{"schema_version":1,"layer":"power","reviewed_on":"2026-10-28","coverage_note":"Selected utility and state proceedings. Other utilities and states are not yet reviewed. One utility tariff does not establish statewide coverage. Current and earlier captured electricity comparisons retain separate periods and sources.","items":[{"id":"grid-va","kind":"grid_context","subject":"PJM regional forecast adjustment process","state_codes":["de","dc","il","in","ky","md","mi","nj","nc","oh","pa","tn","va","wv"],"scope":"PJM regional context. A state assignment is not a quantitative allocation to Virginia.","fields":{"meaning":{"value":"Forecast adjustments, no load interconnection queue","source_ids":["pjm-process"],"scope":"Regional context for the PJM footprint, not a Virginia only total.","locator":"Named request or forecast discussion"},"observation_date":{"value":"2026-09-29","source_ids":["pjm-process"],"scope":"PJM publication date.","locator":"Named request or forecast discussion"},"requested_capacity":{"value":null,"source_ids":["pjm-process"],"scope":"No comparable regional queue total established in this review.","locator":"Named request or forecast discussion","unknown_reason":"No comparable regional queue total established in this review.","unit":"GW","measurement_role":"requested_capacity"}}},{"id":"price-tn","kind":"residential_price","subject":"Tennessee","state_codes":["tn"],"scope":"A two point comparison, not a complete time series. State average revenue per unit sold is not a household bill. No causal attribution to data centers.","fields":{"period":{"value":"July 2026","source_ids":["eia-prices"],"scope":"Residential comparison month.","locator":"Table heading"},"prior_period":{"value":"July 2025","source_ids":["eia-prices"],"scope":"Same month in the preceding year.","locator":"Table heading"},"price":{"value":13.71,"source_ids":["eia-prices"],"scope":"Preliminary residential state average, cents per kWh.","locator":"Residential July 2026, Tennessee","unit":"cents per kWh","measurement_role":"published_price"},"prior_price":{"value":13.21,"source_ids":["eia-prices"],"scope":"Residential state average for the comparison month.","locator":"Residential July 2025, Tennessee","unit":"cents per kWh","measurement_role":"published_price"}}},{"id":"price-tn-202608","kind":"residential_price","subject":"Tennessee","state_codes":["tn"],"scope":"Captured August residential comparison. The earlier July comparison remains in the source history. State average revenue per unit sold is not a household bill or evidence of a data center effect.","fields":{"period":{"value":"August 2026","source_ids":["eia-residential-xlsx-20261023"],"scope":"Residential comparison month.","locator":"Table_5_06_A!B4:C4"},"prior_period":{"value":"August 2025","source_ids":["eia-residential-xlsx-20261023"],"scope":"Same month in the preceding year.","locator":"Table_5_06_A!B4:C4"},"price":{"value":13.42,"source_ids":["eia-residential-xlsx-20261023"],"scope":"Preliminary August2026 residential state average, cents per kWh.","locator":"Table_5_06_A!B44:C44","unit":"cents per kWh","measurement_role":"published_price"},"prior_price":{"value":13.09,"source_ids":["eia-residential-xlsx-20261023"],"scope":"Final August2025 residential state average, cents per kWh.","locator":"Table_5_06_A!B44:C44","unit":"cents per kWh","measurement_role":"published_price"},"source_context":{"value":"The August table and public spreadsheet agree. The surrounding report header still identifies July and its older release date. The exact publication day of these August values is not established here.","source_ids":["eia-price-check-20261023-1645","eia-residential-xlsx-20261023"],"scope":"The scheduled next release day is not treated as proof of actual publication. This review uses the periods stated in the two data tables and preserves the earlier July capture.","locator":"HTML table heading and report header; spreadsheet rows1 through4 and67"}}},{"id":"grid-pjm-manual19-procedure-20260630","kind":"grid_context","subject":"PJM adopted forecast adjustment review procedure","state_codes":["de","dc","il","in","ky","md","mi","nj","nc","oh","pa","tn","va","wv"],"scope":"Regional procedure shown in the PJM state panels for context. Manual approval, utility submissions, final forecasts and actual load remain distinct.","fields":{"status":{"value":"approved","source_ids":["pjm-manual19-current-20261023"],"scope":"Approval concerns this manual revision only.","locator":"Printed page 3"},"process_basis":{"value":"Forecast review procedure","source_ids":["pjm-manual19-current-20261023"],"scope":"Regional process documentation, excluded from utility tariff status.","locator":"Attachment B printed pages 26 through 32"},"revision":{"value":"Revision 39","source_ids":["pjm-manual19-current-20261023"],"scope":"Captured current clean version, separate from the earlier change presentation.","locator":"Cover and printed page 4"},"approved_on":{"value":"2026-06-29","source_ids":["pjm-manual19-current-20261023"],"scope":"Manual approval day.","locator":"Printed page 3"},"effective_on":{"value":"2026-06-30","source_ids":["pjm-manual19-current-20261023"],"scope":"Manual effect, separate from approval and original posting.","locator":"Cover and printed page 3"},"threshold_wording":{"value":"Solicitation covers changes of at least 50 MW, positive or negative. Verification instead says category totals greater than 50 MW.","source_ids":["pjm-manual19-current-20261023"],"scope":"Both threshold descriptions retained; no silent resolution for exactly 50 MW.","locator":"Printed pages 26 and 29"},"regulator_review":{"value":"Submitters must offer each relevant state regulator review before submission. Participation is voluntary, and submissions need not follow regulator feedback if both perspectives are provided.","source_ids":["pjm-manual19-current-20261023"],"scope":"Review opportunity and feedback are distinct from approval of forecasts or connections.","locator":"Printed page 28"},"firm_classification":{"value":"Firm status requires a qualifying service, construction or supply commitment plus financial support. Nonfirm portions may enter forecast periods outside the capacity auction horizon.","source_ids":["pjm-manual19-current-20261023"],"scope":"Forecast classification only. Firm portions can still be reduced for growth constraints.","locator":"Printed pages 28 through 30"},"duplicate_requests":{"value":"Customers must be asked about potentially duplicated requests lacking service or construction commitments. Silence counts toward duplication. Missing site, location and MW details can remove such requests; discounting can reflect project milestones.","source_ids":["pjm-manual19-current-20261023"],"scope":"No actual duplicate count or adjustment result is established.","locator":"Printed pages 29 and 30"},"final_determination":{"value":"PJM reviews assumptions, regulator feedback and independent forecast uncertainty before determining the final adjustment. A submitter can retain its preliminary amount if the calculated final is higher.","source_ids":["pjm-manual19-current-20261023"],"scope":"A submitted number or firm classification does not guarantee unchanged final inclusion.","locator":"Printed pages 30 and 31"},"timing":{"value":"The manual schedules final adjustments for November or December and independent forecast review for October or November.","source_ids":["pjm-manual19-current-20261023"],"scope":"General schedule, not proof of a completed presentation or final 2027 forecast.","locator":"Printed pages 26 and 30"},"utility_tariff":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No individual utility tariff approval is established by this manual.","locator":"Procedure review boundary","unknown_reason":"No individual utility tariff approval is established by this manual."},"actual_load":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No measured actual load quantity is established by this procedure.","locator":"Procedure review boundary","unknown_reason":"No measured actual load quantity is established by this procedure."},"approved_capacity":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No connection capacity approval is established.","locator":"Procedure review boundary","unknown_reason":"No connection capacity approval is established."},"individual_approvals":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No individual customer decision is established.","locator":"Procedure review boundary","unknown_reason":"No individual customer decision is established."},"requested_capacity":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No comparable regional queue total is established.","locator":"Procedure review boundary","unknown_reason":"No comparable regional queue total is established."},"pjm_final_forecast":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No final amount for the current submitted forecast is established.","locator":"Procedure review boundary","unknown_reason":"No final amount for the current submitted forecast is established."},"atlas_record_id":{"value":null,"source_ids":["pjm-manual19-current-20261023"],"scope":"No facility identity join is made.","locator":"Procedure review boundary","unknown_reason":"No facility identity join is made."}}},{"id":"tariff-tn-tva-dc-framework-20260820","kind":"tariff","state_codes":["tn"],"subject":"TVA approved data service classes and capacity commitment framework","scope":"Regional TVA board action shown as Tennessee context with separate billing, cohort and transition clocks. Individual and current outcomes remain unknown.","fields":{"tva_stamped_rate_basis":{"value":"Stamped board approval with separate implementation clocks","source_ids":["tva-rate-resolution-20260820-20261024","tva-official-release-syndicated-20260820-20261024"],"scope":"Regional TVA framework shown as Tennessee context. Not a Tennessee statewide commission tariff or a claim of complete coverage of other TVA states.","locator":"Resolution pages 1 and 2, board approval stamp; memo attachments"},"status":{"value":"approved","source_ids":["tva-rate-resolution-20260820-20261024","tva-official-release-syndicated-20260820-20261024"],"scope":"Dated board approval. Detailed later schedules, delegation decisions and individual service outcomes remain unknown.","locator":"Page 2 approval stamp; TVA issued announcement"},"utility":{"value":"Tennessee Valley Authority","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Wholesale, resale and direct service paths remain distinct. One regional supplier, not every Tennessee utility.","locator":"Resolution page 1; Attachment I page 11"},"approved_on":{"value":"2026-08-20","source_ids":["tva-rate-resolution-20260820-20261024","tva-official-release-syndicated-20260820-20261024"],"scope":"Actual board stamp and agency announcement, not the earlier internal memorandum signatures.","locator":"Resolution page 2; agency release"},"memorandum_on":{"value":"2026-08-10","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Memo and internal review signatures only, not board adoption.","locator":"PDF pages 3 and 6"},"original_notice_on":{"value":"2026-02-18","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Memo reports the distributor notice date; the original notice exhibit itself was not reviewed.","locator":"Memo page 1, physical page 3"},"wholesale_meter_readings_begin_on":{"value":"2026-10-02","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Wholesale bills based on scheduled meter readings on and after this day, not a universal customer service start.","locator":"Resolution page 1, operative paragraph"},"resale_revenue_month":{"value":"October 2026","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Distributor resale revenue month, distinct from wholesale reading day and future phase in.","locator":"Resolution page 1, operative paragraph"},"classification":{"value":"Specified 2022 NAICS 518/519 activities, excluding 519210, plus 522320/541214 or computational equipment in TVA judgment.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Major electricity use at the delivery point controls; no individual classification is inferred.","locator":"Attachment I physical page 8; Attachment II page 12"},"threshold":{"value":"Schedule DC is mandatory above 5,000 kW of the higher onpeak or offpeak contract demand, with the stated activity criteria.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Contract demand classification, not measured load or an automatic rule for all buildings called data centers.","locator":"Attachment II page 12"},"optional_dca":{"value":"DCA is an optional distributor offering above 1,000 kW and no more than 5,000 kW, with the same activity criteria.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Availability is not mandatory service at exactly 1,000 kW or proof the distributor offers this option.","locator":"Attachment II page 12"},"capacity_charge":{"value":"Initial fiscal 2027 cohort: 1.521 million dollars per MW for up to 2,000 MW. Payments are nonrefundable and additional to rate charges.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Cohort specific charge, not a universal price for future cohorts, monthly energy rate, refundable collateral or actual payment.","locator":"Attachment II page 12; Attachment I pages 9 and 10"},"new_load_exclusion":{"value":"For new load requests the charge applies only above the first 5 MW of contract demand.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Charging exclusion, not the whole tariff threshold or an automatic waiver for every expansion.","locator":"Attachment I page 11"},"existing_load_boundary":{"value":"Existing load means board approved arrangements before June 1, 2026, or effective contracts before October 1, 2026 with required TVA coordination.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"No charge on qualifying Existing load. Contract timing alone without required coordination does not prove an exemption.","locator":"Attachment I page 10"},"existing_expansion_waiver":{"value":"Existing loads may request one location specific waiver for expansion of 5 MW or less; once approved and used, no future waiver at that location.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Request is not approval and the waiver is not repeatable or automatically available to every expansion.","locator":"Resolution page 2; Attachment I page 11"},"inflight_entry":{"value":"For load requests of 100 MW or less, qualifying prior engagement by June 1, 2026 includes the specified paid study, completed study without upgrades, or executed deposit routes.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"All stated availability and documentary conditions apply. No individual inflight status or automatic exemption from interruption requirements established.","locator":"Attachment II page 13"},"inflight_retention":{"value":"Status can be lost after failure to execute a required deposit agreement within six months of study results, or failure to use 50 percent of contract demand by the later of two years after contract execution or one year after required transmission upgrades.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Demand use condition for keeping inflight status, not a universal minimum energy purchase or a contract duration. Status cannot be assigned or transferred.","locator":"Attachment II pages 13 and 14"},"delegated_terms":{"value":"TVA officers can determine payment options, interruption requirements, Firm Generation Date and consistent inflight criteria modifications.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"No fixed current payment period, interruption hours or individual firm date inferred from the memo.","locator":"Resolution pages 1 and 2; Attachment II pages 13 and 14"},"rate_phase":{"value":"Fiscal 2027 corresponding manufacturing rate levels precede two approximately 8.25 percent increments of fiscal 2027 nonfuel/nonhydro rates in fiscal 2028 and 2029.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Expected overall bill effect near 10 percent uses then current fuel assumptions, not an observed or guaranteed 10 percent increase for every customer today.","locator":"Attachment I page 8"},"manufacturing_transition":{"value":"The memo allows MSA or equivalent service until October 1, 2027 and separately removes data center eligibility from manufacturing schedules.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Specific MSA transition, not a blanket right to stay on all factory schedules until that day.","locator":"Attachment II page 14"},"manufacturing_credit_dates":{"value":"General Manufacturing Credit eligibility ends October 1, 2027 for the specified data center classes; customers moving to DCA lose it beginning October 1, 2026.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Two different program clocks, not the rate phase in or an actual customer credit change.","locator":"Attachment III page 17"},"demand_alignment":{"value":"From October 1, 2027, annual review compares the preceding 36 month highest billing demand with 75 percent of contract demand and can reset contract demand using division by 0.75 after at least 60 days notice.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Contract demand alignment, not a 75 percent energy purchase floor. Applies with the named schedule and customer conditions.","locator":"Attachment II pages 14 and 15"},"alignment_exceptions":{"value":"Single delivery point service younger than ten years and specified national defense customers are excluded; a conditional one year relief request has a 30 day notice response window.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"The ten year boundary is not a minimum contract term. Relief requires stated prior use and recovery plan criteria.","locator":"Attachment II page 15"},"separate_board_approval":{"value":"Board consultation and approval applies where ultimate commitments could exceed 100 MW over any five year period, including a shared parent within one distributor territory.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Separate power commitment approval rule, not the 5 MW rate boundary or proof any individual project was approved.","locator":"Attachment III pages 17 and 18"},"excluded_stabilization_context":{"value":"An up to eleven year stabilization option is limited to the specified manufacturing schedules.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"This does not establish the term of a Schedule DC data center agreement.","locator":"Attachment III page 18"},"prospective_context":{"value":"The August memo describes 27.5 GW of expressions of interest and approximately 5,000 MW in the connection process.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Requests and prospects, not actual load or installed capacity. Measures are not added, and most prospects are not expected to materialize. Regional totals are not allocated to Tennessee.","locator":"Attachment I page 7"},"items_still_discussed":{"value":"A seasonal onpeak hours shift and marginal pricing option remain under discussion, with later board approval to be sought.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not adopted changes in this resolution and no later outcome established.","locator":"Attachment III page 19"},"review_boundary":{"value":"All 19 public resolution, memorandum and attachment pages were read and viewed.","source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Detailed schedule exhibits listed for a separate board folder, later guidance and customer agreements were not accessed. The page 1 proposed heading is retained, while page 2 visibly stamps approval.","locator":"Complete PDF and exhibit lists on pages 11 and 16"},"stated_purpose":{"value":"TVA describes its rate structure changes as protecting other customers against data center cost shifts.","source_ids":["tva-official-release-syndicated-20260820-20261024"],"scope":"Agency stated purpose, not a measured residential saving or a guarantee of unchanged bills.","locator":"TVA issued announcement"},"effective_on":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"contract_length":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"minimum_bill":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"collateral":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"exit_fees":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"current_governing_tariff":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"current_rate_schedule":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"current_capacity_charge":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"actual_payment_terms":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"individual_project_approval":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"individual_contract":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"actual_load":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"actual_energy":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"actual_service_on":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"actual_bill":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"actual_capacity_payment":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"actual_waiver":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"actual_inflight_status":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"actual_interruption_hours":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"actual_firm_generation_on":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"actual_ratepayer_savings":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."},"atlas_record_id":{"value":null,"source_ids":["tva-rate-resolution-20260820-20261024"],"scope":"Not established for a specific customer or complete current governing tariff.","locator":"Stamped resolution and bounded memorandum review","unknown_reason":"Requires category specific implementation records, detailed schedules, an exact campus agreement or observed evidence. No outcome inferred from the adopted framework."}}},{"id":"sector-price-tn-202608","kind":"sector_price_context","subject":"Tennessee commercial and industrial electricity prices","state_codes":["tn"],"scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","fields":{"period":{"value":"August 2026","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A header","scope":"Current preliminary comparison month."},"prior_period":{"value":"August 2025","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A header","scope":"Final same month previous year."},"sector_price_boundary":{"value":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table5.6.A notes, including row67","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class."},"commercial_price":{"value":13.13,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!D44; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"prior_commercial_price":{"value":12.86,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!E44; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"industrial_price":{"value":6.92,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!F44; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"prior_industrial_price":{"value":6.85,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"locator":"Table_5_06_A!G44; matching HTML state row","scope":"State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_price":{"value":11.93,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Tennessee All Sectors August comparison","unit":"cents per kWh","measurement_role":"published_price"},"prior_all_sector_price":{"value":11.7,"source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Tennessee All Sectors August comparison","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_boundary":{"value":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","source_ids":["eia-sector-xlsx-20261026","eia-sector-html-20261026"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A sector headers and notes"},"ytd_commercial_price":{"value":13.57,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!D44; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_commercial_price":{"value":12.99,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!E44; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_industrial_price":{"value":6.84,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!F44; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_industrial_price":{"value":6.75,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!G44; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_all_sector_price":{"value":12.08,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!J44; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"prior_ytd_all_sector_price":{"value":11.67,"source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table_5_06_B!K44; matching HTML state row","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","unit":"cents per kWh","measurement_role":"published_price"},"ytd_period":{"value":"January through August 2026","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"prior_ytd_period":{"value":"January through August 2025","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"ytd_price_boundary":{"value":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","source_ids":["eia-ytd-xlsx-20261026","eia-ytd-html-20261026"],"locator":"Table5.6.B header and notes","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible."},"retail_sales_basis":{"value":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Title,end-use headers and source notes"},"retail_sales_period":{"value":"August 2026","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"retail_sales_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"retail_sales_residential":{"value":4840.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Tennessee row,column1","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"4,840"},"retail_sales_residential_prior":{"value":4863.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Tennessee row,column2","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"4,863"},"retail_sales_commercial":{"value":3716.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Tennessee row,column3","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"3,716"},"retail_sales_commercial_prior":{"value":3687.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Tennessee row,column4","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"3,687"},"retail_sales_industrial":{"value":2331.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Tennessee row,column5","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"2,331"},"retail_sales_industrial_prior":{"value":2279.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Tennessee row,column6","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"2,279"},"retail_sales_transportation":{"value":0.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Tennessee row,column7","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"0"},"retail_sales_transportation_prior":{"value":0.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Tennessee row,column8","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"0"},"retail_sales_all":{"value":10886.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Tennessee row,column9","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"10,886"},"retail_sales_all_prior":{"value":10829.0,"source_ids":["eia-state-retail-sales-month-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.A Tennessee row,column10","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"10,829"},"ytd_retail_sales_basis":{"value":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Title,end-use headers and source notes"},"ytd_retail_sales_period":{"value":"January through August 2026","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"ytd_retail_sales_prior_period":{"value":"January through August 2025","source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Column headers"},"ytd_retail_sales_residential":{"value":31444.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Tennessee row,column1","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"31,444"},"ytd_retail_sales_residential_prior":{"value":31670.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Tennessee row,column2","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"31,670"},"ytd_retail_sales_commercial":{"value":24916.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Tennessee row,column3","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"24,916"},"ytd_retail_sales_commercial_prior":{"value":24638.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Tennessee row,column4","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"24,638"},"ytd_retail_sales_industrial":{"value":17445.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Tennessee row,column5","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"17,445"},"ytd_retail_sales_industrial_prior":{"value":16725.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Tennessee row,column6","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"16,725"},"ytd_retail_sales_transportation":{"value":0.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Tennessee row,column7","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"0"},"ytd_retail_sales_transportation_prior":{"value":0.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Tennessee row,column8","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"0"},"ytd_retail_sales_all":{"value":73804.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Tennessee row,column9","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"73,804"},"ytd_retail_sales_all_prior":{"value":73034.0,"source_ids":["eia-state-retail-sales-ytd-aug2026"],"scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","locator":"Table5.4.B Tennessee row,column10","unit":"thousand MWh","measurement_role":"reported_retail_electricity_sales","source_token":"73,034"},"retail_revenue_basis":{"value":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Title,end-use headers and source notes"},"retail_revenue_period":{"value":"August 2026","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"retail_revenue_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"retail_revenue_residential":{"value":649.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Tennessee row,column1","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"649"},"retail_revenue_residential_prior":{"value":637.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Tennessee row,column2","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"637"},"retail_revenue_commercial":{"value":488.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Tennessee row,column3","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"488"},"retail_revenue_commercial_prior":{"value":474.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Tennessee row,column4","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"474"},"retail_revenue_industrial":{"value":161.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Tennessee row,column5","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"161"},"retail_revenue_industrial_prior":{"value":156.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Tennessee row,column6","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"156"},"retail_revenue_transportation":{"value":0.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Tennessee row,column7","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"0"},"retail_revenue_transportation_prior":{"value":0.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Tennessee row,column8","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"0"},"retail_revenue_all":{"value":1299.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Tennessee row,column9","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1,299"},"retail_revenue_all_prior":{"value":1267.0,"source_ids":["eia-state-retail-revenue-month-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.A Tennessee row,column10","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1,267"},"ytd_retail_revenue_basis":{"value":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Title,end-use headers and source notes"},"ytd_retail_revenue_period":{"value":"January through August 2026","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"ytd_retail_revenue_prior_period":{"value":"January through August 2025","source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Column headers"},"ytd_retail_revenue_residential":{"value":4339.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Tennessee row,column1","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"4,339"},"ytd_retail_revenue_residential_prior":{"value":4193.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Tennessee row,column2","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"4,193"},"ytd_retail_revenue_commercial":{"value":3382.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Tennessee row,column3","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"3,382"},"ytd_retail_revenue_commercial_prior":{"value":3200.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Tennessee row,column4","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"3,200"},"ytd_retail_revenue_industrial":{"value":1192.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Tennessee row,column5","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1,192"},"ytd_retail_revenue_industrial_prior":{"value":1129.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Tennessee row,column6","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"1,129"},"ytd_retail_revenue_transportation":{"value":0.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Tennessee row,column7","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"0"},"ytd_retail_revenue_transportation_prior":{"value":0.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Tennessee row,column8","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"0"},"ytd_retail_revenue_all":{"value":8913.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Tennessee row,column9","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"8,913"},"ytd_retail_revenue_all_prior":{"value":8522.0,"source_ids":["eia-state-retail-revenue-ytd-aug2026"],"scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","locator":"Table5.5.B Tennessee row,column10","unit":"million USD","measurement_role":"reported_retail_electricity_revenue","source_token":"8,522"},"retail_customers_basis":{"value":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Title,end-use headers and source notes"},"retail_customers_period":{"value":"August 2026","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Column headers"},"retail_customers_prior_period":{"value":"August 2025","source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Column headers"},"retail_customers_residential":{"value":3159497,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Tennessee row,column1","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"3,159,497"},"retail_customers_residential_prior":{"value":3201287,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Tennessee row,column2","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"3,201,287"},"retail_customers_commercial":{"value":572986,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Tennessee row,column3","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"572,986"},"retail_customers_commercial_prior":{"value":548519,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Tennessee row,column4","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"548,519"},"retail_customers_industrial":{"value":998,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Tennessee row,column5","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"998"},"retail_customers_industrial_prior":{"value":1024,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Tennessee row,column6","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"1,024"},"retail_customers_transportation":{"value":0,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Tennessee row,column7","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"0"},"retail_customers_transportation_prior":{"value":0,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Tennessee row,column8","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"0"},"retail_customers_all":{"value":3733481,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Tennessee row,column9","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"3,733,481"},"retail_customers_all_prior":{"value":3750830,"source_ids":["eia-state-retail-customers-aug2026"],"scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","locator":"Table5.8 Tennessee row,column10","unit":"customers","measurement_role":"reported_ultimate_customer_count","source_token":"3,750,830"}}},{"id":"sector-price-tn-202607","kind":"sector_price_context","subject":"Tennessee historical commercial and industrial electricity prices","state_codes":["tn"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","fields":{"period":{"value":"July 2026","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"prior_period":{"value":"July 2025","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"sector_price_boundary":{"value":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedTable5.6.A July header"},"commercial_price":{"value":13.43,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Tennessee commercial_price","unit":"cents per kWh","measurement_role":"published_price"},"prior_commercial_price":{"value":12.81,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Tennessee prior_commercial_price","unit":"cents per kWh","measurement_role":"published_price"},"industrial_price":{"value":7.13,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Tennessee industrial_price","unit":"cents per kWh","measurement_role":"published_price"},"prior_industrial_price":{"value":7.24,"source_ids":["eia-prices"],"scope":"Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.","locator":"RetainedJulyTable5.6.A Tennessee prior_industrial_price","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_price":{"value":12.21,"source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Tennessee All Sectors July comparison","unit":"cents per kWh","measurement_role":"published_price"},"prior_all_sector_price":{"value":11.87,"source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A Tennessee All Sectors July comparison","unit":"cents per kWh","measurement_role":"published_price"},"all_sector_boundary":{"value":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","source_ids":["eia-prices"],"scope":"All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.","locator":"Table5.6.A sector headers and notes"}}},{"id":"generation-tn-202608","subject":"Tennessee utility scale generation","kind":"generation_context","state_codes":["tn"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","fields":{"status":{"value":"historical","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A period and source notes"},"period":{"value":"August 2026","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"prior_period":{"value":"August 2025","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table title, producer sector headers and source notes"},"all_generation":{"value":8430.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"8,430"},"prior_all_generation":{"value":7555.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"7,555"},"published_generation_change":{"value":11.6,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Tennessee row; column3","unit":"percent","measurement_role":"published_net_generation_percentage_change","source_token":"11.6%"},"utility_generation":{"value":7876.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"7,876"},"prior_utility_generation":{"value":7122.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"7,122"},"ipp_generation":{"value":363.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"363"},"prior_ipp_generation":{"value":238.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"238"},"commercial_generation":{"value":19.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"19"},"prior_commercial_generation":{"value":20.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"20"},"industrial_generation":{"value":173.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"173"},"prior_industrial_generation":{"value":176.0,"source_ids":["eia-state-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"176"},"gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table title, producer sector headers and source notes"},"gas_period":{"value":"August 2026","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_prior_period":{"value":"August 2025","source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_all_generation":{"value":1899.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"1,899"},"gas_prior_all_generation":{"value":1656.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"1,656"},"gas_published_generation_change":{"value":14.7,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Tennessee row; column3","unit":"percent","measurement_role":"published_gas_generation_percentage_change","source_token":"14.7%"},"gas_utility_generation":{"value":1776.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"1,776"},"gas_prior_utility_generation":{"value":1534.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"1,534"},"gas_ipp_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"gas_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"gas_commercial_generation":{"value":18.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"18"},"gas_prior_commercial_generation":{"value":19.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"19"},"gas_industrial_generation":{"value":104.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"104"},"gas_prior_industrial_generation":{"value":102.0,"source_ids":["eia-state-gas-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"102"},"nuclear_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table title, producer sector headers and source notes"},"nuclear_period":{"value":"August 2026","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_prior_period":{"value":"August 2025","source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_all_generation":{"value":3361.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"3,361"},"nuclear_prior_all_generation":{"value":3390.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"3,390"},"nuclear_published_generation_change":{"value":-0.9,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Tennessee row; column3","unit":"percent","measurement_role":"published_nuclear_generation_percentage_change","source_token":"-0.9%"},"nuclear_utility_generation":{"value":3361.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"3,361"},"nuclear_prior_utility_generation":{"value":3390.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"3,390"},"nuclear_ipp_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"coal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table title, producer sector headers and source notes"},"coal_period":{"value":"August 2026","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_prior_period":{"value":"August 2025","source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_all_generation":{"value":2141.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"2,141"},"coal_prior_all_generation":{"value":1596.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"1,596"},"coal_published_generation_change":{"value":34.2,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Tennessee row; column3","unit":"percent","measurement_role":"published_coal_generation_percentage_change","source_token":"34.2%"},"coal_utility_generation":{"value":2108.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"2,108"},"coal_prior_utility_generation":{"value":1560.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"1,560"},"coal_ipp_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_industrial_generation":{"value":33.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"33"},"coal_prior_industrial_generation":{"value":36.0,"source_ids":["eia-state-coal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"36"},"wind_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table title, producer sector headers and source notes"},"wind_period":{"value":"August 2026","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_prior_period":{"value":"August 2025","source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_all_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_all_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_published_generation_change":{"value":null,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Tennessee row; column3","unit":"percent","measurement_role":"published_wind_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"wind_utility_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_ipp_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"hydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table title, producer sector headers and source notes"},"hydro_period":{"value":"August 2026","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_prior_period":{"value":"August 2025","source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_all_generation":{"value":761.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"761"},"hydro_prior_all_generation":{"value":766.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"766"},"hydro_published_generation_change":{"value":-0.5,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Tennessee row; column3","unit":"percent","measurement_role":"published_hydro_generation_percentage_change","source_token":"-0.5%"},"hydro_utility_generation":{"value":702.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"702"},"hydro_prior_utility_generation":{"value":703.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"703"},"hydro_ipp_generation":{"value":60.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"60"},"hydro_prior_ipp_generation":{"value":63.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"63"},"hydro_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"pumped_storage_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table title, producer sector headers and source notes"},"pumped_storage_period":{"value":"August 2026","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_prior_period":{"value":"August 2025","source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_all_generation":{"value":-82.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-82"},"pumped_storage_prior_all_generation":{"value":-78.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-78"},"pumped_storage_published_generation_change":{"value":5.4,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Tennessee row; column3","unit":"percent","measurement_role":"published_pumped_storage_generation_percentage_change","source_token":"5.4%"},"pumped_storage_utility_generation":{"value":-82.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-82"},"pumped_storage_prior_utility_generation":{"value":-78.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-78"},"pumped_storage_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"solar_pv_period":{"value":"August 2026","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_prior_period":{"value":"August 2025","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_generation_basis":{"value":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table title, producer sector headers and source notes"},"solar_pv_all_estimated_generation":{"value":307.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"307"},"solar_pv_prior_all_estimated_generation":{"value":179.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"179"},"solar_pv_published_generation_change":{"value":71.2,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column3","unit":"percent","measurement_role":"published_solar_pv_generation_percentage_change","source_token":"71.2%"},"solar_pv_utility_scale_generation":{"value":298.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"298"},"solar_pv_utility_scale_prior_generation":{"value":171.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"171"},"solar_pv_estimated_small_scale_generation":{"value":9.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"9"},"solar_pv_estimated_small_scale_prior_generation":{"value":9.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"9"},"solar_pv_electric_utilities_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_electric_utilities_prior_generation":{"value":0.25,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0.25"},"solar_pv_independent_producers_generation":{"value":297.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"297"},"solar_pv_independent_producers_prior_generation":{"value":169.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"169"},"solar_pv_commercial_estimated_total_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column12","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_commercial_estimated_total_prior_generation":{"value":6.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column13","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"6"},"solar_pv_commercial_utility_scale_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column14","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_commercial_utility_scale_prior_generation":{"value":0.33,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column15","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"0.33"},"solar_pv_commercial_estimated_small_scale_generation":{"value":6.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column16","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"6"},"solar_pv_commercial_estimated_small_scale_prior_generation":{"value":6.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column17","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"6"},"solar_pv_industrial_estimated_total_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column18","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_industrial_estimated_total_prior_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column19","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_industrial_utility_scale_generation":{"value":1.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column20","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1"},"solar_pv_industrial_utility_scale_prior_generation":{"value":1.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column21","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1"},"solar_pv_industrial_estimated_small_scale_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column22","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_industrial_estimated_small_scale_prior_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column23","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_residential_estimated_small_scale_generation":{"value":3.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column24","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"3"},"solar_pv_residential_estimated_small_scale_prior_generation":{"value":3.0,"source_ids":["eia-state-solar-pv-generation-month-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.A Tennessee row; column25","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"3"},"solar_thermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table title, producer sector headers and source notes"},"solar_thermal_period":{"value":"August 2026","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_prior_period":{"value":"August 2025","source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_published_generation_change":{"value":null,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Tennessee row; column3","unit":"percent","measurement_role":"published_solar_thermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"solar_thermal_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"other_energy_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"other_energy_period":{"value":"August 2026","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_prior_period":{"value":"August 2025","source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_all_generation":{"value":0.01,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0.01"},"other_energy_prior_all_generation":{"value":0.06,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0.06"},"other_energy_published_generation_change":{"value":-76.6,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Tennessee row; column3","unit":"percent","measurement_role":"published_other_energy_generation_percentage_change","source_token":"-76.6%"},"other_energy_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_industrial_generation":{"value":0.01,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0.01"},"other_energy_prior_industrial_generation":{"value":0.06,"source_ids":["eia-state-other-energy-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0.06"},"geothermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table title, producer sector headers and source notes"},"geothermal_period":{"value":"August 2026","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_prior_period":{"value":"August 2025","source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_published_generation_change":{"value":null,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Tennessee row; column3","unit":"percent","measurement_role":"published_geothermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"geothermal_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"biomass_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"biomass_period":{"value":"August 2026","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_prior_period":{"value":"August 2025","source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_all_generation":{"value":39.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"39"},"biomass_prior_all_generation":{"value":42.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"42"},"biomass_published_generation_change":{"value":-7.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Tennessee row; column3","unit":"percent","measurement_role":"published_biomass_generation_percentage_change","source_token":"-7.0%"},"biomass_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_ipp_generation":{"value":6.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"6"},"biomass_prior_ipp_generation":{"value":6.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"6"},"biomass_commercial_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_industrial_generation":{"value":33.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"33"},"biomass_prior_industrial_generation":{"value":36.0,"source_ids":["eia-state-biomass-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"36"},"petroleum_liquids_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_liquids_period":{"value":"August 2026","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_prior_period":{"value":"August 2025","source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_all_generation":{"value":11.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"11"},"petroleum_liquids_prior_all_generation":{"value":12.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"12"},"petroleum_liquids_published_generation_change":{"value":-1.6,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Tennessee row; column3","unit":"percent","measurement_role":"published_petroleum_liquids_generation_percentage_change","source_token":"-1.6%"},"petroleum_liquids_utility_generation":{"value":11.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"11"},"petroleum_liquids_prior_utility_generation":{"value":12.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"12"},"petroleum_liquids_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_industrial_generation":{"value":0.03,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.03"},"petroleum_liquids_prior_industrial_generation":{"value":0.03,"source_ids":["eia-state-petroleum-liquids-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.03"},"petroleum_coke_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_coke_period":{"value":"August 2026","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_prior_period":{"value":"August 2025","source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_all_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_all_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_published_generation_change":{"value":null,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Tennessee row; column3","unit":"percent","measurement_role":"published_petroleum_coke_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"petroleum_coke_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"other_fossil_gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table title, producer sector headers and source notes"},"other_fossil_gas_period":{"value":"August 2026","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_prior_period":{"value":"August 2025","source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_all_generation":{"value":1.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"1"},"other_fossil_gas_prior_all_generation":{"value":1.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"1"},"other_fossil_gas_published_generation_change":{"value":5.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Tennessee row; column3","unit":"percent","measurement_role":"published_other_fossil_gas_generation_percentage_change","source_token":"5.0%"},"other_fossil_gas_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_industrial_generation":{"value":1.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"1"},"other_fossil_gas_prior_industrial_generation":{"value":1.0,"source_ids":["eia-state-other-fossil-gas-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"1"},"nonhydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table title, producer sector headers and source notes"},"nonhydro_period":{"value":"August 2026","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_prior_period":{"value":"August 2025","source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_all_generation":{"value":337.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"337"},"nonhydro_prior_all_generation":{"value":213.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"213"},"nonhydro_published_generation_change":{"value":58.5,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Tennessee row; column3","unit":"percent","measurement_role":"published_nonhydro_generation_percentage_change","source_token":"58.5%"},"nonhydro_utility_generation":{"value":null,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"nonhydro_prior_utility_generation":{"value":0.25,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"0.25"},"nonhydro_ipp_generation":{"value":303.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"303"},"nonhydro_prior_ipp_generation":{"value":176.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"176"},"nonhydro_commercial_generation":{"value":null,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"nonhydro_prior_commercial_generation":{"value":0.33,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"0.33"},"nonhydro_industrial_generation":{"value":34.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"34"},"nonhydro_prior_industrial_generation":{"value":37.0,"source_ids":["eia-state-nonhydro-renewables-generation-month-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.A Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"37"}}},{"id":"generation-tn-202608-ytd","subject":"Tennessee utility scale generation","kind":"generation_context","state_codes":["tn"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","fields":{"status":{"value":"historical","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B period and source notes"},"period":{"value":"January through August 2026","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"prior_period":{"value":"January through August 2025","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Column headers"},"generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table title, producer sector headers and source notes"},"all_generation":{"value":58598.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"58,598"},"prior_all_generation":{"value":51123.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"51,123"},"published_generation_change":{"value":14.6,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Tennessee row; column3","unit":"percent","measurement_role":"published_net_generation_percentage_change","source_token":"14.6%"},"utility_generation":{"value":55006.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"55,006"},"prior_utility_generation":{"value":48194.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"48,194"},"ipp_generation":{"value":2120.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"2,120"},"prior_ipp_generation":{"value":1386.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"1,386"},"commercial_generation":{"value":139.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"139"},"prior_commercial_generation":{"value":147.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"147"},"industrial_generation":{"value":1333.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"1,333"},"prior_industrial_generation":{"value":1396.0,"source_ids":["eia-state-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.","locator":"Table1.3.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_utility_scale_net_generation","source_token":"1,396"},"gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table title, producer sector headers and source notes"},"gas_period":{"value":"January through August 2026","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_prior_period":{"value":"January through August 2025","source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Column headers"},"gas_all_generation":{"value":12358.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"12,358"},"gas_prior_all_generation":{"value":12969.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"12,969"},"gas_published_generation_change":{"value":-4.7,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Tennessee row; column3","unit":"percent","measurement_role":"published_gas_generation_percentage_change","source_token":"-4.7%"},"gas_utility_generation":{"value":11401.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"11,401"},"gas_prior_utility_generation":{"value":11963.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"11,963"},"gas_ipp_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"gas_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"0"},"gas_commercial_generation":{"value":136.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"136"},"gas_prior_commercial_generation":{"value":145.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"145"},"gas_industrial_generation":{"value":821.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"821"},"gas_prior_industrial_generation":{"value":861.0,"source_ids":["eia-state-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.","locator":"Table1.7.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_gas_net_generation","source_token":"861"},"nuclear_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table title, producer sector headers and source notes"},"nuclear_period":{"value":"January through August 2026","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_prior_period":{"value":"January through August 2025","source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Column headers"},"nuclear_all_generation":{"value":26067.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"26,067"},"nuclear_prior_all_generation":{"value":17739.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"17,739"},"nuclear_published_generation_change":{"value":46.9,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Tennessee row; column3","unit":"percent","measurement_role":"published_nuclear_generation_percentage_change","source_token":"46.9%"},"nuclear_utility_generation":{"value":26067.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"26,067"},"nuclear_prior_utility_generation":{"value":17739.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"17,739"},"nuclear_ipp_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"nuclear_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-nuclear-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.","locator":"Table1.9.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_nuclear_net_generation","source_token":"0"},"coal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table title, producer sector headers and source notes"},"coal_period":{"value":"January through August 2026","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Column headers"},"coal_all_generation":{"value":12643.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"12,643"},"coal_prior_all_generation":{"value":13111.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"13,111"},"coal_published_generation_change":{"value":-3.6,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Tennessee row; column3","unit":"percent","measurement_role":"published_coal_generation_percentage_change","source_token":"-3.6%"},"coal_utility_generation":{"value":12408.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"12,408"},"coal_prior_utility_generation":{"value":12847.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"12,847"},"coal_ipp_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"0"},"coal_industrial_generation":{"value":235.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"235"},"coal_prior_industrial_generation":{"value":264.0,"source_ids":["eia-state-coal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.","locator":"Table1.4.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_coal_net_generation","source_token":"264"},"wind_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table title, producer sector headers and source notes"},"wind_period":{"value":"January through August 2026","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_prior_period":{"value":"January through August 2025","source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Column headers"},"wind_all_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_all_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_published_generation_change":{"value":null,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Tennessee row; column3","unit":"percent","measurement_role":"published_wind_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"wind_utility_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_ipp_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"wind_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-wind-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.","locator":"Table1.14.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_wind_net_generation","source_token":"0"},"hydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table title, producer sector headers and source notes"},"hydro_period":{"value":"January through August 2026","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_prior_period":{"value":"January through August 2025","source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Column headers"},"hydro_all_generation":{"value":5935.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"5,935"},"hydro_prior_all_generation":{"value":6412.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"6,412"},"hydro_published_generation_change":{"value":-7.4,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Tennessee row; column3","unit":"percent","measurement_role":"published_hydro_generation_percentage_change","source_token":"-7.4%"},"hydro_utility_generation":{"value":5470.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"5,470"},"hydro_prior_utility_generation":{"value":5910.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"5,910"},"hydro_ipp_generation":{"value":465.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"465"},"hydro_prior_ipp_generation":{"value":502.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"502"},"hydro_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"hydro_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-hydro-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.","locator":"Table1.10.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_conventional_hydro_net_generation","source_token":"0"},"pumped_storage_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table title, producer sector headers and source notes"},"pumped_storage_period":{"value":"January through August 2026","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_prior_period":{"value":"January through August 2025","source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Column headers"},"pumped_storage_all_generation":{"value":-441.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-441"},"pumped_storage_prior_all_generation":{"value":-354.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-354"},"pumped_storage_published_generation_change":{"value":24.5,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Tennessee row; column3","unit":"percent","measurement_role":"published_pumped_storage_generation_percentage_change","source_token":"24.5%"},"pumped_storage_utility_generation":{"value":-441.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-441"},"pumped_storage_prior_utility_generation":{"value":-354.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"-354"},"pumped_storage_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"pumped_storage_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-pumped-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.","locator":"Table1.12.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_pumped_storage_net_generation","source_token":"0"},"solar_pv_period":{"value":"January through August 2026","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_prior_period":{"value":"January through August 2025","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Column headers"},"solar_pv_generation_basis":{"value":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table title, producer sector headers and source notes"},"solar_pv_all_estimated_generation":{"value":1675.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"1,675"},"solar_pv_prior_all_estimated_generation":{"value":904.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"904"},"solar_pv_published_generation_change":{"value":85.3,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column3","unit":"percent","measurement_role":"published_solar_pv_generation_percentage_change","source_token":"85.3%"},"solar_pv_utility_scale_generation":{"value":1614.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1,614"},"solar_pv_utility_scale_prior_generation":{"value":842.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"842"},"solar_pv_estimated_small_scale_generation":{"value":62.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"62"},"solar_pv_estimated_small_scale_prior_generation":{"value":62.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"62"},"solar_pv_electric_utilities_generation":{"value":null,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"solar_pv_electric_utilities_prior_generation":{"value":2.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"2"},"solar_pv_independent_producers_generation":{"value":1604.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"1,604"},"solar_pv_independent_producers_prior_generation":{"value":834.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"834"},"solar_pv_commercial_estimated_total_generation":{"value":45.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column12","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"45"},"solar_pv_commercial_estimated_total_prior_generation":{"value":44.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column13","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"44"},"solar_pv_commercial_utility_scale_generation":{"value":3.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column14","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"3"},"solar_pv_commercial_utility_scale_prior_generation":{"value":3.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column15","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"3"},"solar_pv_commercial_estimated_small_scale_generation":{"value":42.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column16","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"42"},"solar_pv_commercial_estimated_small_scale_prior_generation":{"value":42.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column17","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"42"},"solar_pv_industrial_estimated_total_generation":{"value":4.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column18","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"4"},"solar_pv_industrial_estimated_total_prior_generation":{"value":4.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column19","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"4"},"solar_pv_industrial_utility_scale_generation":{"value":4.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column20","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"4"},"solar_pv_industrial_utility_scale_prior_generation":{"value":4.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column21","unit":"thousand MWh","measurement_role":"reported_solar_pv_utility_scale_net_generation","source_token":"4"},"solar_pv_industrial_estimated_small_scale_generation":{"value":0.03,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column22","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"0.03"},"solar_pv_industrial_estimated_small_scale_prior_generation":{"value":0.03,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column23","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"0.03"},"solar_pv_residential_estimated_small_scale_generation":{"value":20.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column24","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"20"},"solar_pv_residential_estimated_small_scale_prior_generation":{"value":20.0,"source_ids":["eia-state-solar-pv-generation-ytd-aug2026"],"scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","locator":"Table1.17.B Tennessee row; column25","unit":"thousand MWh","measurement_role":"estimated_solar_pv_net_generation","source_token":"20"},"solar_thermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table title, producer sector headers and source notes"},"solar_thermal_period":{"value":"January through August 2026","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Column headers"},"solar_thermal_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_published_generation_change":{"value":null,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Tennessee row; column3","unit":"percent","measurement_role":"published_solar_thermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"solar_thermal_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"solar_thermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-solar-thermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","locator":"Table1.18.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_solar_thermal_net_generation","source_token":"0"},"other_energy_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"other_energy_period":{"value":"January through August 2026","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_prior_period":{"value":"January through August 2025","source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Column headers"},"other_energy_all_generation":{"value":0.15,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0.15"},"other_energy_prior_all_generation":{"value":0.16,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0.16"},"other_energy_published_generation_change":{"value":-5.5,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Tennessee row; column3","unit":"percent","measurement_role":"published_other_energy_generation_percentage_change","source_token":"-5.5%"},"other_energy_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0"},"other_energy_industrial_generation":{"value":0.15,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0.15"},"other_energy_prior_industrial_generation":{"value":0.16,"source_ids":["eia-state-other-energy-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.","locator":"Table1.13.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_other_energy_net_generation","source_token":"0.16"},"geothermal_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table title, producer sector headers and source notes"},"geothermal_period":{"value":"January through August 2026","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_prior_period":{"value":"January through August 2025","source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Column headers"},"geothermal_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_all_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_published_generation_change":{"value":null,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Tennessee row; column3","unit":"percent","measurement_role":"published_geothermal_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"geothermal_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"geothermal_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-geothermal-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","locator":"Table1.16.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_geothermal_net_generation","source_token":"0"},"biomass_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table title, producer sector headers and source notes"},"biomass_period":{"value":"January through August 2026","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_prior_period":{"value":"January through August 2025","source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Column headers"},"biomass_all_generation":{"value":318.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"318"},"biomass_prior_all_generation":{"value":309.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"309"},"biomass_published_generation_change":{"value":3.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Tennessee row; column3","unit":"percent","measurement_role":"published_biomass_generation_percentage_change","source_token":"3.0%"},"biomass_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_ipp_generation":{"value":50.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"50"},"biomass_prior_ipp_generation":{"value":50.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"50"},"biomass_commercial_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"0"},"biomass_industrial_generation":{"value":268.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"268"},"biomass_prior_industrial_generation":{"value":259.0,"source_ids":["eia-state-biomass-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","locator":"Table1.15.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_biomass_net_generation","source_token":"259"},"petroleum_liquids_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_liquids_period":{"value":"January through August 2026","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_prior_period":{"value":"January through August 2025","source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_liquids_all_generation":{"value":99.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"99"},"petroleum_liquids_prior_all_generation":{"value":87.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"87"},"petroleum_liquids_published_generation_change":{"value":13.5,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Tennessee row; column3","unit":"percent","measurement_role":"published_petroleum_liquids_generation_percentage_change","source_token":"13.5%"},"petroleum_liquids_utility_generation":{"value":99.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"99"},"petroleum_liquids_prior_utility_generation":{"value":87.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"87"},"petroleum_liquids_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0"},"petroleum_liquids_industrial_generation":{"value":0.17,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.17"},"petroleum_liquids_prior_industrial_generation":{"value":0.24,"source_ids":["eia-state-petroleum-liquids-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.5.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_liquids_net_generation","source_token":"0.24"},"petroleum_coke_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table title, producer sector headers and source notes"},"petroleum_coke_period":{"value":"January through August 2026","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_prior_period":{"value":"January through August 2025","source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Column headers"},"petroleum_coke_all_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_all_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_published_generation_change":{"value":null,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Tennessee row; column3","unit":"percent","measurement_role":"published_petroleum_coke_generation_percentage_change","source_token":"--","unknown_reason":"Published -- marker; no numerical percentage supplied, not interpreted as zero."},"petroleum_coke_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"petroleum_coke_prior_industrial_generation":{"value":0.0,"source_ids":["eia-state-petroleum-coke-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","locator":"Table1.6.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_petroleum_coke_net_generation","source_token":"0"},"other_fossil_gas_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table title, producer sector headers and source notes"},"other_fossil_gas_period":{"value":"January through August 2026","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_prior_period":{"value":"January through August 2025","source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Column headers"},"other_fossil_gas_all_generation":{"value":6.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"6"},"other_fossil_gas_prior_all_generation":{"value":7.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"7"},"other_fossil_gas_published_generation_change":{"value":-19.9,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Tennessee row; column3","unit":"percent","measurement_role":"published_other_fossil_gas_generation_percentage_change","source_token":"-19.9%"},"other_fossil_gas_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_utility_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_ipp_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_prior_commercial_generation":{"value":0.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"0"},"other_fossil_gas_industrial_generation":{"value":6.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"6"},"other_fossil_gas_prior_industrial_generation":{"value":7.0,"source_ids":["eia-state-other-fossil-gas-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.","locator":"Table1.8.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_other_fossil_gas_net_generation","source_token":"7"},"nonhydro_generation_basis":{"value":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table title, producer sector headers and source notes"},"nonhydro_period":{"value":"January through August 2026","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_prior_period":{"value":"January through August 2025","source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Column headers"},"nonhydro_all_generation":{"value":1931.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Tennessee row; column1","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"1,931"},"nonhydro_prior_all_generation":{"value":1151.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Tennessee row; column2","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"1,151"},"nonhydro_published_generation_change":{"value":67.8,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Tennessee row; column3","unit":"percent","measurement_role":"published_nonhydro_generation_percentage_change","source_token":"67.8%"},"nonhydro_utility_generation":{"value":null,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Tennessee row; column4","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"NM","unknown_reason":"Published NM: not meaningful due to large relative standard error or excessive percentage change; not zero."},"nonhydro_prior_utility_generation":{"value":2.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Tennessee row; column5","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"2"},"nonhydro_ipp_generation":{"value":1654.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Tennessee row; column6","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"1,654"},"nonhydro_prior_ipp_generation":{"value":884.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Tennessee row; column7","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"884"},"nonhydro_commercial_generation":{"value":3.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Tennessee row; column8","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"3"},"nonhydro_prior_commercial_generation":{"value":3.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Tennessee row; column9","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"3"},"nonhydro_industrial_generation":{"value":272.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Tennessee row; column10","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"272"},"nonhydro_prior_industrial_generation":{"value":263.0,"source_ids":["eia-state-nonhydro-renewables-generation-ytd-aug2026"],"scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","locator":"Table1.11.B Tennessee row; column11","unit":"thousand MWh","measurement_role":"reported_nonhydro_net_generation","source_token":"263"}}},{"id":"capacity-state-utility-tn-202608","subject":"Tennessee utility scale net summer capacity","kind":"capacity_context","state_codes":["tn"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","fields":{"utility_capacity_basis":{"value":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Title,technology headers and exclusions"},"utility_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Column headers"},"utility_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Column headers"},"status":{"value":"historical","source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Dated source period"},"utility_capacity_renewables":{"value":3946.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Tennessee row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"3,946.0"},"utility_capacity_renewables_prior":{"value":3500.4,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Tennessee row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"3,500.4"},"utility_capacity_fossil":{"value":11077.6,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Tennessee row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"11,077.6"},"utility_capacity_fossil_prior":{"value":11077.6,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Tennessee row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"11,077.6"},"utility_capacity_pumped_storage":{"value":1616.3,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Tennessee row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,616.3"},"utility_capacity_pumped_storage_prior":{"value":1616.3,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Tennessee row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,616.3"},"utility_capacity_other_storage":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Tennessee row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_other_storage_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Tennessee row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_nuclear":{"value":4522.7,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Tennessee row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"4,522.7"},"utility_capacity_nuclear_prior":{"value":4522.7,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Tennessee row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"4,522.7"},"utility_capacity_other_sources":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Tennessee row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_other_sources_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Tennessee row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"utility_capacity_all":{"value":21162.6,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Tennessee row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"21,162.6"},"utility_capacity_all_prior":{"value":20717.0,"source_ids":["eia-state-utility-capacity-aug2026"],"scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","locator":"Table6.2.A Tennessee row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"20,717.0"},"renew_capacity_basis":{"value":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Title,technology headers and exclusions"},"renew_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Column headers"},"renew_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Column headers"},"renew_capacity_status":{"value":"historical","source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Dated source period"},"renew_capacity_wind":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_wind_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_solar_pv":{"value":1250.7,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"1,250.7"},"renew_capacity_solar_pv_prior":{"value":805.1,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"805.1"},"renew_capacity_solar_thermal":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_solar_thermal_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_conventional_hydro":{"value":2608.6,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"2,608.6"},"renew_capacity_conventional_hydro_prior":{"value":2608.6,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"2,608.6"},"renew_capacity_biomass":{"value":86.7,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"86.7"},"renew_capacity_biomass_prior":{"value":86.7,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"86.7"},"renew_capacity_geothermal":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_geothermal_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"renew_capacity_total_utility":{"value":3946.0,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"3,946.0"},"renew_capacity_total_utility_prior":{"value":3500.4,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"3,500.4"},"renew_capacity_small_pv_estimated":{"value":53.4,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column15","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"53.4"},"renew_capacity_small_pv_estimated_prior":{"value":54.3,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column16","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"54.3"},"renew_capacity_combined_pv_estimated":{"value":1304.1,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column17","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"1,304.1"},"renew_capacity_combined_pv_estimated_prior":{"value":859.4,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column18","unit":"MW","measurement_role":"estimated_solar_pv_net_summer_capacity","source_token":"859.4"},"renew_capacity_combined_solar_estimated":{"value":1304.1,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column19","unit":"MW","measurement_role":"estimated_solar_net_summer_capacity","source_token":"1,304.1"},"renew_capacity_combined_solar_estimated_prior":{"value":859.4,"source_ids":["eia-state-utility-capacity-b-aug2026"],"scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","locator":"Table6.2.B Tennessee row,column20","unit":"MW","measurement_role":"estimated_solar_net_summer_capacity","source_token":"859.4"},"fossil_capacity_basis":{"value":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Title,technology headers and exclusions"},"fossil_capacity_period":{"value":"August 2026","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Column headers"},"fossil_capacity_prior_period":{"value":"August 2025","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Column headers"},"fossil_capacity_status":{"value":"historical","source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Dated source period"},"fossil_capacity_gas_combined_cycle":{"value":2455.1,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column1","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"2,455.1"},"fossil_capacity_gas_combined_cycle_prior":{"value":2455.1,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column2","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"2,455.1"},"fossil_capacity_gas_combustion_turbine":{"value":3652.7,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column3","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"3,652.7"},"fossil_capacity_gas_combustion_turbine_prior":{"value":3652.7,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column4","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"3,652.7"},"fossil_capacity_gas_other":{"value":130.3,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column5","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"130.3"},"fossil_capacity_gas_other_prior":{"value":130.3,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column6","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"130.3"},"fossil_capacity_coal":{"value":4703.5,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column7","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"4,703.5"},"fossil_capacity_coal_prior":{"value":4703.5,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column8","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"4,703.5"},"fossil_capacity_petroleum_coke":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column9","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_petroleum_coke_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column10","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_petroleum_liquids":{"value":136.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column11","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"136.0"},"fossil_capacity_petroleum_liquids_prior":{"value":136.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column12","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"136.0"},"fossil_capacity_other_fossil_gas":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column13","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_other_fossil_gas_prior":{"value":0.0,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column14","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"0.0"},"fossil_capacity_total":{"value":11077.6,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column15","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"11,077.6"},"fossil_capacity_total_prior":{"value":11077.6,"source_ids":["eia-state-utility-capacity-c-aug2026"],"scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","locator":"Table6.2.C Tennessee row,column16","unit":"MW","measurement_role":"reported_utility_scale_net_summer_capacity","source_token":"11,077.6"},"reported_new_unit_rows":{"value":9,"source_ids":["eia-new-utility-units-aug2026"],"scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","locator":"Calculated count of Table6.3 rows for TN","unit":"generators","measurement_role":"calculated_count_reported_new_utility_unit_rows"},"reported_new_unit_capacity_sum":{"value":424.2,"source_ids":["eia-new-utility-units-aug2026"],"scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","locator":"Calculated sum of rounded Table6.3 Net Summer Capacity(MW) cells for TN","unit":"MW","measurement_role":"calculated_sum_reported_unit_net_summer_capacity"},"reported_new_unit_basis":{"value":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","source_ids":["eia-new-utility-units-aug2026"],"scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","locator":"Table6.3 title,columns,notes and explicit calculation scope"},"reported_planned_unit_rows":{"value":33,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for TN across all source target dates,not simultaneous supply","unit":"generators","measurement_role":"calculated_count_reported_planned_utility_unit_rows"},"reported_planned_unit_capacity_sum":{"value":3340.1,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for TN across all source target dates,not simultaneous supply","unit":"MW","measurement_role":"calculated_sum_planned_unit_net_summer_capacity"},"reported_planned_unit_nameplate_sum":{"value":3997.8,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for TN across all source target dates,not simultaneous supply","unit":"MW","measurement_role":"calculated_sum_planned_unit_nameplate_capacity"},"reported_planned_unit_complete_nonoperating_rows":{"value":0,"source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Calculated from Table6.5 reported rows for TN across all source target dates,not simultaneous supply","unit":"generators","measurement_role":"calculated_count_reported_complete_nonoperating_planned_units"},"reported_planned_unit_basis":{"value":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","source_ids":["eia-planned-utility-additions-aug2026"],"scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","locator":"Table6.5 title,status/date/capacity columns,notes and explicit calculation boundary"},"reported_retirement_plan_rows":{"value":33,"source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Calculated from Table6.6 reported rows for TN across all target dates,not simultaneous removal","unit":"generators","measurement_role":"calculated_count_reported_retirement_plan_units"},"reported_retirement_plan_capacity_sum":{"value":5643.6,"source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Calculated from Table6.6 reported rows for TN across all target dates,not simultaneous removal","unit":"MW","measurement_role":"calculated_sum_retirement_plan_net_summer_capacity"},"reported_retirement_plan_unknown_month_rows":{"value":0,"source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Calculated from Table6.6 reported rows for TN across all target dates,not simultaneous removal","unit":"generators","measurement_role":"calculated_count_retirement_plan_missing_months"},"reported_retirement_plan_basis":{"value":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","source_ids":["eia-planned-utility-retirements-aug2026"],"scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","locator":"Table6.6 title/date/capacity columns,notes and explicit calculation scope"}}},{"id":"power-ieee-reliability-2025-tn","kind":"reliability_context","subject":"Tennessee historical IEEE distribution reliability2025 and2024","state_codes":["tn"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","fields":{"status":{"value":"historical","source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 years2025 and2024"},"ieee_reliability_basis":{"value":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 header and definitions"},"ieee_coverage_2025":{"value":69.3,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;coverage;Year 2025","source_token":"69.3%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"ieee_coverage_2024":{"value":73.5,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;coverage;Year 2024","source_token":"73.5%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saidi_2025":{"value":227.7,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;all_events_saidi;Year 2025","source_token":"227.7","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saidi_2024":{"value":289.3,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;all_events_saidi;Year 2024","source_token":"289.3","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saifi_2025":{"value":1.553,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;all_events_saifi;Year 2025","source_token":"1.553","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_saifi_2024":{"value":1.939,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;all_events_saifi;Year 2024","source_token":"1.939","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_caidi_2025":{"value":146.7,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;all_events_caidi;Year 2025","source_token":"146.7","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_all_events_caidi_2024":{"value":149.2,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;all_events_caidi;Year 2024","source_token":"149.2","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saidi_2025":{"value":146.9,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;without_major_days_saidi;Year 2025","source_token":"146.9","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saidi_2024":{"value":169.9,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;without_major_days_saidi;Year 2024","source_token":"169.9","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saifi_2025":{"value":1.464,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;without_major_days_saifi;Year 2025","source_token":"1.464","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_saifi_2024":{"value":1.752,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;without_major_days_saifi;Year 2024","source_token":"1.752","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_caidi_2025":{"value":100.3,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;without_major_days_caidi;Year 2025","source_token":"100.3","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_without_major_days_caidi_2024":{"value":97.0,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;without_major_days_caidi;Year 2024","source_token":"97","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saidi_2025":{"value":178.3,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;loss_supply_removed_saidi;Year 2025","source_token":"178.3","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saidi_2024":{"value":283.3,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;loss_supply_removed_saidi;Year 2024","source_token":"283.3","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saifi_2025":{"value":1.44,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;loss_supply_removed_saifi;Year 2025","source_token":"1.44","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_saifi_2024":{"value":1.896,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;loss_supply_removed_saifi;Year 2024","source_token":"1.896","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_caidi_2025":{"value":123.8,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;loss_supply_removed_caidi;Year 2025","source_token":"123.8","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"ieee_loss_supply_removed_caidi_2024":{"value":149.4,"source_ids":["eia-epa2025-ieee-reliability-states"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.","locator":"Table11.2 Tennessee row;loss_supply_removed_caidi;Year 2024","source_token":"149.4","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"saidi_history_ieee_all_events_2023":{"value":926.9,"source_token":"926.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_all_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2022":{"value":428.3,"source_token":"428.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_all_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2021":{"value":316.8,"source_token":"316.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_all_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2020":{"value":618.4,"source_token":"618.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_all_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2019":{"value":252.9,"source_token":"252.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_all_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2018":{"value":217.5,"source_token":"217.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_all_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2017":{"value":621.5,"source_token":"621.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_all_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2016":{"value":212.9,"source_token":"212.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_all_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_all_events_2015":{"value":257.5,"source_token":"257.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_all_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2023":{"value":192.7,"source_token":"192.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_without_major_days;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2022":{"value":194.1,"source_token":"194.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_without_major_days;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2021":{"value":151.7,"source_token":"151.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_without_major_days;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2020":{"value":144.5,"source_token":"144.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_without_major_days;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2019":{"value":160.4,"source_token":"160.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_without_major_days;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2018":{"value":145.6,"source_token":"145.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_without_major_days;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2017":{"value":141.7,"source_token":"141.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_without_major_days;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2016":{"value":141.6,"source_token":"141.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_without_major_days;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_without_major_days_2015":{"value":134.6,"source_token":"134.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_without_major_days;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2023":{"value":933.4,"source_token":"933.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2022":{"value":425.9,"source_token":"425.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2021":{"value":299.5,"source_token":"299.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2020":{"value":601.1,"source_token":"601.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2019":{"value":251.6,"source_token":"251.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2018":{"value":213.1,"source_token":"213.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2017":{"value":603.1,"source_token":"603.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2016":{"value":206.4,"source_token":"206.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_ieee_loss_supply_removed_2015":{"value":256.3,"source_token":"256.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_basis":{"value":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","source_ids":["eia-epa2025-saidi-state-history"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","locator":"Table11.4 header and method notes;2015-2023 supplemental history"},"saifi_history_ieee_all_events_2023":{"value":2.803,"source_token":"2.803","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_all_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2022":{"value":3.326,"source_token":"3.326","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_all_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2021":{"value":2.007,"source_token":"2.007","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_all_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2020":{"value":2.128,"source_token":"2.128","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_all_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2019":{"value":2.134,"source_token":"2.134","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_all_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2018":{"value":1.956,"source_token":"1.956","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_all_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2017":{"value":1.865,"source_token":"1.865","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_all_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2016":{"value":1.806,"source_token":"1.806","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_all_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_all_events_2015":{"value":1.787,"source_token":"1.787","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_all_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2023":{"value":1.891,"source_token":"1.891","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_without_major_days;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2022":{"value":1.988,"source_token":"1.988","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_without_major_days;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2021":{"value":1.69,"source_token":"1.69","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_without_major_days;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2020":{"value":1.539,"source_token":"1.539","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_without_major_days;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2019":{"value":1.783,"source_token":"1.783","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_without_major_days;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2018":{"value":1.704,"source_token":"1.704","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_without_major_days;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2017":{"value":1.473,"source_token":"1.473","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_without_major_days;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2016":{"value":1.571,"source_token":"1.571","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_without_major_days;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_without_major_days_2015":{"value":1.504,"source_token":"1.504","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_without_major_days;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2023":{"value":2.773,"source_token":"2.773","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2022":{"value":3.073,"source_token":"3.073","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2021":{"value":1.824,"source_token":"1.824","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2020":{"value":2.005,"source_token":"2.005","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2019":{"value":2.065,"source_token":"2.065","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2018":{"value":1.896,"source_token":"1.896","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2017":{"value":1.753,"source_token":"1.753","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2016":{"value":1.707,"source_token":"1.707","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_ieee_loss_supply_removed_2015":{"value":1.738,"source_token":"1.738","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_basis":{"value":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","source_ids":["eia-epa2025-saifi-state-history"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","locator":"Table11.5 header and method notes;2015-2023 supplemental history"},"caidi_history_ieee_all_events_2023":{"value":330.7,"source_token":"330.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_all_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2022":{"value":128.8,"source_token":"128.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_all_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2021":{"value":157.9,"source_token":"157.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_all_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2020":{"value":290.6,"source_token":"290.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_all_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2019":{"value":118.5,"source_token":"118.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_all_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2018":{"value":111.2,"source_token":"111.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_all_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2017":{"value":333.2,"source_token":"333.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_all_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2016":{"value":117.9,"source_token":"117.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_all_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_all_events_2015":{"value":144.1,"source_token":"144.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_all_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2023":{"value":101.9,"source_token":"101.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_without_major_days;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2022":{"value":97.6,"source_token":"97.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_without_major_days;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2021":{"value":89.8,"source_token":"89.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_without_major_days;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2020":{"value":93.9,"source_token":"93.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_without_major_days;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2019":{"value":90.0,"source_token":"90","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_without_major_days;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2018":{"value":85.4,"source_token":"85.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_without_major_days;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2017":{"value":96.2,"source_token":"96.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_without_major_days;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2016":{"value":90.1,"source_token":"90.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_without_major_days;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_without_major_days_2015":{"value":89.5,"source_token":"89.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_without_major_days;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2023":{"value":336.5,"source_token":"336.5","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2022":{"value":138.6,"source_token":"138.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2021":{"value":164.2,"source_token":"164.2","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2020":{"value":299.9,"source_token":"299.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2019":{"value":121.8,"source_token":"121.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2018":{"value":112.4,"source_token":"112.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2017":{"value":344.0,"source_token":"344","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2016":{"value":120.9,"source_token":"120.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_ieee_loss_supply_removed_2015":{"value":147.4,"source_token":"147.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_basis":{"value":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","source_ids":["eia-epa2025-caidi-state-history"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","locator":"Table11.6 header and method notes;2015-2023 supplemental history"}}},{"id":"power-any-reliability-2025-tn","kind":"reliability_context","subject":"Tennessee historical any-method distribution reliability2025 and2024","state_codes":["tn"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","fields":{"status":{"value":"historical","source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 years2025 and2024"},"any_reliability_basis":{"value":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 header and definitions"},"any_coverage_2025":{"value":75.3,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Tennessee row;coverage;Year 2025","source_token":"75.3%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"any_coverage_2024":{"value":85.9,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Tennessee row;coverage;Year 2024","source_token":"85.9%","unit":"percent","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saidi_2025":{"value":229.0,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Tennessee row;all_events_saidi;Year 2025","source_token":"229","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saidi_2024":{"value":278.6,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Tennessee row;all_events_saidi;Year 2024","source_token":"278.6","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saifi_2025":{"value":1.643,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Tennessee row;all_events_saifi;Year 2025","source_token":"1.643","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_saifi_2024":{"value":2.0,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Tennessee row;all_events_saifi;Year 2024","source_token":"2","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_caidi_2025":{"value":139.3,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Tennessee row;all_events_caidi;Year 2025","source_token":"139.3","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_all_events_caidi_2024":{"value":139.3,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Tennessee row;all_events_caidi;Year 2024","source_token":"139.3","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saidi_2025":{"value":150.6,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Tennessee row;without_major_events_saidi;Year 2025","source_token":"150.6","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saidi_2024":{"value":159.5,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Tennessee row;without_major_events_saidi;Year 2024","source_token":"159.5","unit":"minutes per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saifi_2025":{"value":1.539,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Tennessee row;without_major_events_saifi;Year 2025","source_token":"1.539","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_saifi_2024":{"value":1.764,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Tennessee row;without_major_events_saifi;Year 2024","source_token":"1.764","unit":"times per year","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_caidi_2025":{"value":97.9,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Tennessee row;without_major_events_caidi;Year 2025","source_token":"97.9","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"any_without_major_events_caidi_2024":{"value":90.4,"source_ids":["eia-epa2025-any-reliability-states"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.","locator":"Table11.3 Tennessee row;without_major_events_caidi;Year 2024","source_token":"90.4","unit":"minutes per interruption","measurement_role":"agency_reported_distribution_reliability"},"saidi_history_any_all_events_2023":{"value":857.9,"source_token":"857.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_all_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2022":{"value":404.5,"source_token":"404.5","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_all_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2021":{"value":302.7,"source_token":"302.7","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_all_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2020":{"value":588.0,"source_token":"588","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_all_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2019":{"value":266.9,"source_token":"266.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_all_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2018":{"value":199.8,"source_token":"199.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_all_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2017":{"value":512.8,"source_token":"512.8","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_all_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2016":{"value":197.2,"source_token":"197.2","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_all_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_all_events_2015":{"value":222.4,"source_token":"222.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_all_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2023":{"value":186.1,"source_token":"186.1","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_without_major_events;Year 2023","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2022":{"value":188.3,"source_token":"188.3","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_without_major_events;Year 2022","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2021":{"value":149.4,"source_token":"149.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_without_major_events;Year 2021","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2020":{"value":148.4,"source_token":"148.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_without_major_events;Year 2020","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2019":{"value":161.4,"source_token":"161.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_without_major_events;Year 2019","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2018":{"value":139.6,"source_token":"139.6","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_without_major_events;Year 2018","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2017":{"value":142.4,"source_token":"142.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_without_major_events;Year 2017","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2016":{"value":144.4,"source_token":"144.4","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_without_major_events;Year 2016","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_any_without_major_events_2015":{"value":124.9,"source_token":"124.9","source_ids":["eia-epa2025-saidi-state-history"],"unit":"minutes per year","measurement_role":"agency_reported_historical_saidi","locator":"Table11.4 Tennessee row;any_without_major_events;Year 2015","scope":"Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saidi_history_basis":{"value":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","source_ids":["eia-epa2025-saidi-state-history"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.","locator":"Table11.4 header and method notes;2015-2023 supplemental history"},"saifi_history_any_all_events_2023":{"value":2.812,"source_token":"2.812","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_all_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2022":{"value":3.196,"source_token":"3.196","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_all_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2021":{"value":2.019,"source_token":"2.019","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_all_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2020":{"value":2.14,"source_token":"2.14","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_all_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2019":{"value":2.151,"source_token":"2.151","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_all_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2018":{"value":1.901,"source_token":"1.901","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_all_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2017":{"value":1.806,"source_token":"1.806","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_all_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2016":{"value":1.78,"source_token":"1.78","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_all_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_all_events_2015":{"value":1.769,"source_token":"1.769","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_all_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2023":{"value":1.898,"source_token":"1.898","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_without_major_events;Year 2023","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2022":{"value":1.949,"source_token":"1.949","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_without_major_events;Year 2022","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2021":{"value":1.706,"source_token":"1.706","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_without_major_events;Year 2021","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2020":{"value":1.573,"source_token":"1.573","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_without_major_events;Year 2020","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2019":{"value":1.794,"source_token":"1.794","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_without_major_events;Year 2019","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2018":{"value":1.689,"source_token":"1.689","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_without_major_events;Year 2018","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2017":{"value":1.469,"source_token":"1.469","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_without_major_events;Year 2017","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2016":{"value":1.566,"source_token":"1.566","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_without_major_events;Year 2016","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_any_without_major_events_2015":{"value":1.49,"source_token":"1.49","source_ids":["eia-epa2025-saifi-state-history"],"unit":"times per year","measurement_role":"agency_reported_historical_saifi","locator":"Table11.5 Tennessee row;any_without_major_events;Year 2015","scope":"Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"saifi_history_basis":{"value":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","source_ids":["eia-epa2025-saifi-state-history"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.","locator":"Table11.5 header and method notes;2015-2023 supplemental history"},"caidi_history_any_all_events_2023":{"value":305.1,"source_token":"305.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_all_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2022":{"value":126.6,"source_token":"126.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_all_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2021":{"value":149.9,"source_token":"149.9","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_all_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2020":{"value":274.8,"source_token":"274.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_all_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2019":{"value":124.1,"source_token":"124.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_all_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2018":{"value":105.1,"source_token":"105.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_all_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2017":{"value":284.0,"source_token":"284","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_all_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2016":{"value":110.7,"source_token":"110.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_all_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_all_events_2015":{"value":125.8,"source_token":"125.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_all_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2023":{"value":98.1,"source_token":"98.1","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_without_major_events;Year 2023","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2022":{"value":96.6,"source_token":"96.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_without_major_events;Year 2022","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2021":{"value":87.6,"source_token":"87.6","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_without_major_events;Year 2021","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2020":{"value":94.4,"source_token":"94.4","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_without_major_events;Year 2020","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2019":{"value":90.0,"source_token":"90","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_without_major_events;Year 2019","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2018":{"value":82.7,"source_token":"82.7","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_without_major_events;Year 2018","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2017":{"value":97.0,"source_token":"97","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_without_major_events;Year 2017","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2016":{"value":92.3,"source_token":"92.3","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_without_major_events;Year 2016","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_any_without_major_events_2015":{"value":83.8,"source_token":"83.8","source_ids":["eia-epa2025-caidi-state-history"],"unit":"minutes per interruption","measurement_role":"agency_reported_historical_caidi","locator":"Table11.6 Tennessee row;any_without_major_events;Year 2015","scope":"Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation."},"caidi_history_basis":{"value":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","source_ids":["eia-epa2025-caidi-state-history"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.","locator":"Table11.6 header and method notes;2015-2023 supplemental history"}}}],"sources":{"pjm-process":{"url":"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/","title":"Annual process for vetting large load requests","publisher":"PJM Interconnection","published_on":"2026-09-29","date_note":null,"checked_at":"2026-10-23T11:36:35.258210+00:00","sha256":"fd217cefb4a51c7c12bc244d293d2933e95d84ac8115ceb58e7b1f76a192cae6","scope":"PJM says it does not have a load interconnection queue. Utilities submit forecast adjustments. No comparable queue total is established.","tier":"A","establishes_status":[]},"eia-prices":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"Electric Power Monthly, table 5.6.A","publisher":"U.S. Energy Information Administration","published_on":"2026-09-24","date_note":null,"checked_at":"2026-10-23T11:36:34.899891+00:00","sha256":"17ebeca2c90f3f0e5aa41062a2f90952c8ffdf396479281ce6b363ef2fcc1b90","scope":"Captured public table compares July 2026 and July 2025 residential average prices. Preliminary estimates, not bills or data center cost attribution. The next scheduled release is not treated as available.","tier":"A","establishes_status":[],"additional_review_scope":"October26additionalreview of retainedJulycommercialandindustrialcolumns,51states/DC. Originalresidentialscope,clocks,releaseidentityandhashpreserved;no newsourcecapture."},"eia-price-check-20261023-1645":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"EIA table5.6.A August2026 and2025 public HTML capture","publisher":"U.S. Energy Information Administration","published_on":null,"date_note":"Exact publication day is not established by these captures. The table and spreadsheet show August2026 and August2025, while the report page header and main index still identify July2026 with a September24 release and October23 scheduled next release. That older header date is not assigned to these new values.","checked_at":"2026-10-23T16:45:07.936393+00:00","sha256":"fbfc4385f5613eb8d2b118ef2603bd81d1162f33e5ffda2dc8f03a1a3bfeb813","scope":"Public table5.6.A residential state average prices in cents per kWh. All51 state and DC pairs agree across the retained HTML and spreadsheet at the displayed hundredth. 2026values are preliminary and2025values final. Regional divisions and the U.S.total are excluded.","tier":"A","establishes_status":[]},"eia-residential-xlsx-20261023":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx","title":"EIA table5.6.A August2026 and2025 public spreadsheet","publisher":"U.S. Energy Information Administration","published_on":null,"date_note":"Exact publication day is not established by these captures. The table and spreadsheet show August2026 and August2025, while the report page header and main index still identify July2026 with a September24 release and October23 scheduled next release. That older header date is not assigned to these new values.","checked_at":"2026-10-23T16:47:20.189135+00:00","sha256":"7830737eb277be4096b3c0eb491f53c71ff91ce7133e9869b76de61f64f679b9","scope":"Public table5.6.A residential state average prices in cents per kWh. All51 state and DC pairs agree across the retained HTML and spreadsheet at the displayed hundredth. 2026values are preliminary and2025values final. Regional divisions and the U.S.total are excluded.","tier":"A","establishes_status":[]},"pjm-manual19-current-20261023":{"url":"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf","title":"PJM Manual 19 revision 39 and current forecast adjustment guidelines","publisher":"PJM Interconnection","published_on":null,"date_note":"Original public posting day is unknown. Approval June 29 and effect June 30, 2026 are separately documented, not substituted for publication.","checked_at":"2026-10-23T20:06:42.444133+00:00","sha256":"50434e43f309ae57ca33e49943552a46248ddd1f271086e9a45524c01dabc449","scope":"Actual current clean manual, cover, approval and full Attachment B. Supports adoption of this forecast review procedure only, not tariff approval, final adoption of any submitted forecast or actual connection and load.","tier":"A","establishes_status":["approved"]},"tva-rate-resolution-20260820-20261024":{"url":"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1","title":"Stamped TVA rate change resolution and memorandum","publisher":"Tennessee Valley Authority","published_on":null,"date_note":"The memorandum is dated August 10, 2026; the board stamp says approved August 20, 2026. Neither filename nor the proposed heading alone establishes approval. Publication day unknown.","scope":"All 19 PDF pages read and visually inspected, including the actual approval stamp, memorandum and attachments I through III. Referenced detailed schedule exhibits in a separate board folder are not in this PDF and were not accessed. Later implementation guidance and governing tariff stack unreviewed.","checked_at":"2026-10-24T16:04:14.542904+00:00","sha256":"a409b310fea99ec56736b766b27a1444550968cbe23c4be527cce38bc8c83c6e","tier":"A","establishes_status":["approved"]},"tva-official-release-syndicated-20260820-20261024":{"url":"https://www.prnewswire.com/news-releases/tva-board-protects-consumers-strengthens-reliability-amid-rising-power-demand-302856900.html","title":"TVA issued announcement of the August 20 board action","publisher":"Tennessee Valley Authority","published_on":"2026-08-20","date_note":"TVA issued release dated August 20, 2026 at 6:55 p.m. Eastern, syndicated on PR Newswire.","scope":"Agency issued announcement corroborates the dated rate structure approval and identifies the stated consumer protection purpose. Not an editorial report or proof of actual savings, load, local rate implementation or an individual service agreement.","checked_at":"2026-10-24T16:04:14.750150+00:00","sha256":"fd7e4d46fdd09531723ce07da18aadd807477d824b3da509d1527168a4c307b1","tier":"A","establishes_status":["approved"]},"eia-sector-xlsx-20261026":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx","title":"EIA table5.6.A commercial and industrial state comparisons","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"CurrentcapturedHTMLexplicitlyReleaseDateOctober23,2026;nextNovember24isnotactualpublicationofnewdata.","scope":"Commercial/industrial columnsDthroughG XLSX and matchingHTMLrows for50statesandDC,notregionalorUSaggregate rows. State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","checked_at":"2026-10-26T12:25:57.117925+00:00","sha256":"7830737eb277be4096b3c0eb491f53c71ff91ce7133e9869b76de61f64f679b9","tier":"A","establishes_status":["historical"]},"eia-sector-html-20261026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a","title":"EIA August2026 price table and released report header","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"CurrentcapturedHTMLexplicitlyReleaseDateOctober23,2026;nextNovember24isnotactualpublicationofnewdata.","scope":"Commercial/industrial columnsDthroughG XLSX and matchingHTMLrows for50statesandDC,notregionalorUSaggregate rows. State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.","checked_at":"2026-10-26T12:25:57.563354+00:00","sha256":"fd9538a038063f2ad2d62d799c6616392150c100da2e27001b409a7db61e43c0","tier":"A","establishes_status":["historical"]},"eia-ytd-xlsx-20261026":{"url":"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx","title":"EIA Table5.6.B January through August cumulative sector prices","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"Report header explicitly releases August2026 data October23,2026. Next scheduled release is not actual publication.","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","checked_at":"2026-10-26T15:32:57.123492+00:00","sha256":"bddeeb6e562bf3c982d11ad990d3ea22285275d7d5a75b54039e19757876994e","tier":"A","establishes_status":["historical"]},"eia-ytd-html-20261026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b","title":"EIA Table5.6.B January through August cumulative sector prices","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","date_note":"Report header explicitly releases August2026 data October23,2026. Next scheduled release is not actual publication.","scope":"January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.","checked_at":"2026-10-26T15:32:38.218526+00:00","sha256":"8c7409cacc21048b831d96d094400d3a7b2bbac0d4cbd78e84c3d4c99b334a29","tier":"A","establishes_status":["historical"]},"eia-state-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a","title":"EIA Electric Power Monthly Table1.3.A, utility scale facility net generation by state and sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T00:26:58.495431+00:00","sha256":"9a89406a41427b37eda8d8f18d214983c7f51834ebceeb528cdfdb4244f09990","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-net-generation-aug2026.html","tier":"A","scope":"Complete51state/DC utility scale generation rows, not Census division totals or USaggregate. August2026 preliminary versusAugust2025 final;commercial/industrial generator classification is not customer electricity use.","establishes_status":["historical"]},"eia-state-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b","title":"EIA Electric Power Monthly Table1.3.B utility scale facility net generation by state and sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T00:55:44.858242+00:00","sha256":"c8ba76926634a47f369116b1c7820b084eabb24d7d5f83bd1a4683a703f825d6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulative January throughAugust2026/2025 generation rows, not monthlyAugust, annualtotals orCensusdivision/USaggregates. Generatorsectors notcustomeruse.","establishes_status":["historical"]},"eia-state-gas-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a","title":"EIA Electric Power Monthly Table1.7.A utility scale facility net generation from natural gas by state and producer sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T01:25:59.736250+00:00","sha256":"6a32013bfbe60c7bb68a2c80aeadb72b7dd57a7f66a64e835f1ef62beff2fa3e","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-gas-generation-aug2026.html","tier":"A","scope":"Whole51state/DC list for natural gas fuel generation only. Not gasproduction/fuelconsumption/allfuelgeneration ordata-center electricityfuelmix. NM/-- andnegativezero source markers retained.","establishes_status":["historical"]},"eia-state-gas-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b","title":"EIA Electric Power Monthly Table1.7.B utility scale facility net generation from natural gas by state and producer sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T01:55:48.321070+00:00","sha256":"c306bd11fb76bc034b474ed8f06f7c29000d2b93b10afe14ee9a3563220db80c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-gas-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulativeJanthroughAug naturalgas generation rows,notmonthlyAugust/annualtotals,gasproduction/fuelconsumption ordata-centerfuelmix. Publishedpercentagescalculatedbeforerounding;NMand--retainliteralmeaning.","establishes_status":["historical"]},"eia-state-nuclear-generation-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a","title":"EIA Electric Power Monthly Table1.9.A utility scale facility net generation from nuclear energy by state and producer sector, August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T05:25:41.261720+00:00","sha256":"ae346eb0bc5140a0fe5e38187badd5ce334c10c1468707f4af5147d56dacdb28","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nuclear-generation-aug2026.html","tier":"A","scope":"Complete51state/DC nuclear generation rows,not installedcapacity/plantinventory,customerdemand,deliveredpowerfuelmix or emissions. Preliminary2026/final2025;sourcepercentagecalculatedbeforerounding. Zero generation notabsenceofnuclearcapacity.","establishes_status":["historical"]},"eia-state-nuclear-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b","title":"EIA Electric Power Monthly Table1.9.B utility scale facility net generation from nuclear energy by state and producer sector, year to date through August2026 and2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T05:55:38.727441+00:00","sha256":"159560c5a77a375a4c2f3ebb7aab21c2ecfb013d23fa7baa0781eddf7e642471","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nuclear-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC cumulativeJanthroughAug nuclear netgeneration rows,notmonthlyAugust/annualtotals,capacity/plantinventory or data-center deliveredfuelmix. Preliminary2026/final2025;publishedpercentagebeforerounding,zero notplantabsence.","establishes_status":["historical"]},"eia-state-coal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a","title":"EIA Electric Power Monthly Table1.4.A August2026/2025 utility scale facility net generation from coal by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:26:07.500962+00:00","sha256":"fc35026730bc070c8b0094d7394bd496c2fed4e09aa42688371d0ca1a1246495","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-coal-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC coal netgeneration rows;monthlyAugust notYTD;notcoalreceipts/fuelconsumption/capacity/plantinventory/emissions ordata-centerfuelmix. Preliminary2026/final2025,sourceNM/--percentagesnotzero.","establishes_status":["historical"]},"eia-state-coal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b","title":"EIA Electric Power Monthly Table1.4.B cumulativeJanuarythroughAugust2026/2025 utility scale facility net generation from coal by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:26:07.859775+00:00","sha256":"69316d2a9768e8ff9285da375c444eb7b187c4caefbda6d753bf9cbbc5dca9d3","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-coal-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC coal netgeneration rows;cumulativeYTD notmonthly/annual;notcoalreceipts/fuelconsumption/capacity/plantinventory/emissions ordata-centerfuelmix. Preliminary2026/final2025,sourceNM/--percentagesnotzero.","establishes_status":["historical"]},"eia-state-wind-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a","title":"EIA Electric Power Monthly Table1.14.A August2026/2025 utility scale facility net generation from wind by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:56:02.206920+00:00","sha256":"e58a6e19a58949e89669f6a56b58918418a443c305a4ac8bcc1d37417abcb437","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-wind-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC wind netgeneration rows;monthAugust notYTD;notcapacity/turbineinventory,renewableprocurement/hourlymatching,deliveredpower oravoidedemissions. Preliminary2026/final2025;NM/--retained,zero notcapacityabsence.","establishes_status":["historical"]},"eia-state-wind-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b","title":"EIA Electric Power Monthly Table1.14.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from wind by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T06:56:02.511460+00:00","sha256":"ea80ce88a0eb5af674faa0e89b52b7a03a1af2fe547f6750160c5c895281a03c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-wind-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC wind netgeneration rows;cumulativeYTD notmonth/annual;notcapacity/turbineinventory,renewableprocurement/hourlymatching,deliveredpower oravoidedemissions. Preliminary2026/final2025;NM/--retained,zero notcapacityabsence.","establishes_status":["historical"]},"eia-state-hydro-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a","title":"EIA Electric Power Monthly Table1.10.A August2026/2025 utility scale facility net generation from conventional hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:30:06.432055+00:00","sha256":"9e12df2bd7d252a9fa01d46fc8457ba8ad61319a7eab99f9314316b04c3b3589","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-hydro-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC conventionalhydro generation rows,excludingpumpedstorage;monthAugust notYTD;notreservoirlevels/wateravailability/withdrawal,capacity/daminventory,deliveredpower/renewableprocurement oravoidedemissions. Preliminary2026/final2025;NM/--retained.","establishes_status":["historical"]},"eia-state-hydro-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b","title":"EIA Electric Power Monthly Table1.10.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from conventional hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:30:07.032975+00:00","sha256":"4b7f8c5f24097203262594ab1a5943139918233f3fe99b4eec3c6c40f7ec4565","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-hydro-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC conventionalhydro generation rows,excludingpumpedstorage;cumulativeYTD notmonth/annual;notreservoirlevels/wateravailability/withdrawal,capacity/daminventory,deliveredpower/renewableprocurement oravoidedemissions. Preliminary2026/final2025;NM/--retained.","establishes_status":["historical"]},"eia-state-pumped-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a","title":"EIA Electric Power Monthly Table1.12.A August2026/2025 utility scale facility net generation from pumped storage hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:55:51.178196+00:00","sha256":"f47cb6a724ad141bfef77dd1b93133635b60b03ef6f373012aeee441f3fd250b","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-pumped-generation-month-aug2026.html","tier":"A","scope":"Complete51state/DC pumpedstorage netgeneration rows,separatefromconventionalhydro;month notYTD;negativevalueskept,notstoragecapacity/grossdischargedenergy/efficiency/waterwithdrawal ordatacenterpower. Preliminary2026/final2025,undefinedpercentmarkersretained.","establishes_status":["historical"]},"eia-state-pumped-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b","title":"EIA Electric Power Monthly Table1.12.B cumulativeJanthroughAug2026/2025 utility scale facility net generation from pumped storage hydroelectric power by state and producer sector","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T07:55:51.535361+00:00","sha256":"7adac72989762f18b744568df6258ad9a8ef9c26b3e6b3acee36d31948f85ec2","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-pumped-generation-ytd-aug2026.html","tier":"A","scope":"Complete51state/DC pumpedstorage netgeneration rows,separatefromconventionalhydro;YTD notmonth/annual;negativevalueskept,notstoragecapacity/grossdischargedenergy/efficiency/waterwithdrawal ordatacenterpower. Preliminary2026/final2025,undefinedpercentmarkersretained.","establishes_status":["historical"]},"eia-state-solar-pv-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a","title":"EIA Electric Power Monthly Table1.17.A solar photovoltaic state net generation: utility scale and estimated small scale, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:26:06.274803+00:00","sha256":"527d6c8a60272658c71f308929e0f68ee652fd8c922947fe574963371e6f2b56","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-pv-generation-month-aug2026.html","tier":"A","scope":"Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","establishes_status":["historical"]},"eia-state-solar-pv-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b","title":"EIA Electric Power Monthly Table1.17.B solar photovoltaic state net generation: utility scale and estimated small scale, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:26:06.616834+00:00","sha256":"6f6fce2d81012f27d144838cc41d611e8d7e5b75c472289c064f1934cdf6be4c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-pv-generation-ytd-aug2026.html","tier":"A","scope":"Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.","establishes_status":["historical"]},"eia-state-solar-thermal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a","title":"EIA Electric Power Monthly Table1.18.A solar thermal utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:55:36.602781+00:00","sha256":"9741f9ca822bd33c5ed8414f2dc95dcfa451ac39975a3207e188104d9303f7aa","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-thermal-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","establishes_status":["historical"]},"eia-state-solar-thermal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b","title":"EIA Electric Power Monthly Table1.18.B solar thermal utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T09:55:36.899676+00:00","sha256":"522fb2bee7cace3160be662d153680672e3d07c3494ac1882b71561f7514e22e","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-solar-thermal-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.","establishes_status":["historical"]},"eia-state-other-energy-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a","title":"EIA Electric Power Monthly Table1.13.A Other Energy Sources utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:25:44.215156+00:00","sha256":"b8589b23d096be4e03c11bedffc6d7af0bed5fa2ec64fa89e2f21624909cc7b6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Capture filename initially called geothermal in error; exact source title is Other Energy Sources. Filename is not evidence of fuel identity.","establishes_status":["historical"]},"eia-state-other-energy-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b","title":"EIA Electric Power Monthly Table1.13.B Other Energy Sources utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:25:44.437082+00:00","sha256":"cc0d7f4a0db49596101f43d4cd1103a6b80dcb399ed620f52157ffa31e28269c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Capture filename initially called geothermal in error; exact source title is Other Energy Sources. Filename is not evidence of fuel identity.","establishes_status":["historical"]},"eia-state-geothermal-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a","title":"EIA Electric Power Monthly Table1.16.A Geothermal utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:55:37.792695+00:00","sha256":"430765fda25b13841593833228c799f768849344f4e4645d5c29783c76b3a310","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-actual-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","establishes_status":["historical"]},"eia-state-geothermal-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b","title":"EIA Electric Power Monthly Table1.16.B Geothermal utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T10:55:38.021096+00:00","sha256":"02b888bc082f02e9a803e89552c180df37b090ac4bb92376bcc69f668a9bc109","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-geothermal-actual-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.","establishes_status":["historical"]},"eia-state-biomass-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a","title":"EIA Electric Power Monthly Table1.15.A Biomass utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:25:40.960261+00:00","sha256":"1f5e6b6e275bacc2d88c3d2692efda69e80284e71dddfd1e5caca84dffae92d4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-biomass-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","establishes_status":["historical"]},"eia-state-biomass-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b","title":"EIA Electric Power Monthly Table1.15.B Biomass utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:25:41.153412+00:00","sha256":"f3f3f854afa04798193429529b13e82f74000ac95e7d1a2a12aa51662437eca2","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-biomass-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.","establishes_status":["historical"]},"eia-state-petroleum-liquids-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a","title":"EIA Electric Power Monthly Table1.5.A Petroleum Liquids utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:44.484512+00:00","sha256":"a23eb87738ca68822004a0426eed58a8ea1b0ee0f5ae96170253a31cbd18942f","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-liquids-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-liquids-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b","title":"EIA Electric Power Monthly Table1.5.B Petroleum Liquids utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:44.728254+00:00","sha256":"5ee9f2be2884f3e256ce2a3e02c8270753ab2e5d7ab0507d54250638c00487a8","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-liquids-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-coke-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a","title":"EIA Electric Power Monthly Table1.6.A Petroleum Coke utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:45.070566+00:00","sha256":"64935012da6e62146d74425ac1c830a9c62e840901393f03f3ad363dad2f9d17","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-coke-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-petroleum-coke-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b","title":"EIA Electric Power Monthly Table1.6.B Petroleum Coke utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T11:55:45.279055+00:00","sha256":"1e09b99b06270a93a8293578b1e47c67dcdddf03959878851a1ac453f2202f80","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-petroleum-coke-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.","establishes_status":["historical"]},"eia-state-other-fossil-gas-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a","title":"EIA Electric Power Monthly Table1.8.A Other Fossil Gas utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:25:42.932701+00:00","sha256":"ebc1838c0d9e26e1884695c95399f2793f7fa08d6de5762f9ab8c0a5daebda9c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-other-gases-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Index uses Other Gases; original table title specifies Other Fossil Gas, retained here without equating Natural Gas.","establishes_status":["historical"]},"eia-state-other-fossil-gas-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b","title":"EIA Electric Power Monthly Table1.8.B Other Fossil Gas utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:25:43.279403+00:00","sha256":"b273bf54a3b99a153e08448d69e5e56cf5496cc792125e6a73f9e4e915a27104","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-other-gases-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Index uses Other Gases; original table title specifies Other Fossil Gas, retained here without equating Natural Gas.","establishes_status":["historical"]},"eia-state-nonhydro-renewables-generation-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a","title":"EIA Electric Power Monthly Table1.11.A Renewable Sources Excluding Hydroelectric utility scale state net generation, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:55:43.156505+00:00","sha256":"d98e7e79804a0ccd737e9ac399f64c210a141f7df3200368f3a2b0a6433f6f00","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nonhydro-renewables-generation-month-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","establishes_status":["historical"]},"eia-state-nonhydro-renewables-generation-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b","title":"EIA Electric Power Monthly Table1.11.B Renewable Sources Excluding Hydroelectric utility scale state net generation, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T12:55:43.340447+00:00","sha256":"3d4249d5d441323d0849b1fdb08845cb45ee2587311b84364aa75d52f0dce665","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-nonhydro-renewables-generation-ytd-aug2026.html","tier":"A","scope":"Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.","establishes_status":["historical"]},"eia-state-retail-sales-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a","title":"EIA Electric Power Monthly Table5.4.A Sales of Electricity to Ultimate Customers by End-Use Sector,by State, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:01:02.155248+00:00","sha256":"f289ad1eb2b68b07f015bb846f8c19135fbbe9ff4a5aabead8de9796c354212f","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-sales-month-aug2026.html","tier":"A","scope":"Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","establishes_status":["historical"]},"eia-state-retail-sales-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b","title":"EIA Electric Power Monthly Table5.4.B Sales of Electricity to Ultimate Customers by End-Use Sector,by State, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:01:02.440305+00:00","sha256":"836b3186730666bcf3a4adcbe5fd29931786fffc3cd5663f22dfde4ee2389243","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-sales-ytd-aug2026.html","tier":"A","scope":"Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.","establishes_status":["historical"]},"eia-state-retail-revenue-month-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a","title":"EIA Electric Power Monthly Table5.5.A Revenue from Sales of Electricity to Ultimate Customers by End-Use Sector,by State, August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:30:48.417748+00:00","sha256":"67b465253fdf956455755bd3ca342eeee983672af9cf883ec12fc3bdacd8eba6","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-revenue-month-aug2026.html","tier":"A","scope":"Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","establishes_status":["historical"]},"eia-state-retail-revenue-ytd-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b","title":"EIA Electric Power Monthly Table5.5.B Revenue from Sales of Electricity to Ultimate Customers by End-Use Sector,by State, January through August 2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T16:30:49.025316+00:00","sha256":"f3630914ac0a13920af8b7afad9e321630c90d87731b7ca06b278312db06273b","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-revenue-ytd-aug2026.html","tier":"A","scope":"Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.","establishes_status":["historical"]},"eia-state-retail-customers-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08","title":"EIA Electric Power Monthly Table5.8 Number of Ultimate Customers Served by Sector by State:August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T17:01:56.921729+00:00","sha256":"94daef9ec234f1151524adbc5a5a221aeaccc71a48d1c117663f50a52a89d2b7","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-retail-customers-aug2026.html","tier":"A","scope":"Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.","establishes_status":["historical"]},"eia-state-utility-capacity-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a","title":"EIA Electric Power Monthly Table6.2.A Net Summer Capacity of Utility Scale Units by Technology and State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:03:55.269501+00:00","sha256":"489bfa1db54aa8bebb976a2f1f0e9e6f85076837cdb16b785ce7727484a41ef4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-aug2026.html","tier":"A","scope":"Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.","establishes_status":["historical"]},"eia-state-utility-capacity-b-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b","title":"EIA Electric Power Monthly Table6.2.B Net Summer Capacity Using Primarily Renewable Energy Sources and by State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:33:44.899891+00:00","sha256":"20f576441d75cc9a13b4fecd53baea7b9c348ce5a405db26a130ba9d907cd6e5","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-b-aug2026.html","tier":"A","scope":"Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.","establishes_status":["historical"]},"eia-state-utility-capacity-c-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c","title":"EIA Electric Power Monthly Table6.2.C Net Summer Capacity of Utility Scale Units Using Primarily Fossil Fuels and by State,August2026/2025","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T18:33:45.187621+00:00","sha256":"c02ce3ee446a70f915c4a47e07e680b6b048cf2b1d7e51cb055c1a6beeab78a7","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-state-utility-capacity-c-aug2026.html","tier":"A","scope":"Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.","establishes_status":["historical"]},"eia-new-utility-units-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03","title":"EIA Electric Power Monthly Table6.3 New Utility Scale Generating Units by Operating Company,Plant,and Month,2026(January-August rows)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T19:04:07.797419+00:00","sha256":"051d48e2118d42562fccb54c91dc2e566cea1e24bf3dd2ccfff5094597e72f5f","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-new-utility-units-aug2026.html","tier":"A","scope":"EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.","establishes_status":["historical"]},"eia-planned-utility-additions-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05","title":"EIA Electric Power Monthly Table6.5 Planned U.S.Electric Generating Unit Additions(August2026 dataset)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T20:03:52.284370+00:00","sha256":"769a513425ec30e9bf6983fc4186d2f367e253fb6ed1072537ae44495c762912","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-planned-utility-additions-aug2026.html","tier":"A","scope":"EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.","establishes_status":["historical"]},"eia-planned-utility-retirements-aug2026":{"url":"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06","title":"EIA Electric Power Monthly Table6.6 Planned U.S.Electric Generating Unit Retirements(August2026 dataset)","publisher":"U.S. Energy Information Administration","published_on":"2026-10-23","checked_at":"2026-10-27T20:33:47.123009+00:00","sha256":"41ddaac546510a68c479078c4a014eb477bf8d230f0a4a2c18e6596f4f2f1f71","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-planned-utility-retirements-aug2026.html","tier":"A","scope":"EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.","establishes_status":["historical"]},"eia-epa2025-ieee-reliability-states":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.2 IEEE distribution reliability by state2025 and2024","published_on":"2026-10-21","checked_at":"2026-10-27T23:04:08.692385+00:00","sha256":"5709d427dc11697b35e5e04aa1a247483fe64906acac03437366504ec591003c","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-reliability-ieee-20261027.html","tier":"A","establishes_status":["historical"],"scope":"EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution."},"eia-epa2025-any-reliability-states":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.3 any-method distribution reliability by state2025 and2024","published_on":"2026-10-21","checked_at":"2026-10-27T23:33:56.041642+00:00","sha256":"40cf45b1731954b256ee1d6c79f2e29b126baf8012ba47794d6546dd6f239cb5","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-reliability-any-method-20261027.html","tier":"A","establishes_status":["historical"],"scope":"EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins."},"eia-epa2025-saidi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.4 annual SAIDI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T00:04:10.386421+00:00","sha256":"52f619cdbec1026136cd0b2a0414cc6b551066272aebf2de3c6ddee772b1fc3d","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-saidi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution."},"eia-epa2025-saifi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.5 annual SAIFI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T00:34:19.009385+00:00","sha256":"6b41da37d3a8d7491eee3d7355e4625b385f362fb6c4796d0335b92f4d0b3ff4","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-saifi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation."},"eia-epa2025-caidi-state-history":{"url":"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html","publisher":"U.S. Energy Information Administration","title":"Electric Power Annual Table11.6 annual CAIDI by state2015 through2025","published_on":"2026-10-21","checked_at":"2026-10-28T01:03:57.191681+00:00","sha256":"1b065b30dbde195e80079c282ba99411c62ead9d971e378dd03df0baae861675","raw_path":"/Users/shaunwilson/Documents/Data Centers Atlas/build/cache/layers-20261023/eia-epa2025-caidi-history-20261028.html","tier":"A","establishes_status":["historical"],"scope":"EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution."}},"details":[{"id":"grid-va","html":"<article><h3>PJM regional forecast adjustment process</h3><p class=\"layer-scope\">PJM regional context. A state assignment is not a quantitative allocation to Virginia.</p><dl class=\"layer-fields\"><dt>Meaning</dt><dd>Forecast adjustments, no load interconnection queue<span class=\"layer-source\"><a href=\"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/\">PJM Interconnection</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Regional context for the PJM footprint, not a Virginia only total. Locator: Named request or forecast discussion.</p></dd><dt>Observation date</dt><dd>September 29, 2026<span class=\"layer-source\"><a href=\"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/\">PJM Interconnection</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">PJM publication date. Locator: Named request or forecast discussion.</p></dd><dt>Requested capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/\">PJM Interconnection</a>. Source: September 29, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No comparable regional queue total established in this review. Locator: Named request or forecast discussion.</p></dd></dl></article>"},{"id":"price-tn","html":"<article><h3>Tennessee</h3><p class=\"layer-scope\">A two point comparison, not a complete time series. State average revenue per unit sold is not a household bill. No causal attribution to data centers.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>July 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential comparison month. Locator: Table heading.</p></dd><dt>Prior period</dt><dd>July 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Same month in the preceding year. Locator: Table heading.</p></dd><dt>Price</dt><dd>13.71 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Preliminary residential state average, cents per kWh. Locator: Residential July 2026, Tennessee.</p></dd><dt>Prior price</dt><dd>13.21 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential state average for the comparison month. Locator: Residential July 2025, Tennessee.</p></dd></dl></article>"},{"id":"price-tn-202608","html":"<article><h3>Tennessee</h3><p class=\"layer-scope\">Captured August residential comparison. The earlier July comparison remains in the source history. State average revenue per unit sold is not a household bill or evidence of a data center effect.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Residential comparison month. Locator: Table_5_06_A!B4:C4.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Same month in the preceding year. Locator: Table_5_06_A!B4:C4.</p></dd><dt>Price</dt><dd>13.42 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Preliminary August2026 residential state average, cents per kWh. Locator: Table_5_06_A!B44:C44.</p></dd><dt>Prior price</dt><dd>13.09 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Final August2025 residential state average, cents per kWh. Locator: Table_5_06_A!B44:C44.</p></dd><dt>Source context</dt><dd>The August table and public spreadsheet agree. The surrounding report header still identifies July and its older release date. The exact publication day of these August values is not established here.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">The scheduled next release day is not treated as proof of actual publication. This review uses the periods stated in the two data tables and preserves the earlier July capture. Locator: HTML table heading and report header; spreadsheet rows1 through4 and67.</p></dd></dl></article>"},{"id":"grid-pjm-manual19-procedure-20260630","html":"<article><h3>PJM adopted forecast adjustment review procedure</h3><p class=\"layer-scope\">Regional procedure shown in the PJM state panels for context. Manual approval, utility submissions, final forecasts and actual load remain distinct.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>approved<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Approval concerns this manual revision only. Locator: Printed page 3.</p></dd><dt>Process basis</dt><dd>Forecast review procedure<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Regional process documentation, excluded from utility tariff status. Locator: Attachment B printed pages 26 through 32.</p></dd><dt>Revision</dt><dd>Revision 39<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Captured current clean version, separate from the earlier change presentation. Locator: Cover and printed page 4.</p></dd><dt>Approved on</dt><dd>June 29, 2026<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Manual approval day. Locator: Printed page 3.</p></dd><dt>Effective on</dt><dd>June 30, 2026<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Manual effect, separate from approval and original posting. Locator: Cover and printed page 3.</p></dd><dt>Threshold wording</dt><dd>Solicitation covers changes of at least 50 MW, positive or negative. Verification instead says category totals greater than 50 MW.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Both threshold descriptions retained; no silent resolution for exactly 50 MW. Locator: Printed pages 26 and 29.</p></dd><dt>Regulator review</dt><dd>Submitters must offer each relevant state regulator review before submission. Participation is voluntary, and submissions need not follow regulator feedback if both perspectives are provided.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Review opportunity and feedback are distinct from approval of forecasts or connections. Locator: Printed page 28.</p></dd><dt>Firm classification</dt><dd>Firm status requires a qualifying service, construction or supply commitment plus financial support. Nonfirm portions may enter forecast periods outside the capacity auction horizon.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Forecast classification only. Firm portions can still be reduced for growth constraints. Locator: Printed pages 28 through 30.</p></dd><dt>Duplicate requests</dt><dd>Customers must be asked about potentially duplicated requests lacking service or construction commitments. Silence counts toward duplication. Missing site, location and MW details can remove such requests; discounting can reflect project milestones.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No actual duplicate count or adjustment result is established. Locator: Printed pages 29 and 30.</p></dd><dt>Final determination</dt><dd>PJM reviews assumptions, regulator feedback and independent forecast uncertainty before determining the final adjustment. A submitter can retain its preliminary amount if the calculated final is higher.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">A submitted number or firm classification does not guarantee unchanged final inclusion. Locator: Printed pages 30 and 31.</p></dd><dt>Timing</dt><dd>The manual schedules final adjustments for November or December and independent forecast review for October or November.<span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">General schedule, not proof of a completed presentation or final 2027 forecast. Locator: Printed pages 26 and 30.</p></dd><dt>Utility tariff</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual utility tariff approval is established by this manual. Locator: Procedure review boundary.</p></dd><dt>Actual load</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No measured actual load quantity is established by this procedure. Locator: Procedure review boundary.</p></dd><dt>Approved capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No connection capacity approval is established. Locator: Procedure review boundary.</p></dd><dt>Individual approvals</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No individual customer decision is established. Locator: Procedure review boundary.</p></dd><dt>Requested capacity</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No comparable regional queue total is established. Locator: Procedure review boundary.</p></dd><dt>Pjm final forecast</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No final amount for the current submitted forecast is established. Locator: Procedure review boundary.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf\">PJM Interconnection</a>. Source: Publication date not stated. Checked: October 23, 2026.</span> <p class=\"layer-scope\">No facility identity join is made. Locator: Procedure review boundary.</p></dd></dl></article>"},{"id":"tariff-tn-tva-dc-framework-20260820","html":"<article><h3>TVA approved data service classes and capacity commitment framework</h3><p class=\"layer-scope\">Regional TVA board action shown as Tennessee context with separate billing, cohort and transition clocks. Individual and current outcomes remain unknown.</p><dl class=\"layer-fields\"><dt>Tva stamped rate basis</dt><dd>Stamped board approval with separate implementation clocks<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.prnewswire.com/news-releases/tva-board-protects-consumers-strengthens-reliability-amid-rising-power-demand-302856900.html\">Tennessee Valley Authority</a>. Source: August 20, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Regional TVA framework shown as Tennessee context. Not a Tennessee statewide commission tariff or a claim of complete coverage of other TVA states. Locator: Resolution pages 1 and 2, board approval stamp; memo attachments.</p></dd><dt>Status</dt><dd>approved<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.prnewswire.com/news-releases/tva-board-protects-consumers-strengthens-reliability-amid-rising-power-demand-302856900.html\">Tennessee Valley Authority</a>. Source: August 20, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Dated board approval. Detailed later schedules, delegation decisions and individual service outcomes remain unknown. Locator: Page 2 approval stamp; TVA issued announcement.</p></dd><dt>Utility</dt><dd>Tennessee Valley Authority<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Wholesale, resale and direct service paths remain distinct. One regional supplier, not every Tennessee utility. Locator: Resolution page 1; Attachment I page 11.</p></dd><dt>Approved on</dt><dd>August 20, 2026<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.prnewswire.com/news-releases/tva-board-protects-consumers-strengthens-reliability-amid-rising-power-demand-302856900.html\">Tennessee Valley Authority</a>. Source: August 20, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Actual board stamp and agency announcement, not the earlier internal memorandum signatures. Locator: Resolution page 2; agency release.</p></dd><dt>Memorandum on</dt><dd>August 10, 2026<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Memo and internal review signatures only, not board adoption. Locator: PDF pages 3 and 6.</p></dd><dt>Original notice on</dt><dd>February 18, 2026<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Memo reports the distributor notice date; the original notice exhibit itself was not reviewed. Locator: Memo page 1, physical page 3.</p></dd><dt>Wholesale meter readings begin on</dt><dd>October 2, 2026<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Wholesale bills based on scheduled meter readings on and after this day, not a universal customer service start. Locator: Resolution page 1, operative paragraph.</p></dd><dt>Resale revenue month</dt><dd>October 2026<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Distributor resale revenue month, distinct from wholesale reading day and future phase in. Locator: Resolution page 1, operative paragraph.</p></dd><dt>Classification</dt><dd>Specified 2022 NAICS 518/519 activities, excluding 519210, plus 522320/541214 or computational equipment in TVA judgment.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Major electricity use at the delivery point controls; no individual classification is inferred. Locator: Attachment I physical page 8; Attachment II page 12.</p></dd><dt>Threshold</dt><dd>Schedule DC is mandatory above 5,000 kW of the higher onpeak or offpeak contract demand, with the stated activity criteria.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Contract demand classification, not measured load or an automatic rule for all buildings called data centers. Locator: Attachment II page 12.</p></dd><dt>Optional dca</dt><dd>DCA is an optional distributor offering above 1,000 kW and no more than 5,000 kW, with the same activity criteria.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Availability is not mandatory service at exactly 1,000 kW or proof the distributor offers this option. Locator: Attachment II page 12.</p></dd><dt>Capacity charge</dt><dd>Initial fiscal 2027 cohort: 1.521 million dollars per MW for up to 2,000 MW. Payments are nonrefundable and additional to rate charges.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Cohort specific charge, not a universal price for future cohorts, monthly energy rate, refundable collateral or actual payment. Locator: Attachment II page 12; Attachment I pages 9 and 10.</p></dd><dt>New load exclusion</dt><dd>For new load requests the charge applies only above the first 5 MW of contract demand.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Charging exclusion, not the whole tariff threshold or an automatic waiver for every expansion. Locator: Attachment I page 11.</p></dd><dt>Existing load boundary</dt><dd>Existing load means board approved arrangements before June 1, 2026, or effective contracts before October 1, 2026 with required TVA coordination.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No charge on qualifying Existing load. Contract timing alone without required coordination does not prove an exemption. Locator: Attachment I page 10.</p></dd><dt>Existing expansion waiver</dt><dd>Existing loads may request one location specific waiver for expansion of 5 MW or less; once approved and used, no future waiver at that location.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Request is not approval and the waiver is not repeatable or automatically available to every expansion. Locator: Resolution page 2; Attachment I page 11.</p></dd><dt>Inflight entry</dt><dd>For load requests of 100 MW or less, qualifying prior engagement by June 1, 2026 includes the specified paid study, completed study without upgrades, or executed deposit routes.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">All stated availability and documentary conditions apply. No individual inflight status or automatic exemption from interruption requirements established. Locator: Attachment II page 13.</p></dd><dt>Inflight retention</dt><dd>Status can be lost after failure to execute a required deposit agreement within six months of study results, or failure to use 50 percent of contract demand by the later of two years after contract execution or one year after required transmission upgrades.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Demand use condition for keeping inflight status, not a universal minimum energy purchase or a contract duration. Status cannot be assigned or transferred. Locator: Attachment II pages 13 and 14.</p></dd><dt>Delegated terms</dt><dd>TVA officers can determine payment options, interruption requirements, Firm Generation Date and consistent inflight criteria modifications.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">No fixed current payment period, interruption hours or individual firm date inferred from the memo. Locator: Resolution pages 1 and 2; Attachment II pages 13 and 14.</p></dd><dt>Rate phase</dt><dd>Fiscal 2027 corresponding manufacturing rate levels precede two approximately 8.25 percent increments of fiscal 2027 nonfuel/nonhydro rates in fiscal 2028 and 2029.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Expected overall bill effect near 10 percent uses then current fuel assumptions, not an observed or guaranteed 10 percent increase for every customer today. Locator: Attachment I page 8.</p></dd><dt>Manufacturing transition</dt><dd>The memo allows MSA or equivalent service until October 1, 2027 and separately removes data center eligibility from manufacturing schedules.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Specific MSA transition, not a blanket right to stay on all factory schedules until that day. Locator: Attachment II page 14.</p></dd><dt>Manufacturing credit dates</dt><dd>General Manufacturing Credit eligibility ends October 1, 2027 for the specified data center classes; customers moving to DCA lose it beginning October 1, 2026.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Two different program clocks, not the rate phase in or an actual customer credit change. Locator: Attachment III page 17.</p></dd><dt>Demand alignment</dt><dd>From October 1, 2027, annual review compares the preceding 36 month highest billing demand with 75 percent of contract demand and can reset contract demand using division by 0.75 after at least 60 days notice.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Contract demand alignment, not a 75 percent energy purchase floor. Applies with the named schedule and customer conditions. Locator: Attachment II pages 14 and 15.</p></dd><dt>Alignment exceptions</dt><dd>Single delivery point service younger than ten years and specified national defense customers are excluded; a conditional one year relief request has a 30 day notice response window.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">The ten year boundary is not a minimum contract term. Relief requires stated prior use and recovery plan criteria. Locator: Attachment II page 15.</p></dd><dt>Separate board approval</dt><dd>Board consultation and approval applies where ultimate commitments could exceed 100 MW over any five year period, including a shared parent within one distributor territory.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Separate power commitment approval rule, not the 5 MW rate boundary or proof any individual project was approved. Locator: Attachment III pages 17 and 18.</p></dd><dt>Excluded stabilization context</dt><dd>An up to eleven year stabilization option is limited to the specified manufacturing schedules.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">This does not establish the term of a Schedule DC data center agreement. Locator: Attachment III page 18.</p></dd><dt>Prospective context</dt><dd>The August memo describes 27.5 GW of expressions of interest and approximately 5,000 MW in the connection process.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Requests and prospects, not actual load or installed capacity. Measures are not added, and most prospects are not expected to materialize. Regional totals are not allocated to Tennessee. Locator: Attachment I page 7.</p></dd><dt>Items still discussed</dt><dd>A seasonal onpeak hours shift and marginal pricing option remain under discussion, with later board approval to be sought.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not adopted changes in this resolution and no later outcome established. Locator: Attachment III page 19.</p></dd><dt>Review boundary</dt><dd>All 19 public resolution, memorandum and attachment pages were read and viewed.<span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Detailed schedule exhibits listed for a separate board folder, later guidance and customer agreements were not accessed. The page 1 proposed heading is retained, while page 2 visibly stamps approval. Locator: Complete PDF and exhibit lists on pages 11 and 16.</p></dd><dt>Stated purpose</dt><dd>TVA describes its rate structure changes as protecting other customers against data center cost shifts.<span class=\"layer-source\"><a href=\"https://www.prnewswire.com/news-releases/tva-board-protects-consumers-strengthens-reliability-amid-rising-power-demand-302856900.html\">Tennessee Valley Authority</a>. Source: August 20, 2026. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Agency stated purpose, not a measured residential saving or a guarantee of unchanged bills. Locator: TVA issued announcement.</p></dd><dt>Effective on</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Contract length</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Minimum bill</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Collateral</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Exit fees</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Current governing tariff</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Current rate schedule</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Current capacity charge</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Actual payment terms</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Individual project approval</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Individual contract</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Actual load</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Actual energy</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Actual service on</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Actual bill</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Actual capacity payment</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Actual waiver</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Actual inflight status</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Actual interruption hours</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Actual firm generation on</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Actual ratepayer savings</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd><dt>Atlas record id</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/about-tva/board-of-directors/august-20--2026/resolutions/board-resolution---rate-change-and-related-actions---stamped-(1).pdf?sfvrsn=fefcb72d_1\">Tennessee Valley Authority</a>. Source: Publication date not stated. Checked: October 24, 2026.</span> <p class=\"layer-scope\">Not established for a specific customer or complete current governing tariff. Locator: Stamped resolution and bounded memorandum review.</p></dd></dl></article>"},{"id":"sector-price-tn-202608","html":"<article><h3>Tennessee commercial and industrial electricity prices</h3><p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Current preliminary comparison month. Locator: Table5.6.A header.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">Final same month previous year. Locator: Table5.6.A header.</p></dd><dt>Sector price boundary</dt><dd>State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table5.6.A notes, including row67.</p></dd><dt>Commercial price</dt><dd>13.13 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!D44; matching HTML state row.</p></dd><dt>Prior commercial price</dt><dd>12.86 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!E44; matching HTML state row.</p></dd><dt>Industrial price</dt><dd>6.92 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!F44; matching HTML state row.</p></dd><dt>Prior industrial price</dt><dd>6.85 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">State sector average revenue per kilowatthour sold, not a quoted tariff, individual bill, dedicated data center rate or evidence of a data center effect. August2026 preliminary and August2025 final. Commercial and industrial customer classification may change; averages do not establish a facility customer class. Locator: Table_5_06_A!G44; matching HTML state row.</p></dd><dt>All sector price</dt><dd>11.93 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Tennessee All Sectors August comparison.</p></dd><dt>Prior all sector price</dt><dd>11.70 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Tennessee All Sectors August comparison.</p></dd><dt>All sector boundary</dt><dd>All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_a.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A sector headers and notes.</p></dd><dt>Ytd commercial price</dt><dd>13.57 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!D44; matching HTML state row.</p></dd><dt>Prior ytd commercial price</dt><dd>12.99 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!E44; matching HTML state row.</p></dd><dt>Ytd industrial price</dt><dd>6.84 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!F44; matching HTML state row.</p></dd><dt>Prior ytd industrial price</dt><dd>6.75 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!G44; matching HTML state row.</p></dd><dt>Ytd all sector price</dt><dd>12.08 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!J44; matching HTML state row.</p></dd><dt>Prior ytd all sector price</dt><dd>11.67 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table_5_06_B!K44; matching HTML state row.</p></dd><dt>Ytd period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Prior ytd period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Ytd price boundary</dt><dd>January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/xls/table_5_06_b.xlsx\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 26, 2026.</span> <p class=\"layer-scope\">January through August cumulative state sector average revenue per kilowatthour sold. Not August alone, a full calendar year, a simple average of monthly prices, a quoted data center tariff, household bill or measured data center effect. 2026 preliminary and 2025 final; customer reclassification and independent rounding remain possible. Locator: Table5.6.B header and notes.</p></dd><dt>Retail sales basis</dt><dd>Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail sales period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Retail sales prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Retail sales residential</dt><dd>4840.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Tennessee row,column1.</p></dd><dt>Retail sales residential prior</dt><dd>4863.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Tennessee row,column2.</p></dd><dt>Retail sales commercial</dt><dd>3716.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Tennessee row,column3.</p></dd><dt>Retail sales commercial prior</dt><dd>3687.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Tennessee row,column4.</p></dd><dt>Retail sales industrial</dt><dd>2331.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Tennessee row,column5.</p></dd><dt>Retail sales industrial prior</dt><dd>2279.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Tennessee row,column6.</p></dd><dt>Retail sales transportation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Tennessee row,column7.</p></dd><dt>Retail sales transportation prior</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Tennessee row,column8.</p></dd><dt>Retail sales all</dt><dd>10886.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Tennessee row,column9.</p></dd><dt>Retail sales all prior</dt><dd>10829.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.A Tennessee row,column10.</p></dd><dt>Ytd retail sales basis</dt><dd>Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Ytd retail sales period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Ytd retail sales prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Column headers.</p></dd><dt>Ytd retail sales residential</dt><dd>31444.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Tennessee row,column1.</p></dd><dt>Ytd retail sales residential prior</dt><dd>31670.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Tennessee row,column2.</p></dd><dt>Ytd retail sales commercial</dt><dd>24916.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Tennessee row,column3.</p></dd><dt>Ytd retail sales commercial prior</dt><dd>24638.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Tennessee row,column4.</p></dd><dt>Ytd retail sales industrial</dt><dd>17445.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Tennessee row,column5.</p></dd><dt>Ytd retail sales industrial prior</dt><dd>16725.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Tennessee row,column6.</p></dd><dt>Ytd retail sales transportation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Tennessee row,column7.</p></dd><dt>Ytd retail sales transportation prior</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Tennessee row,column8.</p></dd><dt>Ytd retail sales all</dt><dd>73804.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Tennessee row,column9.</p></dd><dt>Ytd retail sales all prior</dt><dd>73034.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Sales of electricity to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in thousand megawatthours. Customer sectors differ from generation producer sectors. Utilities and energy service providers may classify customers using NAICS or rate-schedule demand/usage limits; changes may reflect customer reclassification. Not electricity generation, installed capacity, peak demand, customer count, revenue, tariff, data center load or an attributable data center effect. Independently rounded totals are not forced to equal component sums. Zero sales is not proof of no customers. Locator: Table5.4.B Tennessee row,column10.</p></dd><dt>Retail revenue basis</dt><dd>Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail revenue period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Retail revenue prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Retail revenue residential</dt><dd>649.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Tennessee row,column1.</p></dd><dt>Retail revenue residential prior</dt><dd>637.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Tennessee row,column2.</p></dd><dt>Retail revenue commercial</dt><dd>488.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Tennessee row,column3.</p></dd><dt>Retail revenue commercial prior</dt><dd>474.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Tennessee row,column4.</p></dd><dt>Retail revenue industrial</dt><dd>161.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Tennessee row,column5.</p></dd><dt>Retail revenue industrial prior</dt><dd>156.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Tennessee row,column6.</p></dd><dt>Retail revenue transportation</dt><dd>0.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Tennessee row,column7.</p></dd><dt>Retail revenue transportation prior</dt><dd>0.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Tennessee row,column8.</p></dd><dt>Retail revenue all</dt><dd>1299.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Tennessee row,column9.</p></dd><dt>Retail revenue all prior</dt><dd>1267.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, August2026 preliminary cutoff-model estimates versus August2025 final, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.A Tennessee row,column10.</p></dd><dt>Ytd retail revenue basis</dt><dd>Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Title,end-use headers and source notes.</p></dd><dt>Ytd retail revenue period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Ytd retail revenue prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Column headers.</p></dd><dt>Ytd retail revenue residential</dt><dd>4339.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Tennessee row,column1.</p></dd><dt>Ytd retail revenue residential prior</dt><dd>4193.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Tennessee row,column2.</p></dd><dt>Ytd retail revenue commercial</dt><dd>3382.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Tennessee row,column3.</p></dd><dt>Ytd retail revenue commercial prior</dt><dd>3200.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Tennessee row,column4.</p></dd><dt>Ytd retail revenue industrial</dt><dd>1192.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Tennessee row,column5.</p></dd><dt>Ytd retail revenue industrial prior</dt><dd>1129.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Tennessee row,column6.</p></dd><dt>Ytd retail revenue transportation</dt><dd>0.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Tennessee row,column7.</p></dd><dt>Ytd retail revenue transportation prior</dt><dd>0.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Tennessee row,column8.</p></dd><dt>Ytd retail revenue all</dt><dd>8913.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Tennessee row,column9.</p></dd><dt>Ytd retail revenue all prior</dt><dd>8522.00 million USD<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Revenue from electricity sales to ultimate customers by end-use sector, January through August2026 preliminary cutoff-model estimates versus January through August2025 final; cumulative year to date,not August alone or a full annual total, in million U.S. dollars. Customer sectors differ from generation producer sectors. NAICS or rate-schedule classifications and respondent reclassifications may affect year comparisons. Not tax receipts, incentives, profit, a tariff or an individual bill, electricity quantity, data center revenue or an attributable data center effect. No revenue/sales quotient or bill impact computed. Independently rounded totals are not forced to equal component sums. Zero revenue does not establish no customers. Locator: Table5.5.B Tennessee row,column10.</p></dd><dt>Retail customers basis</dt><dd>Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Title,end-use headers and source notes.</p></dd><dt>Retail customers period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Column headers.</p></dd><dt>Retail customers prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Column headers.</p></dd><dt>Retail customers residential</dt><dd>3,159,497 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Tennessee row,column1.</p></dd><dt>Retail customers residential prior</dt><dd>3,201,287 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Tennessee row,column2.</p></dd><dt>Retail customers commercial</dt><dd>572,986 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Tennessee row,column3.</p></dd><dt>Retail customers commercial prior</dt><dd>548,519 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Tennessee row,column4.</p></dd><dt>Retail customers industrial</dt><dd>998 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Tennessee row,column5.</p></dd><dt>Retail customers industrial prior</dt><dd>1,024 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Tennessee row,column6.</p></dd><dt>Retail customers transportation</dt><dd>0 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Tennessee row,column7.</p></dd><dt>Retail customers transportation prior</dt><dd>0 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Tennessee row,column8.</p></dd><dt>Retail customers all</dt><dd>3,733,481 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Tennessee row,column9.</p></dd><dt>Retail customers all prior</dt><dd>3,750,830 customers<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_08\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Number of ultimate electricity customers served by end-use sector by state, August2026 preliminary cutoff-model estimates versus August2025 final. A reported customer count is not a count of people, households, meters, physical sites or data centers. Customer sectors differ from generation producer sectors; NAICS/rate-schedule classifications and respondent reclassifications may affect changes. Not electricity sales, generation, peak demand, capacity, revenue or a data center effect. Monthly observations,not cumulative year-to-date counts; no sums across months or utilities inferred. Independently rounded totals retained; zero does not establish no residents or facilities. Locator: Table5.8 Tennessee row,column10.</p></dd></dl></article>"},{"id":"sector-price-tn-202607","html":"<article><h3>Tennessee historical commercial and industrial electricity prices</h3><p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.</p><dl class=\"layer-fields\"><dt>Period</dt><dd>July 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Prior period</dt><dd>July 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Sector price boundary</dt><dd>Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedTable5.6.A July header.</p></dd><dt>Commercial price</dt><dd>13.43 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Tennessee commercial_price.</p></dd><dt>Prior commercial price</dt><dd>12.81 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Tennessee prior_commercial_price.</p></dd><dt>Industrial price</dt><dd>7.13 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Tennessee industrial_price.</p></dd><dt>Prior industrial price</dt><dd>7.24 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">Historical July2026 preliminary and July2025 final state sector average revenue per kilowatthour sold. Not August values, a quoted tariff, data center customer classification, individual bill or measured data center impact. Utility sector classification and independent rounding limitations remain. Locator: RetainedJulyTable5.6.A Tennessee prior_industrial_price.</p></dd><dt>All sector price</dt><dd>12.21 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Tennessee All Sectors July comparison.</p></dd><dt>Prior all sector price</dt><dd>11.87 cents per kWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A Tennessee All Sectors July comparison.</p></dd><dt>All sector boundary</dt><dd>All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a\">U.S. Energy Information Administration</a>. Source: September 24, 2026. Checked: October 23, 2026.</span> <p class=\"layer-scope\">All sector state average revenue per kilowatthour is a separate reported aggregate. It is not a simple average of sector prices, a residential bill, a data center tariff or proof of a data center effect. Preliminary2026 versus final2025; historical month retained. Locator: Table5.6.A sector headers and notes.</p></dd></dl></article>"},{"id":"generation-tn-202608","html":"<article><h3>Tennessee utility scale generation</h3><p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A period and source notes.</p></dd><dt>Period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table title, producer sector headers and source notes.</p></dd><dt>All generation</dt><dd>8430.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Tennessee row; column1.</p></dd><dt>Prior all generation</dt><dd>7555.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Tennessee row; column2.</p></dd><dt>Published generation change</dt><dd>11.60 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Tennessee row; column3.</p></dd><dt>Utility generation</dt><dd>7876.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Tennessee row; column4.</p></dd><dt>Prior utility generation</dt><dd>7122.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Tennessee row; column5.</p></dd><dt>Ipp generation</dt><dd>363.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Tennessee row; column6.</p></dd><dt>Prior ipp generation</dt><dd>238.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Tennessee row; column7.</p></dd><dt>Commercial generation</dt><dd>19.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Tennessee row; column8.</p></dd><dt>Prior commercial generation</dt><dd>20.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Tennessee row; column9.</p></dd><dt>Industrial generation</dt><dd>173.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Tennessee row; column10.</p></dd><dt>Prior industrial generation</dt><dd>176.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.A Tennessee row; column11.</p></dd><dt>Gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Gas period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas all generation</dt><dd>1899.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Tennessee row; column1.</p></dd><dt>Gas prior all generation</dt><dd>1656.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Tennessee row; column2.</p></dd><dt>Gas published generation change</dt><dd>14.70 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Tennessee row; column3.</p></dd><dt>Gas utility generation</dt><dd>1776.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Tennessee row; column4.</p></dd><dt>Gas prior utility generation</dt><dd>1534.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Tennessee row; column5.</p></dd><dt>Gas ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Tennessee row; column6.</p></dd><dt>Gas prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Tennessee row; column7.</p></dd><dt>Gas commercial generation</dt><dd>18.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Tennessee row; column8.</p></dd><dt>Gas prior commercial generation</dt><dd>19.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Tennessee row; column9.</p></dd><dt>Gas industrial generation</dt><dd>104.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Tennessee row; column10.</p></dd><dt>Gas prior industrial generation</dt><dd>102.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.A Tennessee row; column11.</p></dd><dt>Nuclear generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nuclear period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear all generation</dt><dd>3361.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Tennessee row; column1.</p></dd><dt>Nuclear prior all generation</dt><dd>3390.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Tennessee row; column2.</p></dd><dt>Nuclear published generation change</dt><dd>-0.90 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Tennessee row; column3.</p></dd><dt>Nuclear utility generation</dt><dd>3361.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Tennessee row; column4.</p></dd><dt>Nuclear prior utility generation</dt><dd>3390.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Tennessee row; column5.</p></dd><dt>Nuclear ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Tennessee row; column6.</p></dd><dt>Nuclear prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Tennessee row; column7.</p></dd><dt>Nuclear commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Tennessee row; column8.</p></dd><dt>Nuclear prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Tennessee row; column9.</p></dd><dt>Nuclear industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Tennessee row; column10.</p></dd><dt>Nuclear prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.A Tennessee row; column11.</p></dd><dt>Coal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Coal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal all generation</dt><dd>2141.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Tennessee row; column1.</p></dd><dt>Coal prior all generation</dt><dd>1596.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Tennessee row; column2.</p></dd><dt>Coal published generation change</dt><dd>34.20 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Tennessee row; column3.</p></dd><dt>Coal utility generation</dt><dd>2108.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Tennessee row; column4.</p></dd><dt>Coal prior utility generation</dt><dd>1560.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Tennessee row; column5.</p></dd><dt>Coal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Tennessee row; column6.</p></dd><dt>Coal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Tennessee row; column7.</p></dd><dt>Coal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Tennessee row; column8.</p></dd><dt>Coal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Tennessee row; column9.</p></dd><dt>Coal industrial generation</dt><dd>33.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Tennessee row; column10.</p></dd><dt>Coal prior industrial generation</dt><dd>36.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.A Tennessee row; column11.</p></dd><dt>Wind generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Wind period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Tennessee row; column1.</p></dd><dt>Wind prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Tennessee row; column2.</p></dd><dt>Wind published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Tennessee row; column3.</p></dd><dt>Wind utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Tennessee row; column4.</p></dd><dt>Wind prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Tennessee row; column5.</p></dd><dt>Wind ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Tennessee row; column6.</p></dd><dt>Wind prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Tennessee row; column7.</p></dd><dt>Wind commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Tennessee row; column8.</p></dd><dt>Wind prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Tennessee row; column9.</p></dd><dt>Wind industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Tennessee row; column10.</p></dd><dt>Wind prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.A Tennessee row; column11.</p></dd><dt>Hydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Hydro period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro all generation</dt><dd>761.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Tennessee row; column1.</p></dd><dt>Hydro prior all generation</dt><dd>766.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Tennessee row; column2.</p></dd><dt>Hydro published generation change</dt><dd>-0.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Tennessee row; column3.</p></dd><dt>Hydro utility generation</dt><dd>702.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Tennessee row; column4.</p></dd><dt>Hydro prior utility generation</dt><dd>703.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Tennessee row; column5.</p></dd><dt>Hydro ipp generation</dt><dd>60.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Tennessee row; column6.</p></dd><dt>Hydro prior ipp generation</dt><dd>63.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Tennessee row; column7.</p></dd><dt>Hydro commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Tennessee row; column8.</p></dd><dt>Hydro prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Tennessee row; column9.</p></dd><dt>Hydro industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Tennessee row; column10.</p></dd><dt>Hydro prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.A Tennessee row; column11.</p></dd><dt>Pumped storage generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Pumped storage period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage all generation</dt><dd>-82.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Tennessee row; column1.</p></dd><dt>Pumped storage prior all generation</dt><dd>-78.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Tennessee row; column2.</p></dd><dt>Pumped storage published generation change</dt><dd>5.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Tennessee row; column3.</p></dd><dt>Pumped storage utility generation</dt><dd>-82.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Tennessee row; column4.</p></dd><dt>Pumped storage prior utility generation</dt><dd>-78.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Tennessee row; column5.</p></dd><dt>Pumped storage ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Tennessee row; column6.</p></dd><dt>Pumped storage prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Tennessee row; column7.</p></dd><dt>Pumped storage commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Tennessee row; column8.</p></dd><dt>Pumped storage prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Tennessee row; column9.</p></dd><dt>Pumped storage industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Tennessee row; column10.</p></dd><dt>Pumped storage prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.A Tennessee row; column11.</p></dd><dt>Solar pv period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv generation basis</dt><dd>Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar pv all estimated generation</dt><dd>307.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column1.</p></dd><dt>Solar pv prior all estimated generation</dt><dd>179.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column2.</p></dd><dt>Solar pv published generation change</dt><dd>71.20 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column3.</p></dd><dt>Solar pv utility scale generation</dt><dd>298.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column4.</p></dd><dt>Solar pv utility scale prior generation</dt><dd>171.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column5.</p></dd><dt>Solar pv estimated small scale generation</dt><dd>9.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column6.</p></dd><dt>Solar pv estimated small scale prior generation</dt><dd>9.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column7.</p></dd><dt>Solar pv electric utilities generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column8.</p></dd><dt>Solar pv electric utilities prior generation</dt><dd>0.25 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column9.</p></dd><dt>Solar pv independent producers generation</dt><dd>297.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column10.</p></dd><dt>Solar pv independent producers prior generation</dt><dd>169.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column11.</p></dd><dt>Solar pv commercial estimated total generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column12.</p></dd><dt>Solar pv commercial estimated total prior generation</dt><dd>6.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column13.</p></dd><dt>Solar pv commercial utility scale generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column14.</p></dd><dt>Solar pv commercial utility scale prior generation</dt><dd>0.33 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column15.</p></dd><dt>Solar pv commercial estimated small scale generation</dt><dd>6.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column16.</p></dd><dt>Solar pv commercial estimated small scale prior generation</dt><dd>6.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column17.</p></dd><dt>Solar pv industrial estimated total generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column18.</p></dd><dt>Solar pv industrial estimated total prior generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column19.</p></dd><dt>Solar pv industrial utility scale generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column20.</p></dd><dt>Solar pv industrial utility scale prior generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column21.</p></dd><dt>Solar pv industrial estimated small scale generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column22.</p></dd><dt>Solar pv industrial estimated small scale prior generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column23.</p></dd><dt>Solar pv residential estimated small scale generation</dt><dd>3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column24.</p></dd><dt>Solar pv residential estimated small scale prior generation</dt><dd>3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, August2026 preliminary versus August2025 final, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.A Tennessee row; column25.</p></dd><dt>Solar thermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar thermal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Tennessee row; column1.</p></dd><dt>Solar thermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Tennessee row; column2.</p></dd><dt>Solar thermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Tennessee row; column3.</p></dd><dt>Solar thermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Tennessee row; column4.</p></dd><dt>Solar thermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Tennessee row; column5.</p></dd><dt>Solar thermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Tennessee row; column6.</p></dd><dt>Solar thermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Tennessee row; column7.</p></dd><dt>Solar thermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Tennessee row; column8.</p></dd><dt>Solar thermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Tennessee row; column9.</p></dd><dt>Solar thermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Tennessee row; column10.</p></dd><dt>Solar thermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.A Tennessee row; column11.</p></dd><dt>Other energy generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other energy period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy all generation</dt><dd>0.01 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Tennessee row; column1.</p></dd><dt>Other energy prior all generation</dt><dd>0.06 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Tennessee row; column2.</p></dd><dt>Other energy published generation change</dt><dd>-76.60 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Tennessee row; column3.</p></dd><dt>Other energy utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Tennessee row; column4.</p></dd><dt>Other energy prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Tennessee row; column5.</p></dd><dt>Other energy ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Tennessee row; column6.</p></dd><dt>Other energy prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Tennessee row; column7.</p></dd><dt>Other energy commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Tennessee row; column8.</p></dd><dt>Other energy prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Tennessee row; column9.</p></dd><dt>Other energy industrial generation</dt><dd>0.01 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Tennessee row; column10.</p></dd><dt>Other energy prior industrial generation</dt><dd>0.06 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.A Tennessee row; column11.</p></dd><dt>Geothermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Geothermal period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Tennessee row; column1.</p></dd><dt>Geothermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Tennessee row; column2.</p></dd><dt>Geothermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Tennessee row; column3.</p></dd><dt>Geothermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Tennessee row; column4.</p></dd><dt>Geothermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Tennessee row; column5.</p></dd><dt>Geothermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Tennessee row; column6.</p></dd><dt>Geothermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Tennessee row; column7.</p></dd><dt>Geothermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Tennessee row; column8.</p></dd><dt>Geothermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Tennessee row; column9.</p></dd><dt>Geothermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Tennessee row; column10.</p></dd><dt>Geothermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.A Tennessee row; column11.</p></dd><dt>Biomass generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Biomass period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass all generation</dt><dd>39.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Tennessee row; column1.</p></dd><dt>Biomass prior all generation</dt><dd>42.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Tennessee row; column2.</p></dd><dt>Biomass published generation change</dt><dd>-7.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Tennessee row; column3.</p></dd><dt>Biomass utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Tennessee row; column4.</p></dd><dt>Biomass prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Tennessee row; column5.</p></dd><dt>Biomass ipp generation</dt><dd>6.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Tennessee row; column6.</p></dd><dt>Biomass prior ipp generation</dt><dd>6.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Tennessee row; column7.</p></dd><dt>Biomass commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Tennessee row; column8.</p></dd><dt>Biomass prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Tennessee row; column9.</p></dd><dt>Biomass industrial generation</dt><dd>33.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Tennessee row; column10.</p></dd><dt>Biomass prior industrial generation</dt><dd>36.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.A Tennessee row; column11.</p></dd><dt>Petroleum liquids generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum liquids period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids all generation</dt><dd>11.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Tennessee row; column1.</p></dd><dt>Petroleum liquids prior all generation</dt><dd>12.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Tennessee row; column2.</p></dd><dt>Petroleum liquids published generation change</dt><dd>-1.60 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Tennessee row; column3.</p></dd><dt>Petroleum liquids utility generation</dt><dd>11.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Tennessee row; column4.</p></dd><dt>Petroleum liquids prior utility generation</dt><dd>12.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Tennessee row; column5.</p></dd><dt>Petroleum liquids ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Tennessee row; column6.</p></dd><dt>Petroleum liquids prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Tennessee row; column7.</p></dd><dt>Petroleum liquids commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Tennessee row; column8.</p></dd><dt>Petroleum liquids prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Tennessee row; column9.</p></dd><dt>Petroleum liquids industrial generation</dt><dd>0.03 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Tennessee row; column10.</p></dd><dt>Petroleum liquids prior industrial generation</dt><dd>0.03 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.A Tennessee row; column11.</p></dd><dt>Petroleum coke generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum coke period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Tennessee row; column1.</p></dd><dt>Petroleum coke prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Tennessee row; column2.</p></dd><dt>Petroleum coke published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Tennessee row; column3.</p></dd><dt>Petroleum coke utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Tennessee row; column4.</p></dd><dt>Petroleum coke prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Tennessee row; column5.</p></dd><dt>Petroleum coke ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Tennessee row; column6.</p></dd><dt>Petroleum coke prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Tennessee row; column7.</p></dd><dt>Petroleum coke commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Tennessee row; column8.</p></dd><dt>Petroleum coke prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Tennessee row; column9.</p></dd><dt>Petroleum coke industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Tennessee row; column10.</p></dd><dt>Petroleum coke prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.A Tennessee row; column11.</p></dd><dt>Other fossil gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other fossil gas period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas all generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Tennessee row; column1.</p></dd><dt>Other fossil gas prior all generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Tennessee row; column2.</p></dd><dt>Other fossil gas published generation change</dt><dd>5.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Tennessee row; column3.</p></dd><dt>Other fossil gas utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Tennessee row; column4.</p></dd><dt>Other fossil gas prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Tennessee row; column5.</p></dd><dt>Other fossil gas ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Tennessee row; column6.</p></dd><dt>Other fossil gas prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Tennessee row; column7.</p></dd><dt>Other fossil gas commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Tennessee row; column8.</p></dd><dt>Other fossil gas prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Tennessee row; column9.</p></dd><dt>Other fossil gas industrial generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Tennessee row; column10.</p></dd><dt>Other fossil gas prior industrial generation</dt><dd>1.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.A Tennessee row; column11.</p></dd><dt>Nonhydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nonhydro period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro all generation</dt><dd>337.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Tennessee row; column1.</p></dd><dt>Nonhydro prior all generation</dt><dd>213.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Tennessee row; column2.</p></dd><dt>Nonhydro published generation change</dt><dd>58.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Tennessee row; column3.</p></dd><dt>Nonhydro utility generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Tennessee row; column4.</p></dd><dt>Nonhydro prior utility generation</dt><dd>0.25 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Tennessee row; column5.</p></dd><dt>Nonhydro ipp generation</dt><dd>303.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Tennessee row; column6.</p></dd><dt>Nonhydro prior ipp generation</dt><dd>176.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Tennessee row; column7.</p></dd><dt>Nonhydro commercial generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Tennessee row; column8.</p></dd><dt>Nonhydro prior commercial generation</dt><dd>0.33 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Tennessee row; column9.</p></dd><dt>Nonhydro industrial generation</dt><dd>34.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Tennessee row; column10.</p></dd><dt>Nonhydro prior industrial generation</dt><dd>37.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, August2026 preliminary versus August2025 final. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.A Tennessee row; column11.</p></dd></dl></article>"},{"id":"generation-tn-202608-ytd","html":"<article><h3>Tennessee utility scale generation</h3><p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B period and source notes.</p></dd><dt>Period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Column headers.</p></dd><dt>Generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table title, producer sector headers and source notes.</p></dd><dt>All generation</dt><dd>58598.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Tennessee row; column1.</p></dd><dt>Prior all generation</dt><dd>51123.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Tennessee row; column2.</p></dd><dt>Published generation change</dt><dd>14.60 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Tennessee row; column3.</p></dd><dt>Utility generation</dt><dd>55006.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Tennessee row; column4.</p></dd><dt>Prior utility generation</dt><dd>48194.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Tennessee row; column5.</p></dd><dt>Ipp generation</dt><dd>2120.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Tennessee row; column6.</p></dd><dt>Prior ipp generation</dt><dd>1386.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Tennessee row; column7.</p></dd><dt>Commercial generation</dt><dd>139.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Tennessee row; column8.</p></dd><dt>Prior commercial generation</dt><dd>147.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Tennessee row; column9.</p></dd><dt>Industrial generation</dt><dd>1333.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Tennessee row; column10.</p></dd><dt>Prior industrial generation</dt><dd>1396.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_03_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Locator: Table1.3.B Tennessee row; column11.</p></dd><dt>Gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Gas period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Column headers.</p></dd><dt>Gas all generation</dt><dd>12358.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Tennessee row; column1.</p></dd><dt>Gas prior all generation</dt><dd>12969.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Tennessee row; column2.</p></dd><dt>Gas published generation change</dt><dd>-4.70 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Tennessee row; column3.</p></dd><dt>Gas utility generation</dt><dd>11401.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Tennessee row; column4.</p></dd><dt>Gas prior utility generation</dt><dd>11963.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Tennessee row; column5.</p></dd><dt>Gas ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Tennessee row; column6.</p></dd><dt>Gas prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Tennessee row; column7.</p></dd><dt>Gas commercial generation</dt><dd>136.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Tennessee row; column8.</p></dd><dt>Gas prior commercial generation</dt><dd>145.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Tennessee row; column9.</p></dd><dt>Gas industrial generation</dt><dd>821.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Tennessee row; column10.</p></dd><dt>Gas prior industrial generation</dt><dd>861.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_07_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Natural gas fuel only, not all energy sources, gas consumption or gas production. State generation does not establish the fuel mix delivered to a data center, renewable matching or marginal emissions. Locator: Table1.7.B Tennessee row; column11.</p></dd><dt>Nuclear generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nuclear period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Column headers.</p></dd><dt>Nuclear all generation</dt><dd>26067.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Tennessee row; column1.</p></dd><dt>Nuclear prior all generation</dt><dd>17739.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Tennessee row; column2.</p></dd><dt>Nuclear published generation change</dt><dd>46.90 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Tennessee row; column3.</p></dd><dt>Nuclear utility generation</dt><dd>26067.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Tennessee row; column4.</p></dd><dt>Nuclear prior utility generation</dt><dd>17739.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Tennessee row; column5.</p></dd><dt>Nuclear ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Tennessee row; column6.</p></dd><dt>Nuclear prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Tennessee row; column7.</p></dd><dt>Nuclear commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Tennessee row; column8.</p></dd><dt>Nuclear prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Tennessee row; column9.</p></dd><dt>Nuclear industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Tennessee row; column10.</p></dd><dt>Nuclear prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_09_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Nuclear energy generation only, not installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no plant or nuclear capacity; source percentage markers stay unknown rather than computed from rounded values. Locator: Table1.9.B Tennessee row; column11.</p></dd><dt>Coal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Coal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Column headers.</p></dd><dt>Coal all generation</dt><dd>12643.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Tennessee row; column1.</p></dd><dt>Coal prior all generation</dt><dd>13111.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Tennessee row; column2.</p></dd><dt>Coal published generation change</dt><dd>-3.60 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Tennessee row; column3.</p></dd><dt>Coal utility generation</dt><dd>12408.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Tennessee row; column4.</p></dd><dt>Coal prior utility generation</dt><dd>12847.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Tennessee row; column5.</p></dd><dt>Coal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Tennessee row; column6.</p></dd><dt>Coal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Tennessee row; column7.</p></dd><dt>Coal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Tennessee row; column8.</p></dd><dt>Coal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Tennessee row; column9.</p></dd><dt>Coal industrial generation</dt><dd>235.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Tennessee row; column10.</p></dd><dt>Coal prior industrial generation</dt><dd>264.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_04_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Coal generation only, not coal receipts or fuel consumption, installed capacity, a plant inventory, power delivered to data centers or an emissions calculation. Published zero generation is not proof of no coal plant or capacity; unknown percentages stay unknown. Locator: Table1.4.B Tennessee row; column11.</p></dd><dt>Wind generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Wind period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Column headers.</p></dd><dt>Wind all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Tennessee row; column1.</p></dd><dt>Wind prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Tennessee row; column2.</p></dd><dt>Wind published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Tennessee row; column3.</p></dd><dt>Wind utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Tennessee row; column4.</p></dd><dt>Wind prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Tennessee row; column5.</p></dd><dt>Wind ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Tennessee row; column6.</p></dd><dt>Wind prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Tennessee row; column7.</p></dd><dt>Wind commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Tennessee row; column8.</p></dd><dt>Wind prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Tennessee row; column9.</p></dd><dt>Wind industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Tennessee row; column10.</p></dd><dt>Wind prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_14_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Wind generation only, not installed capacity, a turbine inventory, renewable procurement, hourly matching, data center delivered power or avoided emissions. Published zero generation does not prove no wind capacity. Locator: Table1.14.B Tennessee row; column11.</p></dd><dt>Hydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Hydro period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Column headers.</p></dd><dt>Hydro all generation</dt><dd>5935.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Tennessee row; column1.</p></dd><dt>Hydro prior all generation</dt><dd>6412.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Tennessee row; column2.</p></dd><dt>Hydro published generation change</dt><dd>-7.40 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Tennessee row; column3.</p></dd><dt>Hydro utility generation</dt><dd>5470.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Tennessee row; column4.</p></dd><dt>Hydro prior utility generation</dt><dd>5910.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Tennessee row; column5.</p></dd><dt>Hydro ipp generation</dt><dd>465.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Tennessee row; column6.</p></dd><dt>Hydro prior ipp generation</dt><dd>502.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Tennessee row; column7.</p></dd><dt>Hydro commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Tennessee row; column8.</p></dd><dt>Hydro prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Tennessee row; column9.</p></dd><dt>Hydro industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Tennessee row; column10.</p></dd><dt>Hydro prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_10_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Conventional hydroelectric power only, excluding pumped storage. Not installed capacity, a dam inventory, reservoir levels, water withdrawal or availability, data center delivered power, renewable procurement or avoided emissions. Published zero generation is not proof of no dam or hydroelectric capacity. Locator: Table1.10.B Tennessee row; column11.</p></dd><dt>Pumped storage generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Pumped storage period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Column headers.</p></dd><dt>Pumped storage all generation</dt><dd>-441.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Tennessee row; column1.</p></dd><dt>Pumped storage prior all generation</dt><dd>-354.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Tennessee row; column2.</p></dd><dt>Pumped storage published generation change</dt><dd>24.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Tennessee row; column3.</p></dd><dt>Pumped storage utility generation</dt><dd>-441.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Tennessee row; column4.</p></dd><dt>Pumped storage prior utility generation</dt><dd>-354.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Tennessee row; column5.</p></dd><dt>Pumped storage ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Tennessee row; column6.</p></dd><dt>Pumped storage prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Tennessee row; column7.</p></dd><dt>Pumped storage commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Tennessee row; column8.</p></dd><dt>Pumped storage prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Tennessee row; column9.</p></dd><dt>Pumped storage industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Tennessee row; column10.</p></dd><dt>Pumped storage prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_12_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Pumped storage hydroelectric power only, separate from conventional hydro. Negative net generation retains the source sign and means plant electricity use exceeds gross generation; it is not negative storage capacity or gross discharged energy. Not storage capacity, round trip efficiency, water withdrawal or availability, data center delivered power or renewable matching. Zero does not prove no storage capacity. Locator: Table1.12.B Tennessee row; column11.</p></dd><dt>Solar pv period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Column headers.</p></dd><dt>Solar pv generation basis</dt><dd>Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar pv all estimated generation</dt><dd>1675.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column1.</p></dd><dt>Solar pv prior all estimated generation</dt><dd>904.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column2.</p></dd><dt>Solar pv published generation change</dt><dd>85.30 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column3.</p></dd><dt>Solar pv utility scale generation</dt><dd>1614.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column4.</p></dd><dt>Solar pv utility scale prior generation</dt><dd>842.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column5.</p></dd><dt>Solar pv estimated small scale generation</dt><dd>62.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column6.</p></dd><dt>Solar pv estimated small scale prior generation</dt><dd>62.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column7.</p></dd><dt>Solar pv electric utilities generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column8.</p></dd><dt>Solar pv electric utilities prior generation</dt><dd>2.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column9.</p></dd><dt>Solar pv independent producers generation</dt><dd>1604.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column10.</p></dd><dt>Solar pv independent producers prior generation</dt><dd>834.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column11.</p></dd><dt>Solar pv commercial estimated total generation</dt><dd>45.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column12.</p></dd><dt>Solar pv commercial estimated total prior generation</dt><dd>44.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column13.</p></dd><dt>Solar pv commercial utility scale generation</dt><dd>3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column14.</p></dd><dt>Solar pv commercial utility scale prior generation</dt><dd>3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column15.</p></dd><dt>Solar pv commercial estimated small scale generation</dt><dd>42.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column16.</p></dd><dt>Solar pv commercial estimated small scale prior generation</dt><dd>42.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column17.</p></dd><dt>Solar pv industrial estimated total generation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column18.</p></dd><dt>Solar pv industrial estimated total prior generation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column19.</p></dd><dt>Solar pv industrial utility scale generation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column20.</p></dd><dt>Solar pv industrial utility scale prior generation</dt><dd>4.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column21.</p></dd><dt>Solar pv industrial estimated small scale generation</dt><dd>0.03 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column22.</p></dd><dt>Solar pv industrial estimated small scale prior generation</dt><dd>0.03 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column23.</p></dd><dt>Solar pv residential estimated small scale generation</dt><dd>20.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column24.</p></dd><dt>Solar pv residential estimated small scale prior generation</dt><dd>20.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_17_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Solar photovoltaic net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total, in thousand megawatthours. All sector estimates include utility and small scale facilities; separate utility scale, estimated small scale and residential estimates retain their own scopes. Commercial and industrial sectors classify generators, not electricity customers. Not solar thermal, installed capacity, electricity sales, data center delivered power, renewable procurement, hourly matching or avoided emissions. Published zero does not prove no photovoltaic capacity. NM remains unknown, not zero. Independent rounding and published percentage changes are retained, never forced to sum or recomputed. Negative net generation means plant electricity use exceeds gross generation. Locator: Table1.17.B Tennessee row; column25.</p></dd><dt>Solar thermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Solar thermal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Column headers.</p></dd><dt>Solar thermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Tennessee row; column1.</p></dd><dt>Solar thermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Tennessee row; column2.</p></dd><dt>Solar thermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Tennessee row; column3.</p></dd><dt>Solar thermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Tennessee row; column4.</p></dd><dt>Solar thermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Tennessee row; column5.</p></dd><dt>Solar thermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Tennessee row; column6.</p></dd><dt>Solar thermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Tennessee row; column7.</p></dd><dt>Solar thermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Tennessee row; column8.</p></dd><dt>Solar thermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Tennessee row; column9.</p></dd><dt>Solar thermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Tennessee row; column10.</p></dd><dt>Solar thermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_18_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Solar thermal generation only, separate from solar photovoltaic and small scale photovoltaic estimates. Not installed capacity, solar heat consumption, electricity delivered to data centers, renewable procurement, hourly matching or avoided emissions. Zero generation is not proof of no solar thermal capacity or projects. Locator: Table1.18.B Tennessee row; column11.</p></dd><dt>Other energy generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other energy period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Column headers.</p></dd><dt>Other energy all generation</dt><dd>0.15 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Tennessee row; column1.</p></dd><dt>Other energy prior all generation</dt><dd>0.16 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Tennessee row; column2.</p></dd><dt>Other energy published generation change</dt><dd>-5.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Tennessee row; column3.</p></dd><dt>Other energy utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Tennessee row; column4.</p></dd><dt>Other energy prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Tennessee row; column5.</p></dd><dt>Other energy ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Tennessee row; column6.</p></dd><dt>Other energy prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Tennessee row; column7.</p></dd><dt>Other energy commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Tennessee row; column8.</p></dd><dt>Other energy prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Tennessee row; column9.</p></dd><dt>Other energy industrial generation</dt><dd>0.15 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Tennessee row; column10.</p></dd><dt>Other energy prior industrial generation</dt><dd>0.16 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_13_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Energy Sources is the source table category, not a geothermal-only or renewable-only fuel designation. No disaggregation into individual fuel technologies, plant identity, waste treatment, emissions or eligibility is inferred. Not installed capacity, electricity delivered to data centers, renewable procurement or hourly matching. Zero generation does not prove no facilities or capacity. Locator: Table1.13.B Tennessee row; column11.</p></dd><dt>Geothermal generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Geothermal period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Column headers.</p></dd><dt>Geothermal all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Tennessee row; column1.</p></dd><dt>Geothermal prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Tennessee row; column2.</p></dd><dt>Geothermal published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Tennessee row; column3.</p></dd><dt>Geothermal utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Tennessee row; column4.</p></dd><dt>Geothermal prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Tennessee row; column5.</p></dd><dt>Geothermal ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Tennessee row; column6.</p></dd><dt>Geothermal prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Tennessee row; column7.</p></dd><dt>Geothermal commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Tennessee row; column8.</p></dd><dt>Geothermal prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Tennessee row; column9.</p></dd><dt>Geothermal industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Tennessee row; column10.</p></dd><dt>Geothermal prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_16_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Geothermal electricity generation only, separate from the Other Energy Sources aggregate and solar thermal. Not installed capacity, geothermal heating/cooling, subsurface resources, a well or plant inventory, permit approval, data center delivered electricity, procurement, hourly matching or emissions. Published zero does not prove no geothermal resource, project or capacity. Locator: Table1.16.B Tennessee row; column11.</p></dd><dt>Biomass generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Biomass period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Column headers.</p></dd><dt>Biomass all generation</dt><dd>318.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Tennessee row; column1.</p></dd><dt>Biomass prior all generation</dt><dd>309.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Tennessee row; column2.</p></dd><dt>Biomass published generation change</dt><dd>3.00 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Tennessee row; column3.</p></dd><dt>Biomass utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Tennessee row; column4.</p></dd><dt>Biomass prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Tennessee row; column5.</p></dd><dt>Biomass ipp generation</dt><dd>50.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Tennessee row; column6.</p></dd><dt>Biomass prior ipp generation</dt><dd>50.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Tennessee row; column7.</p></dd><dt>Biomass commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Tennessee row; column8.</p></dd><dt>Biomass prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Tennessee row; column9.</p></dd><dt>Biomass industrial generation</dt><dd>268.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Tennessee row; column10.</p></dd><dt>Biomass prior industrial generation</dt><dd>259.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_15_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Biomass electricity generation is the source aggregate category, not individual fuel feedstock consumption, a plant inventory, sustainable sourcing certification, a permit or renewable eligibility determination. Not installed capacity, carbon neutrality, avoided emissions, data center delivered electricity, procurement or hourly matching. Published zero does not prove no biomass facilities or capacity. Locator: Table1.15.B Tennessee row; column11.</p></dd><dt>Petroleum liquids generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum liquids period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum liquids all generation</dt><dd>99.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Tennessee row; column1.</p></dd><dt>Petroleum liquids prior all generation</dt><dd>87.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Tennessee row; column2.</p></dd><dt>Petroleum liquids published generation change</dt><dd>13.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Tennessee row; column3.</p></dd><dt>Petroleum liquids utility generation</dt><dd>99.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Tennessee row; column4.</p></dd><dt>Petroleum liquids prior utility generation</dt><dd>87.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Tennessee row; column5.</p></dd><dt>Petroleum liquids ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Tennessee row; column6.</p></dd><dt>Petroleum liquids prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Tennessee row; column7.</p></dd><dt>Petroleum liquids commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Tennessee row; column8.</p></dd><dt>Petroleum liquids prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Tennessee row; column9.</p></dd><dt>Petroleum liquids industrial generation</dt><dd>0.17 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Tennessee row; column10.</p></dd><dt>Petroleum liquids prior industrial generation</dt><dd>0.24 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_05_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Liquids electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.5.B Tennessee row; column11.</p></dd><dt>Petroleum coke generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Petroleum coke period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Column headers.</p></dd><dt>Petroleum coke all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Tennessee row; column1.</p></dd><dt>Petroleum coke prior all generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Tennessee row; column2.</p></dd><dt>Petroleum coke published generation change</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Tennessee row; column3.</p></dd><dt>Petroleum coke utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Tennessee row; column4.</p></dd><dt>Petroleum coke prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Tennessee row; column5.</p></dd><dt>Petroleum coke ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Tennessee row; column6.</p></dd><dt>Petroleum coke prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Tennessee row; column7.</p></dd><dt>Petroleum coke commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Tennessee row; column8.</p></dd><dt>Petroleum coke prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Tennessee row; column9.</p></dd><dt>Petroleum coke industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Tennessee row; column10.</p></dd><dt>Petroleum coke prior industrial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_06_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Petroleum Coke electricity generation only, separate from the other petroleum category, coal and natural gas. Not fuel consumption, refinery output, stocks, fuel mass or heat input, installed generator capacity, emergency backup runtime, a facility inventory, data center delivered power or emissions. Published zero is not proof of no fuel or generators. Locator: Table1.6.B Tennessee row; column11.</p></dd><dt>Other fossil gas generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Other fossil gas period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Column headers.</p></dd><dt>Other fossil gas all generation</dt><dd>6.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Tennessee row; column1.</p></dd><dt>Other fossil gas prior all generation</dt><dd>7.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Tennessee row; column2.</p></dd><dt>Other fossil gas published generation change</dt><dd>-19.90 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Tennessee row; column3.</p></dd><dt>Other fossil gas utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Tennessee row; column4.</p></dd><dt>Other fossil gas prior utility generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Tennessee row; column5.</p></dd><dt>Other fossil gas ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Tennessee row; column6.</p></dd><dt>Other fossil gas prior ipp generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Tennessee row; column7.</p></dd><dt>Other fossil gas commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Tennessee row; column8.</p></dd><dt>Other fossil gas prior commercial generation</dt><dd>0.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Tennessee row; column9.</p></dd><dt>Other fossil gas industrial generation</dt><dd>6.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Tennessee row; column10.</p></dd><dt>Other fossil gas prior industrial generation</dt><dd>7.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_08_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Other Fossil Gas electricity generation is the source aggregate category, separate from Natural Gas and Other Energy Sources. No individual gas composition or technology disaggregation inferred. Not gas production, fuel volume or heat input, pipeline supply, installed capacity, facility inventory, emergency backup runtime, data center delivered power or emissions. Published zero does not prove no gas resource or generators. Locator: Table1.8.B Tennessee row; column11.</p></dd><dt>Nonhydro generation basis</dt><dd>Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table title, producer sector headers and source notes.</p></dd><dt>Nonhydro period</dt><dd>January through August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro prior period</dt><dd>January through August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Column headers.</p></dd><dt>Nonhydro all generation</dt><dd>1931.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Tennessee row; column1.</p></dd><dt>Nonhydro prior all generation</dt><dd>1151.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Tennessee row; column2.</p></dd><dt>Nonhydro published generation change</dt><dd>67.80 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Tennessee row; column3.</p></dd><dt>Nonhydro utility generation</dt><dd><span class=\"layer-empty\">Not established</span><span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Tennessee row; column4.</p></dd><dt>Nonhydro prior utility generation</dt><dd>2.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Tennessee row; column5.</p></dd><dt>Nonhydro ipp generation</dt><dd>1654.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Tennessee row; column6.</p></dd><dt>Nonhydro prior ipp generation</dt><dd>884.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Tennessee row; column7.</p></dd><dt>Nonhydro commercial generation</dt><dd>3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Tennessee row; column8.</p></dd><dt>Nonhydro prior commercial generation</dt><dd>3.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Tennessee row; column9.</p></dd><dt>Nonhydro industrial generation</dt><dd>272.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Tennessee row; column10.</p></dd><dt>Nonhydro prior industrial generation</dt><dd>263.00 thousand MWh<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_11_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Utility scale facility net generation by state and producer sector, January through August2026 preliminary versus January through August2025 final; cumulative year to date, not August alone or a full annual total. Energy is reported in thousand megawatthours, not MW capacity, electricity sales, customer consumption, grid reliability or data center demand. Commercial and industrial here classify generators, not electricity customers. Small scale generation is outside this table. NM means not meaningful due to large relative standard error or excessive percentage change, not zero. Negative net generation means plant use exceeds gross generation. Components and percentage changes retain independent rounding; no facility association or causal data center inference. Renewable Sources Excluding Hydroelectric is a utility scale aggregate, overlapping component wind, biomass, geothermal and solar generation; never add it to those component tables as a separate fuel. Small scale photovoltaic estimates are outside this table. Not all renewable generation, installed capacity, renewable eligibility or procurement, hourly matching, data center delivered power or avoided emissions. Published zero is not proof of no renewable resources or projects. Locator: Table1.11.B Tennessee row; column11.</p></dd></dl></article>"},{"id":"capacity-state-utility-tn-202608","html":"<article><h3>Tennessee utility scale net summer capacity</h3><p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.</p><dl class=\"layer-fields\"><dt>Utility capacity basis</dt><dd>Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Title,technology headers and exclusions.</p></dd><dt>Utility capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Column headers.</p></dd><dt>Utility capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Column headers.</p></dd><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Dated source period.</p></dd><dt>Utility capacity renewables</dt><dd>3946.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Tennessee row,column1.</p></dd><dt>Utility capacity renewables prior</dt><dd>3500.40 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Tennessee row,column2.</p></dd><dt>Utility capacity fossil</dt><dd>11077.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Tennessee row,column3.</p></dd><dt>Utility capacity fossil prior</dt><dd>11077.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Tennessee row,column4.</p></dd><dt>Utility capacity pumped storage</dt><dd>1616.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Tennessee row,column5.</p></dd><dt>Utility capacity pumped storage prior</dt><dd>1616.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Tennessee row,column6.</p></dd><dt>Utility capacity other storage</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Tennessee row,column7.</p></dd><dt>Utility capacity other storage prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Tennessee row,column8.</p></dd><dt>Utility capacity nuclear</dt><dd>4522.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Tennessee row,column9.</p></dd><dt>Utility capacity nuclear prior</dt><dd>4522.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Tennessee row,column10.</p></dd><dt>Utility capacity other sources</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Tennessee row,column11.</p></dd><dt>Utility capacity other sources prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Tennessee row,column12.</p></dd><dt>Utility capacity all</dt><dd>21162.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Tennessee row,column13.</p></dd><dt>Utility capacity all prior</dt><dd>20717.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_a\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units by technology and state, August2026 preliminary versus August2025 final,in MW. Facilities with total generator nameplate capacity less than1MW are excluded; this is a facility threshold,not a claim that every unit is at least1MW. Concentrated Solar Power Energy Storage is included in Renewable Sources,not Other Energy Storage. Renewable,fossil,pumped storage,other storage,nuclear andother categories are distinct. Not nameplate capacity,energy generation,MWh storage volume,dispatchable output,reserve margin,grid availability or power allocated to data centers. Zero does not establish no projects or resources; no small scale capacity or facility association inferred. Locator: Table6.2.A Tennessee row,column14.</p></dd><dt>Renew capacity basis</dt><dd>Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Title,technology headers and exclusions.</p></dd><dt>Renew capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Column headers.</p></dd><dt>Renew capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Column headers.</p></dd><dt>Renew capacity status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Dated source period.</p></dd><dt>Renew capacity wind</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column1.</p></dd><dt>Renew capacity wind prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column2.</p></dd><dt>Renew capacity solar pv</dt><dd>1250.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column3.</p></dd><dt>Renew capacity solar pv prior</dt><dd>805.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column4.</p></dd><dt>Renew capacity solar thermal</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column5.</p></dd><dt>Renew capacity solar thermal prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column6.</p></dd><dt>Renew capacity conventional hydro</dt><dd>2608.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column7.</p></dd><dt>Renew capacity conventional hydro prior</dt><dd>2608.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column8.</p></dd><dt>Renew capacity biomass</dt><dd>86.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column9.</p></dd><dt>Renew capacity biomass prior</dt><dd>86.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column10.</p></dd><dt>Renew capacity geothermal</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column11.</p></dd><dt>Renew capacity geothermal prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column12.</p></dd><dt>Renew capacity total utility</dt><dd>3946.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column13.</p></dd><dt>Renew capacity total utility prior</dt><dd>3500.40 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column14.</p></dd><dt>Renew capacity small pv estimated</dt><dd>53.40 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column15.</p></dd><dt>Renew capacity small pv estimated prior</dt><dd>54.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column16.</p></dd><dt>Renew capacity combined pv estimated</dt><dd>1304.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column17.</p></dd><dt>Renew capacity combined pv estimated prior</dt><dd>859.40 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column18.</p></dd><dt>Renew capacity combined solar estimated</dt><dd>1304.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column19.</p></dd><dt>Renew capacity combined solar estimated prior</dt><dd>859.40 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity using primarily renewable energy sources by state,August2026 preliminary versus August2025 final,in MW. Utility scale renewable categories and total,estimated small scale PV,estimated combined utility/small PV and estimated total solar are separate scopes. Estimated combined solar totals overlap their components and utility aggregate; never sum them as separate technologies. NM due to large relative standard error remains unknown,not zero. Primarily renewable is the source category,not an exclusive-fuel or procurement/eligibility certification. Not generation,MWh storage volume,dispatchable supply,data center power or avoided emissions. Locator: Table6.2.B Tennessee row,column20.</p></dd><dt>Fossil capacity basis</dt><dd>Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Title,technology headers and exclusions.</p></dd><dt>Fossil capacity period</dt><dd>August 2026<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Column headers.</p></dd><dt>Fossil capacity prior period</dt><dd>August 2025<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Column headers.</p></dd><dt>Fossil capacity status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Dated source period.</p></dd><dt>Fossil capacity gas combined cycle</dt><dd>2455.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column1.</p></dd><dt>Fossil capacity gas combined cycle prior</dt><dd>2455.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column2.</p></dd><dt>Fossil capacity gas combustion turbine</dt><dd>3652.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column3.</p></dd><dt>Fossil capacity gas combustion turbine prior</dt><dd>3652.70 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column4.</p></dd><dt>Fossil capacity gas other</dt><dd>130.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column5.</p></dd><dt>Fossil capacity gas other prior</dt><dd>130.30 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column6.</p></dd><dt>Fossil capacity coal</dt><dd>4703.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column7.</p></dd><dt>Fossil capacity coal prior</dt><dd>4703.50 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column8.</p></dd><dt>Fossil capacity petroleum coke</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column9.</p></dd><dt>Fossil capacity petroleum coke prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column10.</p></dd><dt>Fossil capacity petroleum liquids</dt><dd>136.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column11.</p></dd><dt>Fossil capacity petroleum liquids prior</dt><dd>136.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column12.</p></dd><dt>Fossil capacity other fossil gas</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column13.</p></dd><dt>Fossil capacity other fossil gas prior</dt><dd>0.00 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column14.</p></dd><dt>Fossil capacity total</dt><dd>11077.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column15.</p></dd><dt>Fossil capacity total prior</dt><dd>11077.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_c\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">Net summer capacity of utility scale units using primarily fossil fuels by state,August2026 preliminary versus August2025 final,in MW. Natural gas combined cycle,combustion turbine andother gas are distinct categories; coal,petroleum coke,petroleum liquids andother fossil gas stay separate. Total fossil overlaps the components and Table6.2.A aggregate,not additive. Facilities with total generator nameplate less than1MW excluded,not per-unit minimum. Not nameplate capacity,fuel consumption,exclusive fuel capability,energy generation,emissions or data center allocated supply. Locator: Table6.2.C Tennessee row,column16.</p></dd><dt>Reported new unit rows</dt><dd>9 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred. Locator: Calculated count of Table6.3 rows for TN.</p></dd><dt>Reported new unit capacity sum</dt><dd>424.20 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred. Locator: Calculated sum of rounded Table6.3 Net Summer Capacity(MW) cells for TN.</p></dd><dt>Reported new unit basis</dt><dd>EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_03\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.3 reported new utility scale generating-unit rows for January-August2026,not physical plant or data center sites. Entity and plant IDs are EIA IDs; generator IDs are owner/operator assigned and unique here only with Plant ID. Reported month has no certified day. A state count and sum are calculated from retained rows,not published state totals or contemporaneous installed capacity. Capacity sums use individually rounded net summer MW,not generation or battery MWh volume. Facilities with total generator nameplate less than1MW excluded,not a per-unit threshold. No exclusive fuel capability,grid availability,data center association,ownership or current operating status inferred. Locator: Table6.3 title,columns,notes and explicit calculation scope.</p></dd><dt>Reported planned unit rows</dt><dd>33 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for TN across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit capacity sum</dt><dd>3340.10 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for TN across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit nameplate sum</dt><dd>3997.80 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for TN across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit complete nonoperating rows</dt><dd>0 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Calculated from Table6.5 reported rows for TN across all source target dates,not simultaneous supply.</p></dd><dt>Reported planned unit basis</dt><dd>EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.5 planned utility generating-unit additions,target months September2026-December2039 as reported in the August2026 dataset. Target months are plans,not actual commissioning dates,even when now in the past. Regulatory approval and construction status labels remain literal; construction complete explicitly does not mean commercial operation. State counts and rounded net summer/nameplate MW sums are calculated across different future dates,not simultaneous installed capacity,available power or firm supply. Net summer and nameplate remain separate; no probability weighting or net system change inferred. Facilities with total generator nameplate less than1MW excluded,not a per-unit minimum. Generator IDs need EIA Plant ID for identity. No data center/site/company joins,ownership or Native stage changes. Locator: Table6.5 title,status/date/capacity columns,notes and explicit calculation boundary.</p></dd><dt>Reported retirement plan rows</dt><dd>33 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Calculated from Table6.6 reported rows for TN across all target dates,not simultaneous removal.</p></dd><dt>Reported retirement plan capacity sum</dt><dd>5643.60 MW<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Calculated from Table6.6 reported rows for TN across all target dates,not simultaneous removal.</p></dd><dt>Reported retirement plan unknown month rows</dt><dd>0 generators<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Calculated from Table6.6 reported rows for TN across all target dates,not simultaneous removal.</p></dd><dt>Reported retirement plan basis</dt><dd>EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_06\">U.S. Energy Information Administration</a>. Source: October 23, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Table6.6 planned utility generating-unit retirements,targets September2026-August2072 as reported in the August2026 dataset. Target year/month is a plan,not an actual retirement or data center closure,even when now in the past. Seven source blank months remain unknown; no January,December or day assigned. Calculated state unit-row counts and sums of individually rounded net summer MW span different future target dates,not simultaneous capacity removal,negative generation,available supply or a reconciled net system change. Facility total generator nameplate less than1MW exclusion is not a per-unit minimum. Plant+owner generator composite identity only; no Native/data center/company joins or operating-status changes. Locator: Table6.6 title/date/capacity columns,notes and explicit calculation scope.</p></dd></dl></article>"},{"id":"power-ieee-reliability-2025-tn","html":"<article><h3>Tennessee historical IEEE distribution reliability2025 and2024</h3><p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 years2025 and2024.</p></dd><dt>Ieee reliability basis</dt><dd>EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 header and definitions.</p></dd><dt>Ieee coverage 2025</dt><dd>69.30 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;coverage;Year 2025.</p></dd><dt>Ieee coverage 2024</dt><dd>73.50 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;coverage;Year 2024.</p></dd><dt>Ieee all events saidi 2025</dt><dd>227.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;all_events_saidi;Year 2025.</p></dd><dt>Ieee all events saidi 2024</dt><dd>289.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;all_events_saidi;Year 2024.</p></dd><dt>Ieee all events saifi 2025</dt><dd>1.55 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;all_events_saifi;Year 2025.</p></dd><dt>Ieee all events saifi 2024</dt><dd>1.94 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;all_events_saifi;Year 2024.</p></dd><dt>Ieee all events caidi 2025</dt><dd>146.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;all_events_caidi;Year 2025.</p></dd><dt>Ieee all events caidi 2024</dt><dd>149.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;all_events_caidi;Year 2024.</p></dd><dt>Ieee without major days saidi 2025</dt><dd>146.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;without_major_days_saidi;Year 2025.</p></dd><dt>Ieee without major days saidi 2024</dt><dd>169.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;without_major_days_saidi;Year 2024.</p></dd><dt>Ieee without major days saifi 2025</dt><dd>1.46 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;without_major_days_saifi;Year 2025.</p></dd><dt>Ieee without major days saifi 2024</dt><dd>1.75 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;without_major_days_saifi;Year 2024.</p></dd><dt>Ieee without major days caidi 2025</dt><dd>100.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;without_major_days_caidi;Year 2025.</p></dd><dt>Ieee without major days caidi 2024</dt><dd>97.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;without_major_days_caidi;Year 2024.</p></dd><dt>Ieee loss supply removed saidi 2025</dt><dd>178.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;loss_supply_removed_saidi;Year 2025.</p></dd><dt>Ieee loss supply removed saidi 2024</dt><dd>283.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;loss_supply_removed_saidi;Year 2024.</p></dd><dt>Ieee loss supply removed saifi 2025</dt><dd>1.44 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;loss_supply_removed_saifi;Year 2025.</p></dd><dt>Ieee loss supply removed saifi 2024</dt><dd>1.90 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;loss_supply_removed_saifi;Year 2024.</p></dd><dt>Ieee loss supply removed caidi 2025</dt><dd>123.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;loss_supply_removed_caidi;Year 2025.</p></dd><dt>Ieee loss supply removed caidi 2024</dt><dd>149.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_02.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.2 historical2025 and2024 distribution-system reliability reported using IEEE1366. Coverage varies by state and year;percent of customers reported is meters on the reliability schedule divided by customers on the sales schedule and can exceed100percent,not a probability or uptime percentage. SAIDI is annual minutes of non-momentary interruptions experienced by the average customer;SAIFI is annual number of interruptions;CAIDI is minutes per interruption. All events,without major event days,and loss of supply removed are distinct series,not additive. Loss of supply removed excludes high-voltage/bulk-system supply-loss outages,not all major events. Source blanks remain unknown with no stated individual cause;literal source zeros remain zero. No complete utility census,site-specific uptime,SLA,transmission reliability,capacity availability,data center load effect or causal attribution. Locator: Table11.2 Tennessee row;loss_supply_removed_caidi;Year 2024.</p></dd><dt>Saidi history ieee all events 2023</dt><dd>926.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_all_events;Year 2023.</p></dd><dt>Saidi history ieee all events 2022</dt><dd>428.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_all_events;Year 2022.</p></dd><dt>Saidi history ieee all events 2021</dt><dd>316.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_all_events;Year 2021.</p></dd><dt>Saidi history ieee all events 2020</dt><dd>618.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_all_events;Year 2020.</p></dd><dt>Saidi history ieee all events 2019</dt><dd>252.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_all_events;Year 2019.</p></dd><dt>Saidi history ieee all events 2018</dt><dd>217.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_all_events;Year 2018.</p></dd><dt>Saidi history ieee all events 2017</dt><dd>621.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_all_events;Year 2017.</p></dd><dt>Saidi history ieee all events 2016</dt><dd>212.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_all_events;Year 2016.</p></dd><dt>Saidi history ieee all events 2015</dt><dd>257.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_all_events;Year 2015.</p></dd><dt>Saidi history ieee without major days 2023</dt><dd>192.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_without_major_days;Year 2023.</p></dd><dt>Saidi history ieee without major days 2022</dt><dd>194.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_without_major_days;Year 2022.</p></dd><dt>Saidi history ieee without major days 2021</dt><dd>151.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_without_major_days;Year 2021.</p></dd><dt>Saidi history ieee without major days 2020</dt><dd>144.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_without_major_days;Year 2020.</p></dd><dt>Saidi history ieee without major days 2019</dt><dd>160.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_without_major_days;Year 2019.</p></dd><dt>Saidi history ieee without major days 2018</dt><dd>145.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_without_major_days;Year 2018.</p></dd><dt>Saidi history ieee without major days 2017</dt><dd>141.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_without_major_days;Year 2017.</p></dd><dt>Saidi history ieee without major days 2016</dt><dd>141.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_without_major_days;Year 2016.</p></dd><dt>Saidi history ieee without major days 2015</dt><dd>134.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_without_major_days;Year 2015.</p></dd><dt>Saidi history ieee loss supply removed 2023</dt><dd>933.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Saidi history ieee loss supply removed 2022</dt><dd>425.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Saidi history ieee loss supply removed 2021</dt><dd>299.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Saidi history ieee loss supply removed 2020</dt><dd>601.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Saidi history ieee loss supply removed 2019</dt><dd>251.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Saidi history ieee loss supply removed 2018</dt><dd>213.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Saidi history ieee loss supply removed 2017</dt><dd>603.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Saidi history ieee loss supply removed 2016</dt><dd>206.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Saidi history ieee loss supply removed 2015</dt><dd>256.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Saidi history basis</dt><dd>EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution. Locator: Table11.4 header and method notes;2015-2023 supplemental history.</p></dd><dt>Saifi history ieee all events 2023</dt><dd>2.80 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_all_events;Year 2023.</p></dd><dt>Saifi history ieee all events 2022</dt><dd>3.33 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_all_events;Year 2022.</p></dd><dt>Saifi history ieee all events 2021</dt><dd>2.01 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_all_events;Year 2021.</p></dd><dt>Saifi history ieee all events 2020</dt><dd>2.13 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_all_events;Year 2020.</p></dd><dt>Saifi history ieee all events 2019</dt><dd>2.13 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_all_events;Year 2019.</p></dd><dt>Saifi history ieee all events 2018</dt><dd>1.96 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_all_events;Year 2018.</p></dd><dt>Saifi history ieee all events 2017</dt><dd>1.86 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_all_events;Year 2017.</p></dd><dt>Saifi history ieee all events 2016</dt><dd>1.81 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_all_events;Year 2016.</p></dd><dt>Saifi history ieee all events 2015</dt><dd>1.79 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_all_events;Year 2015.</p></dd><dt>Saifi history ieee without major days 2023</dt><dd>1.89 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_without_major_days;Year 2023.</p></dd><dt>Saifi history ieee without major days 2022</dt><dd>1.99 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_without_major_days;Year 2022.</p></dd><dt>Saifi history ieee without major days 2021</dt><dd>1.69 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_without_major_days;Year 2021.</p></dd><dt>Saifi history ieee without major days 2020</dt><dd>1.54 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_without_major_days;Year 2020.</p></dd><dt>Saifi history ieee without major days 2019</dt><dd>1.78 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_without_major_days;Year 2019.</p></dd><dt>Saifi history ieee without major days 2018</dt><dd>1.70 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_without_major_days;Year 2018.</p></dd><dt>Saifi history ieee without major days 2017</dt><dd>1.47 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_without_major_days;Year 2017.</p></dd><dt>Saifi history ieee without major days 2016</dt><dd>1.57 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_without_major_days;Year 2016.</p></dd><dt>Saifi history ieee without major days 2015</dt><dd>1.50 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_without_major_days;Year 2015.</p></dd><dt>Saifi history ieee loss supply removed 2023</dt><dd>2.77 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Saifi history ieee loss supply removed 2022</dt><dd>3.07 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Saifi history ieee loss supply removed 2021</dt><dd>1.82 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Saifi history ieee loss supply removed 2020</dt><dd>2.00 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Saifi history ieee loss supply removed 2019</dt><dd>2.06 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Saifi history ieee loss supply removed 2018</dt><dd>1.90 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Saifi history ieee loss supply removed 2017</dt><dd>1.75 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Saifi history ieee loss supply removed 2016</dt><dd>1.71 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Saifi history ieee loss supply removed 2015</dt><dd>1.74 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Saifi history basis</dt><dd>EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation. Locator: Table11.5 header and method notes;2015-2023 supplemental history.</p></dd><dt>Caidi history ieee all events 2023</dt><dd>330.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_all_events;Year 2023.</p></dd><dt>Caidi history ieee all events 2022</dt><dd>128.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_all_events;Year 2022.</p></dd><dt>Caidi history ieee all events 2021</dt><dd>157.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_all_events;Year 2021.</p></dd><dt>Caidi history ieee all events 2020</dt><dd>290.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_all_events;Year 2020.</p></dd><dt>Caidi history ieee all events 2019</dt><dd>118.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_all_events;Year 2019.</p></dd><dt>Caidi history ieee all events 2018</dt><dd>111.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_all_events;Year 2018.</p></dd><dt>Caidi history ieee all events 2017</dt><dd>333.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_all_events;Year 2017.</p></dd><dt>Caidi history ieee all events 2016</dt><dd>117.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_all_events;Year 2016.</p></dd><dt>Caidi history ieee all events 2015</dt><dd>144.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_all_events;Year 2015.</p></dd><dt>Caidi history ieee without major days 2023</dt><dd>101.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_without_major_days;Year 2023.</p></dd><dt>Caidi history ieee without major days 2022</dt><dd>97.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_without_major_days;Year 2022.</p></dd><dt>Caidi history ieee without major days 2021</dt><dd>89.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_without_major_days;Year 2021.</p></dd><dt>Caidi history ieee without major days 2020</dt><dd>93.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_without_major_days;Year 2020.</p></dd><dt>Caidi history ieee without major days 2019</dt><dd>90.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_without_major_days;Year 2019.</p></dd><dt>Caidi history ieee without major days 2018</dt><dd>85.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_without_major_days;Year 2018.</p></dd><dt>Caidi history ieee without major days 2017</dt><dd>96.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_without_major_days;Year 2017.</p></dd><dt>Caidi history ieee without major days 2016</dt><dd>90.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_without_major_days;Year 2016.</p></dd><dt>Caidi history ieee without major days 2015</dt><dd>89.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_without_major_days;Year 2015.</p></dd><dt>Caidi history ieee loss supply removed 2023</dt><dd>336.50 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2023.</p></dd><dt>Caidi history ieee loss supply removed 2022</dt><dd>138.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2022.</p></dd><dt>Caidi history ieee loss supply removed 2021</dt><dd>164.20 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2021.</p></dd><dt>Caidi history ieee loss supply removed 2020</dt><dd>299.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2020.</p></dd><dt>Caidi history ieee loss supply removed 2019</dt><dd>121.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2019.</p></dd><dt>Caidi history ieee loss supply removed 2018</dt><dd>112.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2018.</p></dd><dt>Caidi history ieee loss supply removed 2017</dt><dd>344.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2017.</p></dd><dt>Caidi history ieee loss supply removed 2016</dt><dd>120.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2016.</p></dd><dt>Caidi history ieee loss supply removed 2015</dt><dd>147.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;ieee_loss_supply_removed;Year 2015.</p></dd><dt>Caidi history basis</dt><dd>EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution. Locator: Table11.6 header and method notes;2015-2023 supplemental history.</p></dd></dl></article>"},{"id":"power-any-reliability-2025-tn","html":"<article><h3>Tennessee historical any-method distribution reliability2025 and2024</h3><p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.</p><dl class=\"layer-fields\"><dt>Status</dt><dd>historical<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 years2025 and2024.</p></dd><dt>Any reliability basis</dt><dd>EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 header and definitions.</p></dd><dt>Any coverage 2025</dt><dd>75.30 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Tennessee row;coverage;Year 2025.</p></dd><dt>Any coverage 2024</dt><dd>85.90 percent<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Tennessee row;coverage;Year 2024.</p></dd><dt>Any all events saidi 2025</dt><dd>229.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Tennessee row;all_events_saidi;Year 2025.</p></dd><dt>Any all events saidi 2024</dt><dd>278.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Tennessee row;all_events_saidi;Year 2024.</p></dd><dt>Any all events saifi 2025</dt><dd>1.64 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Tennessee row;all_events_saifi;Year 2025.</p></dd><dt>Any all events saifi 2024</dt><dd>2.00 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Tennessee row;all_events_saifi;Year 2024.</p></dd><dt>Any all events caidi 2025</dt><dd>139.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Tennessee row;all_events_caidi;Year 2025.</p></dd><dt>Any all events caidi 2024</dt><dd>139.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Tennessee row;all_events_caidi;Year 2024.</p></dd><dt>Any without major events saidi 2025</dt><dd>150.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Tennessee row;without_major_events_saidi;Year 2025.</p></dd><dt>Any without major events saidi 2024</dt><dd>159.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Tennessee row;without_major_events_saidi;Year 2024.</p></dd><dt>Any without major events saifi 2025</dt><dd>1.54 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Tennessee row;without_major_events_saifi;Year 2025.</p></dd><dt>Any without major events saifi 2024</dt><dd>1.76 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Tennessee row;without_major_events_saifi;Year 2024.</p></dd><dt>Any without major events caidi 2025</dt><dd>97.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Tennessee row;without_major_events_caidi;Year 2025.</p></dd><dt>Any without major events caidi 2024</dt><dd>90.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_03.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 27, 2026.</span> <p class=\"layer-scope\">EIA Electric Power Annual Table11.3 historical2025 and2024 distribution-system reliability using any method. Any method combines utilities using IEEE standards and utilities not using IEEE;it is not a separate disjoint population to add to Table11.2. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE utilities self-determine major events. All events and without major events remain distinct,not additive or equivalent to IEEE loss-of-supply-removed. Reporting coverage varies by state/year;meters on the reliability schedule divided by sales-schedule customers may exceed100percent,not uptime or probability. SAIDI annual minutes,SAIFI annual interruption counts and CAIDI minutes per interruption remain separate. Source-reported customer averages are not individual site performance,SLA,complete utility coverage,current2026 observations,bulk transmission capacity or data center causation. No Native or facility joins. Locator: Table11.3 Tennessee row;without_major_events_caidi;Year 2024.</p></dd><dt>Saidi history any all events 2023</dt><dd>857.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_all_events;Year 2023.</p></dd><dt>Saidi history any all events 2022</dt><dd>404.50 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_all_events;Year 2022.</p></dd><dt>Saidi history any all events 2021</dt><dd>302.70 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_all_events;Year 2021.</p></dd><dt>Saidi history any all events 2020</dt><dd>588.00 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_all_events;Year 2020.</p></dd><dt>Saidi history any all events 2019</dt><dd>266.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_all_events;Year 2019.</p></dd><dt>Saidi history any all events 2018</dt><dd>199.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_all_events;Year 2018.</p></dd><dt>Saidi history any all events 2017</dt><dd>512.80 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_all_events;Year 2017.</p></dd><dt>Saidi history any all events 2016</dt><dd>197.20 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_all_events;Year 2016.</p></dd><dt>Saidi history any all events 2015</dt><dd>222.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_all_events;Year 2015.</p></dd><dt>Saidi history any without major events 2023</dt><dd>186.10 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_without_major_events;Year 2023.</p></dd><dt>Saidi history any without major events 2022</dt><dd>188.30 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_without_major_events;Year 2022.</p></dd><dt>Saidi history any without major events 2021</dt><dd>149.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_without_major_events;Year 2021.</p></dd><dt>Saidi history any without major events 2020</dt><dd>148.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_without_major_events;Year 2020.</p></dd><dt>Saidi history any without major events 2019</dt><dd>161.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_without_major_events;Year 2019.</p></dd><dt>Saidi history any without major events 2018</dt><dd>139.60 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_without_major_events;Year 2018.</p></dd><dt>Saidi history any without major events 2017</dt><dd>142.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_without_major_events;Year 2017.</p></dd><dt>Saidi history any without major events 2016</dt><dd>144.40 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_without_major_events;Year 2016.</p></dd><dt>Saidi history any without major events 2015</dt><dd>124.90 minutes per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.4 Tennessee row;any_without_major_events;Year 2015.</p></dd><dt>Saidi history basis</dt><dd>EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_04.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.4 historical annual SAIDI2015-2025,minutes of non-momentary electric interruptions per year experienced by the average reported customer. IEEE and any-method populations overlap and must not be added;any method combines IEEE and non-IEEE utilities. For IEEE utilities major event days use a daily SAIDI threshold from five years of daily values;non-IEEE major events are self-determined. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;this table does not establish constant-customer trends or data center causation. Nine source Hawaii blanks remain unknown,not zero;individual causes not stated. No site uptime,SLA,current2026 observations,bulk capacity,Native joins or facility attribution. Locator: Table11.4 header and method notes;2015-2023 supplemental history.</p></dd><dt>Saifi history any all events 2023</dt><dd>2.81 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_all_events;Year 2023.</p></dd><dt>Saifi history any all events 2022</dt><dd>3.20 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_all_events;Year 2022.</p></dd><dt>Saifi history any all events 2021</dt><dd>2.02 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_all_events;Year 2021.</p></dd><dt>Saifi history any all events 2020</dt><dd>2.14 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_all_events;Year 2020.</p></dd><dt>Saifi history any all events 2019</dt><dd>2.15 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_all_events;Year 2019.</p></dd><dt>Saifi history any all events 2018</dt><dd>1.90 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_all_events;Year 2018.</p></dd><dt>Saifi history any all events 2017</dt><dd>1.81 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_all_events;Year 2017.</p></dd><dt>Saifi history any all events 2016</dt><dd>1.78 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_all_events;Year 2016.</p></dd><dt>Saifi history any all events 2015</dt><dd>1.77 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_all_events;Year 2015.</p></dd><dt>Saifi history any without major events 2023</dt><dd>1.90 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_without_major_events;Year 2023.</p></dd><dt>Saifi history any without major events 2022</dt><dd>1.95 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_without_major_events;Year 2022.</p></dd><dt>Saifi history any without major events 2021</dt><dd>1.71 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_without_major_events;Year 2021.</p></dd><dt>Saifi history any without major events 2020</dt><dd>1.57 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_without_major_events;Year 2020.</p></dd><dt>Saifi history any without major events 2019</dt><dd>1.79 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_without_major_events;Year 2019.</p></dd><dt>Saifi history any without major events 2018</dt><dd>1.69 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_without_major_events;Year 2018.</p></dd><dt>Saifi history any without major events 2017</dt><dd>1.47 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_without_major_events;Year 2017.</p></dd><dt>Saifi history any without major events 2016</dt><dd>1.57 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_without_major_events;Year 2016.</p></dd><dt>Saifi history any without major events 2015</dt><dd>1.49 times per year<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual SAIFI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.5 Tennessee row;any_without_major_events;Year 2015.</p></dd><dt>Saifi history basis</dt><dd>EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_05.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.5 historical annual SAIFI2015-2025,number of non-momentary electric interruptions per year experienced by the average reported customer. Frequency is not SAIDI minutes or CAIDI minutes per interruption;do not multiply rounded state indices to reconstruct duration. IEEE and any-method populations overlap and must not be added. Any method combines IEEE and non-IEEE utilities;non-IEEE major events are utility self-determined,IEEE major event days use a five-year daily-SAIDI threshold. All events,without major events and IEEE loss of supply removed remain separate. Reporting populations and coverage may change between years;no fixed-customer trend or data center causal attribution. Nine Hawaii source blanks remain unknown,not zero;individual causes unstated. No site uptime,SLA,current2026 observation,Native join or facility allocation. Locator: Table11.5 header and method notes;2015-2023 supplemental history.</p></dd><dt>Caidi history any all events 2023</dt><dd>305.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_all_events;Year 2023.</p></dd><dt>Caidi history any all events 2022</dt><dd>126.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_all_events;Year 2022.</p></dd><dt>Caidi history any all events 2021</dt><dd>149.90 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_all_events;Year 2021.</p></dd><dt>Caidi history any all events 2020</dt><dd>274.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_all_events;Year 2020.</p></dd><dt>Caidi history any all events 2019</dt><dd>124.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_all_events;Year 2019.</p></dd><dt>Caidi history any all events 2018</dt><dd>105.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_all_events;Year 2018.</p></dd><dt>Caidi history any all events 2017</dt><dd>284.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_all_events;Year 2017.</p></dd><dt>Caidi history any all events 2016</dt><dd>110.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_all_events;Year 2016.</p></dd><dt>Caidi history any all events 2015</dt><dd>125.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_all_events;Year 2015.</p></dd><dt>Caidi history any without major events 2023</dt><dd>98.10 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_without_major_events;Year 2023.</p></dd><dt>Caidi history any without major events 2022</dt><dd>96.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_without_major_events;Year 2022.</p></dd><dt>Caidi history any without major events 2021</dt><dd>87.60 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_without_major_events;Year 2021.</p></dd><dt>Caidi history any without major events 2020</dt><dd>94.40 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_without_major_events;Year 2020.</p></dd><dt>Caidi history any without major events 2019</dt><dd>90.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_without_major_events;Year 2019.</p></dd><dt>Caidi history any without major events 2018</dt><dd>82.70 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_without_major_events;Year 2018.</p></dd><dt>Caidi history any without major events 2017</dt><dd>97.00 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_without_major_events;Year 2017.</p></dd><dt>Caidi history any without major events 2016</dt><dd>92.30 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_without_major_events;Year 2016.</p></dd><dt>Caidi history any without major events 2015</dt><dd>83.80 minutes per interruption<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">Historical annual CAIDI;method and event exclusions retained;reporting population may vary. Not site uptime or data center causation. Locator: Table11.6 Tennessee row;any_without_major_events;Year 2015.</p></dd><dt>Caidi history basis</dt><dd>EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution.<span class=\"layer-source\"><a href=\"https://www.eia.gov/electricity/annual/table.php?t=epa_11_06.html\">U.S. Energy Information Administration</a>. Source: October 21, 2026. Checked: October 28, 2026.</span> <p class=\"layer-scope\">EIA Table11.6 historical annual CAIDI2015-2025,average minutes to restore non-momentary electric interruptions. Unit is minutes per interruption,not annual SAIDI minutes or SAIFI interruption frequency. Retain source-reported indices;do not divide rounded state SAIDI by SAIFI to replace CAIDI. IEEE and any-method reporting populations overlap and must not be added;major-event definitions and event exclusions remain distinct. Reporting coverage and populations may vary across years;no fixed-customer causal trend. Eleven Hawaii blanks in the original2015-2025 table include two2025/2024 cells already retained as unknown in Table11.2;nine supplemental2015-2023 blanks remain unknown with individual causes unstated,not zero restoration time. No site-specific restoration guarantee,SLA,current2026 observation,Native join,capacity or data center attribution. Locator: Table11.6 header and method notes;2015-2023 supplemental history.</p></dd></dl></article>"}]}