania row; column7.</p></dd><dt>Coal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Pennsylvania row; column8.</p></dd><dt>Coal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Pennsylvania row; column9.</p></dd><dt>Coal industrial generation</dt><dd>8.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Pennsylvania row; column10.</p></dd><dt>Coal prior industrial generation</dt><dd>8.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Pennsylvania row; column11.</p></dd><dt>Wind generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Wind period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind all generation</dt><dd>187.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Pennsylvania row; column1.</p></dd><dt>Wind prior all generation</dt><dd>128.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Pennsylvania row; column2.</p></dd><dt>Wind published generation change</dt><dd>45.90 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Pennsylvania row; column3.</p></dd><dt>Wind utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Pennsylvania row; column4.</p></dd><dt>Wind prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Pennsylvania row; column5.</p></dd><dt>Wind ipp generation</dt><dd>187.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Pennsylvania row; column6.</p></dd><dt>Wind prior ipp generation</dt><dd>128.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Pennsylvania row; column7.</p></dd><dt>Wind commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Pennsylvania row; column8.</p></dd><dt>Wind prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Pennsylvania row; column9.</p></dd><dt>Wind industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Pennsylvania row; column10.</p></dd><dt>Wind prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Pennsylvania row; column11.</p></dd><dt>Hydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Hydro period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro all generation</dt><dd>207.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Pennsylvania row; column1.</p></dd><dt>Hydro prior all generation</dt><dd>70.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Pennsylvania row; column2.</p></dd><dt>Hydro published generation change</dt><dd>194.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Pennsylvania row; column3.</p></dd><dt>Hydro utility generation</dt><dd>5.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Pennsylvania row; column4.</p></dd><dt>Hydro prior utility generation</dt><dd>2.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Pennsylvania row; column5.</p></dd><dt>Hydro ipp generation</dt><dd>202.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Pennsylvania row; column6.</p></dd><dt>Hydro prior ipp generation</dt><dd>68.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Pennsylvania row; column7.</p></dd><dt>Hydro commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Pennsylvania row; column8.</p></dd><dt>Hydro prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Pennsylvania row; column9.</p></dd><dt>Hydro industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Pennsylvania row; column10.</p></dd><dt>Hydro prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Pennsylvania row; column11.</p></dd><dt>Pumped storage generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Pumped storage period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage all generation</dt><dd>-96.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Pennsylvania row; column1.</p></dd><dt>Pumped storage prior all generation</dt><dd>-85.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Pennsylvania row; column2.</p></dd><dt>Pumped storage published generation change</dt><dd>12.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Pennsylvania row; column3.</p></dd><dt>Pumped storage utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Pennsylvania row; column4.</p></dd><dt>Pumped storage prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Pennsylvania row; column5.</p></dd><dt>Pumped storage ipp generation</dt><dd>-96.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Pennsylvania row; column6.</p></dd><dt>Pumped storage prior ipp generation</dt><dd>-85.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Pennsylvania row; column7.</p></dd><dt>Pumped storage commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Pennsylvania row; column8.</p></dd><dt>Pumped storage prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Pennsylvania row; column9.</p></dd><dt>Pumped storage industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Pennsylvania row; column10.</p></dd><dt>Pumped storage prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Pennsylvania row; column11.</p></dd><dt>Solar pv period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv generation basis</dt><dd>Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar pv all estimated generation</dt><dd>430.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column1.</p></dd><dt>Solar pv prior all estimated generation</dt><dd>367.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column2.</p></dd><dt>Solar pv published generation change</dt><dd>17.20 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column3.</p></dd><dt>Solar pv utility scale generation</dt><dd>225.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column4.</p></dd><dt>Solar pv utility scale prior generation</dt><dd>212.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column5.</p></dd><dt>Solar pv estimated small scale generation</dt><dd>205.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column6.</p></dd><dt>Solar pv estimated small scale prior generation</dt><dd>155.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column7.</p></dd><dt>Solar pv electric utilities generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column8.</p></dd><dt>Solar pv electric utilities prior generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column9.</p></dd><dt>Solar pv independent producers generation</dt><dd>223.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column10.</p></dd><dt>Solar pv independent producers prior generation</dt><dd>211.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column11.</p></dd><dt>Solar pv commercial estimated total generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column12.</p></dd><dt>Solar pv commercial estimated total prior generation</dt><dd>46.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column13.</p></dd><dt>Solar pv commercial utility scale generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column14.</p></dd><dt>Solar pv commercial utility scale prior generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column15.</p></dd><dt>Solar pv commercial estimated small scale generation</dt><dd>63.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column16.</p></dd><dt>Solar pv commercial estimated small scale prior generation</dt><dd>46.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column17.</p></dd><dt>Solar pv industrial estimated total generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column18.</p></dd><dt>Solar pv industrial estimated total prior generation</dt><dd>15.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column19.</p></dd><dt>Solar pv industrial utility scale generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column20.</p></dd><dt>Solar pv industrial utility scale prior generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column21.</p></dd><dt>Solar pv industrial estimated small scale generation</dt><dd>16.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column22.</p></dd><dt>Solar pv industrial estimated small scale prior generation</dt><dd>14.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column23.</p></dd><dt>Solar pv residential estimated small scale generation</dt><dd>126.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column24.</p></dd><dt>Solar pv residential estimated small scale prior generation</dt><dd>95.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Pennsylvania row; column25.</p></dd><dt>Solar thermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar thermal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Pennsylvania row; column1.</p></dd><dt>Solar thermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Pennsylvania row; column2.</p></dd><dt>Solar thermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Pennsylvania row; column3.</p></dd><dt>Solar thermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Pennsylvania row; column4.</p></dd><dt>Solar thermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Pennsylvania row; column5.</p></dd><dt>Solar thermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Pennsylvania row; column6.</p></dd><dt>Solar thermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Pennsylvania row; column7.</p></dd><dt>Solar thermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Pennsylvania row; column8.</p></dd><dt>Solar thermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Pennsylvania row; column9.</p></dd><dt>Solar thermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Pennsylvania row; column10.</p></dd><dt>Solar thermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Pennsylvania row; column11.</p></dd><dt>Other energy generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other energy period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy all generation</dt><dd>82.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Pennsylvania row; column1.</p></dd><dt>Other energy prior all generation</dt><dd>69.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Pennsylvania row; column2.</p></dd><dt>Other energy published generation change</dt><dd>18.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Pennsylvania row; column3.</p></dd><dt>Other energy utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Pennsylvania row; column4.</p></dd><dt>Other energy prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Pennsylvania row; column5.</p></dd><dt>Other energy ipp generation</dt><dd>62.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Pennsylvania row; column6.</p></dd><dt>Other energy prior ipp generation</dt><dd>49.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Pennsylvania row; column7.</p></dd><dt>Other energy commercial generation</dt><dd>20.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Pennsylvania row; column8.</p></dd><dt>Other energy prior commercial generation</dt><dd>20.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Pennsylvania row; column9.</p></dd><dt>Other energy industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Pennsylvania row; column10.</p></dd><dt>Other energy prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Pennsylvania row; column11.</p></dd><dt>Geothermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Geothermal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Pennsylvania row; column1.</p></dd><dt>Geothermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Pennsylvania row; column2.</p></dd><dt>Geothermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Pennsylvania row; column3.</p></dd><dt>Geothermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Pennsylvania row; column4.</p></dd><dt>Geothermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Pennsylvania row; column5.</p></dd><dt>Geothermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Pennsylvania row; column6.</p></dd><dt>Geothermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Pennsylvania row; column7.</p></dd><dt>Geothermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Pennsylvania row; column8.</p></dd><dt>Geothermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Pennsylvania row; column9.</p></dd><dt>Geothermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Pennsylvania row; column10.</p></dd><dt>Geothermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Pennsylvania row; column11.</p></dd><dt>Biomass generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Biomass period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass all generation</dt><dd>139.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Pennsylvania row; column1.</p></dd><dt>Biomass prior all generation</dt><dd>126.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Pennsylvania row; column2.</p></dd><dt>Biomass published generation change</dt><dd>9.60 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Pennsylvania row; column3.</p></dd><dt>Biomass utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Pennsylvania row; column4.</p></dd><dt>Biomass prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Pennsylvania row; column5.</p></dd><dt>Biomass ipp generation</dt><dd>85.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Pennsylvania row; column6.</p></dd><dt>Biomass prior ipp generation</dt><dd>74.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Pennsylvania row; column7.</p></dd><dt>Biomass commercial generation</dt><dd>17.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Pennsylvania row; column8.</p></dd><dt>Biomass prior commercial generation</dt><dd>20.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Pennsylvania row; column9.</p></dd><dt>Biomass industrial generation</dt><dd>36.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Pennsylvania row; column10.</p></dd><dt>Biomass prior industrial generation</dt><dd>33.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Pennsylvania row; column11.</p></dd><dt>Petroleum liquids generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum liquids period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids all generation</dt><dd>14.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Pennsylvania row; column1.</p></dd><dt>Petroleum liquids prior all generation</dt><dd>14.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Pennsylvania row; column2.</p></dd><dt>Petroleum liquids published generation change</dt><dd>2.20 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Pennsylvania row; column3.</p></dd><dt>Petroleum liquids utility generation</dt><dd>0.25 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Pennsylvania row; column4.</p></dd><dt>Petroleum liquids prior utility generation</dt><dd>0.17 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Pennsylvania row; column5.</p></dd><dt>Petroleum liquids ipp generation</dt><dd>14.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Pennsylvania row; column6.</p></dd><dt>Petroleum liquids prior ipp generation</dt><dd>12.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Pennsylvania row; column7.</p></dd><dt>Petroleum liquids commercial generation</dt><dd>0.38 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Pennsylvania row; column8.</p></dd><dt>Petroleum liquids prior commercial generation</dt><dd>0.37 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Pennsylvania row; column9.</p></dd><dt>Petroleum liquids industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Pennsylvania row; column10.</p></dd><dt>Petroleum liquids prior industrial generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Pennsylvania row; column11.</p></dd><dt>Petroleum coke generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum coke period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Pennsylvania row; column1.</p></dd><dt>Petroleum coke prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Pennsylvania row; column2.</p></dd><dt>Petroleum coke published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Pennsylvania row; column3.</p></dd><dt>Petroleum coke utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Pennsylvania row; column4.</p></dd><dt>Petroleum coke prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Pennsylvania row; column5.</p></dd><dt>Petroleum coke ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Pennsylvania row; column6.</p></dd><dt>Petroleum coke prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Pennsylvania row; column7.</p></dd><dt>Petroleum coke commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Pennsylvania row; column8.</p></dd><dt>Petroleum coke prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Pennsylvania row; column9.</p></dd><dt>Petroleum coke industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Pennsylvania row; column10.</p></dd><dt>Petroleum coke prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Pennsylvania row; column11.</p></dd><dt>Other fossil gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other fossil gas period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas all generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Pennsylvania row; column1.</p></dd><dt>Other fossil gas prior all generation</dt><dd>52.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Pennsylvania row; column2.</p></dd><dt>Other fossil gas published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Pennsylvania row; column3.</p></dd><dt>Other fossil gas utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Pennsylvania row; column4.</p></dd><dt>Other fossil gas prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Pennsylvania row; column5.</p></dd><dt>Other fossil gas ipp generation</dt><dd>3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Pennsylvania row; column6.</p></dd><dt>Other fossil gas prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Pennsylvania row; column7.</p></dd><dt>Other fossil gas commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Pennsylvania row; column8.</p></dd><dt>Other fossil gas prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Pennsylvania row; column9.</p></dd><dt>Other fossil gas industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Pennsylvania row; column10.</p></dd><dt>Other fossil gas prior industrial generation</dt><dd>52.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Pennsylvania row; column11.</p></dd><dt>Nonhydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nonhydro period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro all generation</dt><dd>551.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Pennsylvania row; column1.</p></dd><dt>Nonhydro prior all generation</dt><dd>467.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Pennsylvania row; column2.</p></dd><dt>Nonhydro published generation change</dt><dd>18.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Pennsylvania row; column3.</p></dd><dt>Nonhydro utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Pennsylvania row; column4.</p></dd><dt>Nonhydro prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Pennsylvania row; column5.</p></dd><dt>Nonhydro ipp generation</dt><dd>495.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Pennsylvania row; column6.</p></dd><dt>Nonhydro prior ipp generation</dt><dd>413.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Pennsylvania row; column7.</p></dd><dt>Nonhydro commercial generation</dt><dd>19.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Pennsylvania row; column8.</p></dd><dt>Nonhydro prior commercial generation</dt><dd>20.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Pennsylvania row; column9.</p></dd><dt>Nonhydro industrial generation</dt><dd>37.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Pennsylvania row; column10.</p></dd><dt>Nonhydro prior industrial generation</dt><dd>34.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Pennsylvania row; column11.</p></dd></dl></article>"},{"id":"generation-pa-202608-ytd","html":"<article><h3>Pennsylvania utility scale generation</h3><p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B period and source notes.</p></dd><dt>Period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table title, producer sector headers and source notes.</p></dd><dt>All generation</dt><dd>167936.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Pennsylvania row; column1.</p></dd><dt>Prior all generation</dt><dd>170114.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Pennsylvania row; column2.</p></dd><dt>Published generation change</dt><dd>-1.30 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Pennsylvania row; column3.</p></dd><dt>Utility generation</dt><dd>73.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Pennsylvania row; column4.</p></dd><dt>Prior utility generation</dt><dd>102.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Pennsylvania row; column5.</p></dd><dt>Ipp generation</dt><dd>164682.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Pennsylvania row; column6.</p></dd><dt>Prior ipp generation</dt><dd>166908.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Pennsylvania row; column7.</p></dd><dt>Commercial generation</dt><dd>395.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Pennsylvania row; column8.</p></dd><dt>Prior commercial generation</dt><dd>411.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Pennsylvania row; column9.</p></dd><dt>Industrial generation</dt><dd>2786.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Pennsylvania row; column10.</p></dd><dt>Prior industrial generation</dt><dd>2693.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Pennsylvania row; column11.</p></dd><dt>Gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Gas period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas all generation</dt><dd>97951.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Pennsylvania row; column1.</p></dd><dt>Gas prior all generation</dt><dd>99720.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Pennsylvania row; column2.</p></dd><dt>Gas published generation change</dt><dd>-1.80 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Pennsylvania row; column3.</p></dd><dt>Gas utility generation</dt><dd>27.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Pennsylvania row; column4.</p></dd><dt>Gas prior utility generation</dt><dd>27.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Pennsylvania row; column5.</p></dd><dt>Gas ipp generation</dt><dd>95630.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Pennsylvania row; column6.</p></dd><dt>Gas prior ipp generation</dt><dd>97589.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Pennsylvania row; column7.</p></dd><dt>Gas commercial generation</dt><dd>109.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Pennsylvania row; column8.</p></dd><dt>Gas prior commercial generation</dt><dd>106.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Pennsylvania row; column9.</p></dd><dt>Gas industrial generation</dt><dd>2186.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Pennsylvania row; column10.</p></dd><dt>Gas prior industrial generation</dt><dd>1997.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Pennsylvania row; column11.</p></dd><dt>Nuclear generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nuclear period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear all generation</dt><dd>50653.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Pennsylvania row; column1.</p></dd><dt>Nuclear prior all generation</dt><dd>50089.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Pennsylvania row; column2.</p></dd><dt>Nuclear published generation change</dt><dd>1.10 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Pennsylvania row; column3.</p></dd><dt>Nuclear utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Pennsylvania row; column4.</p></dd><dt>Nuclear prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Pennsylvania row; column5.</p></dd><dt>Nuclear ipp generation</dt><dd>50653.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Pennsylvania row; column6.</p></dd><dt>Nuclear prior ipp generation</dt><dd>50089.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Pennsylvania row; column7.</p></dd><dt>Nuclear commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Pennsylvania row; column8.</p></dd><dt>Nuclear prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Pennsylvania row; column9.</p></dd><dt>Nuclear industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Pennsylvania row; column10.</p></dd><dt>Nuclear prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Pennsylvania row; column11.</p></dd><dt>Coal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Coal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal all generation</dt><dd>11806.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Pennsylvania row; column1.</p></dd><dt>Coal prior all generation</dt><dd>12854.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Pennsylvania row; column2.</p></dd><dt>Coal published generation change</dt><dd>-8.20 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Pennsylvania row; column3.</p></dd><dt>Coal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Pennsylvania row; column4.</p></dd><dt>Coal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Pennsylvania row; column5.</p></dd><dt>Coal ipp generation</dt><dd>11755.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Pennsylvania row; column6.</p></dd><dt>Coal prior ipp generation</dt><dd>12790.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Pennsylvania row; column7.</p></dd><dt>Coal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Pennsylvania row; column8.</p></dd><dt>Coal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Pennsylvania row; column9.</p></dd><dt>Coal industrial generation</dt><dd>51.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Pennsylvania row; column10.</p></dd><dt>Coal prior industrial generation</dt><dd>64.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Pennsylvania row; column11.</p></dd><dt>Wind generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Wind period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind all generation</dt><dd>2540.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Pennsylvania row; column1.</p></dd><dt>Wind prior all generation</dt><dd>2582.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Pennsylvania row; column2.</p></dd><dt>Wind published generation change</dt><dd>-1.60 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Pennsylvania row; column3.</p></dd><dt>Wind utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Pennsylvania row; column4.</p></dd><dt>Wind prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Pennsylvania row; column5.</p></dd><dt>Wind ipp generation</dt><dd>2540.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Pennsylvania row; column6.</p></dd><dt>Wind prior ipp generation</dt><dd>2582.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Pennsylvania row; column7.</p></dd><dt>Wind commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Pennsylvania row; column8.</p></dd><dt>Wind prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Pennsylvania row; column9.</p></dd><dt>Wind industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Pennsylvania row; column10.</p></dd><dt>Wind prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Pennsylvania row; column11.</p></dd><dt>Hydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Hydro period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro all generation</dt><dd>1628.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Pennsylvania row; column1.</p></dd><dt>Hydro prior all generation</dt><dd>2170.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Pennsylvania row; column2.</p></dd><dt>Hydro published generation change</dt><dd>-25.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Pennsylvania row; column3.</p></dd><dt>Hydro utility generation</dt><dd>43.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Pennsylvania row; column4.</p></dd><dt>Hydro prior utility generation</dt><dd>71.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Pennsylvania row; column5.</p></dd><dt>Hydro ipp generation</dt><dd>1585.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Pennsylvania row; column6.</p></dd><dt>Hydro prior ipp generation</dt><dd>2099.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Pennsylvania row; column7.</p></dd><dt>Hydro commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Pennsylvania row; column8.</p></dd><dt>Hydro prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Pennsylvania row; column9.</p></dd><dt>Hydro industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Pennsylvania row; column10.</p></dd><dt>Hydro prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Pennsylvania row; column11.</p></dd><dt>Pumped storage generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Pumped storage period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage all generation</dt><dd>-644.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Pennsylvania row; column1.</p></dd><dt>Pumped storage prior all generation</dt><dd>-653.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Pennsylvania row; column2.</p></dd><dt>Pumped storage published generation change</dt><dd>-1.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Pennsylvania row; column3.</p></dd><dt>Pumped storage utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Pennsylvania row; column4.</p></dd><dt>Pumped storage prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Pennsylvania row; column5.</p></dd><dt>Pumped storage ipp generation</dt><dd>-644.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Pennsylvania row; column6.</p></dd><dt>Pumped storage prior ipp generation</dt><dd>-653.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Pennsylvania row; column7.</p></dd><dt>Pumped storage commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Pennsylvania row; column8.</p></dd><dt>Pumped storage prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Pennsylvania row; column9.</p></dd><dt>Pumped storage industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Pennsylvania row; column10.</p></dd><dt>Pumped storage prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Pennsylvania row; column11.</p></dd><dt>Solar pv period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv generation basis</dt><dd>Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar pv all estimated generation</dt><dd>2897.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column1.</p></dd><dt>Solar pv prior all estimated generation</dt><dd>2279.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column2.</p></dd><dt>Solar pv published generation change</dt><dd>27.20 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column3.</p></dd><dt>Solar pv utility scale generation</dt><dd>1494.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column4.</p></dd><dt>Solar pv utility scale prior generation</dt><dd>1204.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column5.</p></dd><dt>Solar pv estimated small scale generation</dt><dd>1404.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column6.</p></dd><dt>Solar pv estimated small scale prior generation</dt><dd>1074.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column7.</p></dd><dt>Solar pv electric utilities generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column8.</p></dd><dt>Solar pv electric utilities prior generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column9.</p></dd><dt>Solar pv independent producers generation</dt><dd>1482.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column10.</p></dd><dt>Solar pv independent producers prior generation</dt><dd>1194.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column11.</p></dd><dt>Solar pv commercial estimated total generation</dt><dd>432.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column12.</p></dd><dt>Solar pv commercial estimated total prior generation</dt><dd>320.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column13.</p></dd><dt>Solar pv commercial utility scale generation</dt><dd>7.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column14.</p></dd><dt>Solar pv commercial utility scale prior generation</dt><dd>6.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column15.</p></dd><dt>Solar pv commercial estimated small scale generation</dt><dd>425.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column16.</p></dd><dt>Solar pv commercial estimated small scale prior generation</dt><dd>314.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column17.</p></dd><dt>Solar pv industrial estimated total generation</dt><dd>119.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column18.</p></dd><dt>Solar pv industrial estimated total prior generation</dt><dd>101.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column19.</p></dd><dt>Solar pv industrial utility scale generation</dt><dd>5.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column20.</p></dd><dt>Solar pv industrial utility scale prior generation</dt><dd>5.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column21.</p></dd><dt>Solar pv industrial estimated small scale generation</dt><dd>114.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column22.</p></dd><dt>Solar pv industrial estimated small scale prior generation</dt><dd>96.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column23.</p></dd><dt>Solar pv residential estimated small scale generation</dt><dd>865.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column24.</p></dd><dt>Solar pv residential estimated small scale prior generation</dt><dd>664.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Pennsylvania row; column25.</p></dd><dt>Solar thermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar thermal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Pennsylvania row; column1.</p></dd><dt>Solar thermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Pennsylvania row; column2.</p></dd><dt>Solar thermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Pennsylvania row; column3.</p></dd><dt>Solar thermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Pennsylvania row; column4.</p></dd><dt>Solar thermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Pennsylvania row; column5.</p></dd><dt>Solar thermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Pennsylvania row; column6.</p></dd><dt>Solar thermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Pennsylvania row; column7.</p></dd><dt>Solar thermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Pennsylvania row; column8.</p></dd><dt>Solar thermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Pennsylvania row; column9.</p></dd><dt>Solar thermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Pennsylvania row; column10.</p></dd><dt>Solar thermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Pennsylvania row; column11.</p></dd><dt>Other energy generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other energy period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy all generation</dt><dd>591.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Pennsylvania row; column1.</p></dd><dt>Other energy prior all generation</dt><dd>537.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Pennsylvania row; column2.</p></dd><dt>Other energy published generation change</dt><dd>9.90 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Pennsylvania row; column3.</p></dd><dt>Other energy utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Pennsylvania row; column4.</p></dd><dt>Other energy prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Pennsylvania row; column5.</p></dd><dt>Other energy ipp generation</dt><dd>450.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Pennsylvania row; column6.</p></dd><dt>Other energy prior ipp generation</dt><dd>389.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Pennsylvania row; column7.</p></dd><dt>Other energy commercial generation</dt><dd>140.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Pennsylvania row; column8.</p></dd><dt>Other energy prior commercial generation</dt><dd>149.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Pennsylvania row; column9.</p></dd><dt>Other energy industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Pennsylvania row; column10.</p></dd><dt>Other energy prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Pennsylvania row; column11.</p></dd><dt>Geothermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Geothermal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Pennsylvania row; column1.</p></dd><dt>Geothermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Pennsylvania row; column2.</p></dd><dt>Geothermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Pennsylvania row; column3.</p></dd><dt>Geothermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Pennsylvania row; column4.</p></dd><dt>Geothermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Pennsylvania row; column5.</p></dd><dt>Geothermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Pennsylvania row; column6.</p></dd><dt>Geothermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Pennsylvania row; column7.</p></dd><dt>Geothermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Pennsylvania row; column8.</p></dd><dt>Geothermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Pennsylvania row; column9.</p></dd><dt>Geothermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Pennsylvania row; column10.</p></dd><dt>Geothermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Pennsylvania row; column11.</p></dd><dt>Biomass generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Biomass period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass all generation</dt><dd>979.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Pennsylvania row; column1.</p></dd><dt>Biomass prior all generation</dt><dd>955.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Pennsylvania row; column2.</p></dd><dt>Biomass published generation change</dt><dd>2.60 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Pennsylvania row; column3.</p></dd><dt>Biomass utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Pennsylvania row; column4.</p></dd><dt>Biomass prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Pennsylvania row; column5.</p></dd><dt>Biomass ipp generation</dt><dd>633.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Pennsylvania row; column6.</p></dd><dt>Biomass prior ipp generation</dt><dd>582.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Pennsylvania row; column7.</p></dd><dt>Biomass commercial generation</dt><dd>136.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Pennsylvania row; column8.</p></dd><dt>Biomass prior commercial generation</dt><dd>147.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Pennsylvania row; column9.</p></dd><dt>Biomass industrial generation</dt><dd>210.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Pennsylvania row; column10.</p></dd><dt>Biomass prior industrial generation</dt><dd>226.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Pennsylvania row; column11.</p></dd><dt>Petroleum liquids generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum liquids period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids all generation</dt><dd>600.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Pennsylvania row; column1.</p></dd><dt>Petroleum liquids prior all generation</dt><dd>262.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Pennsylvania row; column2.</p></dd><dt>Petroleum liquids published generation change</dt><dd>129.30 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Pennsylvania row; column3.</p></dd><dt>Petroleum liquids utility generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Pennsylvania row; column4.</p></dd><dt>Petroleum liquids prior utility generation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Pennsylvania row; column5.</p></dd><dt>Petroleum liquids ipp generation</dt><dd>591.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Pennsylvania row; column6.</p></dd><dt>Petroleum liquids prior ipp generation</dt><dd>248.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Pennsylvania row; column7.</p></dd><dt>Petroleum liquids commercial generation</dt><dd>2.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Pennsylvania row; column8.</p></dd><dt>Petroleum liquids prior commercial generation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Pennsylvania row; column9.</p></dd><dt>Petroleum liquids industrial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Pennsylvania row; column10.</p></dd><dt>Petroleum liquids prior industrial generation</dt><dd>6.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Pennsylvania row; column11.</p></dd><dt>Petroleum coke generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum coke period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke all generation</dt><dd>-0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Pennsylvania row; column1.</p></dd><dt>Petroleum coke prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Pennsylvania row; column2.</p></dd><dt>Petroleum coke published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Pennsylvania row; column3.</p></dd><dt>Petroleum coke utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Pennsylvania row; column4.</p></dd><dt>Petroleum coke prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Pennsylvania row; column5.</p></dd><dt>Petroleum coke ipp generation</dt><dd>-0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Pennsylvania row; column6.</p></dd><dt>Petroleum coke prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Pennsylvania row; column7.</p></dd><dt>Petroleum coke commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Pennsylvania row; column8.</p></dd><dt>Petroleum coke prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Pennsylvania row; column9.</p></dd><dt>Petroleum coke industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Pennsylvania row; column10.</p></dd><dt>Petroleum coke prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Pennsylvania row; column11.</p></dd><dt>Other fossil gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other fossil gas period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas all generation</dt><dd>337.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Pennsylvania row; column1.</p></dd><dt>Other fossil gas prior all generation</dt><dd>395.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Pennsylvania row; column2.</p></dd><dt>Other fossil gas published generation change</dt><dd>-14.60 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Pennsylvania row; column3.</p></dd><dt>Other fossil gas utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Pennsylvania row; column4.</p></dd><dt>Other fossil gas prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Pennsylvania row; column5.</p></dd><dt>Other fossil gas ipp generation</dt><dd>6.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Pennsylvania row; column6.</p></dd><dt>Other fossil gas prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Pennsylvania row; column7.</p></dd><dt>Other fossil gas commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Pennsylvania row; column8.</p></dd><dt>Other fossil gas prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Pennsylvania row; column9.</p></dd><dt>Other fossil gas industrial generation</dt><dd>331.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Pennsylvania row; column10.</p></dd><dt>Other fossil gas prior industrial generation</dt><dd>395.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Pennsylvania row; column11.</p></dd><dt>Nonhydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nonhydro period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro all generation</dt><dd>5013.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Pennsylvania row; column1.</p></dd><dt>Nonhydro prior all generation</dt><dd>4741.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Pennsylvania row; column2.</p></dd><dt>Nonhydro published generation change</dt><dd>5.80 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Pennsylvania row; column3.</p></dd><dt>Nonhydro utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Pennsylvania row; column4.</p></dd><dt>Nonhydro prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Pennsylvania row; column5.</p></dd><dt>Nonhydro ipp generation</dt><dd>4655.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Pennsylvania row; column6.</p></dd><dt>Nonhydro prior ipp generation</dt><dd>4357.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Pennsylvania row; column7.</p></dd><dt>Nonhydro commercial generation</dt><dd>143.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Pennsylvania row; column8.</p></dd><dt>Nonhydro prior commercial generation</dt><dd>152.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Pennsylvania row; column9.</p></dd><dt>Nonhydro industrial generation</dt><dd>215.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Pennsylvania row; column10.</p></dd><dt>Nonhydro prior industrial generation</dt><dd>231.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Pennsylvania row; column11.</p></dd></dl></article>"},{"id":"capacity-state-utility-pa-202608","html":"<article><h3>Pennsylvania utility scale net summer capacity</h3><p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.</p><dl class=\"layer-fields\"><dt>Utility capacity basis</dt><dd>Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Title,technology headers and exclusions.</p></dd><dt>Utility capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Column headers.</p></dd><dt>Utility capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Column headers.</p></dd><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Dated source period.</p></dd><dt>Utility capacity renewables</dt><dd>4226.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Pennsylvania row,column1.</p></dd><dt>Utility capacity renewables prior</dt><dd>4039.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Pennsylvania row,column2.</p></dd><dt>Utility capacity fossil</dt><dd>33777.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Pennsylvania row,column3.</p></dd><dt>Utility capacity fossil prior</dt><dd>33716.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Pennsylvania row,column4.</p></dd><dt>Utility capacity pumped storage</dt><dd>1491.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Pennsylvania row,column5.</p></dd><dt>Utility capacity pumped storage prior</dt><dd>1491.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Pennsylvania row,column6.</p></dd><dt>Utility capacity other storage</dt><dd>54.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Pennsylvania row,column7.</p></dd><dt>Utility capacity other storage prior</dt><dd>54.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Pennsylvania row,column8.</p></dd><dt>Utility capacity nuclear</dt><dd>9896.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Pennsylvania row,column9.</p></dd><dt>Utility capacity nuclear prior</dt><dd>9896.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Pennsylvania row,column10.</p></dd><dt>Utility capacity other sources</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Pennsylvania row,column11.</p></dd><dt>Utility capacity other sources prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Pennsylvania row,column12.</p></dd><dt>Utility capacity all</dt><dd>49446.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Pennsylvania row,column13.</p></dd><dt>Utility capacity all prior</dt><dd>49197.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Pennsylvania row,column14.</p></dd><dt>Renew capacity basis</dt><dd>Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Title,technology headers and exclusions.</p></dd><dt>Renew capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Column headers.</p></dd><dt>Renew capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Column headers.</p></dd><dt>Renew capacity status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Dated source period.</p></dd><dt>Renew capacity wind</dt><dd>1662.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column1.</p></dd><dt>Renew capacity wind prior</dt><dd>1552.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column2.</p></dd><dt>Renew capacity solar pv</dt><dd>1206.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column3.</p></dd><dt>Renew capacity solar pv prior</dt><dd>1125.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column4.</p></dd><dt>Renew capacity solar thermal</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column5.</p></dd><dt>Renew capacity solar thermal prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column6.</p></dd><dt>Renew capacity conventional hydro</dt><dd>929.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column7.</p></dd><dt>Renew capacity conventional hydro prior</dt><dd>929.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column8.</p></dd><dt>Renew capacity biomass</dt><dd>428.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column9.</p></dd><dt>Renew capacity biomass prior</dt><dd>431.80 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column10.</p></dd><dt>Renew capacity geothermal</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column11.</p></dd><dt>Renew capacity geothermal prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column12.</p></dd><dt>Renew capacity total utility</dt><dd>4226.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column13.</p></dd><dt>Renew capacity total utility prior</dt><dd>4039.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column14.</p></dd><dt>Renew capacity small pv estimated</dt><dd>1380.40 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column15.</p></dd><dt>Renew capacity small pv estimated prior</dt><dd>1079.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column16.</p></dd><dt>Renew capacity combined pv estimated</dt><dd>2586.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column17.</p></dd><dt>Renew capacity combined pv estimated prior</dt><dd>2204.80 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column18.</p></dd><dt>Renew capacity combined solar estimated</dt><dd>2586.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column19.</p></dd><dt>Renew capacity combined solar estimated prior</dt><dd>2204.80 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Pennsylvania row,column20.</p></dd><dt>Fossil capacity basis</dt><dd>Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Title,technology headers and exclusions.</p></dd><dt>Fossil capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Column headers.</p></dd><dt>Fossil capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Column headers.</p></dd><dt>Fossil capacity status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Dated source period.</p></dd><dt>Fossil capacity gas combined cycle</dt><dd>19145.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column1.</p></dd><dt>Fossil capacity gas combined cycle prior</dt><dd>19085.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column2.</p></dd><dt>Fossil capacity gas combustion turbine</dt><dd>1913.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column3.</p></dd><dt>Fossil capacity gas combustion turbine prior</dt><dd>1913.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column4.</p></dd><dt>Fossil capacity gas other</dt><dd>6666.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column5.</p></dd><dt>Fossil capacity gas other prior</dt><dd>6664.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column6.</p></dd><dt>Fossil capacity coal</dt><dd>4631.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column7.</p></dd><dt>Fossil capacity coal prior</dt><dd>4631.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column8.</p></dd><dt>Fossil capacity petroleum coke</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column9.</p></dd><dt>Fossil capacity petroleum coke prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column10.</p></dd><dt>Fossil capacity petroleum liquids</dt><dd>1334.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column11.</p></dd><dt>Fossil capacity petroleum liquids prior</dt><dd>1334.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column12.</p></dd><dt>Fossil capacity other fossil gas</dt><dd>85.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column13.</p></dd><dt>Fossil capacity other fossil gas prior</dt><dd>85.90 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column14.</p></dd><dt>Fossil capacity total</dt><dd>33777.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column15.</p></dd><dt>Fossil capacity total prior</dt><dd>33716.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Pennsylvania row,column16.</p></dd><dt>Reported new unit rows</dt><dd>8 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred. Locator: Calculated count of Table6.3 rows for PA.</p></dd><dt>Reported new unit capacity sum</dt><dd>186.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred. Locator: Calculated sum of rounded Table6.3 Net Summer Capacity(MW) cells for PA.</p></dd><dt>Reported new unit basis</dt><dd>EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred. Locator: Table6.3 title,columns,notes and explicit calculation scope.</p></dd><dt>Reported retired unit rows</dt><dd>2 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_04\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference. Locator: Calculated count of Table6.4 rows for PA.</p></dd><dt>Reported retired unit capacity sum</dt><dd>3.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_04\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference. Locator: Calculated sum of rounded Table6.4 Net Summer Capacity(MW) cells for PA.</p></dd><dt>Reported retired unit basis</dt><dd>EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_04\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.4 reported retired utility scale generating-unit rows for January-August2026,not physical plant or data center closures. Entity and plant IDs are EIA IDs; owner/operator generator IDs require Plant ID for identity. Month has no certified day. State counts and sums are calculated from retained rows,not published state totals or negative generation. Capacity sums use reported rounded net summer MW,not MWh or contemporaneous installed capacity. Do not subtract these from additions or August capacity to infer net system changes; other changes and timing are not reconciled. Facility total nameplate less than1MW exclusion is not a per-unit minimum. No data center,ownership,grid reliability or current operating status inference. Locator: Table6.4 title,columns,notes and explicit calculation scope.</p></dd><dt>Reported planned unit rows</dt><dd>116 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for PA across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit capacity sum</dt><dd>6540.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for PA across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit nameplate sum</dt><dd>6571.40 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for PA across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit complete nonoperating rows</dt><dd>2 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for PA across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit basis</dt><dd>EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Table6.5 title,status/date/capacity columns,notes and explicit calculation boundary.</p></dd><dt>Reported retirement plan rows</dt><dd>9 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Calculated from Table6.6 reported rows for PA across all target dates,not simultaneous removal.</p></dd><dt>Reported retirement plan capacity sum</dt><dd>3875.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Calculated from Table6.6 reported rows for PA across all target dates,not simultaneous removal.</p></dd><dt>Reported retirement plan unknown month rows</dt><dd>0 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Calculated from Table6.6 reported rows for PA across all target dates,not simultaneous removal.</p></dd><dt>Reported retirement plan basis</dt><dd>EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Table6.6 title/date/capacity columns,notes and explicit calculation scope.</p></dd></dl></article>"},{"id":"power-ieee-reliability-2025-pa","html":"<article><h3>Pennsylvania historical IEEE distribution reliability2025 and2024</h3><p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 years2025 and2024.</p></dd><dt>Ieee reliability basis</dt><dd>EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 header and definitions.</p></dd><dt>Ieee coverage 2025</dt><dd>84.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;coverage;Year 2025.</p></dd><dt>Ieee coverage 2024</dt><dd>84.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;coverage;Year 2024.</p></dd><dt>Ieee all events saidi 2025</dt><dd>413.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;all_events_saidi;Year 2025.</p></dd><dt>Ieee all events saidi 2024</dt><dd>353.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;all_events_saidi;Year 2024.</p></dd><dt>Ieee all events saifi 2025</dt><dd>1.42 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;all_events_saifi;Year 2025.</p></dd><dt>Ieee all events saifi 2024</dt><dd>1.39 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;all_events_saifi;Year 2024.</p></dd><dt>Ieee all events caidi 2025</dt><dd>290.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;all_events_caidi;Year 2025.</p></dd><dt>Ieee all events caidi 2024</dt><dd>253.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;all_events_caidi;Year 2024.</p></dd><dt>Ieee without major days saidi 2025</dt><dd>136.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;without_major_days_saidi;Year 2025.</p></dd><dt>Ieee without major days saidi 2024</dt><dd>131.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;without_major_days_saidi;Year 2024.</p></dd><dt>Ieee without major days saifi 2025</dt><dd>1.04 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;without_major_days_saifi;Year 2025.</p></dd><dt>Ieee without major days saifi 2024</dt><dd>0.99 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;without_major_days_saifi;Year 2024.</p></dd><dt>Ieee without major days caidi 2025</dt><dd>131.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;without_major_days_caidi;Year 2025.</p></dd><dt>Ieee without major days caidi 2024</dt><dd>133.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;without_major_days_caidi;Year 2024.</p></dd><dt>Ieee loss supply removed saidi 2025</dt><dd>384.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;loss_supply_removed_saidi;Year 2025.</p></dd><dt>Ieee loss supply removed saidi 2024</dt><dd>340.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;loss_supply_removed_saidi;Year 2024.</p></dd><dt>Ieee loss supply removed saifi 2025</dt><dd>1.28 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;loss_supply_removed_saifi;Year 2025.</p></dd><dt>Ieee loss supply removed saifi 2024</dt><dd>1.28 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;loss_supply_removed_saifi;Year 2024.</p></dd><dt>Ieee loss supply removed caidi 2025</dt><dd>300.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;loss_supply_removed_caidi;Year 2025.</p></dd><dt>Ieee loss supply removed caidi 2024</dt><dd>266.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Pennsylvania row;loss_supply_removed_caidi;Year 2024.</p></dd><dt>Saidi history ieee all events 2023</dt><dd>265.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_all_events;Year 2023.</p></dd><dt>Saidi history ieee all events 2022</dt><dd>207.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_all_events;Year 2022.</p></dd><dt>Saidi history ieee all events 2021</dt><dd>222.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_all_events;Year 2021.</p></dd><dt>Saidi history ieee all events 2020</dt><dd>355.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_all_events;Year 2020.</p></dd><dt>Saidi history ieee all events 2019</dt><dd>252.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_all_events;Year 2019.</p></dd><dt>Saidi history ieee all events 2018</dt><dd>564.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_all_events;Year 2018.</p></dd><dt>Saidi history ieee all events 2017</dt><dd>184.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_all_events;Year 2017.</p></dd><dt>Saidi history ieee all events 2016</dt><dd>132.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_all_events;Year 2016.</p></dd><dt>Saidi history ieee all events 2015</dt><dd>166.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_all_events;Year 2015.</p></dd><dt>Saidi history ieee without major days 2023</dt><dd>125.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_without_major_days;Year 2023.</p></dd><dt>Saidi history ieee without major days 2022</dt><dd>125.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_without_major_days;Year 2022.</p></dd><dt>Saidi history ieee without major days 2021</dt><dd>125.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_without_major_days;Year 2021.</p></dd><dt>Saidi history ieee without major days 2020</dt><dd>107.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_without_major_days;Year 2020.</p></dd><dt>Saidi history ieee without major days 2019</dt><dd>130.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_without_major_days;Year 2019.</p></dd><dt>Saidi history ieee without major days 2018</dt><dd>122.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_without_major_days;Year 2018.</p></dd><dt>Saidi history ieee without major days 2017</dt><dd>108.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_without_major_days;Year 2017.</p></dd><dt>Saidi history ieee without major days 2016</dt><dd>105.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_without_major_days;Year 2016.</p></dd><dt>Saidi history ieee without major days 2015</dt><dd>102.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_without_major_days;Year 2015.</p></dd><dt>Saidi history ieee loss supply removed 2023</dt><dd>248.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Saidi history ieee loss supply removed 2022</dt><dd>195.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Saidi history ieee loss supply removed 2021</dt><dd>209.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Saidi history ieee loss supply removed 2020</dt><dd>343.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Saidi history ieee loss supply removed 2019</dt><dd>240.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Saidi history ieee loss supply removed 2018</dt><dd>551.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Saidi history ieee loss supply removed 2017</dt><dd>169.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Saidi history ieee loss supply removed 2016</dt><dd>122.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Saidi history ieee loss supply removed 2015</dt><dd>157.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Saidi history basis</dt><dd>EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution. Locator: Table11.4 header and method notes;2015-2023 supplemental history.</p></dd><dt>Saifi history ieee all events 2023</dt><dd>1.14 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_all_events;Year 2023.</p></dd><dt>Saifi history ieee all events 2022</dt><dd>1.16 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_all_events;Year 2022.</p></dd><dt>Saifi history ieee all events 2021</dt><dd>1.23 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_all_events;Year 2021.</p></dd><dt>Saifi history ieee all events 2020</dt><dd>1.34 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_all_events;Year 2020.</p></dd><dt>Saifi history ieee all events 2019</dt><dd>1.31 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_all_events;Year 2019.</p></dd><dt>Saifi history ieee all events 2018</dt><dd>1.49 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_all_events;Year 2018.</p></dd><dt>Saifi history ieee all events 2017</dt><dd>1.13 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_all_events;Year 2017.</p></dd><dt>Saifi history ieee all events 2016</dt><dd>1.09 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_all_events;Year 2016.</p></dd><dt>Saifi history ieee all events 2015</dt><dd>1.02 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_all_events;Year 2015.</p></dd><dt>Saifi history ieee without major days 2023</dt><dd>0.91 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_without_major_days;Year 2023.</p></dd><dt>Saifi history ieee without major days 2022</dt><dd>0.97 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_without_major_days;Year 2022.</p></dd><dt>Saifi history ieee without major days 2021</dt><dd>0.97 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_without_major_days;Year 2021.</p></dd><dt>Saifi history ieee without major days 2020</dt><dd>0.94 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_without_major_days;Year 2020.</p></dd><dt>Saifi history ieee without major days 2019</dt><dd>1.03 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_without_major_days;Year 2019.</p></dd><dt>Saifi history ieee without major days 2018</dt><dd>1.04 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_without_major_days;Year 2018.</p></dd><dt>Saifi history ieee without major days 2017</dt><dd>0.94 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_without_major_days;Year 2017.</p></dd><dt>Saifi history ieee without major days 2016</dt><dd>0.97 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_without_major_days;Year 2016.</p></dd><dt>Saifi history ieee without major days 2015</dt><dd>0.91 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_without_major_days;Year 2015.</p></dd><dt>Saifi history ieee loss supply removed 2023</dt><dd>1.02 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Saifi history ieee loss supply removed 2022</dt><dd>1.06 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Saifi history ieee loss supply removed 2021</dt><dd>1.11 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Saifi history ieee loss supply removed 2020</dt><dd>1.22 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Saifi history ieee loss supply removed 2019</dt><dd>1.19 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Saifi history ieee loss supply removed 2018</dt><dd>1.35 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Saifi history ieee loss supply removed 2017</dt><dd>1.00 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Saifi history ieee loss supply removed 2016</dt><dd>1.01 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Saifi history ieee loss supply removed 2015</dt><dd>0.91 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Saifi history basis</dt><dd>EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation. Locator: Table11.5 header and method notes;2015-2023 supplemental history.</p></dd><dt>Caidi history ieee all events 2023</dt><dd>232.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_all_events;Year 2023.</p></dd><dt>Caidi history ieee all events 2022</dt><dd>178.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_all_events;Year 2022.</p></dd><dt>Caidi history ieee all events 2021</dt><dd>181.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_all_events;Year 2021.</p></dd><dt>Caidi history ieee all events 2020</dt><dd>266.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_all_events;Year 2020.</p></dd><dt>Caidi history ieee all events 2019</dt><dd>192.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_all_events;Year 2019.</p></dd><dt>Caidi history ieee all events 2018</dt><dd>378.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_all_events;Year 2018.</p></dd><dt>Caidi history ieee all events 2017</dt><dd>163.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_all_events;Year 2017.</p></dd><dt>Caidi history ieee all events 2016</dt><dd>121.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_all_events;Year 2016.</p></dd><dt>Caidi history ieee all events 2015</dt><dd>162.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_all_events;Year 2015.</p></dd><dt>Caidi history ieee without major days 2023</dt><dd>137.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_without_major_days;Year 2023.</p></dd><dt>Caidi history ieee without major days 2022</dt><dd>128.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_without_major_days;Year 2022.</p></dd><dt>Caidi history ieee without major days 2021</dt><dd>129.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_without_major_days;Year 2021.</p></dd><dt>Caidi history ieee without major days 2020</dt><dd>114.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_without_major_days;Year 2020.</p></dd><dt>Caidi history ieee without major days 2019</dt><dd>126.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_without_major_days;Year 2019.</p></dd><dt>Caidi history ieee without major days 2018</dt><dd>117.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_without_major_days;Year 2018.</p></dd><dt>Caidi history ieee without major days 2017</dt><dd>115.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_without_major_days;Year 2017.</p></dd><dt>Caidi history ieee without major days 2016</dt><dd>107.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_without_major_days;Year 2016.</p></dd><dt>Caidi history ieee without major days 2015</dt><dd>112.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_without_major_days;Year 2015.</p></dd><dt>Caidi history ieee loss supply removed 2023</dt><dd>242.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Caidi history ieee loss supply removed 2022</dt><dd>184.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Caidi history ieee loss supply removed 2021</dt><dd>188.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Caidi history ieee loss supply removed 2020</dt><dd>282.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Caidi history ieee loss supply removed 2019</dt><dd>202.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Caidi history ieee loss supply removed 2018</dt><dd>408.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Caidi history ieee loss supply removed 2017</dt><dd>169.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Caidi history ieee loss supply removed 2016</dt><dd>120.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Caidi history ieee loss supply removed 2015</dt><dd>173.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Caidi history basis</dt><dd>EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution. Locator: Table11.6 header and method notes;2015-2023 supplemental history.</p></dd></dl></article>"},{"id":"power-any-reliability-2025-pa","html":"<article><h3>Pennsylvania historical any-method distribution reliability2025 and2024</h3><p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 years2025 and2024.</p></dd><dt>Any reliability basis</dt><dd>EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 header and definitions.</p></dd><dt>Any coverage 2025</dt><dd>94.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Pennsylvania row;coverage;Year 2025.</p></dd><dt>Any coverage 2024</dt><dd>94.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Pennsylvania row;coverage;Year 2024.</p></dd><dt>Any all events saidi 2025</dt><dd>458.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Pennsylvania row;all_events_saidi;Year 2025.</p></dd><dt>Any all events saidi 2024</dt><dd>336.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Pennsylvania row;all_events_saidi;Year 2024.</p></dd><dt>Any all events saifi 2025</dt><dd>1.41 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Pennsylvania row;all_events_saifi;Year 2025.</p></dd><dt>Any all events saifi 2024</dt><dd>1.35 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Pennsylvania row;all_events_saifi;Year 2024.</p></dd><dt>Any all events caidi 2025</dt><dd>325.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Pennsylvania row;all_events_caidi;Year 2025.</p></dd><dt>Any all events caidi 2024</dt><dd>248.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Pennsylvania row;all_events_caidi;Year 2024.</p></dd><dt>Any without major events saidi 2025</dt><dd>132.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Pennsylvania row;without_major_events_saidi;Year 2025.</p></dd><dt>Any without major events saidi 2024</dt><dd>131.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Pennsylvania row;without_major_events_saidi;Year 2024.</p></dd><dt>Any without major events saifi 2025</dt><dd>1.02 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Pennsylvania row;without_major_events_saifi;Year 2025.</p></dd><dt>Any without major events saifi 2024</dt><dd>0.97 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Pennsylvania row;without_major_events_saifi;Year 2024.</p></dd><dt>Any without major events caidi 2025</dt><dd>130.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Pennsylvania row;without_major_events_caidi;Year 2025.</p></dd><dt>Any without major events caidi 2024</dt><dd>134.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Pennsylvania row;without_major_events_caidi;Year 2024.</p></dd><dt>Saidi history any all events 2023</dt><dd>252.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_all_events;Year 2023.</p></dd><dt>Saidi history any all events 2022</dt><dd>200.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_all_events;Year 2022.</p></dd><dt>Saidi history any all events 2021</dt><dd>217.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_all_events;Year 2021.</p></dd><dt>Saidi history any all events 2020</dt><dd>334.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_all_events;Year 2020.</p></dd><dt>Saidi history any all events 2019</dt><dd>249.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_all_events;Year 2019.</p></dd><dt>Saidi history any all events 2018</dt><dd>518.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_all_events;Year 2018.</p></dd><dt>Saidi history any all events 2017</dt><dd>176.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_all_events;Year 2017.</p></dd><dt>Saidi history any all events 2016</dt><dd>126.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_all_events;Year 2016.</p></dd><dt>Saidi history any all events 2015</dt><dd>156.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_all_events;Year 2015.</p></dd><dt>Saidi history any without major events 2023</dt><dd>119.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_without_major_events;Year 2023.</p></dd><dt>Saidi history any without major events 2022</dt><dd>126.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_without_major_events;Year 2022.</p></dd><dt>Saidi history any without major events 2021</dt><dd>130.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_without_major_events;Year 2021.</p></dd><dt>Saidi history any without major events 2020</dt><dd>107.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_without_major_events;Year 2020.</p></dd><dt>Saidi history any without major events 2019</dt><dd>127.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_without_major_events;Year 2019.</p></dd><dt>Saidi history any without major events 2018</dt><dd>119.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_without_major_events;Year 2018.</p></dd><dt>Saidi history any without major events 2017</dt><dd>108.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_without_major_events;Year 2017.</p></dd><dt>Saidi history any without major events 2016</dt><dd>101.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_without_major_events;Year 2016.</p></dd><dt>Saidi history any without major events 2015</dt><dd>98.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Pennsylvania row;any_without_major_events;Year 2015.</p></dd><dt>Saidi history basis</dt><dd>EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution. Locator: Table11.4 header and method notes;2015-2023 supplemental history.</p></dd><dt>Saifi history any all events 2023</dt><dd>1.11 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_all_events;Year 2023.</p></dd><dt>Saifi history any all events 2022</dt><dd>1.14 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_all_events;Year 2022.</p></dd><dt>Saifi history any all events 2021</dt><dd>1.20 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_all_events;Year 2021.</p></dd><dt>Saifi history any all events 2020</dt><dd>1.30 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_all_events;Year 2020.</p></dd><dt>Saifi history any all events 2019</dt><dd>1.31 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_all_events;Year 2019.</p></dd><dt>Saifi history any all events 2018</dt><dd>1.43 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_all_events;Year 2018.</p></dd><dt>Saifi history any all events 2017</dt><dd>1.11 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_all_events;Year 2017.</p></dd><dt>Saifi history any all events 2016</dt><dd>1.07 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_all_events;Year 2016.</p></dd><dt>Saifi history any all events 2015</dt><dd>0.99 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_all_events;Year 2015.</p></dd><dt>Saifi history any without major events 2023</dt><dd>0.88 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_without_major_events;Year 2023.</p></dd><dt>Saifi history any without major events 2022</dt><dd>0.97 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_without_major_events;Year 2022.</p></dd><dt>Saifi history any without major events 2021</dt><dd>0.96 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_without_major_events;Year 2021.</p></dd><dt>Saifi history any without major events 2020</dt><dd>0.93 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_without_major_events;Year 2020.</p></dd><dt>Saifi history any without major events 2019</dt><dd>1.02 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_without_major_events;Year 2019.</p></dd><dt>Saifi history any without major events 2018</dt><dd>1.02 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_without_major_events;Year 2018.</p></dd><dt>Saifi history any without major events 2017</dt><dd>0.94 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_without_major_events;Year 2017.</p></dd><dt>Saifi history any without major events 2016</dt><dd>0.96 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_without_major_events;Year 2016.</p></dd><dt>Saifi history any without major events 2015</dt><dd>0.89 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Pennsylvania row;any_without_major_events;Year 2015.</p></dd><dt>Saifi history basis</dt><dd>EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation. Locator: Table11.5 header and method notes;2015-2023 supplemental history.</p></dd><dt>Caidi history any all events 2023</dt><dd>228.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_all_events;Year 2023.</p></dd><dt>Caidi history any all events 2022</dt><dd>175.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_all_events;Year 2022.</p></dd><dt>Caidi history any all events 2021</dt><dd>181.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_all_events;Year 2021.</p></dd><dt>Caidi history any all events 2020</dt><dd>257.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_all_events;Year 2020.</p></dd><dt>Caidi history any all events 2019</dt><dd>190.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_all_events;Year 2019.</p></dd><dt>Caidi history any all events 2018</dt><dd>362.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_all_events;Year 2018.</p></dd><dt>Caidi history any all events 2017</dt><dd>159.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_all_events;Year 2017.</p></dd><dt>Caidi history any all events 2016</dt><dd>118.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_all_events;Year 2016.</p></dd><dt>Caidi history any all events 2015</dt><dd>157.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_all_events;Year 2015.</p></dd><dt>Caidi history any without major events 2023</dt><dd>135.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_without_major_events;Year 2023.</p></dd><dt>Caidi history any without major events 2022</dt><dd>130.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_without_major_events;Year 2022.</p></dd><dt>Caidi history any without major events 2021</dt><dd>135.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_without_major_events;Year 2021.</p></dd><dt>Caidi history any without major events 2020</dt><dd>116.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_without_major_events;Year 2020.</p></dd><dt>Caidi history any without major events 2019</dt><dd>124.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_without_major_events;Year 2019.</p></dd><dt>Caidi history any without major events 2018</dt><dd>116.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_without_major_events;Year 2018.</p></dd><dt>Caidi history any without major events 2017</dt><dd>115.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_without_major_events;Year 2017.</p></dd><dt>Caidi history any without major events 2016</dt><dd>105.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_without_major_events;Year 2016.</p></dd><dt>Caidi history any without major events 2015</dt><dd>110.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Pennsylvania row;any_without_major_events;Year 2015.</p></dd><dt>Caidi history basis</dt><dd>EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution. Locator: Table11.6 header and method notes;2015-2023 supplemental history.</p></dd></dl></article>"}]}